Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water...
Transcript of Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water...
![Page 1: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/1.jpg)
Recycle Project of Produced Water Westwater Utah Project
David R. Stewart, PhD, PEChief Technical Officer – Produced Water Development
Grand County Utah
September 14, 2010
![Page 2: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/2.jpg)
Presentation Outline• Introduction• Energy – Water Nexus of Produced Water• Produced Water Ownership• Volumes of produced water• Costs for treatment• Beneficial use of produced water• Projects by Produced Water Development• Conclusions
![Page 3: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/3.jpg)
Introduction
![Page 4: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/4.jpg)
Big Picture – Tale of Two Problems
• CBM and Oil E&P industry have an environmental and energy waste problem –disposing of huge amounts of produced water
• The arid Western US has a problem – drought, climate change and increasing demand for water
• Produced Water will help slow the Ag to Urban Water transfer
![Page 5: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/5.jpg)
Overview• The billions of barrels of oil and gas waste water produced
annually can be treated, thereby mitigating an environmental problem, and used to augment water supplies
• Population growth, drought and climate change have substantially increased the demand for water in the arid West and are creating crisis conditions in many urban areas resultingin rapidly escalating water prices - Water 2025 Study
• Energy producers benefit through cost savings on wastewater disposal, increased recoverable reserves, reduced energy costs for disposal and reduced environmental exposure
• Agricultural, household and other users benefit from a new water source
![Page 6: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/6.jpg)
Projected Water Shortages
Note that the water short areas match the areas of produced water
This map shows the overlay of Water 2025 and the areas of produced water generation
![Page 7: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/7.jpg)
Water Energy Nexus• Produced Water – Energy Interaction
– 20% to 30% of the energy that is produced is consumed through re-injection to a deep aquifer
– Produced water is the constraint to more domestic energy production – if the constraint to produced water is removed, then more domestic energy production is possible
– Treatment of produced water uses 5% to 8% of the energy produced, depending on the type of treatment employed
– Produced water can be another asset that can be maximized if treated properly
![Page 8: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/8.jpg)
Volumes of Produced Water
![Page 9: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/9.jpg)
Potential Water Sources Example
• Potential Water Volumes by basin:– Green River Basin
325 TCF = 70 MAF
– Piceance Basin99 TCF = 20 MAF
– Raton Basin10 TCF = 2 MAF
![Page 10: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/10.jpg)
Estimated Volumes of CBMProduced Water
• Powder River – 2.75 to 4 bbl’s/MCF• Raton (Southern Colorado) – 1.3 to 2 bbl’s /MCF• Atlantic Rim/Green River Area – 2 to 4 bbl’s/ MCF • In general, we have found that these estimates are
lower than anticipated and that the amount of water available is much higher than anticipated resulting in higher water resource potential
![Page 11: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/11.jpg)
Projected Produced Water Volumes
Produced Water Volumes:
• US – 21 Bbbl/yr
• Wyo – 2.36 Bbbl/yr
• CO – 0.38 Bbbl/yr
• Ut – 0.15 Bbbl/yr
Source – Argone National Laboratories
![Page 12: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/12.jpg)
Potential Beneficial Use of Produced Water
• Upper Colorado River Basin – at 2 bbl’s/MCF –70,000,000 AF or potentially 500,000 to 1,000,000 AF per year
• Potential users:– Environmental groups
for in-stream flow– Energy companies for
drilling and fracing fluids– Downstream water
users for agriculture and municipal uses
![Page 13: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/13.jpg)
Production Water OwnershipWho Owns this water resource?
![Page 14: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/14.jpg)
A New Water Resource
• Produced Water– Highly contaminated water produced concurrently with the
pumping of CBM or oil and gas operations• Conventional Thinking
– Waste Product– High Disposal Costs– Environmental Concerns
• New Reality– New source water– Treatable for beneficial use– Substantial quantities
![Page 15: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/15.jpg)
Produced Water as an Asset• Historically, produced water has been treated as a waste
product– Current methods of disposal – reinjection (Class II Injection
Wells), evaporation ponds and direct discharge – are being challenged due to adverse environmental impacts
• Plan to turn this wastewater into an asset - a marketable product - by:– Treating for surface discharge– Conceiving a unique water delivery system - augmenting
tributary water supplies with non-tributary water– Pioneering a path through the numerous legal and regulatory
obstacles
![Page 16: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/16.jpg)
Ownership of Produced Water• Colorado Example
– Tributary – Non-Tributary Groundwater
– HB 1303 – how does this apply in Colorado
– SB 165 – produced water beneficial use
– COGCC Rules (907)– State Engineer
• Agreement on non-tributary status (Fossil water in other states)
– CDPHE Technical Review, Permit and approval
– Landowner issue– Water Rights & Court
• Legislation is being introduced this year to fight this process
Other Western StatesPrior appropriationFirst in Use – First in RightWyoming – 1,000 AF non export law
![Page 17: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/17.jpg)
Permitting Requirementsin Colorado
![Page 18: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/18.jpg)
State Engineer• Non-tributary Water Determination• Beneficial use permit• Vance vs. Simpson/Wolfe Water
Court Case• Wellington Water Works vs. Dumont
Case• Colorado HB 1303 – beneficial use
of produced water http://water.state.co.us/wateradmin/NontribGw.asp
• Colorado SB 165 – beneficial use of produced water
• Result – need to obtain permits and concurrence regarding the non-tributary status
![Page 19: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/19.jpg)
COGCC Permit Issues
• Was hesitant to issue discharge permit• CDPHE vs. COGCC permit
– Surface discharge – CDPHE– Subsurface discharge – COGCC
• Monitoring requirements• COGCC – State Engineer – CDPHE
coordination
![Page 20: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/20.jpg)
Water Rights Court• Filed water rights
application in Wellington Case –December 2005
• Court case – January 2007
• Final Determination –March 2007
• Produced water can be used beneficially as a vested water right
![Page 21: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/21.jpg)
Treatment of Produced Water
![Page 22: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/22.jpg)
From Produced Water to Beneficial Use
![Page 23: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/23.jpg)
Quality Of Produced Water• Produced Water TDS – range between 1,000 and
50,000 mg/l • Discharge water - typically need to reduce to a level
near 500 ppm (Colo. River basin) and near 1,500 to 2,500 ppm for the eastern slope of Colorado/New Mexico
• SAR’s (Sodium Adsorption Ratio) can range from 0.5 to 30
• Discharge Water - Need to reduce SAR to less than 5• Heavy metals can be a factor – some fields will
require heavy metal removal• Removal of organics, such as benzene, toluene,
xylene – benzene is typically the limiting factor
![Page 24: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/24.jpg)
Typical Unit Operations –Oil Produced Water
Oil/Water Separation
*
AerationVOC
Removal
Desalting & Metals RemovalCMF/RO
Dissolved Organic RemovalSAZ/AC
SAR Adjustment
*
More than likely Possibly likely * Skid Mounted Equipment
WSFOils,
Paraffins, Asphaltines
![Page 25: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/25.jpg)
Westwater Utah Project• Oil/Gas produced water treatment
facility• 15,000 bbls/day facility with the
potential to expand to 60,000 bbls/day
• Pilot plant– Successful treatment of produced water
from Uinta and Piceance basins– Incoming water – TDS 15,000 mg/l O&G
500 mg/l– No heavy metals or organic
contaminates in the discharge water
![Page 26: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/26.jpg)
Westwater Utah Site – Process Flow Diagram
Patent Pending Process
![Page 27: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/27.jpg)
Pilot Plant – Westwater UtahPilot plant – Westwater Utah
•Walnut Shell filter
•Carbon Column
•Raw to finished product
![Page 28: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/28.jpg)
Westwater Utah Project
• Additional considerations– Produced water is from Utah and Colorado– Interstate commerce – water rights issue– Utilization of brine (New Sky Energy) – new
chemistry through electro chemistry and membranes developed at Colorado School of Mines
– Main products are sulfuric or hydrochloric acid and sodium hydroxide or sodium carbonate
![Page 29: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/29.jpg)
Brine Issue - Opportunity
– Utilization of brine (New Sky Energy) – new chemistry through electro chemistry and membranes developed at Colorado School of Mines
– Main products are sulfuric or hydrochloric acid and sodium hydroxide or sodium carbonate
![Page 30: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/30.jpg)
Unexpected issues
• Custom blending of water for frac water make up water
• Green issues for the energy industry• Support from environmental groups
such as the Nature Conservancy, Colorado Environmental Coalition and others
![Page 31: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/31.jpg)
What we are trying to achieve• UIC Permit – Sept 15 ends public comment period –
we are addressing the BLM concerns• Existing land application permit – we are looking to
obtain a NDPES Utah permit for discharge to the surface waters
• Treatment plant will have a TDS of less than 500 and no oil/grease values – we are producing a water suitable for discharge
• There will not be any produced water evaporation ponds
• All VOC’s will be captured on the site• We will likely recycle the water back to the energy
companies
![Page 32: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/32.jpg)
Status of the Special Use Permit
• It was our understanding that the permit was tabled• What do we need to supply to get this back into the
system• We are attempting or desiring to have produced
water into the injection well for the first 6 months• We will likely have the produced water treatment
plant up and running on Jan or Feb 2011 –depending on permitting and approvals
• The New Sky Energy process we hope to have up and running by July 2011 – this will eliminate the need for the UIC but we will keep that active as a backup to the overall process.
![Page 33: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/33.jpg)
Conclusions• Produced Water is a viable water resource• Recycling is an important issue and can be
implemented as part of our overall process –very green option
• Colorado River basin transfers potential– Need for cooperation within the 7 states
• Produced Water treatment is cost effective• Need for permits to be issued to complete this
project
![Page 34: Recycle Project of Produced Water Westwater Utah · PDF fileRecycle Project of Produced Water Westwater Utah Project ... – State Engineer ... Westwater Utah Project • Oil/Gas produced](https://reader036.fdocuments.in/reader036/viewer/2022062504/5aa7d4077f8b9a54748c8c35/html5/thumbnails/34.jpg)
Questions?