References - UM Students'...
Transcript of References - UM Students'...
273
REFERENCES
ABCSE. (2007). Renewable Energy in Asia. Australia: Malaysia Report.
Abdul Aziz, A. R. (2001). Foreign Workers and Labour Segmentation in Malaysia's
Construction Industry. Construction Management and Economics, 19(8), 789-
798.
Abdul Samad, Z. (2007). Intangibles in the Built Environment: Explored through UK
Primary Schools. Unpublished PhD Thesis, University of Cambridge,
Cambridge
Abdullah, A. A., Harun, Z., & Abdul Rahman, H. (2011). Planning Process of
Development Project in the Malaysian Context: A Crucial Brief Overview.
International Journal of Applied Science and Technology, vol. 1(2), 74-81.
Abeysundara, U., & Babel, S. (2010). A quest for sustainable materials for building
elements in Sri Lanka: foundations. Environmental Progress and Sustainable
Energy, 29(3), 370-381.
Abeysundara, U., Babel, S., & Gheewala, S. (2009). A matrix in Life Cycle Perspective
for Selecting Sustainable Materials for Buildings in Sri Lanka. Building and
Environment, 44(5), 997-1004.
ACEM. (2011). Panel of Consulting Firms. Retrieved 25th October, 2011, from
http://www.acem.com.my/index.php?option=com_content&task=view&id=42&
Itemid=61
Act 172: Town and Country Planning Act 1976, (2006). Retrieved 19th September,
2011, from http://www.agc.gov.my/Akta/Vol.%204/Act%20172.pdf
Addis, B., & Talbot, R. (2001). Sustainable Construction Procurement: A Guide to
Delivering Environmentally Responsible Projects. London: CIRIA C571.
Adler, A., Amstrong, J. E., Fuller, S., Kallin, M., Karolides, A., Macaluso, J., et al.
(2006). Green building: Project planning and cost estimating (2nd ed.).
Kingston: R.S Means.
Agamuthu. (2012). Converting Waste into a Green Industry: Who Will be the
Stakeholders. IMPAK, 2, 6-7. Retrived 12th September 2013 from
http://www.doe.gov.my.
274
Ahmad, A., Ab Kadir, M. Z. A., & Shafii, S. (2011). Current Perspective of the
Renewable Energy Development in Malaysia. Renewable and Sustainable
Energy Reviews, 15(2), 897-904.
Ahmed, A. Z. (2008). Integrating Sustainable Energy in Buildings : A Case Study in
Malaysia. Paper presented at the FAU Conference. from
http://www.fau.dk/Azni%20FAU%20Conference%20Paper.doc
Akadiri, P. O., Chinyio, E. A., & Olomolaiye, P. O. (2012). Design of a Sustainable
Building: A Conceptual Framework for Implemanting Sustainability in the
Building Sector. Buildings, 2, 126-152.
Alarcon, L. F., & Ashley, D. B. (1996). Modeling Project Performance for Decision
Making. Journal of Construction Engineering and Management, 1222(3), 265-
273.
Ali, A. (2007). The Montreal Protocol: Commemorating 20 Years of Progress IMPAK,
14-15. Retrieved 12th September 2013 from http://www.doe.gov.my.
Alias, A. (2009). Developing a Compensation Framework for Land Acquisition
Affecting Orang Asli Native Lands. Unpublished PhD Thesis, University of
Malaya, Kuala Lumpur.
Angus, R. B., Gundersen, N. A., & Cullinane, T. P. (2000). Planning, Performing, and
Controlling Projects. Principles and Applications (Second Edition ed.). United
States: Prentice-Hall.
APEC. (2006). APEC Energy Demand and Supply Outlook. Retrieved 12th
September, 2013, from
http://www.ieej.or.jp/aperc/2006pdf/Outlook2006/ER_Malaysia.pdf
APEC. (2012). APEC Energy Overview 2012. Retrieved 12th September, 2013, from
http://publications.apec.org/publication-detail.php?pub_id=1432
APEC. (2013). APEC Energy Demand and Supply Outlook. 5th edns. Retrieved 12th
September, 2013, from publications.apec.org/file-
download.php?filename=2013_ewg...1
APM. (2012). APM Body of Knowledge: Sixth edn. Buckinghamshire: Association for
Project Management.
275
Arif, A. K. N. (2007). The Effect of Construction on Environment. Unpublished
unpublished dissertation, Universiti Sains Malaysia Penang
ASHRAE. (2006). ASHRAE GreenGuide: The Design, Construction and Operation of
Sustainable Buildings (2nd edn). Atlanta: American Society of Heating
Refrigerating and Air Conditioning Engineers. Inc.
Atkinson, R. (1999). Project Management: Cost, Time, Quality, Two Best Guesses and
a Phenomenon, its Time to Accept Other Success Criteria (Atkinson, 1999).
International Journal of Project Management, 17(6), 337-342.
At-Tmeemy, S. M. H. M., Abdul Rahman, H., & Harun, Z. (2011). Future Criteria for
Success of Building Projects in Malaysia. International Journal of Project
Management, 29, 337-348.
Aye, L., Bamford, N., Charters, B., & Robinson, J. (2000). Environmentally Sustainable
Development: A Life-Cycle Costing Approach for a Commercial Office
Building in Melbourne, Australia. Construction Management and Economics,
18, 927-934.
Ayres, R. U., Van Den Bergh, & Gowdy, J. M. (1998). Viewpoint: Weak Versus Strong
Sustainability in Tinbergen Institute Discussion Papers 98-103/3 Retrieved 7th
June, 2011, from http://ideas.repec.org/p/dgr/uvatin/19980103.html
Baker, T. L. (1994). Doing Social Research (2nd ed.). New York: McGraw-Hill Inc.
Bal, M., Bryde, D., Fearon, D., & Ochieng, E. (2013). Stakeholders Engagement:
Achieving Sustainability in the Construction Sector. Sustainability, 5(2), 695-
710.
Balnaves, M., & Caputi, P. (2001). Introduction to Quantitative Research Methods: an
investigative approach. London: Sage Publications.
Bartlet, E., & Howard, N. (2000). Informing the decision makers on the cost and value
of green building. Building Research and Information, 28(5/6), 315-324.
BCA. (2007). Sustainable Construction: Materials for Building. Retrieved 14th October
2010, from
http://www.bca.gov.sg/sustainableconstruction/others/sc_materials_book.pdf
276
BCA. (2012). BCA Green Mark: Certification Standard for New Buildings (GM
Version 4.1). Retrieved 18th July 2013, from
http://www.bca.gov.sg/EnvSusLegislation/others/GM_Certification_Std2012.pd
f
BCA. (2013a). About BCA Green Mark Scheme. Retrieved 18th July 2013, 2013,
from http://www.bca.gov.sg/GreenMark/green_mark_buildings.html
BCA. (2013b). Bca Green Mark Assessment Criteria and Application Forms.
Retrieved 18th July, 2013, from
http://www.bca.gov.sg/GreenMark/green_mark_criteria.html
Beatley, N. (2008). Pathways to green building and sustainable design: A policy primer
for funders, funders’ network for smart growth and liveable communities. from
http://www.fundersnetwork.org/files/learn/Pathways_to_Green_Building_-
Policy_Primer_081112.pdf
Becker, H. S. (1970). Field Work Evidence. In H. S. Becker (Ed.), Sociological Work:
Method and Substance. New Brunswick NJ: Transaction Books.
Becker, H. S. (1996). The Epistemology of Qualitative Research. In R. Jessor, A. Colby
& R. A. Shweder (Eds.), Ethnography and Human Development: Context and
Meaning in Social Inquiry (pp. 53-71). Chicago: University of Chicago Press.
Begum, R. A., Siwar, C., Pereira, J. J., & Jaafar, A. H. (2006). A Benefit-Cost Analysis
on the Economic Feasibility of Construction Waste Minimisation. The Case of
Malaysia. Resources, Conservation and Recycling, 48(1), 86-98.
Begum, R. A., Siwar, C., Pereira, J. J., & Jaafar, A. H. (2007). Factors and Values of
Willingness to Pay for Improved Construction Waste Management- A
Perspective of Malaysian Contractors. Waste Management, 27(12), 1902-1909.
Beheiry, S. M. A., Chong, W. K., & Haas, C. T. (2006). Examining the Bussiness
Impact of Owner Commitment to Sustainability. Journal of Construction
Engineering and Management, 132(4), 384-392.
Belassi, W., & O.I, T. (1996). A New Framework for Determining Critical
Success/Failure Factors in Projects. International Journal of Project
Management, 14(3), 141-151.
Bell, & Morse. (1999). Sustainability Indicators: Measuring the Immeasurable.
London: Earthscan Publications Ltd.
277
Berg, B. L. (1998). Qualitative Research Methods for Social Sciences (3rd Edition ed.).
Boston: Ally & Bacon.
Bergman, M. M. (2009). The Straw Men of the Qualitative-Quantitative Divide and
their Influence on Mixed Methods Research. In M. M. Bergman (Ed.), Advances
in Mixed Methods Research. London: SAGE Publications Inc.
Bernama. (2010, 15th October 2010). Green Lifestyle Essential To Drive Economic
Growth. Bernama, from
http://web10.bernama.com/budget2011/news.php?id=535660
Bernard, H. R. (2000). Social Research Methods: Qualitative and Quantitative
Approaches London: Sage Publishing Ltd.
Bogenstätter, U. (2000). Prediction and optimization of life-cycle costs in early design.
Building Research Information 28(5), 376-386.
Bordass, B. (2000). Cost and value: fact and fiction. Building Research and
Information, 28(5/6), 338-352.
Boyden, S. (2004). The Biology of Civilisation: Understanding Human Culture as a
Focus in Nature. Sidney, New South Wales: University of New South Wales
Press.
BRE. (2011). BREEAM New Construction: Non-Domestic Building Technical Manual.
Retrieved 16th July, 2011, from http://www.breeam.org
BRE. (2013). BREEAM International New Construction Technical Manual. Retrieved
15th July, 2013, from
http://www.breeam.org/BREEAMInt2013SchemeDocument/
Brekke, K. A. (1997). Economic Growth and the Environment: On the Measurement of
Income and Welfare. Cheltenhem.: Edward Elgar.
Brent, A. C., & Labuschange, C. (2004, 18-21 October). Sustainable Life Cycle
Management: Indicators to assess the sustainability of engineering projects and
technologies. Paper presented at the Engineering Management Conference,
2004.
Brown, J. D. (2001). Using Surveys in Language Programs. New York: Cambridge
University Press.
278
Bryde, D. (2008). Perceptions of the Impact of Project Sponsorship Practices on Project
Success. International Journal of Project Management, 26, 800-809.
Bubshait, A. A., & Almohawis, S. A. (1994). Evaluating the General Conditions of a
Construction Contract. International Journal of Project Management, 12(3),
133-135.
Building Science Corporation. (2008). Towards sustainability: Green building,
sustainability objectives and building America whole house systems research
(No. 0801). Building Science Press.
CAFOD (2012). Post-2015 policymaking: What is being planned, what might actually
happen, and CAFOD‟s current policy lines Retrieved 12th March, 2014, from
http://cafodpolicy.files.wordpress.com/2012/03/postmdgs-cafod-policy-
march2012_signedoff1.pdf
Cassidy, R. (2003). White paper on sustainability. Build. Des. Construction (1), 1-48.
CBRE (CB Richard Ellis). (2009). Who Pays for Green? The Economics of Sustainable
Buildings. EMEA Research. CB Richard Ellis
Chaharbaghi, K., & Wilis, R. (1999). The Study and Practice of Sustainable
Development. Engineering Management Journal, vol. 9(1), 41-48.
Chan, A. P. C., & Chan, A. P. L. (2004). Key Performance Indicators for Measuring
Construction Success. Benchmarking. International Journal of Project
Management, vol.11(2), 203-221.
Chan, T. K. (2009). Measuring Performance of the Malaysian Construction Industry.
Construction Management and Economics, 27(12), 1231-1244.
Chantanakome, W. (2006). Asean energy awards and ACE Nodal Centers Network:
Regional energy policy and planning in ASEAN for sustainable development.
Paper presented at the AREPP ASD Workshop. Retrieved 24th Novermber
2011, from www.asean_sustainable_energy.net/documents/libraries/001/ACE
Chaudhary, C. M. (1991). Research Methodology. Jaipur-India: RBSA Publisher.
Cheung, S. O., Tam, C. M., Ndekugri, I., & Harris, F. C. (2000). Factors Affecting
Clients Project Dispute Resolution Satisfaction in Hong Kong. Construction
Management and Economics, 18(3), 281-294.
279
Cheung, Y. K. F., & Rowlinson, S. (2011). Supply Chain Sustainability: A Relationship
Management Approach. International Journal of Managing Projects in
Business, 4(3), 480-497.
Choi, C. (2009). Removing Market Barriers to Green Development: Principles and
Action Projects to Promote Widespread Adoption of Green Development
Practices. JOSRE, 1(1), 107-138.
Choo, F. (1999). Malaysian Economic Development Perspective. Paper presented at the
Seminar Perancangan Agenda 21, Shah Alam Malaysia.
CIDB. (2000). Malaysian Construction Industry: Technology Foresight Report.
Bangkok: CIDB Malaysia and APEC Technology Foresight Center.
CIDB. (2003). IBS Roadmap 2003-2010: CIDB Malaysia.
CIDB. (2006a). CIDB Focus Group. Retrieved 7th March, 2011, from
http://www.cidb.gov.my
CIDB. (2006b). Quality Assessment System for Building Construction Work-
Construction Industry Standard CIS 7:2006. Kuala Lumpur: Construction
Industry Development Board,.
CIDB. (2007a). Construction Industry Master Plan Malaysia 2006-2015, Malaysia:
CIDB.
CIDB. (2007b). Guidelines for Implementing Environmental Management System in the
Construction Industry Kuala Lumpur: CIDB.
CIDB. (2008). Construction Statistics. Kuala Lumpur: CIDB Malaysia.
CIOB. (2010). Code of Practice for Project Management for Construction and
Development. 4th
Edn, United Kingdom: Wiley-Blackwell.
Clark, T. A. (2002). Project Management for Planners, A Practical Guide. United
States: Planners Press, American Planning Association.
Clements, & Gido. (2006). Effective Project Management, Canada: Thompson South-
Western.
280
Coakes, S. J., Lyndall, S., & Clara, O. (2009). SPSS: Analysis without Anguish: Version
17.0 for Windows: . Autralia: John Wiley & Sons Australia.
Cole, R. J. (2006). Shared Market: Coexisting Building Environmental Assessment
Methods. Building Research and Information, 34(4), 357-371.
Cole, R. J. (2007). Energy use and urban buildings. In N. Munier & Dordrecht (Eds.),
Handbook on Urban Sustainability (389-438). The Neatherlands: Springer.
Cole, R. J., & Larsson, N. K. (1999). GBC'98 and GBTool: Background. Building
Research and Information, 27(4-5), 221-229.
Commonwealth Heads of Government. (1989). Langkawi Declaration on the
Environment. Retrieved 13th March, 2014, from
http://thecommonwealth.org/sites/default/files/news-
items/documents/Langkawi-declaration.pdf
Coventry, S., & Woolveridge, A. C. (1999). Environmental Good Practice on Site.
London: Construction Industry Research and Information Association: CIRIA
Special Publication C502.
Creswell, J. W., & Plano Clark, V. (2011). Designing and Conducting Mixed Methods
Research (2nd ed.). Thousand Oaks, California: Sage Publications Inc.
Creswell, J. W., Plano Clark, V., Gutmann, M., & Hanson, W. (2003). Advance Mixed
Methods Research Designs. In A. Tashakkori & C. Teddlie (Eds.), Handbook of
Mixed Methods in Social and Behavioral Research (209-240). Thousand Oaks,
California: Sage Publications Inc.
Dawson, C. (2002). Practical Research Methods: A User-Friendly Guide to Mastering
Research Techniques and Projects. Oxford: How to Books.
De la Rue du Can, S., & Price, L. (2008). Sectoral trends in Global Energy Use and
Greenhouse Gas Emissions. Energy Policy, 36(4), 1386.
De Silva, N., Dulaimi, M. F., Ling, F. Y. Y., & Ofori, G. (2004). Improving the
Maintainability of Buildings in Singapore. Building and Environment, 39(10),
1243-1251.
DECC, DEFRA, & DfT. (2008). Climate Change Act 2008: Chapter 27. London: The
Stationary Office.
281
Department of Electric and Gas Supply Malaysia. (2001). Statistic of Electricity Supply
Industry in Malaysia. Kuala Lumpur: Department of Electric and Gas Supply
Malaysia.
Department of Environment Malaysia (2007) The Planning Guidelines for
Environmental Noise Limits and Control (2nd ed.) Putrajaya, Department of
Environment Malaysia
Department of Environment Malaysia. (2012). Legislation, Acts, Regulation & Order.
Retrieved 29th May, 2012, from http://www.doe.gov.my
Department of Standards Malaysia. (2007). MS1525: Code of Practice on Energy
Efficiency and Use of Renewable Energy for Non-Residential Buildings. Kuala
Lumpur, Malaysia: SIRIM Berhad.
Department of Statistics Malaysia. (2011). Population and Housing Census, Malaysia
2010 (2010 Census). Retrieved 23rd February, 2011, from
www.statistic.gov.my
DETR. (2000). Building a better quality of life: A strategy for more sustainable
construction [Electronic Version]. Retrieved September 2, 2010 from
http://www.berr.gov.uk/files/file13547.pdf.
Dimson, B. (1996). Principles and Challenges of Sustainable Design and Construction.
Industry and Environment, 19(2), 23-27.
Dixon, T. (2009). RICS Green Gauge 2008/09: RICS Members and the Sustainability
Agenda. Oxford: Oxford Institute for Sustainable Development, Oxford Brookes
University.
Dola, K. (2003). Incorporating Sustainable Development Principles into the Local Plan
Preparation Process: The Case of Selected Localities in Southern Region of
Peninsular Malaysia. Unpublished PhD Thesis, Universiti Teknologi Malaysia.
Doyle, J. T., Brown, R. B., De Leon, D. P., & Ludwig, L. (2009). Building Green-
Potential Impacts to the Project Schedule. International Transactions, PS.08.01-
PS.08.11.
Du Plesis, C. (2001). Agenda 21 for Sustainable Construction in Developing Countries:
First discussion document Retrieved 1st April, 2010, from
http://www.sustainablesettlement.co.za/docs/a21/discussiondocexecsum.pdf.
282
Du Plesis, C. (2002). Agenda 21 for Sustainable Construction in Developing Countries:
A Discussion Document. CIB & UNEP-IETC. from
http://www.buildnet.co.za/akani/2002/nov/agenda21.pdf
Du Plesis, C. (2005). Action for Sustainability: Preparing an African Plan for
Sustainable Building and Construction. Building Research and Information,
33(5), 404-415.
Dulaimi, M. F., Ling, F. Y. Y., & Bajracharya, A. (2003). Organisational Motivation
and Inter-Organisational Interaction in Construction Innovation in Singapore.
Construction Management and Economics, 21, 307-318.
Dumont, P., Gibson, G., & Fish, J. (1997). Scope Management Using the Project
Definition Rating Index (PDRI) Journal of Management in Engineering, 13(5),
54-60.
ecogreen4us. (2012). Green Building: ZEO, a Research Lab for Tomorrow’s Buildings.
Retrieved 8th May, 2012, from http://www.ecogreen4us.com/stories/green-
technology-stories/green-building-zeo-research-lab/
Edum-Fotwe, F. T., & Price, A. D. F. (2009). A Social Ontology for Appraising
Sustainability of Construction Projects and Development. International Journal
of Project Management, 27(4), 313-322.
Edward, B. (1998). Green Buildings Pay. Oxford: Alden Press.
Edward, B. (1999). Sustainable Architecture: European Directives and Building Design
(2nd ed.). Oxford: Architectural Press.
Erickson, F. (2007). Specifying 'Usually' and 'Some' Using Simple Descriptive Statistics
in Qualitative Inquiry. Paper presented at the 2007 Congress of Qualitative
Inquiry.
Essa, R., & Fortune, C. (2008). Pre-construction Evaluation Practices of Sustainable
Housing Projects in the UK. Engineering Construction and Architectural
Management, 16(6), 514-526.
Fay, R., Treloar, G., & Iyer-Raniga, U. (2000). Life-cycle energy analysis of buildings:
a case study. Building Research and Information, 28(1), 31–41.
283
Fellows, R., & Liu, A. (2003). Research Methods for Construction (2nd ed.). Oxford:
Blackwell Science.
Francis, G. (1998). The relevance of green buildings to the procurement and
marketability of office. In B. Edward (Ed.), Green Buildings Pay. Oxford: Elden
Press.
Francis, T., Fotwe, E., & Price, A. (2009). A social ontology for appraising
sustainability of construction projects and developments. International Journal of
Project Management, 27, 313-322.
Freedman, D. A. (2011). Sampling. Retrieved 23rd November, 2011, from
www.staf.berkeley.edu I-Cencus/sample.pdf
Freedman, D. A., Pisani, R., & Purves, R. A. (Eds.). (1998). Statistics (3rd ed.). New
York: W.W. Norton Inc.
Freeman, M., & Beale, P. (1992). Measuring project success. Project Management
Journal, 23(1), 8-17.
Gatke, P. (2003). Future Management of Hazardous Household Waste in Petaling Jaya
[Electronic Version]. Retrieved 13th September 2013, from
http://rudar.ruc.dk/bitstream/1800/147/1/Future_Management_of.pdf
GBCA. (2008). Green Star - Office v3 Technical Manual. Retrieved 17th July, 2013,
from http://www.gbca.org.au/green-star/rating-tools/green-star-office-
v3/1710.htm
GBCA. (2013). Green Star Overview. Retrieved 17th July, 2013, from
http://www.gbca.org.au/green-star/green-star-overview
George, D., & Mallery, P. (2003). SPSS for Windows Step by Step: A Simple Guide and
Reference. 11.0 Update. Boston: Allyn & Bacon.
Gething, B., & Bordass, B. (2006). Rapid Asessment Checklist for Sustainable
Buildings. Building Research and Information, 34(4), 416-426
Gibson, G. E., & Gebken, R. J. (2003). Design Quality in Pre-project Planning:
Applications of the Project Definition Rating Index. Building Research and
Information, 31(5), 346-356.
284
Giddings, B., Hopwood, B., & O'Brien, G. (2002). Environment, Economy and Society:
Fitting Them Together into Sustainable Development. Sustainable Development,
10(4), 187-196.
Glavinich, T. E. (2008). Contractor’s guide to green building construction:
management, project delivery, documentation and risk reduction. New York.:
Wiley.
Gliem, J. A., & Gliem, R. R. (2003). Calculating, Interpreting and Reporting
Cronbach's Alpha Reliability Coefficient for Likert-Type Scales. Paper presented
at the 2003 Midwest Research to Pratice Conference in Adult, Continuing and
Community Education, The Ohio State University, Columbus, OH.
Gottfried, D. A. (1996). Sustainable Building Technical Manual. In Public Technology
Inc & U.S Green Building Council (Eds.), Sustainable Building Technical
Manual. US: Public Technology Inc.
Government of Malaysia. Act 172 – Town and Country Planning Act. Retrieved 19th
September 2013. from
http://www.catholiclawyersmalaysia.org/sites/default/files/act_172-
town_and_country_planning_act_1976.pdf
Government of Malaysia. (2010). Tenth Malaysia Plan 2011-2015. Retrieved 19th
September 2013. from
http://www.pmo.gov.my/dokumenattached/RMK/RMK10_Eds.pdf.
Gowdy, J. M., & O’hara. (1997). Weak Sustainability and Viable Technologies.
Ecological Economics, 22, 239-247
Graham, P. (2003). Building Ecology-First Principles for a Sustainable Built
Environment Oxford, UK: Blackwell Publishing.
Greenbuildingideas. (2011). Differences between green and sustainable. Retrieved
15th July, 2011, from http://greenbuildingideas.info/difference-between-green-
and-sustainable/.
greenprospectasia.com. (2012). Thailand wins big at the Asean Energy Awards.
Retrieved 7th November 2012, from
http://www.greenprospectsasia.com/content/thailand-wins-big-asean-energy-
awards
285
GreenTech. (2010a). Annual Report 2010. Retrieved 20th September, 2011, from
www.greentechmalaysia.my/report/pdfview.aspx?filename=2012108172225ann
ual%20report%202010.pdf
Greentech. (2010b) National Green Technology Policy. Bandar Baru Bangi, GreenTech
Malaysia. Retrieved 28th
May 2012 from www.greentechmalaysia.my
Grevelman, L., & Kluiwstra, M. (2010). Sustainability in Project Management: A Case
Study on Enexis. PM World Today, 12(7).
GRI. (2006). Sustainability Reporting Guidelines (G3 Guidelines-2000-2006).
Retrieved 3rd February, 2010, from
https://www.globalreporting.org/resourcelibrary/G3-Guidelines-Incl-Technical-
Protocol.pdf
GRI. (2011). Sustainability Reporting Guidelines (G3.1 Guidelines 2000-2011).
Retrieved 3rd February, 2012, from
https://www.globalreporting.org/reporting/G3andG3-1/Pages/default.aspx
GRI. (2014). The GRI Reporting Guidelines Main Features of G4. Retrieved 28th
January, 2014, from https://www.globalreporting.org/resourcelibrary/main-
features-of-g4.pdf
Groat, L., & Wang, D. (2002). Architectural Research Methods. New York: John Wiley
and Sons.
GSB. (2009). GBI Assessment Criteria for Non-Residential New Construction (NRNC)
Retrieved 19th July, 2011, from
http://www.greenbuildingindex.org/Resources/GBI%20Tools/GBI%20NRNC%
20Non-Residential%20Tool%20V1.0.pdf.
GSB. (2012a). GBI Certified Building. Retrieved 2nd May, 2012, from
http://www.greenbuildingindex.org/organisation-certified-buildings.html
GSB. (2012b). What is a Green Building. Retrieved 4th November, 2012, from
http://www.greenbuildingindex.org/why-green-buildings.html
GSB. (2013a). What is the Green Building Index? Retrieved 9th July, 2013, from
http://www.greenbuildingindex.org/index.html
286
GSB. (2013b). GBI Organisation. Retrieved 19th July, 2013, from
http://www.greenbuildingindex.org/organisation.html
GSB. (2013c). The GBI Rating System. Retrieved 19th July, 2013, from
http://www.greenbuildingindex.org/how-GBI-works2.html
Hair, J. F., Black, B., & Babin, B. (2005). Multivariate Data Analysis. New Jersey:
Prentice Hall.
Halliday, S. (2008). Sustainable Construction. Stoneham, Mass: Butterworth-
Heinemann.
Hamilton, M. R., & Gibson, G. E. (1996). Benchmarking Pre-project Planning Efforts.
Management in Engineering, 12(2), 25-33.
Hammersley, M. (1992). Reconstructing the Qualitative-Quantitative Divide. In M.
Hammersley (Ed.), What's Wrong with Ethnography? Methodological
Explorations (pp. 159-173). London: Routledge.
Hammersley, M. (2009). Troubles with Triangulation. In M. M. Bergman (Ed.),
Advances in Mixed Methods Research (pp. 22-35). London: Sage Publications
Ltd.
Harding, A. (2003). Planning, Environment and Development: A Comparison of
Planning Law in Malaysia and England. Environmental Law Review, 5(4), 231-
255.
Harris, J. M., & Goodwin, N. R. (2001). Volume Introduction. In J. M. Harris, T. A.
Wise, K. P. Gallagher & N. R. Goodwin (Eds.), A Survey of Sustainable
Development: Social and Economic Dimensions Washington DC: Island Press.
Hartley, J. (1994). Case Study in Organisational Research. In C. Cassell & G. Symon
(Eds.), Qualitative Methods in Organisational Research: A Practical Guide.
London: Publication Ltd.
Hassan, A. S. (2004). Issues in Sustainable Development of Architecture in Malaysia.
Penang, Malaysia: Penerbit Universiti Sains Malaysia.
Hayles, C. (2004). The Role of Value Management in the Construction of Sustainable
Communities. The Value Manager, 10(1).
287
Heerwagen, J. (2000). Green building, organisational success and occupant
productivity. Building Research and Information, 28(5/6), 353-367.
Heerwagen, J. H., & Orians, G. H. (1993). Humans. Habitats and Aesthetics In S. R.
Kellert & E. O. Wilson (Eds.), The Biophilia Hypothesis. Washington DC:
Island Press, Shearwater Books.
Hendrickson, C. (2000). Project Management for Construction. Fundamental Concepts
for Owners, Engineers, Architects and Builders (2nd
ed.): World Wide Web
publication, Pittsburgh.
Hezri, A. A. (2004). Sustainability Indicator System and Policy Processess in Malaysia:
A Framework for Utilization and Learning Journal of Environmental
Management, 73, 357-371.
Hezri, A. A., & Hasan, M. N. (2004). Management Framework for Sustainable
Development Indicators in the State of Selangor, Malaysia. Ecological
Indicators, 4, 287-304.
Hill, R. C., & Bowen, P. A. (1997). Sustainable Construction: Principles and a
Framework for Attainment. Construction Management and Economics, 15, 223-
239.
Hodder, L. (1994). The Interpretation of Documents and Materials. In N. K. Denzin &
Y. S. Lincoln (Eds.), Handbook of Qualitative Research. California: Sage
Publication.
Holloway, I. (1997). Basic Concepts for Qualitative Research. Oxford: Blackwell
Science.
HRDC (Human Resources Development Canada). (2003). Introduction to Project
Management Principles. Retrieved 16th October 2011, from
http://www.hrsdc.gc.ca/eng/hip/lld/olt/resources/toolkit/intro_project_managem
ent.pdf
Hutchinson, S., & Purcell, J. (2003). Bringing policies to life: the vital role of front line
managers in people management. Executive briefing. London: Chartered
Institute of Personnel and Development.
Hwang, B.-G., & Ng, W. J. (2013). Project management knowledge and skills for green
construction: Overcoming challenges. International Journal of Project
Management, 31, 272-284.
288
IAEA. (2006). Energy and Environment Data Reference Bank (EEDRB). Retrieved
13th September, 2011, from
http://www.iaea.org/inisnkm/nkm/aws/eedrb/data/MY.html
iiSBE. (2006). GBC'98-2005 Process Overview. Retrieved 17th July, 2011, from
http://www.iisbe.org/iisbe/gbc2k5/gbc2k5-start.htm
iiSBE. (2012). SBTool 2012. Retrieved 17th July, 2013, from
http://www.iisbe.org/sbtool-2012
IPCC. (1990). Climate Change: The IPCC Assessment. Geneva: World Meteorological
Organization.
Iqbaria, M. (1995). The Impact of Job Performance Evaluation on Carreer
Advancement Prospect: An Examination of Gender Difference in the IS
Workplace MIS Quarterly, 19(1), 107-123.
Jallendran, T. (2011). Sustainability: Managing Green Buildings. Retrieved 5th June
2012, 2012, from
http://www.mgbc.org.my/Resources/Ir_Thirukumaran_Jallendran_-
_Managing_Green_Projects.pdf.
Jamaldin, J. (2008, 15 November 2008). Here Comes the Green Brigade. New Straits
Times. 6-7,
Jantan, M., & Ramayah, T. (2006). Goodness of Measures: Factors and Reliability
Analyses. Penang: University of Science Malaysia.
Jayaraman, P. (2013, 27th March 201). Energy Efficient Master Plan to be out by June.
The Sun. Retrieved 19th September 2013, from
http://www.malaysiandigest.com/business/296942-energy-efficient-masterplan-
to-be-out-by-june.html
John, J. I. (2011). Creating the Essence of Cities:The Planning & Development of
Malaysia’s New Federal Administrative Capital, Putrajaya. Putrajaya.
Retrieved 3rd March, 2011, from
https://www.google.com.my/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&
ved=0CDkQFjAA&url=http%3A%2F%2Fwww.chairedelimmateriel.u-
psud.fr%2Ftiki-
download_file.php%3FfileId%3D152&ei=X4v4UoWpJY6Nrge8oYCYCw&usg
=AFQjCNF-W5S9nMb9J7OtH29-
3u_j64XMow&sig2=zubzQRQB7XX70bleHd4GKA
289
Johns, R. (2010). Likert Items and Scales. Retrieved 29th September, 2013, from
http://surveynet.ac.uk/sqb/datacollection/likertfactsheet.pdf
Jugdev, K., & Muller, R. (2005). A Restrospective Look at Our Evolving
Understanding of Project Success. Project Management Journal, 36, 19-31.
Kaatz, E., Root, D., & Bowen, P. (2005). Broadening Project Participation through a
Modified Building Sustainability Assessment. Building Research and
Information, 33(5), 441-454.
Kaatz, E., Root, D., Bowen, P., & Hill, R. C. (2006). Advancing Key Outcomes of
Sustainability Building Assessment. Building Research and Information, 34(4),
308-320.
Kahn, R., & Cannel, C. (1957). The Dynamics of Interviewing. New York and
Chichester: Wiley.
Kamara, J. M., Anumba, C. J., & Evbuomwan, N. F. O. (2001). Assessing the
suitability of current briefing practices in construction within a concurrent
engineering framework. International Journal of Project Management, 19, 337-
351.
Kats, G., Alevantis, L., Berman, A., Mills, E., & Perlman, J. (October 2003.). The Cost
and Financial Benefits of Green Building: A Report to California’s Sustainable
BuildingTask Force. Retrieved 1st January 2011, 2011, from
http://www.usgbc.org/Docs/News/News477.pdf
Kerzner, H. (2003). Project Management: a systems approach to planning, scheduling
and controlling (Eight ed.). New York: Wiley.
KeTTHA. (2011). Incentives. Retrieved 30th May, 2012, from
http://www.kettha.gov.my/content/galakkan-dan-insentif
Kibert, C. J. (1994) Preface. First International Conference of CIB TG 16 on
Sustainable Construction. Tampa, University of Florida on 6-9 November
Kibert, C. J. (2005). Sustainable construction: Green building design and delivery.
Hoboken, N.J: Wiley.
290
Koay, A. (2011). Diamond Building: A Shining Example of Energy Efficiency. The
Star Online, from
http://www.thestar.com.my/Story.aspx/?file=%2F2011%2F7%2F5%2Flifefocus
Kohler, N., & Lützkendorf, T. (2002). Integrated life-cycle analysis. Building Research
and Information, 30(5), 338–348.
Kometa, S., Olomolaiye, P. O., & Harris, F. C. (1995). An Evaluation of Clients' Needs
and Responsibilities in the Construction Process. Engineering, Construction and
Architectural Management. Engineering, Construction and Architectural
Management, 2(1), 45-56.
Korkmaz, S., Riley, D., & Horman, M. (2010). Piloting Evaluation Metrics for
Sustainable High-Performance Building Project Delivery. Journal of
Construction Engineering and Management, 136(8), 877-879.
Kothari, C. R. (2004). Research Methodology: Methods and Techniques. New Delhi:
New Age International Publishers.
KPT (Ministry of Higher Education of Malaysia). (2011). Public Institutions of Higher
Education. Retrieved 25th October, 2011, from http://www.mohe.gov.my
KPKT (Ministry of Housing and Local Government of Malaysia). (2011). Pihak
Berkuasa Tempatan (PBT) di Malaysia Retrieved 25th October, 2011, from
http://www2.epbt.gov.my
Kristensen, P. E., Tang, C. K., Reimann, G., & Ismail, A. Z. (2007). The Design of the
Zero Energy Office Building for Pusat Tenaga Malaysia. Paper presented at the
Conference on Sustainable Building.
Kristensen, P. (2008). Sustainable Buildings for Future. Paper presented at the
FutureArch Forum 2008. Retrieved 3rd February 2011, from
http://www.futurarc.com/
Kumar, R. (1999). Research Methodology: A Step by Step Guide for Beginners.
London: Sage Publication Ltd.
Labuschagne, C., Brent, A., & Claasen, S. J. (2005). Environmental and Social Impact
Considerations for Sustainable Project Life Cycle Management in the Process
Industry. Corporate Social Responsibility and Environmental Management, 12,
38-54.
291
Labuschagne, C., & Brent, A. C. (2005). Sustainable Project Life Cycle Management:
the need to integrate life cycles in the manufacturing sector. International
Journal of Project Management, 23(2), 159-168.
Lake, C. (2010). Mastering Project Management: Key Skills in Ensuring Profitable and
Successful Projects (2nd ed.): Thorogood.
Lapinski, A. R., Horman, M. J., & Riley, D. R. (2006). Lean Processes for Sustainable
Project Delivery. Journal of Construction Engineering and Management,
132(10), 1083-1091.
Larose, D. T. (2006). Data Mining Methods and Models. Hoboken, New Jersey: John
Wiley and Sons.
Larsen, G. L. (2009). An Inquiry Into the Theoretical Basis of Sustainability, Ten
Propositions. In J. Dillard, V. Dujon & M. C. King (Eds.), Understanding the
Social Dimension of Sustainability. New York: Routledge.
Larsson, N. K. (2011). SB Method and SBTool for 2011 - overview. Retrieved 14th
September, 2011, from http://www.iisbe.org/sbtool-2010
Larsson, N. K. (2012). User Guide to the SBTool assessment framework. Retrieved
17th July, 2013, from
http://iisbe.org/system/files/SBTool%202012%20user%20guide%2026Oct12.pd
f
Lee, T., & Mitchell, T. (2000). Control Turnover by Understanding its Causes.
Handbook of Principles of Organizational Behavior. Malden: MA: Blackwell
Publishers Ltd.
Liddle, H. (2006). Eco-minimalism-Less is More, Green Building Bible (Vol. 1).
Llandysul, UK: Green Building Press. Available at;
http://www.seda2.org/articles/Ecominimalism.html.
Lim, C., & Mohamed, M. (1999). Criteria for Project Success: An Exploratory Re-
examination. International Journal of Project Management, 17(4), 243-238.
Ling, C. Y. (2012). The Rio Declaration on Environment and Development: An
Assessment. Penang: Third World Network.
292
Lipovetsky, S., Tishler, A., Dvir, D., & Shenhar, A. (1997). The Relative Importance of
Project Success Dimensions. R & D Management, 27(2), 97-106.
Liu, A. M. M., & Walker, A. (1998). Evaluation of Project Outcomes. Construction
Management and Economics, 16(2), 209-219.
Lombardi, P. L. (2001). Responsibilities Toward the Coming Generations: Forming a
New Creed. Urban Design Studies, 7, 89-102.
Lovelock, J. (1991). Gaia: The Practical Science of Planetary Medicine. Sydney: Allen
& Unwin.
Lovelock, J. (2000). Gaia: A New Look at Life on Earth Oxford: Oxford University
Press.
Lowe, D. J., & Zhou, L. (2003, 1st-2nd September). Economic Challenges of
Sustainable Construction. Paper presented at the The RICS COBRA Foundation
Construction and Building Research Conference, University of Wolverhampton.
Luce, Z. R. (2010). Project Management and Sustainability [Electronic Version].
Retrieved 11th October, 2011, from
www.zulanas.lt/.../2%20ZoydRLuce%20full%20paper%20ENG.pdf
Lutzkendorf, T., & Lorenz, D. (2006). Using and Integrated Performance Approach in
Building Assessment Tools. Building Research and Information, 34(4), 334-
356.
Magis, K., & Shinn, C. (2009). Emergent Principles of Social Sustainability. In J.
Dillard, V. Dujon & M. C. King (Eds.), Understanding the Social Dimension of
Sustainability. New York: Routledge.
Malaysian Meteorological Department. (2012). General Climate of Malaysia.
Retrieved 12th September, 2013, from
http://www.met.gov.my/index.php?option=com_content&task=view&id=75&Ite
mid=1089
Mansur, S. A., Che Wan Putra, C. W. F., & Mohamed, A. H. (2003, 26-28th August
2003). Productivity Assessment and Schedule Compression Index (PASCI) for
Project Planning. Paper presented at the 5th Asia Pacific Structural Engineering
and Construction Conference (ASPEC 2003), Johor Bahru, Malaysia.
293
Marko Pahor. (2011 . Principle Component Analysis. Retrieved 1 th October, 2012,
from miha.ef.uni-lj.si dokumenti plus2 ... MB 2011 Seminar PCA FA.p...
MaSC (2002). Sustainable Project. Retrieved 1st June 2010., from
http://projects.bre.co.uk/masc/pdfs/masc-brochure.pdf
Matthiessen, L., & Morris, P. (2004). Costing Green: A Comprehensive Cost Database
and Budgeting Methodology. Retrieved 7th October, 2011, from
http://www.davislangdon.com/USA/Projects/CostingGreen
Maxwell, J. A. (2005). Using Numbers in Qualitative Research. Qualitative Inquiry,
16(6), 475-482.
May, T. (1997). Social Research: Issues, Methods and Process. Buckingham: Open
University Press.
Maykut, P., & Morehouse, R. (1994). Beginning Qualitative Research: A Philosophic
and Practical Guide. London: Falmer.
McCoach, D. B. (2002). A validation study of the school attitude assessment survey.
Measurement and Evaluation in Counselling and Development (35), 66-77.
McGraw Hill Construction. (2006). Green building smart market report: Design &
construction intelligence. New York: McGraw-Hill Construction. Retrieved
23rd December, 2010, from http://construction.com/SmartMarket/greenbuilding/
Mckee, W. (1998). Green buildings and the UK property industry. In B. Edward (Ed.),
Green Buildings Pay. Oxford: Elden Press.
McKenzie, S. (2004). Social Sustainability: Towards some Definitions. Working Paper
Series no.27 Retrieved 1st October, 2010, from
http://www.unisa.edu.au/hawkeinstitute/documents/wp27.pdf
Md Darus, Z., Hashim, N. A., Salleh, E., Haw, L. C., Abdul Rashid, A. K., & Abdul
Manan, S. N. (2009). Development of Rating System for Sustainable Building in
Malaysia. WSEAS Transactions on Environment and Development, 5(3), 260-
272.
294
MECM. (2011). MECM Low Energy Office Building Putrajaya Malaysia. Retrieved
1st December, 2011, from
http://www.iisbe.org/iisbe/gbpn/non_members_info/malaysia/Malaysia_new_lo
w_e_Ministry_Energy.pdf
Memon, P. A. (2000). Devolution of Environmental Regulation: Environmental Impact
Assessment in Malaysia. Impact Assessment and Project Appraisal, 18(4), 283-
293.
Meredith, J. R., & Mantel, S. J. (2006). Project Management-A Managerial Approach
(Sixth Edition ed.). New York: Wiley.
Merriam, S. (1998). Qualitative Research and Case Study Applications in Education.
California: Jossey-Bass Publisher.
Messing, K., Seifert, A. M., Vezina, N., Balka, E., & Chatigny, C. (2005). Qualitative
Research Using Numbers: An Approach Developed in France and Used to
Transform Work In North America New Solutions: A Journal of Environmental
and Occupational Health Policy, 15(3), 245-260.
Miles, M. B., & Huberman, A. M. (1984). Qualitative Data Analysis: A Sourcebook of
New Methods. Beverly Hills, CA: Sage.
Ministry of Energy Telecommunications and Posts Malaysia. (1989). Guideline for
Energy Efficiency in Buildings Kuala Lumpur: Ministry of Energy
Telecommunications and Posts.
MIP. (2011). Global and National Movement of Sustainable Development Retrieved
30th May, 2011, from http://www.mip.org.my/
MIP. (2011). Membership List. Retrieved 25th October, 2011, from
http://www.mip.org.my/doc/memberlist.pdf
Mochal, T., & Krasnoff, A. (2010). Green Project Management: Supporting ISO 14000
Standard Through Project Management Process. Retrieved 14th October 2011,
from http://greeneconomypost.com/green-project-management-greenpm-iso-
14000-11040.htm
Mochal. T, & Krasnoff. A. (2008). A TenStep White Paper. Retrieved 10th June 2010,
from http://www.green.p.m.com/greenarticles.html
295
Mohd Yunus, M. I. (2007, 18th May). All Must Pay Their Part to Curb Pollution. New
Straits Times,
Molenaar, K., Sobin, N., Gransberg, D., McCuen, T., Korkzmaz, S., & Horman, M.
(2009). Sustainable, High Performance Projects and Project Delivery Methods:
A State of Practice Report. from http://www.dbia.org/NR/rdonlyres/AA033026-
60BF-495B-9C9C-51353F744C71/0/Sep2009ReportPankowDBIA.pdf
Morris, P. W. G. (2011). Managing the Front-End: Back to the Beginning. Project
Perspectives, 33, 4-8.
Muldavin, S. R. (2010). Value Beyond Cost Savings, How to Underwrite Sustainable
Properties. USA: Muldavin Company Inc.
Naoum, S. G. (1998). Dissertation Research and Writing for Construction Students.
Oxford: Butterworth-Heinemann.
National Association of Homebuilders. (2006). Model green homebuilding guidelines.
Retrieved 1st August, 2010, from
http://www.nahb.org/publication_details.aspx?publicationID=1994§ionID=1
55
Navamukundan, A. (1999). The true challenge: To bring about equitable and
meaningful income distribution in society. In International Labour Organization
(ILO) (Ed.), Collective bargaining: A fundamental principle, a right, a
Convention: Labour Education 1999/1-2 Nos. 114-115. Geneva: ILO.
Navarre, C., & Schaan, J. L. (1990). Design of Project Management System from Top
Management's Perspective. Project Management Journal, 21(2), 19-27.
Naylor, H. F. W. (1995). Construction Project Management: Planning and Scheduling.
United Stated: Delmar Publishers.
NCI (National Charrette Institute). (2007). What is a charrette? Retrieved 17th
October, 2011, from http://www.charretteinstitute.org/charrette.html
Neuman, W. L. (2003). Social Research Methods: Qualitative and Quantitative
Approaches (Fifth Edition ed.). United States of America: Pearson Education,
Inc.
296
Neumann, J. E. (2000) Managerial and Employee Involvement in Design Processes. In
Clements-Croome, D. (Ed.) Creating the Productive Workplace. London, E &
FN Spon. 259-271
Newell, G., & Manaf, Z. (2008). The Significance of Sustainability Practices by the
Malaysian Property Sector. Local Economy, 23(3), 152-167.
Norusis, M. J. (2002). SPSS Version 11.0- Guide to Data Analysis. New Jersey, USA:
Prentice Hall.
Nunnally, J. C. (1978). Psychometric Theory. New York: McGraw-Hill.
Olson, T. (2000). Numbers, Narratives, and Nursing History. Social Science Journal,
37, 137-144.
Onwuegbuzie, A. J., & Daniel, L. G. (2003). Typology of Analytical and
Interpretational Errors in Quantitative and Qualitative Educational Research
[Electronic Version]. Current Issues in Education, 6. Retrieved 21st April 2012,
from http://cie.ed.asu.edu/volume6/number2/
O’riordan, T., & H, V. (1998 . The Transition to Sustainability: The Politics of Agenda
21 in Europe. UK: Earthscan.
Osborn, D. (2013). Building on Rio+20 To Spur Action for Sustainable Development.
Retrieved 12th March, 2014, from
http://www.sustainabledevelopment2015.org/index.php/blog/295-blog-
sdgs/1410-building-on-rio-20-to-spur-action-for-sustainable-development
PAM (2009). Green Building Green Design Forum and Preview of Green Building
Index Malaysia. Retrieved 25th
May 2012 from
www.greenbuildingindex.org/...%20Green%20Design%20Forum/20090.*
PAM. (2011). Firm Members. Retrieved 25th October, 2011, from
http://www.pam.org.my
Parfitt, M. K., & Sanvido, V. E. (1993). Checklist of Critical Success Factors for
Building Projects. Journal of Management in Engineering, 9(3), 243-249.
297
Parkin, S., (2000) Sustainable Development: the Concept and the Practical Challenge,
proceedings of the Institution of Civil Engineers: Civil Engineering, vol. 138(6)
pp. 3-8. Retrieved 1st September 2010, from
http://www.icevirtuallibrary.com/content/article/10.1680/cien.2000.138.6.3
Patton, M.Q (2002). Qualitative Research and Evaluation Methods (3rd
ed) Thousand
Oaks: Sage Publications, Inc.
Pearce, D., Markandya, A., & Barbier, E. B. (1989). Blueprint for a Green Economy.
London: Earthscan Publications.
Pearce, D. W. (1993a). Blueprint 3: Measuring Sustainable Development. London:
Earthscan Publications Ltd.
Pearce, David W. (1993b) Economic Values and the Natural World, London:
Earthscan.*
Peireira, J. J., & Hasan, M. N. (2004). Sustainable Development Indicators: An
Overview of Ongoing Initiatives in Malaysia. In Latiff, J. J. Peireira, A. H.
Adnan & A. A. Aldrie (Eds.), Indicators of Sustainable Development: Assessing
Changes in Environmental Conditions (pp3-13). Bangi: Intitute for Environment
and Development (LESTARI).
Perkins, D. F., Feinberg, M. E., Greenberg, M. T., Johnson, L. E., Chilenski, S. M.,
Mincemoyer, C. C., et al. (2011). Team factors that predict to sustainability
indicators for community-based prevention teams. Evaluation and Program
Planning, 34, 283-291.
Perry, M., & Singh, S. (2001). Corporate Environmental Responsibility in Singapore
and Malaysia: The potential and limits of voluntary initiatives. Technology,
Business and Society – Programme Paper Number 3. Retrieved from
http://www.unrisd.org/
Peterson, P. J. (1997). Indicators of Sustainable Development in Industrializing
Countries (volume II). Bangi: Institute for Environment and Development
(LESTARI).
Pezzey, J. (1992). Definition of Sustainability. Cambridge: UK CEED.
Pintér, L., Hardi, P., & Bartelmus, P. (2005). Sustainable Development Indicators:
Proposals for a Way Forward. Retrieved 2nd August, 2011, from
http://www.iisd.org/pdf/2005/measure_indicators_sd_way_forward.pdf
298
Pinto, M., & Pinto, J. (1991). Determinants of Cross-functional Coorperation in Project
Implementation Process. Project Management Journal, 22(2), 243-248.
PKK. (2011). Info Kontraktor. Retrieved 25th October, 2011, from
http://pkk.kkr.gov.my
PMI. (2008). A Guide to the Project Management Body of Knowledge (PMBOK)
(Fourth ed.). United States: Project Management Institute Inc
Polese, M., & Stren, R. (2000). The Social Sustainability of Cities: Diversity and the
Management of Change. Toronto: University of Toronto Press.
Polit, D. F., Beck, C. T., & Hungler, B. P. (2001). Essentials of Nursing Research:
Methods, Appraisal and Utilization (5th ed.). Philadelphia: Lippincott Williams
and Wilkins.
Pons, O., & Aguado, A. (2012). Integrated value model for sustainable assessment
applied to technologies used to build schools in Catalonia, Spain. Building and
Environment(53), 59-58.
Popea, J., Annandale, D., & Morrison-Saunders, A. (2004). Conceptualising
sustainability assessment. Environmental Impact Assessment Review, 24(6),
595-616.
Praveena, S. M., Abdullah, M. H., & Aris, A. Z. (2008). Towards a Low Carbon
Society: Carbon Emissions and the Transport Sector. IMPAK, p1. Retrieved
12th September 2013 from http://www.doe.gov.my.
Prowler, D. (2012). Whole Building Design. Retrieved 7th October, 2012, from
http://www.wbdg.org/wbdg_approach.php
Punch, K. F. (2001). Introduction to Social Research: Quantitative and Qualitative
Approaches. London: Sage Publications Ltd.
Putra Perdana Berhad. (2011). Awards. Retrieved 1st December, 2011, from
http://www.p-perdana.com/
PVdatabase. (____). BIPV Project Summary. Retrieved 2012, 15th September, from
http://www.pvdatabase.org/projects_view_details.php?ID=278
299
PWC (2002) Social Sustainability Survey Report. PWC. Retrieved 30th
April 2011 from
http://www.pwcglobal.com/fas/pdfs/sustainability%20survey%20report.pdf.
PWC Malaysia. (2010). Green Tax Incentives for a Sustainable Malaysia. PWC Alert
Issue 2010 Retrieved 30th May, 2012, from
http://www.greentechmalaysia.my/GreenExplore/ExploreIncentives.aspx
Rao, P. K. (2000). Sustainable development: Economics and Policy. Oxford: Blackwell.
Razak, N. (2009a). U.N. Climate Change Conference 2009 – "15th Conference of
Parties (COP 15)". Retrieved 28th May, 2012, from http://1malaysia.com.my/
Razak, N. (2009b). The 2010 Budget Speech on 23rd October 2009. Retrieved 20th
September, 2011, from http://aibim.com/download-dir/budget/bs10.pdf
Reeder, L. (2010). Guide to Green Building Rating Systems. New Jersey: John Wiley
and Sons, Inc.
Rees, W. E. (1989). Planning for sustainable development: A Resource Book. B.C,
Canada.: UBC Centre for Human Settlements.
REHDA. (2012). Members Listing. Retrieved 25th October, 2011, from
http://www.rehda.com/members/
Reyes, J. P., San-Jose, J. T., Cuadrado, J., & Sancibrian, R. (2014). Health and safety
criteria for determining the sustainable value of construction projects Safety
Science, 62, 221-232.
Riley, D., Magent, C., & Horman, M. (2004). Sustainable Metrics: A Design Process
Model for High Performance Buildings [Electronic Version]. 16th CIB World
Building Congress, from http://www.irbnet.de/daten/iconda/CIB9702.pdf
Ritz, G. J. (1994). Total Construction Project Management (International ed.).
Singapore: McGraw-Hill, Inc.
Robichaud, L. B., & Anantatmula, V. S. (2011). Greening Project Management
Practices for Sustainable Construction. Journal of Management in Engineering,
27(1), 48-57.
300
Rosly, D., & Hashim, N. (2011). Guideline and Framework for Green Township in
Malaysia. Paper presented at the Seminar On Sustainable Cities-Sharing Swedish
Experience. Retrieved 12th September 2013 from
http://www.townplan.gov.my/download/guideline_and_framework_for_green_to
wnship_in_malaysia_-_paper_3a1861603323.pdf
Rowe, D. (2009). Heritage Buildings and Sustainability. Retrieved 25th July, 2013,
from
http://www.dpcd.vic.gov.au/__data/assets/pdf_file/0003/44859/Sustainability_H
eritage_tech_-leaflet.pdf
Rowlinson, S., & Cheung, Y. K. F. (2012). Supply Chain Sustainability-A Relationship
Management Approach Moderate by Culture and Commitment. Project
Perspectives, 66-71.
Roy, A. K., Mahmood, A. R., Balslev-Olesen, O., Lojuntin, S., & Tang, C. (2005). Low
Energy Office Building in Putrajaya, Malaysia: Case Studies and Innovations.
Paper presented at The 2005 World Sustainable Building Conference. Retrieved
1st December 2011, from www.irbnet.de/daten/iconda/CIB3371.pdf
Rusell, R. S., & Taylor, B. W. (2003). Operations Management (4th ed.). Upper Saddle
River, NJ: Pearson Education.
Saarinen, T. F. (1976). Environmental Planning: Perception and Behaviour. Boston:
Houghton Mifflin Company.
Sadeh, A., Dvir, D., & Shenhar, A. (2000). The Role of Contract Type in the Success of
R&D Defence Projects under Increasing Uncertainty Project Management
Journal, 31(3), 14-21.
Sandelowski, M. (2000). Focus on Resarch Methods: Whatever Happened to
Qualitative Description? Research in Nursing and Health, 23, 334-340.
Sandelowski, M. (2001). Focus on Research Methods: Real Qualitative Researchers Do
Not Count: The Use of Numbers in Qualitative Research. Research in Nursing
and Health, 24, 230-240.
Sani, S. (1993). Environment and Development in Malaysia: Changing Concerns and
Approaches. Malaysia: Institute of Strategic and International Studies (ISIS
Malaysia).
301
Sani, S. (1999). Environmental Management Issues and Challenges in the Next
Millenium in Malaysia. Bangi: Environmental Management Programme, UKM.
Sanvido, V. E., Grobler, F., Parfitt, K., Guvenis, M., & Coyle, M. (1992). Critical
Success Factors for Construction Projects. Jounal of Construction Engineering
and Management, 118(1), 94-111.
SANZ (Sustainable Aotearoa New Zealand Inc) (2009) Strong Sustainability for New
Zealand, New Zealand, Nakedize Limited Publication. Available online:
http://nz.phase2.org/strong-sustainability-for-new-zealand
Sappe, R. (2007). Project management solutions for building owners and developers.
Building, 101(4), 22-22.
Sarantakos, S. (1998). Social Research (2nd
ed.). Melbourne: McMillan Education
Australia.
Sayce, S., Walker, A., & McIntosh, A. (2004). Building Sustainability in the Balance:
Promoting Stakeholder Dialogue. London: Estate Gazette.
Schimschar, S., Blok, K., Boermans, T., & Hermelink, A. (2011). Germany's Path
Towards Nearly Zero Energy Buildings-Enabling the Greenhouse Gas
Mitigation Potential in the Building Stock. Energy Policy, 39(6), 3346-3360.
Schumann, B. (2010). Impact of Sustainability on Property Value. Unpublished
Master's Thesis, University of Regenburg, Regenburg.
Sekaran, U. (2000). Research Methods for Business: A Skill-Building Approach (3rd
ed.). United States of America: John Wiley and Sons, Inc.
Sekaran, U., & Bougie, R. (2009). Research methods for bussiness: a skill building
approach (5th ed.). United Kingdom: John Wiley and Sons Ltd.
Sev, A. (2009). How can the Construction Industry Contribute to Sustainable
Development? A Conceptual Framework. Sustainable Development, 17, 161-
173.
Shaaban, A. J., Kavvas, M. L., Faisal, M. S., & Chan, V. T. (2008). Climate Change
Modelling: The Malaysian Experience. IMPAK, pp12-13. Retrieved 12th
September 2013 from http://www.doe.gov.my.
302
Shafii, F. (2007, 3-14 December). Buildings as Energy Producers - A Case from Kuala
Lumpur. Paper presented at the UNFCC Framework Convention on Climate
Change COP 13 and CMP1, Bali, Indonesia.
Shafii, F., Arman Ali, Z., & Othmen, M. Z. (2006, 5-6 September 2006). Achieving
Sustainable Construction in the Developing Countries of Southeast Asia Paper
presented at the 6th Asia-Pacific Structural Engineering and Construction
Conference (APSEC 2006), Kuala Lumpur, Malaysia.
Shafii, F., & Othman, M. Z. (2005, 11-13 April 2005). Sustainable Building and
Construction in South-East Asia. Paper presented at the Sustainable Building
South-East Asia, Kuala Lumpur, Malaysia.
Sham, S. (1993). Environment and Development in Malaysia: Changing Concerns and
Approaches. Malaysia: Institute of Strategic and International Studies (ISI).
Shari, Z. (2011). Development of a Sustainability Assessment Framework for Malaysian
Office Buildings Using a Mixed-Methods Approach. Unpublished PHD Thesis,
The University of Adelaide, Adelaide.
Smith, A. (2003). Building Momentum: National Trends and Prospects for High
Performance Green Buildings., from
www.usgbc.org Docs Resources 04 00 hpgb whitepaper.pdf
Smith, T. M., Fischlein, M., Suh, S., & Huelman, P. (2006). Green Building Rating
Systems: A Comparison of the LEED and GREEN GLOBES systems in the US.
Retrieved 11th October, 2011, from
http://www.thegbi.org/gbi/Green_Building_Rating_UofM.pdf
Songer, A. D., Molenaar, K. R., & Robinson, G. D. (1996). Selection Factors and
Success Criteria for Design-build in the US and UK. Jounal of Construction
Procurement, 2(2), 69-82.
Sonny, N., Chaharbaghi, K., & Boyd, D. (2009). Sustainable Development in Sub-
Saharan Africa: Issues of Knowledge Development and Agenda Setting.
International Journal of Development Issues, 8(2), 119-133.
Stakeholder Forum, & CAFOD. (2013). Post-2015 Development Agenda: Realising the
convergence of the Post-MDG and SDG decision-making processes. Retrieved
12th March, 2014, from http://www.stakeholderforum.org/fileadmin/files/Post-
2015_Development_Agenda_Convergence.pdf
303
St. John, A. (1992). The sourcebook for sustainable design: A guide to environmentally
responsible building materials and processes. Boston: Architects for Social
Responsibility.
Stansfield, K. (2001). Setting a new agenda for sustainable construction Structural
Engineer, 79(12), 14-15.
StatSoft (2003). Principal Components and Factor Analysis. Retrieved 30th May,
2012, from http://www.statsoft.com/Textbook/Principal-Components-Factor-
Analysis
SURIA 1000. (2009). What is SURIA 1000 Programme? Retrieved 19th September
2013, from
http://www.mbipv.net.my/dload/Suria%201000%20application_FINAL%20call.
Syal, M. G., Grobler, F., Willenbrock, J. H., & Parfitti, M. K. (1992). Construction
Project Planning Process Model For Small-Medium Builders. Construction
Engineering and Management, 118(4), 651-666.
Tam, C. M., Deng, Z. M., Zeng, S. X., & Ho, C. S. (2000). Quest for Continous Quality
Improvement for Public Housing Construction in Hong Kong. Journal of
Construction Management and Economics vol. 18(4), 437-446.
Tam, V. W. Y., Tam, C. M., & Ng, W. C. Y. (2007). On Prefabrication Implementation
for Different Project Types and Procurement Methods in Hong Kong. Journal of
Engineering, Design and Technology 5(1), 68-80.
Tan, L. M. (2009). The Development of GBI Malaysia. Retrieved 2nd March, 2012,
from
http://www.greenbuildingindex.org/Resources/GBI%20Documents/20090423%
20-%20The%20Development%20of%20GBI%20Malaysia.pdf
Tanarimba. (2010). Tanarimba Project Development. Retrieved 19th September, 2010,
from http://tanarimba.com.my.
Taylor, S. (2003, 10 Feb. 2003). The human resource side of sustainability, Presentation
at Portland State University.
Teijlingen, E. R. V., & Hundley, V. (2001). The Importance of Pilot Studies. Social
Research Update, Winter 2001(35). Retrieved 15th May 2012 from
http://sru.soc.surrey.ac.uk/SRU35.html
304
Terio, O., & Kahkonen, K. (2011). Developing and implementing environmental
management systems for small and medium-sized construction enterprises.
Constrction Management and Economics, 29(12), 1183-1195.
Thabane, L., Ma, J., Chu, R., Cheng, J., Ismaila, A., Rios, L. P., et al. (2010). A Tutorial
on Pilot Studies: The What, Why and How. Medical Research Methodology,
10(1).
The Economist. (2004). The rise of green building. The Economist, 373, Special section
17-23.
The Edge Property. com. (2010). The Edge Top Property Developers Awards 2010.
Retrieved 23rd January 2011 from http://www.theedgeproperty.com/
The State of Minnesota. (2009). The State of Minnesota Sustainable Building
Guidelines Version 2.1. Retrieved 2nd August, 2011, from
http://www.msbg.umn.edu/guidelines.html.
Thyer, B. A. (1993). Single-Systems Research Design. In R. M. Grinnell (Ed.), Social
Work Research and Evaluation (4th Ed ed.). Illinois, F.E: Peacock Publishers.
Todd, J. A., Crawley, D., Geissler, S., & Lindsey, G. (2001). Comparative Assessment
of Environmental Performance Tools and the Role of the Green Building
Challenge. Building Research and Information, 29(5), 324-335.
Torbica, Z. M., & Stroh, R. C. (2001). Customer Satisfaction in Home Building.
Journal of Construction Engineering and Management, 127(1), 82-86.
Ugwu, O. O., & Chaupt, T. (2005). Key Performance Indicators for Infrastructure
Sustainability – A Comparative Study between Hong Kong and South Africa.
Journal of Engineering, Design and Technology, 3(1), 30-43.
UNDP. (2011). Millenium Development Goals. Retrieved 10th July, 2011, from
http://www.undp.org/content/undp/en/home/mdgoverview/
UNFCC. (2013a). First steps to a safer future: Introducing The United Nations
Framework Convention on Climate Change. Retrieved 8th July, 2013, from
http://unfccc.int/key_steps/the_convention/items/6036.php
UNFCC. (2013b). Kyoto Protocol. Retrieved 8th July, 2013, from
http://unfccc.int/kyoto_protocol/items/2830.php
305
United Nations. (1992a). Agenda 21. United Nations Conference on Environment and
Development (The Earth Summit) Retrieved 1st April 2011, 2011, from
http://www.un.org/esa/sustdev/documents/agenda21/index.htm
United Nations. (1992b). Rio Declaration on Environment and Development: Report of
The United Nations Conference on Environment and Development. Retrieved
1st April, 2011, from http://www.un.org/documents/ga/conf151/aconf15126-
1annex1.htm
United Nations. (2000). United Nations Millenium Declaration. General Assembly
Resolution 55/2. Retrieved 10th July 2011, 2013, from
http://www.un.org/millenium/declaration/ares552e.pdf
United Nations. (2002). Report of the World Summit on Sustainable Development:
Johannesburg Plan of Implementation (26 August – 4 September 2002).
Retrieved 1 st April, 2011, from
http://www.unmilleniumproject.org/documents/131302_wssd_report_reissued.p
df
United Nations. (2012). The Future We Want. Retrieved 12th March 2014, from
http://www.uncsd2012.org/content/documents/727The%20Future%20We%20W
ant%2019%20June%201230pm.pdf
United Nations. (2013). Post-2015 Development Agenda: Realising the convergence of
the Post-MDG and SDG decision-making processes Retrieved 12th March,
2014, from http://www.stakeholderforum.org/fileadmin/files/Post-
2015_Development_Agenda_Convergence.pdf
US Department of Health and Human Services. (2008). Sustainable Buildings
Implementation Plan. Retrieved 3rd December, 2010, from
http://www.hhs.gov/about/sustainability
USGBC. (2003). Building Momentum: National trends and Prospects for High-
performance Green Buildings: A Report Prepared for the U.S Senate Committee
on Environment and Public Works. Retrieved 1st August, 2010, from
http://www.usgbc.org/Docs/Resources/043003_hpgb_whitepaper.pdf
USGBC (2006a). Building a greener future. Special advertising section in partnership
with Fortune. Fortune, March 20, S2-S14. Retrieved 1st August 2010, from
http://www.usgbc.org
306
USGBC. (2006b). Project Profile: Fossil Ridge High School. Fort Collins, Colorado.
USGBC 2006 Case Studies. Retrieved 1st August 2010
from http://www.usgbc.org/DisplayPage.aspx?CMSPageID=75&
USGBC. (2009). LEED 2009 for New Construction and Major Renovations. Retrieved
16 July 2013, from
http://www.usgbc.org/sites/default/files/LEED%202009%20RS_NC_04.01.13_c
urrent.pdf
USGBC. (2013). LEED Rating Systems. Retrieved 16th July 2013, from
http://www.usgbc.org/leed/rating-systems
Vun, L. W., Latif, A., & Nordin, M. (2004). Review of Ecological Input in Preliminary
EIAs for Coastal Resort Development Projects in Malaysia. Journal of
Environmental Assessment Policy and Management, 6(3), 385-401.
Wateridge, J. (1995). IT projects: a basis for success. International Journal of Project
Management, 13(3), 169-172.
WCED. (1987). Our Common Future. Oxford United Kingdom: Oxford University
Press.
Wilson, A. (2000). Building Materials: What Makes a Product Green? Retrieved 3rd
Septermber, 2010, from http://www.BuildingGreen.com
World Bank. (1992). World Development Report 1992: Development and The
Environment. Washington, D.C: The World Bank.
Wu, P., & Low, S. P. (2010). Project Management and Green Buildings: Lesson from
the Rating Systems. Journal of Professional Issues in Engineering Education
and Practice, 136(2), 64-67.
Yates, A. (2001). Quantifying the bussiness benefits of sustainable buildings: Summary
of existing research findings. Walford, UK: Building Research Establishment,
Centre for Sustainable Construction.
Yin, R. K. (1994). Case Study Research: Design and Methods (2nd Edn ed.). United
States of America: Sage Publications Inc.
Yoong, Y. (2008). Pusat Tenaga Malaysia's ZERO Energy Office. futurarc, 2011.
307
Yudelson, J. (2009). Green Building through Integrated Design. United States: Mc
Graw Hill Companies.
Zainul Abidin, N. (2009). Sustainable Construction in Malaysia - Developers’
Awareness. World Academy of Science, Engineering and Technology, 53, 807-
814.
Zainul Abidin, N. (2010a). Environmental Concerns in Malaysian Construction
Industry. Pulau Pinang, Malaysia: Universiti Sains Malaysia.
Zainul Abidin, N. (2010b). Investigating the Awareness and Application of Sustainable
Construction Concept by Malaysian Developers. Habitat International, 34,421-
426.
Zainul Abidin, N., & Pasquire, C. L. (2007). Revolutionize Value Management: A
Mode Towards Sustainability. International Journal of Project Management,
25, 275-282.
Zavrl, M. S., Zarnic, R., & Selih, J. (2009). Multicriteria Sustainability Assessment of
Residential Buildings. Technological and Economic Development of Economic,
15(4), 612-630.
Zimmerman, M., Althaus, H. J., & Haas, A. (2005). Benchmarks for Sustainable
Construction: A Contribution to Develop a Standard. Energy and Buildings, 37,
1147-1157.
Zwikael, O. (2009). Critical Planning Processes in Construction Projects. Construction
Innovation 9(4), 372-387
Zwikael, O., Shimizu, K., & Globerson, S. (2005). Cultural differences in project
management processes: a field study. International Journal of Project
Management, 23(6), 454-462.