CONSTRUCTION SEQUENCE RECORD PEPD DESIGN SUBMISSION Bakersfield to Palmdale CONSTRUCTION SEQUENCE October 2017

Transcript of RECORD PEPD DESIGN SUBMISSION€¦ · 10/31/2017. contract no. hsr13-44. drawing no. cv-b0002....

Page 1: RECORD PEPD DESIGN SUBMISSION€¦ · 10/31/2017. contract no. hsr13-44. drawing no. cv-b0002. scale. as shown. sheet no. general. drawing no. drawing description. cv-a0001; alternative

CONSTRUCTION SEQUENCE

RECORD PEPD DESIGN SUBMISSION Bakersfield to Palmdale

CONSTRUCTION SEQUENCE

October 2017

Page 2: RECORD PEPD DESIGN SUBMISSION€¦ · 10/31/2017. contract no. hsr13-44. drawing no. cv-b0002. scale. as shown. sheet no. general. drawing no. drawing description. cv-a0001; alternative

RECORD

PEPD SUBMITTAL

NOT FOR

CONSTRUCTION

CALIFORNIA HIGH-SPEED RAIL PROJECT

BAKERSFIELD TO PALMDALEALTERNATIVE 1,2,3,5

INDEX OF SHEETS

DESIGNED BY

M. B.

DRAWN BY

A. CARSON

CHECKED BY

W. DURANT

IN CHARGE

S. SMITHDATE

10/31/2017

CONTRACT NO.

HSR13-44

DRAWING NO.

CV-B0002

SCALE

AS SHOWN

SHEET NO.

GENERAL

DRAWING No. DRAWING DESCRIPTION

CV-A0001 ALTERNATIVE 1,2,3,5 COVER SHEET

CV-B0002 ALTERNATIVE 1,2,3,5 INDEX OF SHEETS

CV-B0003 ALTERNATIVE 1,2,3,5 NOTES & LEGEND

CV-C0004 ALTERNATIVE 1 KEY MAP SHEET 1 OF 1

CV-C0005 ALTERNATIVE 2 KEY MAP SHEET 1 OF 1

CV-C0006 ALTERNATIVE 3 KEY MAP SHEET 1 OF 1

CV-C0007 ALTERNATIVE 5 KEY MAP SHEET 1 OF 1

CONSTRUCTION SEQUENCE

DRAWING No. DRAWING DESCRIPTION

CV-I1001 ALTERNATIVE 1 CONSTRUCTION SEQUENCE SHEET 1 OF 11

CV-I1002 ALTERNATIVE 1 CONSTRUCTION SEQUENCE SHEET 2 OF 11

CV-I1003 ALTERNATIVE 1 CONSTRUCTION SEQUENCE SHEET 3 OF 11

CV-I1004 ALTERNATIVE 1 CONSTRUCTION SEQUENCE SHEET 4 OF 11

CV-I1005 ALTERNATIVE 1 CONSTRUCTION SEQUENCE SHEET 5 OF 11

CV-I1006 ALTERNATIVE 1 CONSTRUCTION SEQUENCE SHEET 6 OF 11

CV-I1007 ALTERNATIVE 1 CONSTRUCTION SEQUENCE SHEET 7 OF 11

CV-I1008 ALTERNATIVE 2 CONSTRUCTION SEQUENCE SHEET 8 OF 11

CV-I1009 ALTERNATIVE 3 CONSTRUCTION SEQUENCE SHEET 9 OF 11

CV-I1010 ALTERNATIVE 3 CONSTRUCTION SEQUENCE SHEET 10 OF 11

CV-I1011 ALTERNATIVE 5 CONSTRUCTION SEQUENCE SHEET 11 OF 11

DATE CHK APPBYREV DESCRIPTION

$FIL

E$

$P

LT

DR

VS$

$P

EN

TB

LS$

4:23:18

PM

11/3/2017

$U

SE

R$

Page 3: RECORD PEPD DESIGN SUBMISSION€¦ · 10/31/2017. contract no. hsr13-44. drawing no. cv-b0002. scale. as shown. sheet no. general. drawing no. drawing description. cv-a0001; alternative

ALTERNATIVE 1,2,3,5

NOTES & LEGEND

LEGEND

NORTH ARROW

PROPOSED TEMPORARY ENVIRONMENTAL FOOTPRINT

PROPOSED PERMANENT ENVIRONMENTAL FOOTPRINT

LIMITS OF EXCAVATION (CUT)

LIMITS OF EMBANKMENT (FILL)

CONSTRUCTION STAGING / LAYDOWN AREA, ROCK CRUSHING PLANT,OR ROCK CRUSHING & PRECAST OPERATIONS YARD

PROPOSED RETAINING WALL

PHASE 1

PHASE 2

PHASE 3

CUT AREAS

FILL AREAS

MOIF, MOIS, LMF, TPF, TPS

RS-WA

POTENTIAL SPOIL SITE

DATE CHK APPBYREV DESCRIPTION

$FIL

E$

$P

LT

DR

VS$

$P

EN

TB

LS$

4:18:49

PM

11/3/2017

$U

SE

R$

GENERAL NOTES

1. DETAILED CONSTRUCTION SEQUENCE FOR GRADE SEPARATIONS IS NOT

PROVIDED IN THIS SET OF PLANS. UTILITY RELOCATIONS ARE NOT SHOWN.

2. TRAFFIC DETOURS ARE NOT SHOWN IN THIS SET OF PLANS.

3. LAYDOWN AREAS, STAGING AREAS AND OTHER CONTRACTOR'S FACILITIES

ARE INCLUDED IN THIS SET OF PLANS.

4. DETAILED PHASING OF LONG CHSR VIADUCTS ARE NOT SHOWN.

5. LMF (LIGHT MAINTENANCE FACILITY), MOIF (MAINTENANCE OF

INFRASTRUCTURE FACILITY), MOIS (MAINTENANCE OF INFRASTRUCTURE SIDING),

TPF (TRACTION POWER FACILITY), TPS (TRACTION POWER SUBSTATION) ARE SHOWN,

BUT NOT INCLUDED IN THE SEQUENCING.

6. CONSTRUCTION PHASES WILL OVERLAP AS NEEDED TO REDUCE CONSTRUCTION

DURATIONS.

7. DRAINAGE OVERCROSSINGS ALONG THE ALIGNMENTS ARE NOT SHOWN IN THE

SEQUENCING PLANS.

ABBREVIATIONS

CHSR CALIFORNIA HIGHSPEED RAIL

D&B DRILL AND BLAST

LMF LIGHT MAINTENANCE FACILITY

MOIF MAINTENANCE OF INFRASTRUCTURE FACILITY

OH OVERHEAD

RS-WA RAIL STORAGE & WELDING AREA

SEM SEQUENTIAL EXCAVATION METHOD

STA STATION

TPF TRACTION POWER FACILITY

TPS TRACTION POWER SUBSTATION

TBM TUNNEL BORING MACHINE

UP/UC UNDERPASS / UNDERCROSSING

UPRR UNION PACIFIC RAILROAD

DESIGNED BY

M. B.

DRAWN BY

A. CARSON

CHECKED BY

W. DURANT

IN CHARGE

S. SMITHDATE

10/31/2017

RECORD

PEPD SUBMITTAL

NOT FOR

CONSTRUCTION

CALIFORNIA HIGH-SPEED RAIL PROJECT

BAKERSFIELD TO PALMDALE

CONTRACT NO.

HSR13-44

DRAWING NO.

CV-B0003

SCALE

AS SHOWN

SHEET NO.

Page 4: RECORD PEPD DESIGN SUBMISSION€¦ · 10/31/2017. contract no. hsr13-44. drawing no. cv-b0002. scale. as shown. sheet no. general. drawing no. drawing description. cv-a0001; alternative

DATE CHK APPBYREV DESCRIPTION

$FIL

E$

$P

LT

DR

VS$

$P

EN

TB

LS$

4:23:50

PM

11/3/2017

$U

SE

R$

ALTERNATIVE 1

KEY MAP

ARVIN

LAMONT

KEENE

0

1"=12000' HOR

12000 12000 24000

ST

A 17285

+00

OS

WE

LL

ST

RE

ET

BE

GI

N

SE

GM

EN

T 1

LOS ANGELES COUNTY

KERN COUNTY

TO BAKERSFIELD

STA 21233+00

EAST AVENUE O

END SEGMENT 4

TEHACHAPI

LA

NC

ASTER

ROS

AM

ON

D

WIL

LO

W SPRIN

GS

ANTEL

OPE

ACRES

STA 18325+00

BEALVILLE ROAD

BEGIN SEGMENT 2

END SEGMENT 1

STA 19665+00

SPRINGS ROAD

TEHACHAPI WILLOW

BEGIN SEGMENT 4

END SEGMENT 3

TO P

AL

MD

ALEPALMDALE

LANCASTER

BAKERSFIELD

TEHACHAPI

ARVIN

CITYCALIFORNIA

VICINITY MAP

138

14

138

I5

I5

99

223

58184

178

20258

SHEET LIMITSCL SOUTHBOUND TRACKCL NORTHBOUND TRACK

LEGEND

CV-I1001

MONOLITH

CV-I1002

CV-I1003

CV-I1

004

CV-I1005

CV-I1006

CV-I1007

STA 18900+00

BEGIN SEGMENT 3

END SEGMENT 2

DESIGNED BY

M. B.

DRAWN BY

A. CARSON

CHECKED BY

W. DURANT

IN CHARGE

S. SMITHDATE

10/31/2017

RECORD

PEPD SUBMITTAL

NOT FOR

CONSTRUCTION

CALIFORNIA HIGH-SPEED RAIL PROJECT

BAKERSFIELD TO PALMDALE

CONTRACT NO.

HSR13-44

DRAWING NO.

CV-C0004

SCALE

AS SHOWN

SHEET NO.

Page 5: RECORD PEPD DESIGN SUBMISSION€¦ · 10/31/2017. contract no. hsr13-44. drawing no. cv-b0002. scale. as shown. sheet no. general. drawing no. drawing description. cv-a0001; alternative

DATE CHK APPBYREV DESCRIPTION

$FIL

E$

$P

LT

DR

VS$

$P

EN

TB

LS$

4:22:40

PM

11/3/2017

$U

SE

R$

ALTERNATIVE 2

KEY MAP

ARVIN

LAMONT

KEENE

0

1"=12000' HOR

12000 12000 24000

ST

A 17285

+00

OS

WE

LL

ST

RE

ET

BE

GI

N

SE

GM

EN

T 1

LOS ANGELES COUNTY

KERN COUNTY

TO BAKERSFIELD

STA 21233+00

EAST AVENUE O

END SEGMENT 4

TEHACHAPI

LA

NC

ASTER

ROS

AM

ON

D

WIL

LO

W SPRIN

GS

ANTEL

OPE

ACRES

TO P

AL

MD

ALE

STA 18325+00

BEALVILLE ROAD

BEGIN SEGMENT 2

END SEGMENT 1

STA 19665+00

SPRINGS ROAD

TEHACHAPI WILLOW

BEGIN SEGMENT 4

END SEGMENT 3

PALMDALE

LANCASTER

BAKERSFIELD

TEHACHAPI

ARVIN

CITYCALIFORNIA

VICINITY MAP

138

14

138

I5

I5

99

223

58184

178

20258

SHEET LIMITSCL SOUTHBOUND TRACKCL NORTHBOUND TRACK

LEGEND

MONOLITH

CV-I1008CV-I1002

CV-I1003

CV-I1

004

CV-I1005

CV-I1006

CV-I1007

STA 18900+00

BEGIN SEGMENT 3

END SEGMENT 2

DESIGNED BY

M. B.

DRAWN BY

A. CARSON

CHECKED BY

W. DURANT

IN CHARGE

S. SMITHDATE

10/31/2017

RECORD

PEPD SUBMITTAL

NOT FOR

CONSTRUCTION

CALIFORNIA HIGH-SPEED RAIL PROJECT

BAKERSFIELD TO PALMDALE

CONTRACT NO.

HSR13-44

DRAWING NO.

CV-C0005

SCALE

AS SHOWN

SHEET NO.

Page 6: RECORD PEPD DESIGN SUBMISSION€¦ · 10/31/2017. contract no. hsr13-44. drawing no. cv-b0002. scale. as shown. sheet no. general. drawing no. drawing description. cv-a0001; alternative

DATE CHK APPBYREV DESCRIPTION

$FIL

E$

$P

LT

DR

VS$

$P

EN

TB

LS$

4:23:13

PM

11/3/2017

$U

SE

R$

ALTERNATIVE 3

SHEET 1 OF 1

ARVIN

LAMONT

KEENE

0

1"=12000' HOR

12000 12000 24000

ST

A 17285

+00

OS

WE

LL

ST

RE

ET

BE

GI

N

SE

GM

EN

T 1

LOS ANGELES COUNTY

KERN COUNTY

TO BAKERSFIELD

STA 21233+00

EAST AVENUE O

END SEGMENT 4

TEHACHAPI

MONLITH

LA

NC

ASTER

ROS

AM

ON

D

WIL

LO

W SPRIN

GS

ANTEL

OPE

ACRES

TO P

AL

MD

ALE

STA 18325+00

BEALVILLE ROAD

BEGIN SEGMENT 2

END SEGMENT 1

STA 19665+00

SPRINGS ROAD

TEHACHAPI WILLOW

BEGIN SEGMENT 4

END SEGMENT 3

SHEET LIMITSCL SOUTHBOUND TRACKCL NORTHBOUND TRACK

LEGEND

PALMDALE

LANCASTER

BAKERSFIELD

TEHACHAPI

ARVIN

CITYCALIFORNIA

VICINITY MAP

138

14

138

I5

I5

99

223

58184

178

20258

CV-I1001CV-I1002

CV-I1003

CV-I1

009

CV-I1010

CV-I1006

CV-I1007

STA 18900+00

BEGIN SEGMENT 3

END SEGMENT 2

DESIGNED BY

M. B.

DRAWN BY

A. CARSON

CHECKED BY

W. DURANT

IN CHARGE

S. SMITHDATE

10/31/2017

RECORD

PEPD SUBMITTAL

NOT FOR

CONSTRUCTION

CALIFORNIA HIGH-SPEED RAIL PROJECT

BAKERSFIELD TO PALMDALE

CONTRACT NO.

HSR13-44

DRAWING NO.

CV-C0006

SCALE

AS SHOWN

SHEET NO.

Page 7: RECORD PEPD DESIGN SUBMISSION€¦ · 10/31/2017. contract no. hsr13-44. drawing no. cv-b0002. scale. as shown. sheet no. general. drawing no. drawing description. cv-a0001; alternative

DATE CHK APPBYREV DESCRIPTION

$FIL

E$

$P

LT

DR

VS$

$P

EN

TB

LS$

4:23:40

PM

11/3/2017

$U

SE

R$

ALTERNATIVE 5

KEY MAP

ARVIN

LAMONT

KEENE

0

1"=12000' HOR

12000 12000 24000

ST

A 17285

+00

OS

WE

LL

ST

RE

ET

BE

GI

N

SE

GM

EN

T 1

LOS ANGELES COUNTY

KERN COUNTY

TO BAKERSFIELD

STA 21233+00

EAST AVENUE O

END SEGMENT 4

TEHACHAPI

LA

NC

ASTER

ROS

AM

ON

D

WIL

LO

W SPRIN

GS

ANTEL

OPE

ACRES

TO P

AL

MD

ALE

STA 18325+00

BEALVILLE ROAD

BEGIN SEGMENT 2

END SEGMENT 1

STA 19665+00

SPRINGS ROAD

TEHACHAPI WILLOW

BEGIN SEGMENT 4

END SEGMENT 3

PALMDALE

LANCASTER

BAKERSFIELD

TEHACHAPI

ARVIN

CITYCALIFORNIA

VICINITY MAP

138

14

138

I5

I5

99

223

58184

178

20258

SHEET LIMITSCL SOUTHBOUND TRACKCL NORTHBOUND TRACK

LEGEND

CV-I1001CV-I1002

CV-I1003

CV-I1

004

CV-I1005

CV-I1006

CV-I1011

MONOLITH

STA 18900+00

BEGIN SEGMENT 3

END SEGMENT 2

DESIGNED BY

M. B.

DRAWN BY

A. CARSON

CHECKED BY

W. DURANT

IN CHARGE

S. SMITHDATE

10/31/2017

RECORD

PEPD SUBMITTAL

NOT FOR

CONSTRUCTION

CALIFORNIA HIGH-SPEED RAIL PROJECT

BAKERSFIELD TO PALMDALE

CONTRACT NO.

HSR13-44

DRAWING NO.

CV-C0007

SCALE

AS SHOWN

SHEET NO.

Page 8: RECORD PEPD DESIGN SUBMISSION€¦ · 10/31/2017. contract no. hsr13-44. drawing no. cv-b0002. scale. as shown. sheet no. general. drawing no. drawing description. cv-a0001; alternative

ALTERNATIVE 1

CONSTRUCTION SEQUENCING

SHEET 1 OF 11

DATE CHK APPBYREV DESCRIPTION

DESIGNED BY

M. B.

DRAWN BY

A. CARSON

CHECKED BY

W. DURANT

IN CHARGE

S. SMITHDATE

10/31/2017

$FIL

E$

$P

LT

DR

VS$

$P

EN

TB

LS$

4:43:29

PM

11/4/2017

$U

SE

R$

RECORD

PEPD SUBMITTAL

NOT FOR

CONSTRUCTION

PS

PS

SS

0

1"=2000' HOR

1000 1000 2000

SE

E

BE

LO

W

LE

FT

MA

TC

H

LI

NE

SE

E

AB

OV

E

RI

GH

T

MA

TC

H

LI

NE

SE

E

CV-I1002

MA

TC

H

LI

NE

17285+0017285+0017350+00 17400+00 17450+00

17500+00 17550+00

17600+00 17650+00 17700+00 17750+00 17800+00 17850+00

OS

WE

LL

ST

ST

ER

LI

NG

RD

PIONEER

DR

FAIR

FA

X

RD

E BRUNDAGE L

N

FILL

FILL

MO

RNI

NG

DRI

VE

MA

LA

GA

RO

AD

VI

NE

LA

ND

RD

EDIS

ON

RD

CO

MA

NC

HE

DRI

VE

TEJ

ON

HW

Y

TO

WE

RLI

NE

RO

AD

NE

UM

AR

KE

L

RO

AD

CA

LIE

NT

E

CR

EE

K

PHASE 1

PHASE 1

SR-58 RELOCATION

PHASE 2 PHASE 3SEGMENT 1

PHASE 2SEGMENT 1 PHASE 3

ACCESS ROAD

ACCESS ROAD

ACCESS ROAD

TPS

1.1 ACRESCONSTRUCTION LAYDOWN AREA

MOIS

ACCESS ROAD

ACCESS ROAD

ACCESS ROAD

TPS INTERCONNECTION LINE

12.0 ACRESRS&WA-1

6.1 ACRESCONSTRUCTION STAGING AREA

2. CONSTRUCT MALAGA RD. UP

1. CONSTRUCT VINELAND RD. UP

3. CONSTRUCT NEUMARKEL RD. UP

2. CONSTRUCT TEJON HWY. UP

1. CONSTRUCT SR-58 (110+00 to MULLER RD.)

4. CONSTRUCT CALIENTE CREEK UP

3. CONSTRUCT TOWERLINE RD. INTERCHANGE

2. CONSTRUCT COMANCHE DR. INTERCHANGE

1. SR-58 TEMPORARY RE-ALIGN SR-58 (110+00 TO MULLER RD.)

"ALL OTHER WORK SCHEDULED AT CONTRACTOR'S DISCRETION"

1. REALIGN SR-58 TO ULTIMATE

"ALL OTHER WORK SCHEDULED AT CONTRACTOR'S DISCRETION"

CHSR STRUCTURE

EDISON ROAD UC

1.2 ACRESCONSTRUCTION LAYDOWN AREA

0.7 ACRESCONSTRUCTION LAYDOWN AREA

45.1 ACRESAND PRE-CAST OPERATIONS AREA #1CONSTRUCTION STAGING, ROCK CRUSHING,

1.0 ACRESCONSTRUCTION LAYDOWN AREA

MORNING DRIVE UP

EDISON ROAD UP

VINELAND RD UP

MALAGA ROAD UP

TEJON HIGHWAY UP/UC

NEUMARKEL ROAD UP

COMANCHE DRIVE UP/UCTOWERLINE ROAD UP/UC

CALIENTE CREEK UP

CHSR STRUCTURE

UPRR SHOOFLY

5. CONSTRUCT EDISON RD. INTERCHANGE

4. CONSTRUCT MORNING DRIVE UP

3. CONSTRUCT TEMP UPRR SHOOFLY

2. CONSTRUCT ACCESS ROADS, MASS GRADING, AND CONSTRUCTION STAGING SITES

1. CONSTRUCT CHSR STRUCTURE 17285+00

CALIFORNIA HIGH-SPEED RAIL PROJECT

BAKERSFIELD TO PALMDALE

CONTRACT NO.

HSR13-44

DRAWING NO.

CV-I1001

SCALE

AS SHOWN

SHEET NO.

Page 9: RECORD PEPD DESIGN SUBMISSION€¦ · 10/31/2017. contract no. hsr13-44. drawing no. cv-b0002. scale. as shown. sheet no. general. drawing no. drawing description. cv-a0001; alternative

DATE CHK APPBYREV DESCRIPTION

$FIL

E$

$P

LT

DR

VS$

$P

EN

TB

LS$

4:43:27

PM

11/4/2017

$U

SE

R$

ALTERNATIVE 1

CONSTRUCTION SEQUENCING

SHEET 2 OF 11

0

1"=2000' HOR

1000 1000 2000

SEGMENT 1 PHASE 1

"ALL PHASING AT CONTRACTOR'S DISCRETION"

PHASE 2 PHASE 3

SW

SE

E

BE

LO

W

LE

FT

MA

TC

H

LI

NE

GE

NE

RA

L

BE

AL

E

RO

AD

BE

NA

RO

AD

CALIE

NTE

BO

DFIS

H

RO

AD

SE

E

CV-I1001

MA

TC

H

LI

NE

ROADWAY CONSTRUCTIONGENERAL BEALE ROADACCESS ROAD

TPF

SPOIL SITE-1POTENTIAL

SPOIL SITE-2POTENTIAL

SPOIL SITE-4POTENTIAL

STA 18158+15CALIENTE BODFISH ROAD UP

ACCESS ROAD

ACCESS ROAD

SPOIL SITE-3POTENTIAL

GENERAL BEALE RD. OH

CHSR STRUCTURE

(SEM)CHSR TUNNEL #1

(SEM)CHSR TUNNEL #2

6 ACRESLAYDOWN AREACONSTRUCTION

5.1 ACRESLAYDOWN AREACONSTRUCTION

17900+00 17950+00 18000+00 18050+00 18100+00 18150+00

SEGMENT 1/2 PHASE 1

"ALL PHASING AT CONTRACTOR'S DISCRETION"

PHASE 2 PHASE 3

SW

SE

E

AB

OV

E

RI

GH

T

MA

TC

H

LI

NE

ACCESS ROAD

ST

A 18

325

+00

BE

GIN

SE

GM

EN

T 2

EN

D

SE

GM

EN

T 1

BE

AL

VIL

LE

RO

AD

ACCESS ROAD

UPRREXISTING

SE

E

CV-I1003

MA

TC

H

LI

NE

ACCESS ROAD

CHSR STRUCTURE

GRADE CROSSINGBEALVILLE ROAD

CHSR STRUCTURE

TPS

(SEM)CHSR TUNNEL #3

(D&B)CHSR TUNNEL #4

4.9 ACRESLAYDOWN AREACONSTRUCTION

4.6 ACRESLAYDOWN AREACONSTRUCTION

18200+0018250+00

18300+0018350+00 18400+00

18450+00

BY

DESIGNED BY

M. B.

DRAWN BY

A. CARSON

CHECKED BY

W. DURANT

IN CHARGE

S. SMITHDATE

10/31/2017

RECORD

PEPD SUBMITTAL

NOT FOR

CONSTRUCTION

CALIFORNIA HIGH-SPEED RAIL PROJECT

BAKERSFIELD TO PALMDALE

CONTRACT NO.

HSR13-44

DRAWING NO.

CV-I1002

SCALE

AS SHOWN

SHEET NO.

Page 10: RECORD PEPD DESIGN SUBMISSION€¦ · 10/31/2017. contract no. hsr13-44. drawing no. cv-b0002. scale. as shown. sheet no. general. drawing no. drawing description. cv-a0001; alternative

ALTERNATIVE 1

CONSTRUCTION SEQUENCING

SHEET 3 OF 11

0

1"=2000' HOR

1000 1000 2000

SEGMENT 2 PHASE 1

"ALL PHASING AT CONTRACTOR'S DISCRETION"

PHASE 2 PHASE 3

PS

SE

E

BE

LO

W

LE

FT

MA

TC

H

LI

NE

ACCESS ROAD

ACCESS ROAD

ACCESS ROAD

ACCESS ROAD

UPRR TRACK

ACCESS ROAD

UPRR TRACK

SE

E

CV-I1002

MA

TC

H

LI

NE

TPS

ACCESS ROAD

CHSR STRUCTURE

STRUCTURECHSR

CHSR STRUCTURE

CHSR STRUCTURE

SR-58 UP

(D&B)CHSR TUNNEL #5

(D&B)CHSR TUNNEL #6

3.3 ACRESCONSTRUCTION LAYDOWN AREA

9.5 ACRESCONSTRUCTION STAGING AREA

ACCESS ROAD

18500+00

18550+00 18600+0018650+00

18700+0018750+00

SEGMENT 2/3 PHASE 1

"ALL PHASING AT CONTRACTOR'S DISCRETION"

PHASE 2 PHASE 3

PS

SS

SE

E

AB

OV

E

RI

GH

T

MA

TC

H

LI

NE

UPRR TRACK ST

A 18

900

+00

BE

GIN

SE

GM

EN

T 3

EN

D

SE

GM

EN

T 2

UPRR TRACK

ACCESS ROAD

ACCESS ROAD

SE

E

CV-I1004

MA

TC

H

LI

NE

TPS

LINEINTERCONNECTION

TPS

ACCESS ROAD

SR-58 OHSR-58 UP

TPS

(TBM)CHSR TUNNEL #7

3.3 ACRESLAYDOWN AREACONSTRUCTION

18800+0018850+00

18900+00 18950+00 19000+00

19050+00

DATE CHK APPBYREV DESCRIPTION

$FIL

E$

$P

LT

DR

VS$

$P

EN

TB

LS$

4:43:28

PM

11/4/2017

$U

SE

R$

DESIGNED BY

M. B.

DRAWN BY

A. CARSON

CHECKED BY

W. DURANT

IN CHARGE

S. SMITHDATE

10/31/2017

RECORD

PEPD SUBMITTAL

NOT FOR

CONSTRUCTION

CALIFORNIA HIGH-SPEED RAIL PROJECT

BAKERSFIELD TO PALMDALE

CONTRACT NO.

HSR13-44

DRAWING NO.

CV-I1003

SCALE

AS SHOWN

SHEET NO.