REGATTA FIELD IN TECHNIFICATION SPORTS CENTER, TRASONA

24
REFERENCES REGATTA FIELD IN TECHNIFICATION SPORTS CENTER, TRASONA CLIENT: JESUS MARTINEZ ÁLVAREZ CONSTRUCCIONES LOCATION: TRASONA RESERVOIR. AVILÉS. EXECUTION TIME: 2 MONTHS. MAY 2.010 TYPE OF PONTOONS/PRODUCTS: 2 PIERS FOR HANGAR AREA. 2 PIERS FOR CATAMARAN 84 m. FLOATING WALKWAY 2,5 M WIDTH. 1 FLOATING PODIUM 162 m 2. 3 PLATAFORMS FOR JUDGES. 1 REGATTA FIELD 1000 m. LONG WITH FOR 6 OR 9 STEETS READY FOR ROWING OR CANOEING. BUILT ON THE OCCASION OF THE CANOEING EUROPEAN CHAMPIONSHIP, JULY 2010 MOORING SYSTEM: 238 M. PILES Ø324 x 9,50 mm. BUDGET: 398.893,94 € APPOINTED CONTACT: CRISTINA TEZANOS. +34620800170

Transcript of REGATTA FIELD IN TECHNIFICATION SPORTS CENTER, TRASONA

RREEFFEERREENNCCEESS

RREEGGAATTTTAA FFIIEELLDD IINN TTEECCHHNNIIFFIICCAATTIIOONN SSPPOORRTTSS CCEENNTTEERR,, TTRRAASSOONNAA

CLIENT: JESUS MARTINEZ ÁLVAREZ CONSTRUCCIONES

LOCATION: TRASONA RESERVOIR. AVILÉS.

EXECUTION TIME: 2 MONTHS. MAY 2.010

TYPE OF PONTOONS/PRODUCTS: 2 PIERS FOR HANGAR AREA.

2 PIERS FOR CATAMARAN

84 m. FLOATING WALKWAY 2,5 M WIDTH.

1 FLOATING PODIUM 162 m2.

3 PLATAFORMS FOR JUDGES.

1 REGATTA FIELD 1000 m. LONG WITH FOR 6 OR 9

STEETS READY FOR ROWING OR CANOEING. BUILT ON

THE OCCASION OF THE CANOEING EUROPEAN

CHAMPIONSHIP, JULY 2010

MOORING SYSTEM: 238 M. PILES Ø324 x 9,50 mm.

BUDGET: 398.893,94 €

APPOINTED CONTACT: CRISTINA TEZANOS. +34620800170

RREEFFEERREENNCCEESS

KKAARRPPAAZZ GGAATTEE MMAARRIINNAA

http://www.karpazbay.com

CLIENT: KARPAZ GATE RESORT LTD.

LOCATION: TURKISH REPUBLIC NORTH OF CYPRUS

ECUTION TIME: 7 MONTH. JULY 2.011

SLIPS: 296 BOATS FROM 8 UP TO 40 m LONG

PONTOONS LENGHT: 870 m PONTOONS 2, 2,5 AND 3 M WIDTH.

MOORING SYSTEM: 54 STEEL PILES Ø 508 AND Ø406 mm

BUDGET: 2.048.831 €

APPOINTED CONTACT: Oren Orez phone: +90323744771

RREEFFEERREENNCCEESS

CCAARRAANNZZAA RREECCRREEAATTIIOONNAALL MMAARRIINNAA:: PPHHAASSEE II

CLIENT: FERROL SAN CIBRAO PORT AUTHORITY LOCATION: FERROL. SPAIN

EXECUTION TIME: 2 MONTHS. FEB 2.011

TYPE OF PONTOONS/PRODUCTS: 280m BERTHING PONTOONS

134 BERTHS

4 BREAKWATER SLIDING GANGWAYS

MOORING SYSTEM: 12no. Ø508 x 11,50 mm STEEL DRIVEN PILES

BUDGET: 357.133,41€

APPOINTED CONTACT: ALEJANDRO REY 0034 981 338 000

RREEFFEERREENNCCEESS

PPOONNTTOOOONN IILLLLEE MMIIGGNNOONN PPOOIISSSSYY ((FFRRAANNCCEE))

CLIENT: LES ARTISSANS BATISSEURS LOCATION: POISSY. FRANCE

EXECUTION TIME: 1 MONTH. JAN 2.010

TYPE OF PONTOONS/PRODUCTS: 240m RIVER BERTHING PONTOONS

30 BERTHS

MOORING SYSTEM: 7no. Ø508 x 11,50 mm STEEL DRIVEN PILES

APPOINTED CONTACT: Christophe Réau [email protected]

RREEFFEERREENNCCEESS

CCAALLDDEERRAA PPIIEERR ((CCAALLDDEERRAA,, CCOOSSTTAA RRIICCAA))

CLIENT: INGENIERIA Y DESAROLLO S.A. & US CORPS OF ENGINEERS LOCATION: CALDERA, COSTA RICA

EXECUTION TIME: 1 MONTH. DEC 2.010

TYPE OF PONTOONS/PRODUCTS: 40m REINFORCED PONTOONS

3 BERTHS

MOORING SYSTEM: 10no. 400 x 400 mm CONCRETE DRIVEN PILES

APPOINTED CONTACT: Carlos Moreno Bustos (Ingedesa) 0050626655898

OOBBRRAASS SSIIGGNNIIFFIICCAATTIIVVAASS

RRUUTTAA VVEERRDDEE DDEELL EEMMBBAALLSSEE UULLLLIIBBAARRRRII –– GGAAMMBBOOAA..

CUSTOMER: IC CONSTRUCCION, INGENIE. Y GES. DE OBRAS, S.A.

LOCATION: ULLIBARRI GAMBOA RESERVOIR. ÁLAVA

EXECUTION DATE: JUNE 2010.

LEADTIME: 6 MONTHS.

GANGWAY: REINFORCED FIXED GANGWAY 2,50 m WIDTH.

SUPPORT: CONCRETE PILING

OOBBRRAASS SSIIGGNNIIFFIICCAATTIIVVAASS

FFEERRRRYY WWHHAARRFF.. PPUUEERRTTOO DDEE OO GGRROOVVEE..

CLIENT: PORTOS DE GALICIA.

LOCATION: O GROVE – PONTEVEDRA.

COMPLETION DATE: FEBRUARY 2009.

LEADTIME: 5 MONTHS.

MOORINGS: 108 FROM 6 TO 24 m. lenght.

PONTOONS LENGHT: 745 m PONTONN. 2, 2.5, 3 Y 3.5 M. WIDTH.

MOORING SYSTEM: 52 PILES Ø 609 mm.

BUDGET: 1.745.525 €

APPOINTED CONTACT: JORGE ÁLVAREZ CRUCEIRO.

CONTACT PHONE.: 902 024 444.

OOBBRRAASS SSIIGGNNIIFFIICCAATTIIVVAASS

PPOORRTT IINN GGAARRAACCHHIICCOO ((TTEENNEERRIIFFEE))..

CUSTOMER: CANARY ISLAND GOVERMENT

LOCATION: GARACHICO – TENERIFE.

DATE OF EXECUTION: DECEMBER 2011.

LEADTIME: 2,5 MONTHS.

MOORINGS NUMBER: 200 UP TO 15 m. LOA

PONTOONS LENGTH: 433 m PONTOON 2 M. WIDTH.

MOORING SYSTEM: 20 PILES Ø 508 x 11,1 mm. WALL

BUDGET 530.081,05 €

APPOINTED CONTACT: LUIS LOMO MENÉNDEZ

CONTACT PHONE: 647 353 324.

RREEFFEERREENNCCEESS

CCOOMMBBAARRRROO´́SS MMAARRIINNAA AANNDD RREECCRREEAATTIIOONNAALL DDOOCCKKIINNGG FFAACCIILLIITTIIEESS

http://www.combarromar.com/

CLIENT: COMBARROMAR S.A.

LOCATION: PONTEVEDRA. (SPAIN)

EXECUTION TIME: 8 MONTHS. NOVEMBER 2008

SLIPS: 310

PONTOONS LENGHT: 870

BREAKWATER: 160 M, 8 MODULES 20X4M

MOORING SYSTEM: 63 PILES Ø508x11,1 mm. FOR PONTOONS,

SEAFLEX 10045 FOR BREAKWATERS

BUDGET: 2.581.834,56 €

APPOINTED CONTACT: Mr. MANUEL CAMEANS,. (Phone: +34 986 447 366)

RREEFFEERREENNCCEESS

MMAARRIINNAA DDAAVVIILLAA

http://www.davilasport.es/

CLIENT: MARINA DAVILA SPORT

LOCATION: VIGO (SPAIN)

DEADLINE: AUGUST 2005.

EXECUTION PERIOD: 6 MONTHS

MOORING CAPACITY 150 BERTHS, for yachts between 12- 100 m long

PONTOON LENGTH: 1584 M PONTOON AND 320 M BREAKWATER

PONTOON ANCHORING: 118 PILES Ø 813X 660 mm. AND SEAFLEX

BUDGET: 3.775.719,23 €

APPOINTED CONTACT: Mr. JOAQUÍN DAVILA (+34) 986 244 612

RREEFFEERREENNCCEESS

MMAARRIINNAA SSAALLIINNAASS

http://www.marinasalinas.com/

CLIENT: ALDESA

LOCATION: ALICANTE (SPAIN)

DEADLINE: SEPTEMBER 2006.

EXECUTION PERIOD: 6 MONTHS

SLIPS: 700 BERTHS.

PONTOON LENGTH: 756 M. CONCRETE PONTOONS.

MOORING SYSTEM: 132 PILES FOR FIXED PONTOONS

SEAFLEX FOR FLOATING PONTOONS.

BUDGET: 1.475.772,02 €

APPOINTED CONTACT: MR. GUILLERMO VIDAL (+34) 696 974 083

RREEFFEERREENNCCEESS

PPOORRTT OOFF RRIIAANNXXOO,, PPOONNTTOOOONNSS FFOORR FFIISSHHIINNGG BBOOAATTSS

CLIENT: PORTOS DE GALICIA.

LOCATION: LA CORUÑA (SPAIN)

DEADLINE: DECEMBER 2007.

EXECUTION TIME: 6 MONTHS

MOORING CAPACITY: 120 BERTHS FOR MUSSELS PRODUCTION BOAT´S

PONTOON LENGTH: 557 M, WITH CONCRETE FLOATS.

PONTOON ANCHORING: 89 PILES 660x11, 1 mm.

BUDGET: 1.576.517,27 €

APPOINTED CONTACT: Mr. JORGE ÁLVAREZ CRUCEIRO (+34) 902 024 444.

RREEFFEERREENNCCEESS

AANNDDRRAATTXX TT –– MMOOOORRIINNGGSS AANNDD IISSLLAANNDDSS

CLIENT: PORT OF BALLEARIC ISLANDS

LOCATION: PALMA DE MALLORCA.

DEADLINE: AUGUST 2008.

EXECUTION TIME: 2 MONTHS

SLIPS: 142 BERTHS.

PONTOONS LENGHT: 405 ML.

MOORING SYSTEM: CHAINS / SEAFLEX.

BUDGET: 1.036.422,36 €.

APPOINTED CONTACT: CATALINA GARAU OBRADOR (+34 902 024444)

RREEFFEERREENNCCEESS

EEXXTTEENNSSIIOONN IINN PPAALLMMEEIIRRAA PPOONNTTOOOONNSS..

CLIENT: PORTOS DE GALICIA.

LOCATION: PALMEIRA – LA CORUÑA.

DEADLINE: JULY 2008.

EXECUTION PERIOD: 1 MONTHS.

SLIPS: 40 FOR FISHING BOATS.

PONTOONS LENGTH: 66 ML.

MOORING SYSTEM: 36 PILES Ø609x9,50 mm..

BUDGET: 337.209,02 €.

APPOINTED CONTACT: Mr. JORGE ÁLVAREZ (Phone: +34 902 400 870)

RREEFFEERREENNCCEESS

VVOOLLVVOO OOCCEEAANN RRAACCEE 22000088

CLIENT: PORT AUTHORITY OF ALICANTE.

LOCATION: ALICANTE.

DATE: AUGUST 2008.

EXECUTION TIME: 1 MONTH

SLIPS: 88 BERTHS.

PONTOONS LENGHT: 392 M

MOORING SYSTEM: HEB.

BUDGET: 398.421,95 €.

APPOINTED CONTACT: IGNACIO REVILLA. +34 965 130 095.

RREEFFEERREENNCCEESS

DDÁÁRRSSEENNAA SSUURR.. MMAARRIINNAA JJUUAANN CCAARRLLOOSS II

www.marinarealjuancarlosi.com

CLIENT: UTE CYES-FERROVIAL-DÁRSENA SUR.

LOCATION: PORT OF VALENCIA.

EXECUTION TIME: 3 MONTH

SLIPS: 450 BERTHS.

PONTOONS LENGHT: 1200 ML.

MOORING SYSTEM: 135 PILES Ø609x12,7 mm.

BUDGET: 1.298.062,83 €

RREEFFEERREENNCCEESS

LLUUNNAA RROOSSSSAA BBAASSEE.. 3322 AAMMEERRIICCAA´́SS CCUUPP

CLIENT: LUNA ROSSA CHALLENGER 2007 S. L.

LOCATIÓN: DÁRSENA INTERIOR DEL PUERTO DE VALENCIA.

DATE: 2007

EXECUTION TIME: 2 MONTH

PONTOONS: Special pontoons, high freeboard. Made to measure.

MOORING SYSTEM: PILES Ø508x9,50 mm.

BUDGET: 313.919,80 €

RREEFFEERREENNCCEESS

MMAARRIINNAA PPUUEERRTTOO DDEEPPOORRTTIIVVOO DDEE BBAAIIOONNAA

http://www.puertobaiona.com/

CLIENT: PUERTO DEPORTIVO DE BAIONA, S. A.

LOCATIÓN: BAIONA - PONTEVEDRA.

DATE: MARCH 2002

EXECUTION TIME: 3 MONTH

SLIPS: 316 BERTHS.

PONTOONS LENGHT: 1020 ML

BREAKWATER: 160 M, 8 MODULES 20X4 M

MOORING SYSTEM: 80 PILES

BUDGET: 1.779.700,31 €

RREEFFEERREENNCCEESS

VVIIEEWWIINNGG--PPOOIINNTT IINN MMAAZZAAHHOONN -- HHUUEELLVVAA..

CLIENT: DRAGADOS.

LOCATION: MAZAHON - HUELVA.

EXECUTION TIME: 1,5 MONTH.

STRUCTURE: ALUMINIUM COVERED WITH WOOD

RREEFFEERREENNCCEESS

FFIIXXEEDD GGAANNGGWWAAYY..

CLIENT: UTE PARQUE DE LA DÁRSENA.

LOCATIÓN: INTERIOR DOCK . PORT OF VALENCIA.

DATE: JANUARY 2007.

EXECUTION TIME: 2 MONTHS.

GANGWAY: 135x7,14 M. ALLOWED FOR CAR TRANSIT

MOORING SYSTEM: 16 PILES Ø 660 mm.

BUDGET: 460.302,79 €

RREEFFEERREENNCCEESS

EEXXAAMMPPLLEESS OOFF WWOORRKKSS IINN RRIIVVEERRSS AANNDD RREESSEERRVVOOIISS..

RREEFFEERREENNCCEESS

RREEMMOODDEELLIINNGG OOFF FFIISSHHIINNGG.. PPOORRTT FFAACCIILLIITTIIEESS IINN TTEESSTTAALL..

CLIENT: BARDERA S.L.

LOCATION: TESTAL – A CORUÑA.

DEADLINE: FEBRUARY 2007.

EXECUTION PERIOD: 8 MONTHS

SLIPS: 120 FOR FISHING BOATS

PONTOONS LENGTH: 226 m CONCRETE PONTOONS.

BREAKWATER: 72 m

MOORING SYSTEM: 38 PILES 558X9,5 mm.

BUDGET: 760.064,84 €

RREEFFEERREENNCCEESS

EECCOOLLOOGGIICCAALL CCOONNDDIITTIIOONNIINNGG MMAARRGGIINNSS OOFF RREESSEERRVVOOIIRR UULLLLIIBBAARRRRII –– GGAAMMBBOOAA..

CLIENT: UTE OHL – CONSTRUCCIONES SOBRINO S.A.

LOCATIÓN: RESERVOIR ULLIBARRI GAMBOA. ÁLAVA

DATE: MARCH 2001.

EXECUTION TIME: 2 MONTH.

GANGWAY: FIXED GANGWAY 432 m

SUPPORTS: CONCRETE PILES

RREEFFEERREENNCCEESS

AACCOONNDDIICCIIOONNAAMMIIEENNTTOO RRIIBBEERRAA PPAATTRROOCCIINNIIOO--AALLAAMMIILL

CLIENT: TRAGSA

LOCATION: SEVILLA ISLA DE LA CARTUJA

EXECUTION TIME: 4.5 MONTHS. SEPTEMBER 2009

TYPE OF PONTOONS: 2 BALCONIES

3 FLOATING ISLAND

324 M OF FLOATING WALKWAY 4 M WIDTH

70 M FIXED GANGWAY 4 M WIDTH

1 DISABLED ACCESS RAMP

MOORING SYSTEM 960 M PILES Ø324x9,50 mm.

464 M PILES Ø508x9,50 mm

BUDGET: 1.022.254,67 €

APPOINTED CONTACT: PABLO GACÍA RODRÍGUEZ 689 230 035