References all over the world! HV/MV Transformers …€¦ · HV/MV Transformers Services Range ......

3
HV/MV Transformers Services Range Make the most of your energy Medium Power Transformers - Oil Distribution Transformers - Cast Resin Transformers MULTIBRAND service catalogue Optimize every transformer’s performance! Schneider Electric helps you get the most of your equipment and installations Installation & Commissioning Technical Training Installation Assessment On-Demand Maintenance Modernization Services Maintenance contract End-of-life PE90586 PE90586 PE90586 PE90586 References all over the world! As standards, specifications and designs change from time to time, please ask for confirmation of the information given in this publication. Publishing: SYNTHESE ECA, Schneider Electric. Photos: Schneider Electric 03/2013 SERED111097EN Schneider Electric Industries SAS Head Office 35, rue Joseph Monier CS 30323 92506 Rueil-Malmaison www.schneider-electric.com ECOFIT centres Factories and Workshops dedicated to transformer services

Transcript of References all over the world! HV/MV Transformers …€¦ · HV/MV Transformers Services Range ......

HV/MV TransformersServices Range

Make the most of your energy

Medium Power Transformers - Oil Distribution Transformers - Cast Resin TransformersMULTIBRAND service catalogue

Optimize every transformer’s performance!

Schneider Electric helps you get the most of your equipment and installations

Installation &Commissioning

Technical Training

InstallationAssessment

On-DemandMaintenance

Modernization

ServicesMaintenancecontract

End-of-life

PE

9058

6

PE

9058

6

PE

9058

6

PE

9058

6

References all over the world!

As standards, specifications and designs change from time to time, please ask for confirmation of the information given in this publication.

Publishing: SYNTHESE ECA, Schneider Electric.Photos: Schneider Electric

03/2013SERED111097EN

Schneider Electric Industries SASHead Office35, rue Joseph MonierCS 3032392506 Rueil-Malmaisonwww.schneider-electric.com

ECOFIT centres Factories and Workshops dedicated to transformer services

A real opportunity

The differentiating factors

• Peace of mind for every transformer installation.• Periodic actions focused on maintenance operations to maximize equipment’s service life.• Schneider Electric gives added value to high- and medium-voltage transformer services (including

non Schneider Electric transformers).• Ability to include transformers in global electrical distribution service maintenance contracts.

• The experience of a world leader in Low- & Medium-Voltage electrical distribution installations

Schneider Electric has been manufacturing LV and MV products for more than 50 years and its installed base comprises thousands of millions of products and devices.The Schneider Electric brand is known worldwide and recognized by the most demanding customers.

• True capability for handling every transformer of whatever brand

► COFRAC oil analysis labsCOFRAC accreditation, obtained in 2004, is an assurance given to a customer that the Schneider Electric analysis laboratory has the necessary human and technical resources to provide reliable and reproducible results. The accreditation reflects impartiality and competence.

• High-end capabilities for transformer services

► The "Pro Relay Box" especially designed to combine efficiency and reliability

A perfect mobile "test bench", the "Pro Relay Box" can be used to check the smooth running of 3 functions (gaseous release - pressure - temperature) of the protection relay (DGPT2, DMCR and RIS) of any oil distribution transformer. It is the only box which has been specifically designed with the designers of thoses relays. It therefore has no equivalent anywhere.

• Reactivity: Local support all over the world.There are always Schneider Electric people close to you: 6200 Services people in more than 88 countries!

• Quality certified ISO 9001

• Compliance with international standards such as IEC 60076 and IEC 60422

• Reproducibility and traceabilityAll Schneider Electric operations on every site and all equipment worldwide are systematically carried out according to the same processes, systematically classified and always available online whenever needed.

Service continuity Lifetime optimizationSafety Immediate return on investment

Note: After each analysis, all the collected information is safely recorded to improve the knowledge of every installation and carry out the necessary predictive maintenance actions "just in time".

... And many other analyses available, such as passivator content, interfacial tension, metal assays, etc.

4 "Packs*" available...• Pack 1Objective: To know the dielectric quality level. To characterize the level of quality of the liquid dielectric influencing the transformer’s efficiency (breakdown voltage, water content, acidity, colour index and appearance).

• Pack 2+ (Pack 1 and measurement of dissolved gases)Objective: To characterize internal fault properties (dissolved gases) for enhanced prevention of electrical or thermal problems.

• Pack 3 (Pack 2+ + furan derivatives)Objective: To check the solid insulation performance in order to pre-empt damage at the coil level (furan derivatives).

• Pack 4 (Pack 3 + particle counting + tangent delta and resistivity)Objective: To perform a complete check-up on the transformer (dissolved gases, thermal emission), characterize elements in suspension and the polar compounds of the dielectric for maximum safety.

* For transformers with inhibited oil inside, measurement of the inhibitor content must be added to the pack chosen.

Zero point (1 month after power up)

Normal operation Upon a fault

MV transformersNormal importance

Pack 2+ (every 2 years)

Pack 3

HV transformersStrategic importance

Pack 2+ Pack 3 (every year)

Pack 3

HV transformers Pack 2+ Pack 4 + interfacial tension (every year)

Buchholz relay tripping pack

On-load controllers (OLTC)

Pack 2+ (every 2 years)

Pack 2+ + metals assays

HV bushings Pack 2+ (every 5 years)

Instrument transformers

Pack 3 (≤ 170 kV; every 5 years> 170 kV; every 2 years)

Additional transformer services

Oil Distribution Transformers (ODT) Schneider Electric oil analysis offers

Installation and CommissioningSchneider Electric provide specialists to take care of on-site assembly operations, in full compliance with Schneider Electric procedures.

End-of-life• Recovery of regulated substances Turnkey solution for recovering toxic substances and persistent organic pollutants such as PCBs.• Maximum recycling of materials:Ferrous and non-ferrous materials (85% of the mass) are separated and cleaned and recycled.

Modernization• Factory refurbishment • Oil replenishmentwith either the original dielectric vacuum filling or with a biodegradeable alternative.

On-Demand Maintenance• Supply of spare parts Sourcing of parts guaranteed by the manufacturers. Stocking and supply of parts according to customers’ requirements.• Minor on-site repairsOn-site, Schneider Electric’s team can perform minor repairs e.g. for minor oil leaks in the tank or radiators, replacement of gaskets, replacement of protection devices, or paint work.• On-site electrical testingVerification of the equipment’s compliance with on-site standards (transformation ratios, insulation, resistance and loss values, impedance voltage, etc.).• In-house repairs and electrical testsIn Schneider Electric refurbishment facilities, complete untanking and repairs with full electrical testing range according to standards and customer requests (routine, standard and special tests).

HV/MV Transformers Services Range: a global offer adaptable locally

• Oil treatment:- Particle filtration.- Drying.- Outgassing.- Cleanup and depollution.- Oil replacement, oil recycling, PCB decontamination.

• On-site repairs- Leakages.- Painting.- Gasket replacements.- Improvement of contact resistances.- Expert appraisal.

• In-house repairs- Gasket replacements, re-painting, replacement of protection devices, inspection and cleaning of bushings, complete electrical testing, etc.

• Fan installation

• Spare parts

• On-site repairs- Painting.- Winding wedging.- Improvement of contact resistances.- Expert appraisal.

• In-house repairs- Re-painting, replacement of protection devices, inspection and cleaning of bushings, complete electrical testing, etc.

• Fan installation

• Spare parts

• Visual inspection: - Cleanliness.- Surface coating damage.- Checks for leakage.- Checks on tightening.- Oil level.- Connections and setting of protection relays. • Accessories:- Installation of surge arresters.- Locking devices on connections and housing.- Retention tank.- Cable boxes.- Silica gel replacement, etc. • Maintenance on OLTC (On Load Tap Changer)

• Visual inspection: - Cleanliness.- Surface coating damage.- Checks on tightening.- Magnetic circuit status.- Winding status.- Connections and setting of protection relays. • Accessories:- Installation of surge arresters.- IP housing.- Locking devices on connections and housing.- Cable boxes, etc.

On-Demand Maintenance and Services Maintenance Contracts

Cast Resin Transformers

Oil Immersed Transformers

Preventive Predictive Corrective

Diagnosis• Oil sampling and analysis, interpretation of results (see "ODT- Oil sampling and testing" paragraph on left page, for more explanations if needed)

• Check on hot spots:- IR thermography.- Measurement of contact resistance.- Results interpretation.

• Dielectric measurements:- Expertise and interpretation of results.

• Accessories:- Checks on sensors and temperature protection relays (Pro Relay Box).- Online transformer monitoring.- Online DGA (Dissolved Gas Analysis).

Diagnosis• Check on hot spots:- IR thermography.- Measurement of contact resistance.- Interpretation of results.

• Dielectric measurements:- Expertise appraisal and interpretation of results.

• Accessories:- Checks on sensors and temperature protection relays.- Online transformer monitoring.

Risk assessment according to environment, conditions of use, criticality.

Risk assessment according to environment, conditions of use, criticality.