REGATTA FIELD IN TECHNIFICATION SPORTS CENTER, TRASONA
Transcript of REGATTA FIELD IN TECHNIFICATION SPORTS CENTER, TRASONA
RREEFFEERREENNCCEESS
RREEGGAATTTTAA FFIIEELLDD IINN TTEECCHHNNIIFFIICCAATTIIOONN SSPPOORRTTSS CCEENNTTEERR,, TTRRAASSOONNAA
CLIENT: JESUS MARTINEZ ÁLVAREZ CONSTRUCCIONES
LOCATION: TRASONA RESERVOIR. AVILÉS.
EXECUTION TIME: 2 MONTHS. MAY 2.010
TYPE OF PONTOONS/PRODUCTS: 2 PIERS FOR HANGAR AREA.
2 PIERS FOR CATAMARAN
84 m. FLOATING WALKWAY 2,5 M WIDTH.
1 FLOATING PODIUM 162 m2.
3 PLATAFORMS FOR JUDGES.
1 REGATTA FIELD 1000 m. LONG WITH FOR 6 OR 9
STEETS READY FOR ROWING OR CANOEING. BUILT ON
THE OCCASION OF THE CANOEING EUROPEAN
CHAMPIONSHIP, JULY 2010
MOORING SYSTEM: 238 M. PILES Ø324 x 9,50 mm.
BUDGET: 398.893,94 €
APPOINTED CONTACT: CRISTINA TEZANOS. +34620800170
RREEFFEERREENNCCEESS
KKAARRPPAAZZ GGAATTEE MMAARRIINNAA
http://www.karpazbay.com
CLIENT: KARPAZ GATE RESORT LTD.
LOCATION: TURKISH REPUBLIC NORTH OF CYPRUS
ECUTION TIME: 7 MONTH. JULY 2.011
SLIPS: 296 BOATS FROM 8 UP TO 40 m LONG
PONTOONS LENGHT: 870 m PONTOONS 2, 2,5 AND 3 M WIDTH.
MOORING SYSTEM: 54 STEEL PILES Ø 508 AND Ø406 mm
BUDGET: 2.048.831 €
APPOINTED CONTACT: Oren Orez phone: +90323744771
RREEFFEERREENNCCEESS
CCAARRAANNZZAA RREECCRREEAATTIIOONNAALL MMAARRIINNAA:: PPHHAASSEE II
CLIENT: FERROL SAN CIBRAO PORT AUTHORITY LOCATION: FERROL. SPAIN
EXECUTION TIME: 2 MONTHS. FEB 2.011
TYPE OF PONTOONS/PRODUCTS: 280m BERTHING PONTOONS
134 BERTHS
4 BREAKWATER SLIDING GANGWAYS
MOORING SYSTEM: 12no. Ø508 x 11,50 mm STEEL DRIVEN PILES
BUDGET: 357.133,41€
APPOINTED CONTACT: ALEJANDRO REY 0034 981 338 000
RREEFFEERREENNCCEESS
PPOONNTTOOOONN IILLLLEE MMIIGGNNOONN PPOOIISSSSYY ((FFRRAANNCCEE))
CLIENT: LES ARTISSANS BATISSEURS LOCATION: POISSY. FRANCE
EXECUTION TIME: 1 MONTH. JAN 2.010
TYPE OF PONTOONS/PRODUCTS: 240m RIVER BERTHING PONTOONS
30 BERTHS
MOORING SYSTEM: 7no. Ø508 x 11,50 mm STEEL DRIVEN PILES
APPOINTED CONTACT: Christophe Réau [email protected]
RREEFFEERREENNCCEESS
CCAALLDDEERRAA PPIIEERR ((CCAALLDDEERRAA,, CCOOSSTTAA RRIICCAA))
CLIENT: INGENIERIA Y DESAROLLO S.A. & US CORPS OF ENGINEERS LOCATION: CALDERA, COSTA RICA
EXECUTION TIME: 1 MONTH. DEC 2.010
TYPE OF PONTOONS/PRODUCTS: 40m REINFORCED PONTOONS
3 BERTHS
MOORING SYSTEM: 10no. 400 x 400 mm CONCRETE DRIVEN PILES
APPOINTED CONTACT: Carlos Moreno Bustos (Ingedesa) 0050626655898
OOBBRRAASS SSIIGGNNIIFFIICCAATTIIVVAASS
RRUUTTAA VVEERRDDEE DDEELL EEMMBBAALLSSEE UULLLLIIBBAARRRRII –– GGAAMMBBOOAA..
CUSTOMER: IC CONSTRUCCION, INGENIE. Y GES. DE OBRAS, S.A.
LOCATION: ULLIBARRI GAMBOA RESERVOIR. ÁLAVA
EXECUTION DATE: JUNE 2010.
LEADTIME: 6 MONTHS.
GANGWAY: REINFORCED FIXED GANGWAY 2,50 m WIDTH.
SUPPORT: CONCRETE PILING
OOBBRRAASS SSIIGGNNIIFFIICCAATTIIVVAASS
FFEERRRRYY WWHHAARRFF.. PPUUEERRTTOO DDEE OO GGRROOVVEE..
CLIENT: PORTOS DE GALICIA.
LOCATION: O GROVE – PONTEVEDRA.
COMPLETION DATE: FEBRUARY 2009.
LEADTIME: 5 MONTHS.
MOORINGS: 108 FROM 6 TO 24 m. lenght.
PONTOONS LENGHT: 745 m PONTONN. 2, 2.5, 3 Y 3.5 M. WIDTH.
MOORING SYSTEM: 52 PILES Ø 609 mm.
BUDGET: 1.745.525 €
APPOINTED CONTACT: JORGE ÁLVAREZ CRUCEIRO.
CONTACT PHONE.: 902 024 444.
OOBBRRAASS SSIIGGNNIIFFIICCAATTIIVVAASS
PPOORRTT IINN GGAARRAACCHHIICCOO ((TTEENNEERRIIFFEE))..
CUSTOMER: CANARY ISLAND GOVERMENT
LOCATION: GARACHICO – TENERIFE.
DATE OF EXECUTION: DECEMBER 2011.
LEADTIME: 2,5 MONTHS.
MOORINGS NUMBER: 200 UP TO 15 m. LOA
PONTOONS LENGTH: 433 m PONTOON 2 M. WIDTH.
MOORING SYSTEM: 20 PILES Ø 508 x 11,1 mm. WALL
BUDGET 530.081,05 €
APPOINTED CONTACT: LUIS LOMO MENÉNDEZ
CONTACT PHONE: 647 353 324.
RREEFFEERREENNCCEESS
CCOOMMBBAARRRROO´́SS MMAARRIINNAA AANNDD RREECCRREEAATTIIOONNAALL DDOOCCKKIINNGG FFAACCIILLIITTIIEESS
http://www.combarromar.com/
CLIENT: COMBARROMAR S.A.
LOCATION: PONTEVEDRA. (SPAIN)
EXECUTION TIME: 8 MONTHS. NOVEMBER 2008
SLIPS: 310
PONTOONS LENGHT: 870
BREAKWATER: 160 M, 8 MODULES 20X4M
MOORING SYSTEM: 63 PILES Ø508x11,1 mm. FOR PONTOONS,
SEAFLEX 10045 FOR BREAKWATERS
BUDGET: 2.581.834,56 €
APPOINTED CONTACT: Mr. MANUEL CAMEANS,. (Phone: +34 986 447 366)
RREEFFEERREENNCCEESS
MMAARRIINNAA DDAAVVIILLAA
http://www.davilasport.es/
CLIENT: MARINA DAVILA SPORT
LOCATION: VIGO (SPAIN)
DEADLINE: AUGUST 2005.
EXECUTION PERIOD: 6 MONTHS
MOORING CAPACITY 150 BERTHS, for yachts between 12- 100 m long
PONTOON LENGTH: 1584 M PONTOON AND 320 M BREAKWATER
PONTOON ANCHORING: 118 PILES Ø 813X 660 mm. AND SEAFLEX
BUDGET: 3.775.719,23 €
APPOINTED CONTACT: Mr. JOAQUÍN DAVILA (+34) 986 244 612
RREEFFEERREENNCCEESS
MMAARRIINNAA SSAALLIINNAASS
http://www.marinasalinas.com/
CLIENT: ALDESA
LOCATION: ALICANTE (SPAIN)
DEADLINE: SEPTEMBER 2006.
EXECUTION PERIOD: 6 MONTHS
SLIPS: 700 BERTHS.
PONTOON LENGTH: 756 M. CONCRETE PONTOONS.
MOORING SYSTEM: 132 PILES FOR FIXED PONTOONS
SEAFLEX FOR FLOATING PONTOONS.
BUDGET: 1.475.772,02 €
APPOINTED CONTACT: MR. GUILLERMO VIDAL (+34) 696 974 083
RREEFFEERREENNCCEESS
PPOORRTT OOFF RRIIAANNXXOO,, PPOONNTTOOOONNSS FFOORR FFIISSHHIINNGG BBOOAATTSS
CLIENT: PORTOS DE GALICIA.
LOCATION: LA CORUÑA (SPAIN)
DEADLINE: DECEMBER 2007.
EXECUTION TIME: 6 MONTHS
MOORING CAPACITY: 120 BERTHS FOR MUSSELS PRODUCTION BOAT´S
PONTOON LENGTH: 557 M, WITH CONCRETE FLOATS.
PONTOON ANCHORING: 89 PILES 660x11, 1 mm.
BUDGET: 1.576.517,27 €
APPOINTED CONTACT: Mr. JORGE ÁLVAREZ CRUCEIRO (+34) 902 024 444.
RREEFFEERREENNCCEESS
AANNDDRRAATTXX TT –– MMOOOORRIINNGGSS AANNDD IISSLLAANNDDSS
CLIENT: PORT OF BALLEARIC ISLANDS
LOCATION: PALMA DE MALLORCA.
DEADLINE: AUGUST 2008.
EXECUTION TIME: 2 MONTHS
SLIPS: 142 BERTHS.
PONTOONS LENGHT: 405 ML.
MOORING SYSTEM: CHAINS / SEAFLEX.
BUDGET: 1.036.422,36 €.
APPOINTED CONTACT: CATALINA GARAU OBRADOR (+34 902 024444)
RREEFFEERREENNCCEESS
EEXXTTEENNSSIIOONN IINN PPAALLMMEEIIRRAA PPOONNTTOOOONNSS..
CLIENT: PORTOS DE GALICIA.
LOCATION: PALMEIRA – LA CORUÑA.
DEADLINE: JULY 2008.
EXECUTION PERIOD: 1 MONTHS.
SLIPS: 40 FOR FISHING BOATS.
PONTOONS LENGTH: 66 ML.
MOORING SYSTEM: 36 PILES Ø609x9,50 mm..
BUDGET: 337.209,02 €.
APPOINTED CONTACT: Mr. JORGE ÁLVAREZ (Phone: +34 902 400 870)
RREEFFEERREENNCCEESS
VVOOLLVVOO OOCCEEAANN RRAACCEE 22000088
CLIENT: PORT AUTHORITY OF ALICANTE.
LOCATION: ALICANTE.
DATE: AUGUST 2008.
EXECUTION TIME: 1 MONTH
SLIPS: 88 BERTHS.
PONTOONS LENGHT: 392 M
MOORING SYSTEM: HEB.
BUDGET: 398.421,95 €.
APPOINTED CONTACT: IGNACIO REVILLA. +34 965 130 095.
RREEFFEERREENNCCEESS
DDÁÁRRSSEENNAA SSUURR.. MMAARRIINNAA JJUUAANN CCAARRLLOOSS II
www.marinarealjuancarlosi.com
CLIENT: UTE CYES-FERROVIAL-DÁRSENA SUR.
LOCATION: PORT OF VALENCIA.
EXECUTION TIME: 3 MONTH
SLIPS: 450 BERTHS.
PONTOONS LENGHT: 1200 ML.
MOORING SYSTEM: 135 PILES Ø609x12,7 mm.
BUDGET: 1.298.062,83 €
RREEFFEERREENNCCEESS
LLUUNNAA RROOSSSSAA BBAASSEE.. 3322 AAMMEERRIICCAA´́SS CCUUPP
CLIENT: LUNA ROSSA CHALLENGER 2007 S. L.
LOCATIÓN: DÁRSENA INTERIOR DEL PUERTO DE VALENCIA.
DATE: 2007
EXECUTION TIME: 2 MONTH
PONTOONS: Special pontoons, high freeboard. Made to measure.
MOORING SYSTEM: PILES Ø508x9,50 mm.
BUDGET: 313.919,80 €
RREEFFEERREENNCCEESS
MMAARRIINNAA PPUUEERRTTOO DDEEPPOORRTTIIVVOO DDEE BBAAIIOONNAA
http://www.puertobaiona.com/
CLIENT: PUERTO DEPORTIVO DE BAIONA, S. A.
LOCATIÓN: BAIONA - PONTEVEDRA.
DATE: MARCH 2002
EXECUTION TIME: 3 MONTH
SLIPS: 316 BERTHS.
PONTOONS LENGHT: 1020 ML
BREAKWATER: 160 M, 8 MODULES 20X4 M
MOORING SYSTEM: 80 PILES
BUDGET: 1.779.700,31 €
RREEFFEERREENNCCEESS
VVIIEEWWIINNGG--PPOOIINNTT IINN MMAAZZAAHHOONN -- HHUUEELLVVAA..
CLIENT: DRAGADOS.
LOCATION: MAZAHON - HUELVA.
EXECUTION TIME: 1,5 MONTH.
STRUCTURE: ALUMINIUM COVERED WITH WOOD
RREEFFEERREENNCCEESS
FFIIXXEEDD GGAANNGGWWAAYY..
CLIENT: UTE PARQUE DE LA DÁRSENA.
LOCATIÓN: INTERIOR DOCK . PORT OF VALENCIA.
DATE: JANUARY 2007.
EXECUTION TIME: 2 MONTHS.
GANGWAY: 135x7,14 M. ALLOWED FOR CAR TRANSIT
MOORING SYSTEM: 16 PILES Ø 660 mm.
BUDGET: 460.302,79 €
RREEFFEERREENNCCEESS
RREEMMOODDEELLIINNGG OOFF FFIISSHHIINNGG.. PPOORRTT FFAACCIILLIITTIIEESS IINN TTEESSTTAALL..
CLIENT: BARDERA S.L.
LOCATION: TESTAL – A CORUÑA.
DEADLINE: FEBRUARY 2007.
EXECUTION PERIOD: 8 MONTHS
SLIPS: 120 FOR FISHING BOATS
PONTOONS LENGTH: 226 m CONCRETE PONTOONS.
BREAKWATER: 72 m
MOORING SYSTEM: 38 PILES 558X9,5 mm.
BUDGET: 760.064,84 €
RREEFFEERREENNCCEESS
EECCOOLLOOGGIICCAALL CCOONNDDIITTIIOONNIINNGG MMAARRGGIINNSS OOFF RREESSEERRVVOOIIRR UULLLLIIBBAARRRRII –– GGAAMMBBOOAA..
CLIENT: UTE OHL – CONSTRUCCIONES SOBRINO S.A.
LOCATIÓN: RESERVOIR ULLIBARRI GAMBOA. ÁLAVA
DATE: MARCH 2001.
EXECUTION TIME: 2 MONTH.
GANGWAY: FIXED GANGWAY 432 m
SUPPORTS: CONCRETE PILES
RREEFFEERREENNCCEESS
AACCOONNDDIICCIIOONNAAMMIIEENNTTOO RRIIBBEERRAA PPAATTRROOCCIINNIIOO--AALLAAMMIILL
CLIENT: TRAGSA
LOCATION: SEVILLA ISLA DE LA CARTUJA
EXECUTION TIME: 4.5 MONTHS. SEPTEMBER 2009
TYPE OF PONTOONS: 2 BALCONIES
3 FLOATING ISLAND
324 M OF FLOATING WALKWAY 4 M WIDTH
70 M FIXED GANGWAY 4 M WIDTH
1 DISABLED ACCESS RAMP
MOORING SYSTEM 960 M PILES Ø324x9,50 mm.
464 M PILES Ø508x9,50 mm
BUDGET: 1.022.254,67 €
APPOINTED CONTACT: PABLO GACÍA RODRÍGUEZ 689 230 035