Recovery, Reuse, and Recycling of Debris From the ...

57
Recovery, Reuse, and Recycling of Debris From the Demolition of the Grace and Pearman Bridges at Charleston, South Carolina Fred Cooper, P.E. Earth Tech AECOM

Transcript of Recovery, Reuse, and Recycling of Debris From the ...

Page 1: Recovery, Reuse, and Recycling of Debris From the ...

Recovery, Reuse, and Recycling of Debris From

the Demolition of the Grace and Pearman Bridges

at Charleston, South Carolina

Fred Cooper, P.E.

Earth Tech AECOM

Page 2: Recovery, Reuse, and Recycling of Debris From the ...

Three Bridges Viewed From the Charleston Side

Page 3: Recovery, Reuse, and Recycling of Debris From the ...

Work started with removal of the Grace off-ramp

between King and Meeting Streets.

Page 4: Recovery, Reuse, and Recycling of Debris From the ...

Ken Canty pointing out that supporting columns are

numbered to ensure removal in the correct order.

Page 5: Recovery, Reuse, and Recycling of Debris From the ...

Debris being separated for reuse and recycling

Page 6: Recovery, Reuse, and Recycling of Debris From the ...

FACT

SPECIAL RECOGNITION

Special recognition is given to Mr. Frank Starmer

who is responsible for most of the spectacular

deconstruction photographs in this presentation.

The photos are used with Mr. Starmer‟s permission.

http://oldcooperriverbridge.org/

Page 7: Recovery, Reuse, and Recycling of Debris From the ...

Recovered rebar being separated, and bunched.

Page 8: Recovery, Reuse, and Recycling of Debris From the ...

„Claws and Jaws‟…

Carefully grasping a bridge girder…

Page 9: Recovery, Reuse, and Recycling of Debris From the ...

…and „gently‟ working the girder down..

Page 10: Recovery, Reuse, and Recycling of Debris From the ...

…to the ground. Awesome!

Page 11: Recovery, Reuse, and Recycling of Debris From the ...

FACT

Earth Tech AECOM

Designed reconnection of city streets and

I-26 / US 17 interchange improvements,

Managed prime contractor‟s compliance with

Joint State and Federal environmental permit for

temporary impacts to wetlands,

Designed the „created wetlands‟ at Waterfront Park

in Mount Pleasant.

Page 12: Recovery, Reuse, and Recycling of Debris From the ...

Removing the roadway from the Pearman,

leaving only the steel skeleton near SPA.

Looking toward Charleston Looking toward Mt. Pleasant

Page 13: Recovery, Reuse, and Recycling of Debris From the ...

Grace‟s steel span. Bare steel of this nature

can be easily recycled by the steel industry.

Page 14: Recovery, Reuse, and Recycling of Debris From the ...

NOW THAT‟S A CLAW!

BIGGER IS BETTER, AND THESE GUYS

KNOW HOW TO USE IT.

Page 15: Recovery, Reuse, and Recycling of Debris From the ...

Taking a safety break, …because a

thunderstorm can be a shocking experience.

Page 16: Recovery, Reuse, and Recycling of Debris From the ...

The final layer of roadway is „finally‟ removed,

and now…

Page 17: Recovery, Reuse, and Recycling of Debris From the ...

On to the Reinforced Concrete Piers, the

“Breakfast of Champions”

Page 18: Recovery, Reuse, and Recycling of Debris From the ...

Hammering out boxed girders

Page 19: Recovery, Reuse, and Recycling of Debris From the ...

A „Graceful‟ Decent to Drum Island

Page 20: Recovery, Reuse, and Recycling of Debris From the ...

SURREAL STONEHENGE?

Page 21: Recovery, Reuse, and Recycling of Debris From the ...

From Surreal to Surgical…

Careful „Reverse Construction‟ Over State Ports

Page 22: Recovery, Reuse, and Recycling of Debris From the ...

Inland Area Cleanup…State Ports Authority, Town

Creek, Drum Island, and the Ravenel Bridge in the

Distance, and…

Page 23: Recovery, Reuse, and Recycling of Debris From the ...

Remaining Piers in Shipping Channel June 1, 2006

Page 24: Recovery, Reuse, and Recycling of Debris From the ...

„About Those Piers‟…

The contractor must demonstrate that all parts of the Bridges

have been removed down to or below elevations required,

and that the waterways have been cleared to the satisfaction

of Charleston District US Army Corps of Engineers (USACE)

Commander.

Q: How are we to satisfactorily document removal of piers

and miscellaneous debris in the Cooper River?

A: Provide Hydrographic Surveys of debris field including:

1. Bathometric contour mapping,

2. Side scan sonar survey, and

3. Mapping by magnetometer.

Page 25: Recovery, Reuse, and Recycling of Debris From the ...

Topographic Map - Cooper River Bottom

West of Shipping Channel

Page 26: Recovery, Reuse, and Recycling of Debris From the ...

Topographic Map - Cooper River Bottom

Town Creek

Page 27: Recovery, Reuse, and Recycling of Debris From the ...

Magnetic Intensity Map - Cooper River Bottom

West of Shipping Channel

Page 28: Recovery, Reuse, and Recycling of Debris From the ...

Magnetic Intensity Map - Cooper River Bottom

East of Shipping Channel

Page 29: Recovery, Reuse, and Recycling of Debris From the ...

The Mighty Jay Cashman Sails

to recover the remaining demolition debris

from the floor of the Cooper River

Page 30: Recovery, Reuse, and Recycling of Debris From the ...

Debris…

Page 31: Recovery, Reuse, and Recycling of Debris From the ...

And more debris… Photographs document

the work…about 102 debris removal photos.

Page 32: Recovery, Reuse, and Recycling of Debris From the ...

PROJECT RECORDS

240,292 tons of reinforced concrete placed in

12 off shore artificial reefs,

5,286 tons of debris used to create new artificial

reef adjacent to a new observation pier at

Mount Pleasant, and

24,668 tons of structural steel was recycled,

TOTAL = 270,246 tons Vs. 261,000 tons bid.

Page 33: Recovery, Reuse, and Recycling of Debris From the ...

HOW TO BUILD A REEF FROM

RECOVERED DEMOLITION DEBRIS?

A girder is being removed here over

East Bay Street at night.

Page 34: Recovery, Reuse, and Recycling of Debris From the ...

Note Claw at Right. This girder is being divided

into smaller segments for easier transportation.

Page 35: Recovery, Reuse, and Recycling of Debris From the ...

On Board the reef crew‟s boat, „Jay Michael‟.

Page 36: Recovery, Reuse, and Recycling of Debris From the ...

View from the Jay Michael heading out to the designated reef, and

passing material being loaded onto a barge for another reef site.

Page 37: Recovery, Reuse, and Recycling of Debris From the ...

DESIGNATED REEF DEPLOYMENT LOCATIONS

Page 38: Recovery, Reuse, and Recycling of Debris From the ...

Course tracking with a small GPS to document

our consistent outbound and inbound routes.

Page 39: Recovery, Reuse, and Recycling of Debris From the ...

About an hour later - our reef destination – with Brad's

345 and Rick's 750 positioned on the barge at the site.

Page 40: Recovery, Reuse, and Recycling of Debris From the ...

As we approach, we can see that twin

“jaws” are in sleep-mode.

Page 41: Recovery, Reuse, and Recycling of Debris From the ...

Rick and Brad awaken their machines, …the “jaws”

stretch out, as if to yawn, “good morning”, and then

the action starts…

Page 42: Recovery, Reuse, and Recycling of Debris From the ...

King of the Hill!

Page 43: Recovery, Reuse, and Recycling of Debris From the ...

Jaws „gently‟ snaps up a reef segment…

Page 44: Recovery, Reuse, and Recycling of Debris From the ...

…and gently tosses it…

Page 45: Recovery, Reuse, and Recycling of Debris From the ...

Placing the reinforced concrete debris at the reef site.

(These guys make it look easy, and fun.)

Page 46: Recovery, Reuse, and Recycling of Debris From the ...

SPLASH!

Page 47: Recovery, Reuse, and Recycling of Debris From the ...

It takes two for the big tango…

Page 48: Recovery, Reuse, and Recycling of Debris From the ...

Gittin‟ Busy!

Page 49: Recovery, Reuse, and Recycling of Debris From the ...

Another surreal scene, “ravenous jaws and claws toss parts

from large civil structures into the ocean”.

(Kinda-like old school Sci-Fi!)

• Finishing up - a short conversation and then

Page 50: Recovery, Reuse, and Recycling of Debris From the ...

After finishing up: first a short conversation and then…

Page 51: Recovery, Reuse, and Recycling of Debris From the ...

…a little R&R as the Jay Michael heads home.

Page 52: Recovery, Reuse, and Recycling of Debris From the ...

Nearing port and passing by a sailboat… while the

sun sets…a picture made to order.

Page 53: Recovery, Reuse, and Recycling of Debris From the ...

The sun says, “good evening”... we are home.

Page 54: Recovery, Reuse, and Recycling of Debris From the ...

ARTIFICIAL REEF CONSTRUCTION PROJECT

Largest reef construction project in South

Carolina‟s history based on tonnage.

Largest number of deployments (50), and

Enhanced the largest number of reef sites of

any project in South Carolina‟s history.

Page 55: Recovery, Reuse, and Recycling of Debris From the ...

DNR Photo: Reef Fish and Invertebrates find a home

in our recovered concrete and rebar debris.

Page 56: Recovery, Reuse, and Recycling of Debris From the ...

Another DNR Photo: Our Recovered Concrete and Rebar

make a good home for marine life. A good homes makes for

happy fish, and that makes us happy too~!

Page 57: Recovery, Reuse, and Recycling of Debris From the ...

FACT

SIMULTANEOUS DE-CONSTRUCTION OF

THE GRACE AND PEARMAN BRIDGES

Bid for design and deconstruction included 261,000 tons of

reinforced concrete and structural steel to be recovered and

reused or recycled.

Successfully completed by Jay Cashman, Inc. /Testa Corp., A

Joint Venture (the Joint Venture), and their subcontractors,

one being Earth Tech AECOM.

Demonstrated that recovery, reuse, and recycling of

demolition debris can reduce costs and benefit the

environment.