Page 1: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Moderator: Donna Daniel, PhD, SNMHI Director, Practice Transformation and Measurement

Speaker: Kelly McGrath, MD, Chief Medical Officer, Clearwater Valley Hospital and Clinics

Redesign of the Hospital Discharge: Patient-Centered Care to Improve Safety, Cost and

Outcomes

Page 2: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Transitions and Patient

Centered Care :

Patient-Centered Care to Improve Safety, Cost and Outcomes

Page 3: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

{

Clearwater Valley Hospital & Clinics

Page 4: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

CVHC 23 Bed Critical Access

Hospital with 3 associated rural health clinics in Clearwater and Idaho Counties

Patient-Centered Medical Home

8 Family Medicine Physicians, 3 Physicians Assistants, 1 General Surgeon and 4 ED physicians

CVHC serves 15,000 Patients in an area greater than the state of Delaware

Population density is 4 people / square mile (rural designation is 100 / square mile)

Only Emergency Department along 240 miles of Highway 12

Page 5: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Population Challenges

Compared with the rest of Idaho, this population is: Older Significantly lower per capita income Lower levels of education

Page 6: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Perfect Laboratory For Health Care :

Page 7: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Patient Centered Medical Home

Page 8: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Improve the health of the population

Enhance the patient experience of care (quality, access & reliability)

Reduce or control cost of care

Three-Part Aim:

Page 9: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Care transition = high risk to patients

AHRQ “top ten” safety step for hospitals

Critical events & patient safety Highest risk/cost population Opportunity to leverage PCMH

advantages to improve high risk population health

Why Focus on Hospital Discharge?:

Page 10: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Healthcare Cost Inequality

1% US Population

22% US Health Care

$Costs $

Page 11: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Safer Transitions: The Journey

Page 12: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Project Team

CORE TEAM

Kelly McGrath MD CMO

Sharon Moriarty RN

CNO

Donna Hoopes, Discharge Planning

Nursing Medical Records

Visiting Nurse Service QI

/Patient Safety

UR

Admin. CFO/CEO

Medical Staff

Grants

Clinic / Medical Home

IT

Page 13: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Improve Safety / outcomes around Hospital Discharge

Reduce 30, 60 & 90 day Hospital Readmission Rates

Project Goals

Reduce 30 Day ED Utilization

Improve Patient Experience through PCMH & VNS

Quantitatively Measure Project Outcomes to Assess Effectiveness

Reduce Net Healthcare Costs in Our Patient Population

Page 14: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Reduce Errors in Discharge Process

Educate patient to recognize problems / understand plan of care

Frequent contact with patient post discharge to correct errors and alter treatment plan as needed

Strategy / Methods

Page 15: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

New York

Strategy / Methods

London

3,471 miles

Page 16: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

New York

5 Degree Error

London

304 miles Manchester

Page 17: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

New York

10 Degree Error

London

612 miles

Stavenger, Norway

Page 18: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

20 Degree Error

London New York

1,263 miles

Trondheim , Norway

Page 19: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

20 Degree Error with Corrections

London New York

Course Correction Course Correction Course Correction Course Correction

Page 20: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Shorten the distance

London New York

Course Correction Course Correction

(New London)

Page 21: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

PROJECT BASELINE DATA

Page 22: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

0.0%

5.0%

10.0%

15.0%

20.0%

0 to 30 31 to 60 61 to 90 % R

eadm

issi

ons

Days Post Discharge

CVH Readmission Rates

Page 23: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Risk of ED Visit After Discharge

0%

5%

10%

15%

20%

25%

30%

35%

40%

0 to 30 31 to 60 61 to 90

34.50%

22.70% 20%

% D

isch

arge

s w

/ ED

V

isit

Days Post Discharge

Page 24: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Discharge Redesign Methods

Page 25: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Status Quo at Project Start

DISCHARGEHOSPITAL STAYADMIT

Discharge Planner assessment / management of barriers to safe

discharge care transition

Post Discharge

Care

Inpatient Team Follow-up Phone Call to Patient

Medication Reconciliation Typically completed by

Discharge Planner

Page 26: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Hospital Admission

DISCHARGEHOSPITAL STAYADMITPost

DischargeCare

Page 27: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Medication Reconciliation

DISCHARGEHOSPITAL STAYADMIT

Discharge Planner assessment / management of barriers to safe

discharge care transition

Post Discharge

Care

Inpatient Team Follow-up Phone Call to Patient

Medication Reconciliation Typically completed by

Discharge Planner Medication Reconciliation Starts in ED – must be

complete within 24 hours of admit

Page 28: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Teach Back / MD Orders

DISCHARGEHOSPITAL STAYADMIT

Discharge Planner assessment / management of barriers to safe

discharge care transition

Post Discharge

Care

Inpatient Team Follow-up Phone Call to Patient

Medication Reconciliation Starts in ED – must be

complete within 24 hours of admit

Care Transition Risk Assessment

Physician Standardized “Best Practice”

Discharge Order Sets

“Teach Back” Technique for RN discharge teaching

Page 29: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Improve Follow up Calls

DISCHARGEHOSPITAL STAYADMIT

Inpatient Team Follow-up Phone Call to Patient

Discharge Planner assessment / management of barriers to safe

discharge care transition

Post Discharge

Care

Medication Reconciliation Starts in ED – must be

complete within 24 hours of admit

Care Transition Risk Assessment

Physician Standardized “Best Practice”

Discharge Order Sets

“Teach Back” Technique for RN discharge teaching

Inpatient RN Follow-up Phone Call to Patient < 48-72 hours post DC &

Action Plan / Communication with

PCP if problems

Page 30: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Improved Transcription Times

DISCHARGEHOSPITAL STAYADMIT

Discharge Planner assessment / management of barriers to safe

discharge care transition

Post Discharge

Care

Medication Reconciliation Starts in ED – must be

complete within 24 hours of admit

Care Transition Risk Assessment

Physician Standardized “Best Practice”

Discharge Order Sets

“Teach Back” Technique for RN discharge teaching

Inpatient RN Follow-up Phone Call to Patient < 48-72 hours post DC &

Action Plan / Communication with

PCP if problems

Discharge Summary Transcribed <24 hr

Page 31: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

VNS “opt out” Referral

DISCHARGEHOSPITAL STAYADMIT

Discharge Planner assessment / management of barriers to safe

discharge care transition

Post Discharge

Care

Medication Reconciliation Starts in ED – must be

complete within 24 hours of admit

Care Transition Risk Assessment

Physician Standardized “Best Practice”

Discharge Order Sets

“Teach Back” Technique for RN discharge teaching

Inpatient RN Follow-up Phone Call to Patient < 48-72 hours post DC &

Action Plan / Communication with

PCP if problems

Discharge Summary Transcribed <24 hr

Visiting Nurse Referral < 48 -72 hr post DC

Page 32: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Patient Centered Medical Home

DISCHARGEHOSPITAL STAYADMIT

“Teach Back” Technique for RN discharge teaching

Discharge Planner & Inpatient Care Team Ongoing assessment /

management of barriers to safe discharge care transition

Discharge Summary Transcribed <24 hr

Post Discharge

Care

Medical Home MA/RN Outpatient Care Team Visit during hospital

stay

Physician Standardized “Best Practice”

Discharge Order Sets

Follow up Visit < 7 days post discharge with PCP / Medical Home Team as “opt out” in scheduling

Inpatient RN Follow-up Phone Call to Patient < 48-72 hours post DC &

Action Plan / Communication with

PCP if problems

Care Transition Risk Assessment

Medication Reconciliation Starts in ED – must be

complete within 24 hours of admit

Visiting Nurse Referral < 48 -72 hr post DC

Page 33: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

High Risk Case Review

DISCHARGEHOSPITAL STAYADMIT

“Teach Back” Technique for RN discharge teaching

Discharge Planner & Inpatient Care Team Ongoing assessment /

management of barriers to safe discharge care transition

Discharge Summary Transcribed <24 hr

Post Discharge

Care

Medical Home MA/RN Outpatient Care Team Visit during hospital

stay

Physician Standardized “Best Practice”

Discharge Order Sets

Follow up Visit < 7 days post discharge with PCP / Medical Home Team as “opt out” in scheduling

Inpatient RN Follow-up Phone Call to Patient < 48-72 hours post DC &

Action Plan / Communication with

PCP if problems

Care Transition Risk Assessment

Medication Reconciliation Starts in ED – must be

complete within 24 hours of admit

Visiting Nurse Referral < 48 -72 hr post DC

Physician QI Team Case Review for > 2 admits / 90 days

Page 34: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Outcome Data

Page 35: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Medication Reconciliation

Page 36: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

High Risk Patients with VNS Referral

Page 37: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Patients with PCMH Follow up within 7 days

Page 38: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

30 day Readmission Rates

Page 39: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

60 Day Readmission Rates

Page 40: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

90 Day Readmission Rates

Page 41: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

% Discharge With ED Visit Within 30 Days

Page 42: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Visiting Nurse Visits and Readmission

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

% P

atie

nts

Time Period

CVHC - % Patients Readmitted after having VNS

Goal

% of patients readmitted after VNS visit within 2 days

% of patients readmitted after VNS visit some time after DC

Page 43: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Risk of ED Visit Within 30 Days of Hospital Discharge

0

10

20

30

40

50

60

70

80

90

100

No Yes

% o

f Hig

h R

isk

Dis

char

ges w

ith E

D V

isit

With

in 3

0 da

ys

PCMH Visit within 7 days of Hospital Discharge?

Page 44: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Estimated Savings

$146,000 Program Cost

$660,000 Estimated Prevented

Admissions/ ED Visits

Page 45: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Use similar techniques for discharged patients with subsequent ED visit

Continue to improve current processes Optimize health literacy / patient education

techniques to improve patient role in self management

Extend elements of process to our patient panels when they are hospitalized at other facilities outside our system

Engage in discussions regarding reimbursement

Next Steps

Page 46: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Take Our “Experiment”…

Page 47: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

…and climb your “mountains”

Page 48: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Patient Centered Medical Home – the time has come!!!

Page 49: Redesign of the Hospital Discharge - Safety Net Medical Home · Discharge Redesign Methods . Status Quo at Project Start ADMIT HOSPITAL STAY DISCHARGE Discharge Planner assessment

Questions / Discussion?