Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace...

35
Redwood Heights Stage 2 Update Citizen’s Advisory Committee April 25, 2017

Transcript of Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace...

Page 1: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

Redwood Heights Stage 2 Update

Citizen’s Advisory Committee April 25, 2017

Page 2: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

Outline • Transportation Study • Utility Servicing • Biodiversity Conservation

Strategy • Outstanding Items • Timeline

Presenter
Presentation Notes
MY name is Jeff Arason and I’m the Manager, Utilities in the City’s Engineering Department, and along with my colleague, Jeff Pang, we are going to walking you through the servicing and financial strategies we have developed to date in order to realize the land use plan envisioned for this community. The processes we have undertaken are similar to those undertaken in other NCPs areas and building on the work in the Stage 1 plan. The strategies we have developed are very similar to the strategies developed for the Highway 99 Corridor which has a lot of similarities to the Redwood Area, specifically, a large area of environmentally sensitive lands.
Page 3: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

Water Servicing • Limited water infrastructure exists in the

NCP area. • Water supply will be from the Grandview

pump station and reservoir on 24 Ave / 168 St.

• To service the NCP area, new feeder mains, distribution mains and pressure zone boundaries are required.

Page 4: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

Water Servicing • Limited water infrastructure exists in the

NCP area. • Water supply will be from the Grandview

pump station and reservoir on 24 Ave / 168 St.

• To service the NCP area, new feeder mains, distribution mains and pressure zone boundaries are required.

Page 5: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

Water Servicing • Limited water infrastructure exists in the

NCP area. • Water supply will be from the Grandview

pump station and reservoir on 24 Ave / 168 St.

• To service the NCP area, new feeder mains, distribution mains and pressure zone boundaries are required.

Page 6: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

• New feeder mains are required along 24 Ave for the 142m and 110m pressure zones.

• 142m Zone is supplied by Grandview Pump

Station and Grandview Reservoir.

• 110m Zone is supplied by the Grandview Reservoir.

• 90m Zone is supplied by the 110m Zone via PRVs.

Water Servicing

Page 7: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

• No existing sanitary sewer infrastructure in the NCP area.

• To service the NCP area, a network of gravity sewers is required convey the sanitary sewer.

Sanitary Sewer Servicing

Page 8: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

• No existing sanitary sewer infrastructure in the NCP area.

• To service the NCP area, a network of gravity sewers is required convey the sanitary sewer.

Sanitary Sewer Servicing

Page 9: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

• A pump station, is then required to pump sanitary sewer from Redwood Heights and the surrounding areas

Sanitary Sewer Servicing

Presenter
Presentation Notes
The receiving sewer is known as the Grandview Heights Interceptor. The interceptor has been constructed from the west, up to 164 Street. There is a development application instream that would be required to extend the interceptor and construct both the pump station and forcemain.
Page 10: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

• The NCP area is currently serviced by open ditches and culverts, typical of rural and agricultural areas.

• The existing system conveys stormwater to the Nicomekl River lowlands, to the north.

• A servicing plan has been developed to: – Protect downstream lands from prolonged flooding – Protect receiving watercourses from erosion – Maintain base flows in creeks – Maintain water quality in creeks, ditches and storm systems – Safely convey runoff to large river systems – Protect the natural environment adjacent to watercourses

Stormwater Management

Presenter
Presentation Notes
Ditches shown in green Creeks shown in yellow and red.
Page 11: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

• 5 stormwater catchments • 4 catchments will require stormwater

detention ponds.

Stormwater Management

Presenter
Presentation Notes
While the concept of stormwater detention ponds is the same as Stage 1, the number of ponds has been reduced in order reduce construction costs, land requirements, and reduce the City’s future O&M costs.
Page 12: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

• To mitigate the increase in impervious surface runoff, infiltration measures are required, such as:

– Rain gardens;

Stormwater Management

Page 13: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

• To mitigate the increase in impervious surface runoff, infiltration measures are required, such as:

– Rain gardens; – road infiltration trenches; and

Stormwater Management

Page 14: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

• To mitigate the increase in impervious surface runoff, infiltration measures are required, such as:

– Rain gardens; – road infiltration trenches; and – absorbent lawns.

Stormwater Management

Page 15: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

Utility Infrastructure - Expenditures

Servicing Type

Stage 1 Cost Estimate

(2013)

Stage 2 Draft Cost Estimate

(2017)

Stormwater $36,240,000 $36,660,000

Sanitary Sewer $22,260,000 $11,400,000

Water $13,770,000 $11,510,000

Page 16: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

Utility Infrastructure - Revenues

Servicing Type

2017 DCC Rate RF

Estimated DCC Revenues

Stormwater $4,014 / home $10,470,000

Sanitary Sewer $2,668 / home $9,240,000

Water $2,402 / home $8,310,000

Page 17: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

Utility Infrastructure - Revenues

Servicing Type

Estimated DCC Revenues

Stage 2 Draft Cost Estimate

(2017) Total Shortfall

Stormwater $10,470,000 $36,660,000 $26,190,000

Sanitary Sewer $9,240,000 $11,400,000 $2,160,000

Water $8,310,000 $11,510,000 $3,200,000

Page 18: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

Utility Infrastructure – Financing Tools

• Establish an Area Specific DCC rate for Sanitary, Stormwater and Water infrastructure in the Redwood Heights NCP area.

• Utilize Development Works Agreements to fund any revenue shortfall.

Presenter
Presentation Notes
Area specific DCC - Similar approach introduced in Campbell Heights, Highway 99 Corridor, City Centre (for land acquisition) and West Clayton (for sanitary sewer and stormwater) DWA - Commonly used to tool to fund DCC revenue shortfall on large infrastructure investments.
Page 19: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

Engineering Servicing - Next Steps

• Complete Transportation Servicing Strategy.

• Explore opportunities for interim lower pressure connection from MV.

• Initiate design of high pressure water feeder main.

• Continue property acquisition for the sanitary sewer pump station.

• Initiate design of sanitary sewer pump station and forcemain.

• Establish Recommended Financing Tool(s)

Page 20: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

Discussion / Comments

Page 21: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

Biodiversity Conservation Strategy

Page 22: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

The Biodiversity Conservation Strategy: • Identified and quantified current

biodiversity and habitat resources in the City; and

• Established the Green Infrastructure Network (GIN) to preserve our biodiversity for the benefit of our existing and future residents.

Biodiversity Conservation Strategy

Page 23: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

Biodiversity Conservation Strategy

Ownership of the Green Infrastructure Network (acres)

Presenter
Presentation Notes
The GIN identified in the BCS is over 9,000-acres. About 2/3rds is protected, as they lands are under our control or under the control of other organizations that will not be developing these lands. Approximately 1/3rd of the GIN is held by private landowners and is subject to impact. To eliminate the impact, acquisition is advised.
Page 24: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land
Presenter
Presentation Notes
*NOTES: *ROW may includes a variety of unparcilized areas such as stream channels or Road ROW areas. **Riparian Area Setback assumes 30 meter setback from Stream CL for A and A0 Streams and 15 m Setback for B Streams by Riparian Bylaw Requirements * **Farm Trust option adjacent to Corridors with the ALR Only. Similar to Delta Farm Trust where portions of ALR properties are rented in lieu of farming practices (fallowing) or providing wildlife food functions (winter cropping for Pacific Flyway Birds)  ****NCP Land Uses include Approved or Pending NCP Land Uses such as Parks, Open Space, Landscape Buffers, and Cluster Housing etc.      
Page 25: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

Biodiversity Conservation Strategy

• Of the 625 acres of private land that are to be acquired to support the City’s Biodiversity Conservation Strategy, 40 acres are within the Redwood Heights NCP Area.

• At present, there is no Citywide funding strategy to acquire the 625 acres of private land.

Page 26: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

Biodiversity Conservation Strategy

• In 2012, based on an assumed land value of $1M / acre, a levy of $7,000 - $12,000 per home was estimated.

• Since 2012, land costs have substantially increased.

Page 27: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

Biodiversity Conservation Strategy

• Based on a value of $2M per acre, a levy in the form of a DCC has been estimated as follows:

• $28,300 per SF home

• $18,400 per townhouse (1,550 square feet)

• $15,500 per apartment (950 square feet)

Page 28: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

Discussion / Comments

Page 29: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

STAGE 2 – Other Outstanding Issues Finalize cost of “Greenspace Levy” and financing

strategy;

Prepare “Design Guidelines” for the various land uses and features such as: greenways, walkways, selected streets, neighbourhood gateways, entrance points, gathering places and buffers;

Establish list of “NCP Amenity Contributions needed to serve area including: park development, fire, police and library needs.

Establish per unit “Application Surcharge Fee” to recover NCP ‘consultant’ preparation cost.

Prepare an “Implementation Strategy” to guide the

development in keeping with the NCP's Vision, Principles and land Use Concept Plan.

Greenspace Levy

Design Guidelines

NCP Amenity Contributions

NCP Surcharge Levy

Implementation Strategy

Page 30: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

REDWOOD HEIGHTS NCP Community Amenity Contributions (CAC’s)

Amenity Type Per Dwelling Unit Contribution (Approx. 4,348 Dwelling Units @ Avg.

Density)

Per Acre Contribution (All Non-Residential Uses)

Anticipated Total Revenue (At Build-out)

Police Protection $66.59 per dwelling unit $266.36 per acre

$289,533.32 Residential $9,269.33 Non-Residential

Fire Protection $287.65 per dwelling unit $1,150.60 per acre

$1,250,702.20 Residential $40,040.89 Non-Residential

Parks & Pathway Development $1,5000.00 per dwelling unit (Residential) - TBD

N/A -TBD

$6,522,000.00 Residential -TBD

Library Materials $149.80 per dwelling unit N/A $651,330.40 Residential

Total Contributions (Per Unit) $2,004.04 Per dwelling Unit $1,416.96 Per Acre

TOTAL ANTICIPATED REVENUE $8,762,876.14 - TBD

NCP Amenity Contributions

* Contributions are payable upon subdivision for single-family subdivisions or upon issuance of building permits for multiple development and other uses.

Page 31: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

NCP Surcharge Fee REDWOOD HEIGHTS NCP

Cost Recovery of NCP Preparation (Surcharge)

CONSULTANT STUDY COST UNIT FEE

Stage 1 Environmental Study $6,000.00 $1.38

Stage 1 Heritage Study $4,000.00 $0.92

Stage 1 Planning/Transportation/Servicing Studies $334,351.59 $76.89

Stage 2 Utility Studies $120,000.00 $27.59

Stage 2 Transportation Study $60,890.00 $14.00

Grandview Heights Transportations Study $123,000.00 (Portion Charge to NCP#4?) ?

TOTAL $525,241.59 $120.80

*The surcharge fee per residential unit (or equivalent) is based on the projection of 4,348 units anticipated in the plan, and would result in a fee of $120.80= per unit.

Page 32: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

Potential Land Use Changes Land Use amendments will be required surrounding New and Removed Detention Pond Areas:

Removed Storm water Facility Stage 1 Moved Storm water Facility Stage 2 New Stormwater Facility Location Stage 2

Page 33: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

Potential Land Use Changes Land Use amendments may be required surrounding Highway 15 Corridor depending on Transportation study Outcome and Ministry of Transportation input? Key areas of possible changes may include:

Area surrounding 24 Ave and Highway 15;

Areas surrounding Highway 15;

Areas near proposed Intersections along Highway 15

Page 34: Redwood Height CAC Presentation Rev Apr25 · 2019. 12. 11. · Finalize cost of “Greenspace Levy” and financing strategy; Prepare “sign Guidelines” De for the various land

STAGE 2- Consultation Timeline Stage 2 - Update CAC Meeting

(Initial Servicing & Transport Study Update)

Stage 2 - Additional CAC Meetings (If Required)

Stage 2 - City Internal Committee Meetings (AFSAC, ESAC, DAC)

Interagency and Stakeholder Group Meeting(s)

Final Stage 2 Public Open House

Council Consideration of Stage 2 Final NCP

*We are Here

Estimate: Fall 2017

Estimate: Winter 2017

Dependant on Ministry of

Transportation Review Time

Required.