CONSTRUCTION SEQUENCE
RECORD PEPD DESIGN SUBMISSION Bakersfield to Palmdale
CONSTRUCTION SEQUENCE
October 2017
RECORD
PEPD SUBMITTAL
NOT FOR
CONSTRUCTION
CALIFORNIA HIGH-SPEED RAIL PROJECT
BAKERSFIELD TO PALMDALEALTERNATIVE 1,2,3,5
INDEX OF SHEETS
DESIGNED BY
M. B.
DRAWN BY
A. CARSON
CHECKED BY
W. DURANT
IN CHARGE
S. SMITHDATE
10/31/2017
CONTRACT NO.
HSR13-44
DRAWING NO.
CV-B0002
SCALE
AS SHOWN
SHEET NO.
GENERAL
DRAWING No. DRAWING DESCRIPTION
CV-A0001 ALTERNATIVE 1,2,3,5 COVER SHEET
CV-B0002 ALTERNATIVE 1,2,3,5 INDEX OF SHEETS
CV-B0003 ALTERNATIVE 1,2,3,5 NOTES & LEGEND
CV-C0004 ALTERNATIVE 1 KEY MAP SHEET 1 OF 1
CV-C0005 ALTERNATIVE 2 KEY MAP SHEET 1 OF 1
CV-C0006 ALTERNATIVE 3 KEY MAP SHEET 1 OF 1
CV-C0007 ALTERNATIVE 5 KEY MAP SHEET 1 OF 1
CONSTRUCTION SEQUENCE
DRAWING No. DRAWING DESCRIPTION
CV-I1001 ALTERNATIVE 1 CONSTRUCTION SEQUENCE SHEET 1 OF 11
CV-I1002 ALTERNATIVE 1 CONSTRUCTION SEQUENCE SHEET 2 OF 11
CV-I1003 ALTERNATIVE 1 CONSTRUCTION SEQUENCE SHEET 3 OF 11
CV-I1004 ALTERNATIVE 1 CONSTRUCTION SEQUENCE SHEET 4 OF 11
CV-I1005 ALTERNATIVE 1 CONSTRUCTION SEQUENCE SHEET 5 OF 11
CV-I1006 ALTERNATIVE 1 CONSTRUCTION SEQUENCE SHEET 6 OF 11
CV-I1007 ALTERNATIVE 1 CONSTRUCTION SEQUENCE SHEET 7 OF 11
CV-I1008 ALTERNATIVE 2 CONSTRUCTION SEQUENCE SHEET 8 OF 11
CV-I1009 ALTERNATIVE 3 CONSTRUCTION SEQUENCE SHEET 9 OF 11
CV-I1010 ALTERNATIVE 3 CONSTRUCTION SEQUENCE SHEET 10 OF 11
CV-I1011 ALTERNATIVE 5 CONSTRUCTION SEQUENCE SHEET 11 OF 11
DATE CHK APPBYREV DESCRIPTION
$FIL
E$
$P
LT
DR
VS$
$P
EN
TB
LS$
4:23:18
PM
11/3/2017
$U
SE
R$
ALTERNATIVE 1,2,3,5
NOTES & LEGEND
LEGEND
NORTH ARROW
PROPOSED TEMPORARY ENVIRONMENTAL FOOTPRINT
PROPOSED PERMANENT ENVIRONMENTAL FOOTPRINT
LIMITS OF EXCAVATION (CUT)
LIMITS OF EMBANKMENT (FILL)
CONSTRUCTION STAGING / LAYDOWN AREA, ROCK CRUSHING PLANT,OR ROCK CRUSHING & PRECAST OPERATIONS YARD
PROPOSED RETAINING WALL
PHASE 1
PHASE 2
PHASE 3
CUT AREAS
FILL AREAS
MOIF, MOIS, LMF, TPF, TPS
RS-WA
POTENTIAL SPOIL SITE
DATE CHK APPBYREV DESCRIPTION
$FIL
E$
$P
LT
DR
VS$
$P
EN
TB
LS$
4:18:49
PM
11/3/2017
$U
SE
R$
GENERAL NOTES
1. DETAILED CONSTRUCTION SEQUENCE FOR GRADE SEPARATIONS IS NOT
PROVIDED IN THIS SET OF PLANS. UTILITY RELOCATIONS ARE NOT SHOWN.
2. TRAFFIC DETOURS ARE NOT SHOWN IN THIS SET OF PLANS.
3. LAYDOWN AREAS, STAGING AREAS AND OTHER CONTRACTOR'S FACILITIES
ARE INCLUDED IN THIS SET OF PLANS.
4. DETAILED PHASING OF LONG CHSR VIADUCTS ARE NOT SHOWN.
5. LMF (LIGHT MAINTENANCE FACILITY), MOIF (MAINTENANCE OF
INFRASTRUCTURE FACILITY), MOIS (MAINTENANCE OF INFRASTRUCTURE SIDING),
TPF (TRACTION POWER FACILITY), TPS (TRACTION POWER SUBSTATION) ARE SHOWN,
BUT NOT INCLUDED IN THE SEQUENCING.
6. CONSTRUCTION PHASES WILL OVERLAP AS NEEDED TO REDUCE CONSTRUCTION
DURATIONS.
7. DRAINAGE OVERCROSSINGS ALONG THE ALIGNMENTS ARE NOT SHOWN IN THE
SEQUENCING PLANS.
ABBREVIATIONS
CHSR CALIFORNIA HIGHSPEED RAIL
D&B DRILL AND BLAST
LMF LIGHT MAINTENANCE FACILITY
MOIF MAINTENANCE OF INFRASTRUCTURE FACILITY
OH OVERHEAD
RS-WA RAIL STORAGE & WELDING AREA
SEM SEQUENTIAL EXCAVATION METHOD
STA STATION
TPF TRACTION POWER FACILITY
TPS TRACTION POWER SUBSTATION
TBM TUNNEL BORING MACHINE
UP/UC UNDERPASS / UNDERCROSSING
UPRR UNION PACIFIC RAILROAD
DESIGNED BY
M. B.
DRAWN BY
A. CARSON
CHECKED BY
W. DURANT
IN CHARGE
S. SMITHDATE
10/31/2017
RECORD
PEPD SUBMITTAL
NOT FOR
CONSTRUCTION
CALIFORNIA HIGH-SPEED RAIL PROJECT
BAKERSFIELD TO PALMDALE
CONTRACT NO.
HSR13-44
DRAWING NO.
CV-B0003
SCALE
AS SHOWN
SHEET NO.
DATE CHK APPBYREV DESCRIPTION
$FIL
E$
$P
LT
DR
VS$
$P
EN
TB
LS$
4:23:50
PM
11/3/2017
$U
SE
R$
ALTERNATIVE 1
KEY MAP
ARVIN
LAMONT
KEENE
0
1"=12000' HOR
12000 12000 24000
ST
A 17285
+00
OS
WE
LL
ST
RE
ET
BE
GI
N
SE
GM
EN
T 1
LOS ANGELES COUNTY
KERN COUNTY
TO BAKERSFIELD
STA 21233+00
EAST AVENUE O
END SEGMENT 4
TEHACHAPI
LA
NC
ASTER
ROS
AM
ON
D
WIL
LO
W SPRIN
GS
ANTEL
OPE
ACRES
STA 18325+00
BEALVILLE ROAD
BEGIN SEGMENT 2
END SEGMENT 1
STA 19665+00
SPRINGS ROAD
TEHACHAPI WILLOW
BEGIN SEGMENT 4
END SEGMENT 3
TO P
AL
MD
ALEPALMDALE
LANCASTER
BAKERSFIELD
TEHACHAPI
ARVIN
CITYCALIFORNIA
VICINITY MAP
138
14
138
I5
I5
99
223
58184
178
20258
SHEET LIMITSCL SOUTHBOUND TRACKCL NORTHBOUND TRACK
LEGEND
CV-I1001
MONOLITH
CV-I1002
CV-I1003
CV-I1
004
CV-I1005
CV-I1006
CV-I1007
STA 18900+00
BEGIN SEGMENT 3
END SEGMENT 2
DESIGNED BY
M. B.
DRAWN BY
A. CARSON
CHECKED BY
W. DURANT
IN CHARGE
S. SMITHDATE
10/31/2017
RECORD
PEPD SUBMITTAL
NOT FOR
CONSTRUCTION
CALIFORNIA HIGH-SPEED RAIL PROJECT
BAKERSFIELD TO PALMDALE
CONTRACT NO.
HSR13-44
DRAWING NO.
CV-C0004
SCALE
AS SHOWN
SHEET NO.
DATE CHK APPBYREV DESCRIPTION
$FIL
E$
$P
LT
DR
VS$
$P
EN
TB
LS$
4:22:40
PM
11/3/2017
$U
SE
R$
ALTERNATIVE 2
KEY MAP
ARVIN
LAMONT
KEENE
0
1"=12000' HOR
12000 12000 24000
ST
A 17285
+00
OS
WE
LL
ST
RE
ET
BE
GI
N
SE
GM
EN
T 1
LOS ANGELES COUNTY
KERN COUNTY
TO BAKERSFIELD
STA 21233+00
EAST AVENUE O
END SEGMENT 4
TEHACHAPI
LA
NC
ASTER
ROS
AM
ON
D
WIL
LO
W SPRIN
GS
ANTEL
OPE
ACRES
TO P
AL
MD
ALE
STA 18325+00
BEALVILLE ROAD
BEGIN SEGMENT 2
END SEGMENT 1
STA 19665+00
SPRINGS ROAD
TEHACHAPI WILLOW
BEGIN SEGMENT 4
END SEGMENT 3
PALMDALE
LANCASTER
BAKERSFIELD
TEHACHAPI
ARVIN
CITYCALIFORNIA
VICINITY MAP
138
14
138
I5
I5
99
223
58184
178
20258
SHEET LIMITSCL SOUTHBOUND TRACKCL NORTHBOUND TRACK
LEGEND
MONOLITH
CV-I1008CV-I1002
CV-I1003
CV-I1
004
CV-I1005
CV-I1006
CV-I1007
STA 18900+00
BEGIN SEGMENT 3
END SEGMENT 2
DESIGNED BY
M. B.
DRAWN BY
A. CARSON
CHECKED BY
W. DURANT
IN CHARGE
S. SMITHDATE
10/31/2017
RECORD
PEPD SUBMITTAL
NOT FOR
CONSTRUCTION
CALIFORNIA HIGH-SPEED RAIL PROJECT
BAKERSFIELD TO PALMDALE
CONTRACT NO.
HSR13-44
DRAWING NO.
CV-C0005
SCALE
AS SHOWN
SHEET NO.
DATE CHK APPBYREV DESCRIPTION
$FIL
E$
$P
LT
DR
VS$
$P
EN
TB
LS$
4:23:13
PM
11/3/2017
$U
SE
R$
ALTERNATIVE 3
SHEET 1 OF 1
ARVIN
LAMONT
KEENE
0
1"=12000' HOR
12000 12000 24000
ST
A 17285
+00
OS
WE
LL
ST
RE
ET
BE
GI
N
SE
GM
EN
T 1
LOS ANGELES COUNTY
KERN COUNTY
TO BAKERSFIELD
STA 21233+00
EAST AVENUE O
END SEGMENT 4
TEHACHAPI
MONLITH
LA
NC
ASTER
ROS
AM
ON
D
WIL
LO
W SPRIN
GS
ANTEL
OPE
ACRES
TO P
AL
MD
ALE
STA 18325+00
BEALVILLE ROAD
BEGIN SEGMENT 2
END SEGMENT 1
STA 19665+00
SPRINGS ROAD
TEHACHAPI WILLOW
BEGIN SEGMENT 4
END SEGMENT 3
SHEET LIMITSCL SOUTHBOUND TRACKCL NORTHBOUND TRACK
LEGEND
PALMDALE
LANCASTER
BAKERSFIELD
TEHACHAPI
ARVIN
CITYCALIFORNIA
VICINITY MAP
138
14
138
I5
I5
99
223
58184
178
20258
CV-I1001CV-I1002
CV-I1003
CV-I1
009
CV-I1010
CV-I1006
CV-I1007
STA 18900+00
BEGIN SEGMENT 3
END SEGMENT 2
DESIGNED BY
M. B.
DRAWN BY
A. CARSON
CHECKED BY
W. DURANT
IN CHARGE
S. SMITHDATE
10/31/2017
RECORD
PEPD SUBMITTAL
NOT FOR
CONSTRUCTION
CALIFORNIA HIGH-SPEED RAIL PROJECT
BAKERSFIELD TO PALMDALE
CONTRACT NO.
HSR13-44
DRAWING NO.
CV-C0006
SCALE
AS SHOWN
SHEET NO.
DATE CHK APPBYREV DESCRIPTION
$FIL
E$
$P
LT
DR
VS$
$P
EN
TB
LS$
4:23:40
PM
11/3/2017
$U
SE
R$
ALTERNATIVE 5
KEY MAP
ARVIN
LAMONT
KEENE
0
1"=12000' HOR
12000 12000 24000
ST
A 17285
+00
OS
WE
LL
ST
RE
ET
BE
GI
N
SE
GM
EN
T 1
LOS ANGELES COUNTY
KERN COUNTY
TO BAKERSFIELD
STA 21233+00
EAST AVENUE O
END SEGMENT 4
TEHACHAPI
LA
NC
ASTER
ROS
AM
ON
D
WIL
LO
W SPRIN
GS
ANTEL
OPE
ACRES
TO P
AL
MD
ALE
STA 18325+00
BEALVILLE ROAD
BEGIN SEGMENT 2
END SEGMENT 1
STA 19665+00
SPRINGS ROAD
TEHACHAPI WILLOW
BEGIN SEGMENT 4
END SEGMENT 3
PALMDALE
LANCASTER
BAKERSFIELD
TEHACHAPI
ARVIN
CITYCALIFORNIA
VICINITY MAP
138
14
138
I5
I5
99
223
58184
178
20258
SHEET LIMITSCL SOUTHBOUND TRACKCL NORTHBOUND TRACK
LEGEND
CV-I1001CV-I1002
CV-I1003
CV-I1
004
CV-I1005
CV-I1006
CV-I1011
MONOLITH
STA 18900+00
BEGIN SEGMENT 3
END SEGMENT 2
DESIGNED BY
M. B.
DRAWN BY
A. CARSON
CHECKED BY
W. DURANT
IN CHARGE
S. SMITHDATE
10/31/2017
RECORD
PEPD SUBMITTAL
NOT FOR
CONSTRUCTION
CALIFORNIA HIGH-SPEED RAIL PROJECT
BAKERSFIELD TO PALMDALE
CONTRACT NO.
HSR13-44
DRAWING NO.
CV-C0007
SCALE
AS SHOWN
SHEET NO.
ALTERNATIVE 1
CONSTRUCTION SEQUENCING
SHEET 1 OF 11
DATE CHK APPBYREV DESCRIPTION
DESIGNED BY
M. B.
DRAWN BY
A. CARSON
CHECKED BY
W. DURANT
IN CHARGE
S. SMITHDATE
10/31/2017
$FIL
E$
$P
LT
DR
VS$
$P
EN
TB
LS$
4:43:29
PM
11/4/2017
$U
SE
R$
RECORD
PEPD SUBMITTAL
NOT FOR
CONSTRUCTION
PS
PS
SS
0
1"=2000' HOR
1000 1000 2000
SE
E
BE
LO
W
LE
FT
MA
TC
H
LI
NE
SE
E
AB
OV
E
RI
GH
T
MA
TC
H
LI
NE
SE
E
CV-I1002
MA
TC
H
LI
NE
17285+0017285+0017350+00 17400+00 17450+00
17500+00 17550+00
17600+00 17650+00 17700+00 17750+00 17800+00 17850+00
OS
WE
LL
ST
ST
ER
LI
NG
RD
PIONEER
DR
FAIR
FA
X
RD
E BRUNDAGE L
N
FILL
FILL
MO
RNI
NG
DRI
VE
MA
LA
GA
RO
AD
VI
NE
LA
ND
RD
EDIS
ON
RD
CO
MA
NC
HE
DRI
VE
TEJ
ON
HW
Y
TO
WE
RLI
NE
RO
AD
NE
UM
AR
KE
L
RO
AD
CA
LIE
NT
E
CR
EE
K
PHASE 1
PHASE 1
SR-58 RELOCATION
PHASE 2 PHASE 3SEGMENT 1
PHASE 2SEGMENT 1 PHASE 3
ACCESS ROAD
ACCESS ROAD
ACCESS ROAD
TPS
1.1 ACRESCONSTRUCTION LAYDOWN AREA
MOIS
ACCESS ROAD
ACCESS ROAD
ACCESS ROAD
TPS INTERCONNECTION LINE
12.0 ACRESRS&WA-1
6.1 ACRESCONSTRUCTION STAGING AREA
2. CONSTRUCT MALAGA RD. UP
1. CONSTRUCT VINELAND RD. UP
3. CONSTRUCT NEUMARKEL RD. UP
2. CONSTRUCT TEJON HWY. UP
1. CONSTRUCT SR-58 (110+00 to MULLER RD.)
4. CONSTRUCT CALIENTE CREEK UP
3. CONSTRUCT TOWERLINE RD. INTERCHANGE
2. CONSTRUCT COMANCHE DR. INTERCHANGE
1. SR-58 TEMPORARY RE-ALIGN SR-58 (110+00 TO MULLER RD.)
"ALL OTHER WORK SCHEDULED AT CONTRACTOR'S DISCRETION"
1. REALIGN SR-58 TO ULTIMATE
"ALL OTHER WORK SCHEDULED AT CONTRACTOR'S DISCRETION"
CHSR STRUCTURE
EDISON ROAD UC
1.2 ACRESCONSTRUCTION LAYDOWN AREA
0.7 ACRESCONSTRUCTION LAYDOWN AREA
45.1 ACRESAND PRE-CAST OPERATIONS AREA #1CONSTRUCTION STAGING, ROCK CRUSHING,
1.0 ACRESCONSTRUCTION LAYDOWN AREA
MORNING DRIVE UP
EDISON ROAD UP
VINELAND RD UP
MALAGA ROAD UP
TEJON HIGHWAY UP/UC
NEUMARKEL ROAD UP
COMANCHE DRIVE UP/UCTOWERLINE ROAD UP/UC
CALIENTE CREEK UP
CHSR STRUCTURE
UPRR SHOOFLY
5. CONSTRUCT EDISON RD. INTERCHANGE
4. CONSTRUCT MORNING DRIVE UP
3. CONSTRUCT TEMP UPRR SHOOFLY
2. CONSTRUCT ACCESS ROADS, MASS GRADING, AND CONSTRUCTION STAGING SITES
1. CONSTRUCT CHSR STRUCTURE 17285+00
CALIFORNIA HIGH-SPEED RAIL PROJECT
BAKERSFIELD TO PALMDALE
CONTRACT NO.
HSR13-44
DRAWING NO.
CV-I1001
SCALE
AS SHOWN
SHEET NO.
DATE CHK APPBYREV DESCRIPTION
$FIL
E$
$P
LT
DR
VS$
$P
EN
TB
LS$
4:43:27
PM
11/4/2017
$U
SE
R$
ALTERNATIVE 1
CONSTRUCTION SEQUENCING
SHEET 2 OF 11
0
1"=2000' HOR
1000 1000 2000
SEGMENT 1 PHASE 1
"ALL PHASING AT CONTRACTOR'S DISCRETION"
PHASE 2 PHASE 3
SW
SE
E
BE
LO
W
LE
FT
MA
TC
H
LI
NE
GE
NE
RA
L
BE
AL
E
RO
AD
BE
NA
RO
AD
CALIE
NTE
BO
DFIS
H
RO
AD
SE
E
CV-I1001
MA
TC
H
LI
NE
ROADWAY CONSTRUCTIONGENERAL BEALE ROADACCESS ROAD
TPF
SPOIL SITE-1POTENTIAL
SPOIL SITE-2POTENTIAL
SPOIL SITE-4POTENTIAL
STA 18158+15CALIENTE BODFISH ROAD UP
ACCESS ROAD
ACCESS ROAD
SPOIL SITE-3POTENTIAL
GENERAL BEALE RD. OH
CHSR STRUCTURE
(SEM)CHSR TUNNEL #1
(SEM)CHSR TUNNEL #2
6 ACRESLAYDOWN AREACONSTRUCTION
5.1 ACRESLAYDOWN AREACONSTRUCTION
17900+00 17950+00 18000+00 18050+00 18100+00 18150+00
SEGMENT 1/2 PHASE 1
"ALL PHASING AT CONTRACTOR'S DISCRETION"
PHASE 2 PHASE 3
SW
SE
E
AB
OV
E
RI
GH
T
MA
TC
H
LI
NE
ACCESS ROAD
ST
A 18
325
+00
BE
GIN
SE
GM
EN
T 2
EN
D
SE
GM
EN
T 1
BE
AL
VIL
LE
RO
AD
ACCESS ROAD
UPRREXISTING
SE
E
CV-I1003
MA
TC
H
LI
NE
ACCESS ROAD
CHSR STRUCTURE
GRADE CROSSINGBEALVILLE ROAD
CHSR STRUCTURE
TPS
(SEM)CHSR TUNNEL #3
(D&B)CHSR TUNNEL #4
4.9 ACRESLAYDOWN AREACONSTRUCTION
4.6 ACRESLAYDOWN AREACONSTRUCTION
18200+0018250+00
18300+0018350+00 18400+00
18450+00
BY
DESIGNED BY
M. B.
DRAWN BY
A. CARSON
CHECKED BY
W. DURANT
IN CHARGE
S. SMITHDATE
10/31/2017
RECORD
PEPD SUBMITTAL
NOT FOR
CONSTRUCTION
CALIFORNIA HIGH-SPEED RAIL PROJECT
BAKERSFIELD TO PALMDALE
CONTRACT NO.
HSR13-44
DRAWING NO.
CV-I1002
SCALE
AS SHOWN
SHEET NO.
ALTERNATIVE 1
CONSTRUCTION SEQUENCING
SHEET 3 OF 11
0
1"=2000' HOR
1000 1000 2000
SEGMENT 2 PHASE 1
"ALL PHASING AT CONTRACTOR'S DISCRETION"
PHASE 2 PHASE 3
PS
SE
E
BE
LO
W
LE
FT
MA
TC
H
LI
NE
ACCESS ROAD
ACCESS ROAD
ACCESS ROAD
ACCESS ROAD
UPRR TRACK
ACCESS ROAD
UPRR TRACK
SE
E
CV-I1002
MA
TC
H
LI
NE
TPS
ACCESS ROAD
CHSR STRUCTURE
STRUCTURECHSR
CHSR STRUCTURE
CHSR STRUCTURE
SR-58 UP
(D&B)CHSR TUNNEL #5
(D&B)CHSR TUNNEL #6
3.3 ACRESCONSTRUCTION LAYDOWN AREA
9.5 ACRESCONSTRUCTION STAGING AREA
ACCESS ROAD
18500+00
18550+00 18600+0018650+00
18700+0018750+00
SEGMENT 2/3 PHASE 1
"ALL PHASING AT CONTRACTOR'S DISCRETION"
PHASE 2 PHASE 3
PS
SS
SE
E
AB
OV
E
RI
GH
T
MA
TC
H
LI
NE
UPRR TRACK ST
A 18
900
+00
BE
GIN
SE
GM
EN
T 3
EN
D
SE
GM
EN
T 2
UPRR TRACK
ACCESS ROAD
ACCESS ROAD
SE
E
CV-I1004
MA
TC
H
LI
NE
TPS
LINEINTERCONNECTION
TPS
ACCESS ROAD
SR-58 OHSR-58 UP
TPS
(TBM)CHSR TUNNEL #7
3.3 ACRESLAYDOWN AREACONSTRUCTION
18800+0018850+00
18900+00 18950+00 19000+00
19050+00
DATE CHK APPBYREV DESCRIPTION
$FIL
E$
$P
LT
DR
VS$
$P
EN
TB
LS$
4:43:28
PM
11/4/2017
$U
SE
R$
DESIGNED BY
M. B.
DRAWN BY
A. CARSON
CHECKED BY
W. DURANT
IN CHARGE
S. SMITHDATE
10/31/2017
RECORD
PEPD SUBMITTAL
NOT FOR
CONSTRUCTION
CALIFORNIA HIGH-SPEED RAIL PROJECT
BAKERSFIELD TO PALMDALE
CONTRACT NO.
HSR13-44
DRAWING NO.
CV-I1003
SCALE
AS SHOWN
SHEET NO.