REFERENCES - Information and Library Network...
Transcript of REFERENCES - Information and Library Network...
122
REFERENCES
1. Al-Hussein, M. (1995). “A Computer integrated system for crane selection for
high-rise building construction.” M.A.Sc. thesis, Centre For Building Studies,
Concordia University.
2. Al-Hussein, M., Athar Niaz, M., Yu, H., and Kim, H. (2005). “Integrating 3D
visualization and simulation for tower crane operations on construction
sites.” Automation in Construction, 15(5), 554-562.
3. Al-Hussein, M., Alkass, S., and Moselhi, O. (2005). “Optimization Algorithm for
Selection and on Site Location of Mobile Cranes.” Journal of Construction
Engineering and Management, 131(5), 579-590.
4. Alkass, S., Alhussein, M., and Moselhi. (1997). “Computerized crane selection
for construction projects.” In: Stephenson, P (Ed.), Proceedings 13th Annual
ARCOM Conference, 15-17, Cambridge, UK. Association of Researchers in
Construction Management, Vol. 2, 427–36.
5. Al-Tabtabai, H.M., Kartam, N.I., Flood, I., and Alex, P., Alex. (1997).
“Construction Project Control Using Artificial Neural Networks.” Journal of
Artificial Intelligence for Engineering Design, Analysis and Manufacturing.
6. Albert, Chan, P.C., Daniel, Chan, W.M., and John Yeung, F.Y. (2008). Overview
of the Application of “Fuzzy Techniques in Construction Management
Research.” Journal of Construction Engineering And Management, ASCE.
7. Aviad Shapira, And Marat Goldenberg. (2007). “Soft Considerations in
Equipment Selection for Building Construction Projects.” Journal Of
Construction And Management.” ASCE.
8. André, M., and Sawhney, A. (2001). “IntelliCranes: an integrated crane type and
model selection system.” Construction Management & Economics, 19(2), 227-
237.
9. Ayyub, B.M., and Haldar, A. (1985). “Decision in Construction Operations.”
Journal of Construction Engineering and Management, ASCE, 111(4), 343-357.
10. Bansal, V. K., and Pal, M. (2007). “Potential of geographic information systems
in building cost estimation and visualization.” Automation in Construction, 16(3),
311-322.
123
11. Bansal, V. K., and Pal, M. (2009). “Construction schedule review in GIS with a
navigable 3D animation of project activities.” International Journal of Project
Management, 27(5), 532-542.
12. Bhaskar, V., Prakash, D., Eswar, K., and Kumar ,V.S.S. (2001). “An Effective
Safety Program in Construction Industry.’’ Proc. Of National Conference on
Disaster Prevention Mitigation and Management, Hyderabad, India.
13. Belton, V. and Gear, T. (1983). “On a Short-coming of Saaty's Method of
Analytic Hierarchies”. Omega, 228-230.
14. Beavers, J. E., Moore, J. R., Rinehart, R., and Schriver, W. R. (2006) “Crane-
Related Fatalities in the Construction Industry.”
15. Bellman, R.E., and Zadeh, L.A. (1970). “Decision making in a fuzzy
environment.” Management Science, 17, 141 – 164.
16. Blockly, D. I. (1979). "The Role of Fuzzy Sets in Civil Engineering." Fuzzy Sets
and Systems, 2, North Holland Publishing Co., Amsterdam, The Netherlands, 267
- 278.
17. Bortolan, G., and Degani, R. (1985). “A review of some methods for ranking
fuzzy subsets.” Fuzzy Sets and Systems, 15:1–20.
18. Choobineh, F., and Li, H. (1993). “Ranking fuzzy multi criteria alternatives with
respect to a decision maker’s fuzzy goal.” Information Science, 72, 143 – 155
19. Chen, S.H. (1986). “Ranking fuzzy numbers with maximizing set and minimizing
set.” Fuzzy Sets and Systems, 17:113–130.
20. Change, P.T., and Lee, E.S. (1999).“Fuzzy decision networks and deconvolution.”
Computers and Mathematics with Applications, 37, 53-63.
21. Chen, S.J., and Hwang, C.I. (1992). “Fuzzy multiple attribute decision making
methods and applications.” Springer, Berlin.
22. Choi, C. W., and Harris, F. C. (1991). “A model for determining optimum crane
position.” ICE Proc., 90(3), 627–634.
23. Chalabi, A, F. and Yandow, C. (1989). “An expert system for optimal tower
crane selection and placement.” Proceedings of the 6th
Conference on Computing
in Civil Engineering. P. 290 - 297.
124
24. Dombi, J. (1990). “Membership function as an evaluation.” Fuzzy sets and
Systems, Vol. 35 (1), pp. 1-21. Dong, W., and Shah, H. (1987). “Vertex Method
for computing functions of fuzzy variables.” Fuzzy Sets Sys., vol. 24, PP. 65-78.
25. Dong, W., Shah, H. and Wong, F. (1985). “Fuzzy computations in risk and
decision analysis.” Fuzzy Sets Sys., vol. 2, PP. 201-208.
26. Dubois, D., and Prade, H. (2000). “Fundamentals of fuzzy sets, in: The
Handbooks of Fuzzy Sets.” vol. 7, Kluwer Academic
27. Dickie, D. E. (1990). "Crane Handbook." Construction Safety association of
Ontario, 1-304.
28. Dicleman, B. ( 2002). “Selecting a tower crane.” Cranes Today, 327, 31. Dun &
Bradstreet D&B, (2003). “Dun’s 100. Construction, Development and
infrastructure companies.” Israel.
29. Dubois, D., and Prade, H. (1985). “Possibility theory: an approach to
computerized processing of uncertainty.” Plenum Press: New York.
30. Dubois, D., Gargier, H., and Prade, H. (1996). “Refinements of the maximum
approach to decision making in a fuzzy environment.” Fuzzy Sets and Systems,
81, 103 – 122.
31. Dombi, J. (1982). “A general class of fuzzy operators, the DeMorgan class of
fuzzy operators and fuzziness measures induced by fuzzy operators.” Fuzzy Sets
and Systems, 8:149–163.
32. Dombi, J. (1982). “Basic concepts for a theory of evaluation: The aggregative
operator.” EJOR, 10:282–293.
33. Dombi, J. (1990). “Membership function as an evaluation.” Fuzzy sets and
Systems, Vol. 35 (1), pp. 1-21.
34. Dubois, D., and Prade, H. (1980). “Fuzzy sets and systems, theory and
applications, Academic.” New York.
35. Eshwar, K., Rao, L.S., and Kumar, V.S.S. (2003). “Intelligent Planning for Bridge
Construction using Fuzzy Set Theory.” Proc. of International Conference on
Innovations in Planning, Design, and Techniques in Bridge
Engineering, Hyderabad, India, 655-667.
125
36. Evangelos Triantaphyllou., And Alfonso Sanchez.(1997). “A Sensitivity Analysis
approach For Some Deterministic Multi-Critiria Decision Making Methods.”
Decision Sciences Vol 28.
37. Excon, (2007). “Proceedings of the 4th Construction Equipment and Construction
Technology Trade Fair.”
38. Emsley, M. W. (1992), “Discussion on a model for the selection of the optimum
crane for construction sites.” Proc., Instn. Civ. Engrs., Struct. and Buildings, 94,
503–504.
39. Fattah Chalabi, A. (1989). "Crane, An Expert System for Optional Tower Crane
Selection and Placement." Sixth Conference on Computing in Civil Engineering.
40. Furusaka, S. and Gray, C., (1984). “A module for the selection of the optimum
crane for construction sites, Construction Management and Economics.” 2, 157-
176.
41. Farrell, C. W., and Hover, K. C. (1989). ‘‘Computerized crane selection and
placement for the construction site.’’ Proc., 4th Int. Conf. on Civil and Structural
Engineering Computing: Microcomputers to Supercomputers, ASCE, City
University, London, U.K., Vol. 1, 91–94.
42. Gray, C., and Little, J. (1985). "A Systematic Approach to the Selection of an
Appropriate Crane for a Construction Site." Construction Management and
Economics, 3, 121-144.
43. Givens, J., and Tahani, H. (1987). “An improved method of performing fuzzy
arithmetic for computer vision.” Proceedings of north American information
processing society (NAFIPS), Purdue University, West Lafayette, IN, PP. 275-
280.
44. Hanna, A. S. (1992). "Knowledge -Based System for Crane Selection." A
technical report submitted to National Research Council of Canada, Ottawa,
Canada.
45. Hersh, H. M., Caramazza, A., and Brownell, H.H. (1979). “Effects of Context on
Fuzzy Membership Functions.” in: M. M. Gupta, R. K. Ragade, R. R. Yager:
Advances in Fuzzy Set Theory and Applications. North-Holland.
46. Hanna, A.S. (1994). "Selectcrane: An Expert System for Optimum Crane
Selection." Proc., 1st Congress on Computing in Civil Engineering., Washington
DC, 958-963.
126
47. Hakkinen, K. (1993). “Crane accidents and their prevention revisited.” Safety
Science, 16(2), 267-277.
48. Hwang, C. L., and Yoon, K. (1981). “Multiple Attribute Decision Making
Methods and Applications.” A State of the Art Survey, Springer-Verlag, Berlin,
Heidelberg, New York.
49. Hwang. (1981). “An Intelligent Multi-Criteria Decision Support System for
Systems Design.” American institute of aeronautics and astronutics.
50. Hwang, C.-L., Masud, A. S. (1979). “Multiple Objective. Decision Making -
Methods and Applications.” Lecture Notes in Economics and Mathemetical.
Systems 164.
51. Han, S., Al-Hussein, M., Al-Jibouri, S., and Yu, H. (2012). “Automated post-
simulation visualization of modular building production assembly line.”
Automation in Construction, 21, 229-236.
52. Hung-Lin Chi.and Shih-Chung Kang.(2010).” A physics-based simulation
approach for cooperative erection activities” Dept. of Civil Engineering,
National Taiwan University, Taipei City 10617, Taiwan
53. Javier Irizarry., And Ebrahim, Karan, P. (2012). “Optimization Location Of
Tower Cranes On Construction Sites Through Gis and Bim Integration.” Journal
of information technology in construction. (ITcon).
54. Kandel, A. (1986). “Fuzzy Mathematical Techniques with Applications.”
Adisson-Wesley: Reading, M.A.
55. Kaufmann, A., and Gupta, M.M. (1988). “Fuzzy mathematical models in
engineering and management science.” North – Holland: Amsterdam.
56. Klir, G., and Yuan, B. (1995). “Fuzzy set and fuzzy logic: theory and
applications.” Prentice Hall PTR, Upper Saddle River, NJ.
57. Kumar, V.S.S., Eshwar, K., and Rao, A.R.M. (2002). “Risk management in
Construction Industry.” Proceedings of Fifth National Conference on
Construction – The way Ahead, New Delhi, India, 43-47.
58. Kumar, V.S.S., Eshwar, K., Prakash, D., and Ravi Kumar, K. (2006). “Decision
Making for Contractor Prequalification using Information Technology.”
Proceedings of the World Conference on IT.
127
59. Kumar, V.S.S., Mukesh Sharma.,Vikram, B., And Prakash, D. (2010) “Current
Safety Practices In Construction Industry.” ASCE.
60. Karl A. Raynar, and Gary R. Smith, (1993) “Intelligent positioning of mobile
crane for steel erection.” Microcomputers in Civil Engineering, 8, 67-74.
61. Kondel, A., (1986). “Fuzzy mathematical techniques with applications.” Addison
Wesley: Reading, MA.
62. Kang, S., and Miranda, E. (2008). “Computational Methods for Coordinating
Multiple Construction Cranes.” Journal of Computing in Civil Engineering, 22(4),
252-263.
63. Lai, Y.J., and Hwang, C.L. (1994). “Fuzzy multiple objective decision making
methods and applications.” 404, Springer – Verlag: Berlin.
64. Lootsma, F.A. (1997). “Fuzzy Logic for Planning and Decision Making.” Kluwer
Academic Publishers: Dordrecht/Boston/London.
65. Leung, W.T., And Tam, C.M. (1999). “Models For Assessing Hoisting Times Of
Tower Crane.” Journal of construction and management. ASCE.
66. Lawrence, K., Shapiro., And Jay, P., Shapiro.(2010). “Cranes And Derricks.”
Fourth Edition.
67. Liberling, H. (1981). “On finding compromise solutions in multi criteria problems
using the fuzzy min – operator.” Fuzzy Sets and Systems, 6, 105 – 118.
68. Li, H., and Love, P. E. D. (1998). “Site-level facilities layout using genetic
algorithms.” Journal of Computing in Civil Engineering. 12(4), 227-231.
69. Lee, C.C. (1990). “Fuzzy logic in control Systems: fuzzy logic controller.” part
(I), IEEE Trans, Systems Man Cybernet, 20: 404-418.
70. Meehan, J. (2005). “Computerize to organic.” Cranes Today, 369, 50, North
Cascade Industrial NCI, 2006. “Compu-Crane CSPS/LPS: Crane selection and
lift planning software.” Seattle.
71. Maiers, J. and Sherif, Y.S. (1985). “Applications of fuzzy set theory.” IEEE
Transactions on Systems, Man and Cybernetics, 15(1), 175-189.
72. Mac Crimmon. (1973). “Multi criteria decision analysis.” university of south
Carolina pres.
128
73. Peurifoy, R.L., and Schexnayder, C.J. (2002). “Construction Planning,
Equipment, and Methods.” Sixth Edition, Tata McGraw-Hill Publishing Co. Ltd.
74. Philip, M., Mahadevan, N., and Varghese, K. (1997). “Optimization of
Construction Site Layout - A Genetic Algorithm Approach.” Proc., 4th
Congress
Held in Conjunction with A/E/C Systems, ASCE, 710-717.
75. Peurifoy, R. L., Schexnayder, C. J., and Shapira, A. (2006). “Construction
planning, equipment, and methods”, 7th Ed., McGraw-Hill, Boston.
76. Rodriguez-Ramos, W. E., and Francis, R. L. (1983). “Single crane location
optimization”, Journal of Construction Engineering and Management, 109(4),
387-397.
77. Ross, J.T. (1997). “Fuzzy Logic with Engineering Applications.” McGraw Hill
International Edition, New Delhi, India.
78. Ringen, K., and Stafford, E. J. (1996). “Intervention research in occupational
safety and health: examples from construction.” American Journal of Industrial
Medicine April 29, (4):314-20.
79. Roman. (2004). “Quantum computation of fuzzy numbers.” International Journal
of Theoretical Physics, issue 12, vol.50, pp.3635 - 3645.
80. Sabah Alkass., Mohamed Alhussein., And Osama Moselhi. (1997). “13 th annual
ERCOM conference.” Cambridge.
81. Sawhney, and Andre Mund. (2001). “Abstract: The importance of the utilization
of cranes in Construction Management & Economics.”
82. Shapiro, H. I., Shapiro, J. P., and Shapiro, L. K.(1991). “Cranes and derricks”.
2nd Ed., McGraw-Hill, New York.
83. Shapira, A., And Glascock, J.D. (1996). “Culture of using Mobile Cranes for
Building Construction.” Journal of Constr. Engg. and Mgmt., ASCE, 122(4)
298-307.
84. Shapira A, Luncko and Schexnayder. C. (2007). “Crane for Building Construction
Project.”
85. Sabah Alkass, Mohamed Alhussein, and Osama Moselhi. (1997). “Computerized
Crane Selection For Construction Projects.” School For Building, Concordia
University, Montreal Canada.
129
86. Sang Hyeok Han., Shaful Hasan., Mohd Al-Hussain., Kamil Umut Gokce, And
Ahmed Bouferguene. (2012). “Simulation Of Mobile Crane Operations In 3D
Space.” Winter Simulation conference, Canada.
87. Sebt, M. H., Parvaresh Karan, E., Delavar ,M. R. (2008). “Potential Application
of GIS to Layout of Construction Temporary Facilities.” International journal of
civil engineering, vol 6, no.4.
88. Schriver, W. R., and Cressler, T. E. (1991-2002). “An Analysis of Fatal Events in
the Construction Industry.” Prepared for Office of Statistics, Occupational Safety
and Health Administration, U.S. Department of Labor by Construction Industry
Research and Policy Center, University of Tennessee, 1991 through 2002.
89. Saaty, T.L. (1980). “The Analytic Hierarchy Process”. New York: McGraw Hill.
International, Translated to Russian, Portuguese, and Chinese, Revised editions,
Pittsburgh: RWS Publications.
90. Saaty, T.L. (1994). “How to make a decision: the analytic hierarchy process”,
Interfaces, Vol. 24, No. 6, pp.19–43.
91. Sen, P., Yang, J.-B. (1998). “Multiple Criteria Decision Support in Engineering
Design.” Springer Verlag, Berlin, Heidelberg, New York, London.
92. Sugeno, M. (1985). “An introductory survey of fuzzy control.” Inf Sci 36:59–83.
93. Triantaphyllou, E., Shu, B., Nieto Sanchez., And Ray, T. (1998). “Encyclpedia Of
Electrical and Electronics Engineering.” J.G.Webste, Ed. NY.
94. Tam, C., and Tong, T. (2003). “GA-ANN model for optimizing the locations of
tower crane and supply points for high-rise public housing construction.”
Construction Management and Economics, 21 (3), 257-266.
95. Tantisevi, K. and Akinci, B. (2008). “ Simulation-Based Identification of Possible
locations for Mobile Cranes on Construction Sites.” Journal of Computing in
Civil Engineering, 22 (1), 21-30.
96. Wang, K.H., Chi, J. H., and Wan, E.H. (1993). “Decision making of project under
fuzzy information.” Journal of Chinese Institute of Engineers, 16, 533 – 541.
97. Warszawski, A. (1990). “Expert system for crane selection construction.” Man
and Economics, 8, 179-190.
98. Wang, K.H., Chi, J. H., and Wan, E.H. (1993). “Decision making of project under
fuzzy information.” Journal of Chinese Institute of Engineers, 16, 533 – 541.
130
99. Wu, Di., Lin, Y., Wang, X., and Gao, S. (2011). “Algorithm of Crane Selection
for Heavy Lifts.” Journal of Computing in Civil Engineering.
100. Wijesundera, and Haris. (1986). “Using expert systems in Construction.”
Construction Computing PP 14-17.
101. Yager, R.R., "A Characterization of the Extension Principle." Fuzzy Sets and
Systems 18, 205-217, 1986.
102. Zadeh, L. A. (1965). "Fuzzy Sets." Information and Control, 8, 338-353.
103. Zadeh, L.A. (1972). “A fuzzy set theoretic interpretation of linguistic hedges.”
Journal of Cybernetics, 2:4–34.
104. Zadeh, L. (1975). “The concept of a linguistic variable and its application to
approximate reasoning.” Part I. Inf Sci., 8, 199-249.
105. Zeleny, M. (1982). “Multiple criteria decision making.” McGraw Hill, New York,
U.S.A.
106. Zimmerman, H.J. (1983). “Using fuzzy sets in operational research.” European
Journal of Operational Research, 13(3), 201-216.
107. Zimmerman, H.J. (1987). “Fuzzy set theory – and its applications.” 2nd edition,
Kluwer Academic Publishers, Boston, MA.
108. Zimmermann, H.J. (1991). “Fuzzy Set Theory and Its Applications.” - 2nd edition
Allied Publishers, New Delhi, 1991
109. Zimmerman, H-J. (1996). “Fuzzy set theory.” Kluwer, Academic Publisher,
Boston Mass, Chapter 1, pp. 1-8.
110. Zhang, P., Harris, F.C., Olomollaiye, P.O., And Holt, G.D. (1999). “Location
Optimization For A Group Cranes.” Journal of construction and management.
ASCE.
111. Zhang, P., Harris, F., and Olomolaiye, P. (1996). “A computer‐based model for
optimizing the location of a single tower crane.” Building research and
information, 24(2), 113-123.
112. Zhong, D., Li, J., Zhu, H., and Song, L.(2004). “Geographic information
system-based visual simulation methodology and its application in concrete dam
construction processes.” Journal of Construction Engineering and Management,
130(5), 742-750.