Redevelopment of Residential Buildings

download Redevelopment of Residential Buildings

of 15

Transcript of Redevelopment of Residential Buildings

  • 8/13/2019 Redevelopment of Residential Buildings

    1/15

    REDEVELOPMENT OFRESIDENTIAL BUILDINGS

  • 8/13/2019 Redevelopment of Residential Buildings

    2/15

    PROJECT TRAINING

    WITHDhargalkar Technoesis Private Ltd.,

    D-104, Radha Govind,

    Siddharth Nagar,

    Borivali(East)

    Site Address:

    Flower Bloom Society,

    Veera Desai Road,

    Andheri(East)

  • 8/13/2019 Redevelopment of Residential Buildings

    3/15

    Dhargalkar Technoesis Private

    Ltd.Dhargalkar Technoesis I) Pvt. Ltd.isan organization having extensive

    experience in the domain of

    construction projects. With a track

    record of handling large

    construction projects for ourreputed clients in India and abroad

    for the past sixteen years

  • 8/13/2019 Redevelopment of Residential Buildings

    4/15

    INTRODUCTION Redevelopment is a process by which local government works in

    partnership with private development to enhance the social,

    economic, physical and environmental vitality of a city within

    specified project areas.

    Redevelopment has a direct effect on the economic future ofCountry because it promotes renovation and sponsors

    improvements that are focused on the growth of the

    community.

    The maintenance and improvement of the project area and thepositive effect they have on the rest of the community is a major

    goal of Redevelopment.

  • 8/13/2019 Redevelopment of Residential Buildings

    5/15

    REPAIRS AND REDEVELOPMENT:

    DIFFERNECESREPAIRS

    FUNDS ARE TO BE RAISED FROM THESOCIETY

    THE STRUCTURE AFTER REPAIR LASTFOR 5 YEARS REPAIR DO NOT SOLVE THE PROBLEM

    OF MORE HOUSING REQUIREMENT INTHE CITY LIKE MUMBAI

    REPAIR CAN IMPROVE THETEMPORARY CONDITION OFBUILDINGS

    REDEVELOPMENT

    FUNDS ARE BEING GIVEN BY THEBUILDERS

    THE STRUCTURE AFTERREDEVELOPMENT LAST FOR 20 25YEARS

    REVEVELOPMENT PROVIDE MOREHOUSING REQUIREMENT TO THECITY LIKE MUMBAI

    REDEVELOPMENT INCREASES THESTANDARD OF PEOPLE ANDIMPROVE THE INFRASTRUCTURE OFBUILDINGS.

  • 8/13/2019 Redevelopment of Residential Buildings

    6/15

    LITERATURE REVIEW

    Redevelopment refers to the process of

    reconstruction of the

    residential/commercial premises by

    demolition of the existing structure andconstruction of a new structure.

    This is done by utilizing the potential of the

    land by exploiting additional TDR, FSI asspecified under the Development Control

    Regulations of Municipal Corporation of

    Greater Mumbai (MCGM).

  • 8/13/2019 Redevelopment of Residential Buildings

    7/15

    WHY REDEVELOPMENT IS

    REQUIREDFor Existing Owners: Though they are in direct need of extensive

    repairs, societies are starved of necessary

    funds required to carry them out.

    On one hand, they do not have the resources

    and expertise to handle the repairs on theirown and on the other, the families of the

    members have expanded and they need larger

    space to accommodate themselves.

  • 8/13/2019 Redevelopment of Residential Buildings

    8/15

    WHY REDEVELOPMENT IS

    REQUIREDFor Builders/Developers: Builders/Developers opting for purchasing

    land and developing the same, incur huge

    stamp duty cost on transfer of land.

    Instead redevelopment of old building

    reduces stamp duty to a significant extent.

    Entering into such development agreement

    with the society authorizes the developer to

    develop the land.

  • 8/13/2019 Redevelopment of Residential Buildings

    9/15

    OBJECTIVE OF PROJECT

    Transform the fractured development in to

    cohesive urban unit.

    Provide modern accommodation and social

    services which raise living standard of the people. Provide an environment which permits the

    residents to live fuller and richer lives free of

    physical and social stress.

    To facilitate development and proper maintenance

    of infrastructure facilities such as sewerage /

    storm water drainage /DP Roads which cannot be

    developed because of the present haphazard

    Development

  • 8/13/2019 Redevelopment of Residential Buildings

    10/15

    S OPE OF WORK FEASIBILITY REPORT. LAUNCH OF TENDER. BUILDER SELECTION. PLANNING OF NEW BUILDING. DEMOLISHING OF THE EXISTING STRUCTURE. EXCAVATION. PLINTH LEVEL FOUNDATION. NEW BUILDING CONSTRUCTION. POSSESION TO EXISTING MEMBERS.

  • 8/13/2019 Redevelopment of Residential Buildings

    11/15

    Role Of PMC

    The builder approaches the owner of the

    land, enters into an agreement with the owner

    for permission to develop the land on the

    owners behalf.

    The builder constructs the buildings at his

    cost, retains some flats for himself to be

    sold in the open market, gives a few flats tothe landowner and also pays him some

    monetary consideration.

  • 8/13/2019 Redevelopment of Residential Buildings

    12/15

    Later, these flats are sold by the developer in

    the open market and from such sale, he makes

    a profit.

    Later, when the building is actually conveyed

    to a co-operative society or a company, the

    landowner and builder become party to the

    conveyance deed on which the stamp duty ispayable and the same is also registered

  • 8/13/2019 Redevelopment of Residential Buildings

    13/15

    CHALLENGES Inability to assemble all members of the

    society at a single point of time, as some of

    the members may not be available. Some flats

    may be mortgaged to a bank or a financial

    institution

    Some of the members may be interested in

    purchase of new flats at a discounted rate in

    the new building.

    Anxiety in the minds of the members about

    possible delay in completion of the project.

  • 8/13/2019 Redevelopment of Residential Buildings

    14/15

    The old documents of the members may not be

    traceable.

    The tax issues regarding redevelopment arenot clear to the society.

    Very high prices are expected on sale of old

    flats.

    Corpus amount takes a long time to be fixed by

    the society.

  • 8/13/2019 Redevelopment of Residential Buildings

    15/15

    CONCLUSION

    There are constraints on the availability of open land

    within the city limits with fast growing demand for

    houses and shortage of housing stock.

    There are thousands of ageing buildings which are

    dilapidated and have reached a stage where it is not

    possible to carry out structural repairs and

    rehabilitation.

    The problem of old and dilapidated buildings in the city

    of Mumbai grows more acute with each passing year and

    building becomes dangerous and unfit for habitation.

    The only solution is to put them down totally and to

    reconstruct them.