Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of...
Transcript of Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of...
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
COMMERCIAL & INDUSTRIAL
Weifield Group has a broad range of current and past project experience. Our portfolio includes education, healthcare, transportation, offices, U.S. military, hotels/ hospitality, government/service, and more. We are also a leader in Leadership in Energy and Environmental Design (LEED) standards, completing Denver’s first net‐zero energy building and the first LEED Platinum office building built in Colorado. The following is a summary of Weifield Group’s current and past experience by industry type. We’ve included specific contact information for the owners/partners we’ve worked with so you may contact them about our performance.
About Weifield Group Contracting
Weifield Group Contracting is a
full‐service, privately held electrical company. We have a diverse portfolio of experience in the western electrical business
region.
Weifield Group prides ourselves in our attention to detail, and our ability to deliver the highest level of customer satisfaction.
Whatever the need –
electrical remodeling, new construction, maintenance for wholesale, retail, telecom, non‐profit businesses, or industrial—Weifield Group can help. We are
confident our experience, communication, innovative ideas and cost‐effective
approach will deliver significant value to your critical project. www.weifieldcontracting.com
A Focus on Safety We ensure the safety of our workers, contractors, and the public through
diligent planning, training, and resources. Our employees are certified to use the equipment they operate, and are governed by OSHA regulations. Regular safety inspections are administered by our full‐time safety manager, and
safety training is an ongoing scheduled activity.
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
PROJECTS IN PROCESS
T IC CORPORATE TRAIN ING CENTER | AURORA, CO The Industrical Company (TIC) | Owner FCI Constructors, Inc. | General Contractor | Dax Diaz | 970.535.4725 Davis Partnerships | Architect | Nicolas Allan MV Consulting | Electrical Engineer | Dan Kozisek | 303.325.3271 PROJECT DURATION: May 2015 – Mar. 2016 | PROJECT CONTRACT: $1.2M PROJECT MANAGER AND FOREMAN: Kevin Knox and Lance Davis This design‐assist project includes furnishing and installing complete mechanical (HVAC and plumbing) and electrical systems required for the new TIC corporate training facility in Aurora, Colorado. Project includes approximately 26,000 sq. ft. of single‐story conventional construction of an administration building and 25,000 sq. ft. of pre‐engineered metal buildings. The project will be developed on approximately 11 acres of TIC/Kiewit’s 59‐acre site.
RUNYON ELEMENTARY SCHOOL | L ITTLETON, CO Littleton Public Schools District | Owner | 303.347.4365 GH Phipps | General Contractor Yon Tanner | Architect | Roy E. Tanner | 303.691.8000 MEP | Electrical Engineer | Clara Muller | 303.936.1633 PROJECT DURATION: June 2015 – Mar. 2016 PROJECT CONTRACT: $868K PROJECT MANAGER AND FOREMAN: Tristan Covington and Mark Bogle The project scope includes removal of the existing wood structure roof, and replacing it with a new steel superstructure and roof. Weifield will also install all lighting, lighting controls, branch wiring, and fire alarm systems. All electrical systems installed overhead in the existing building will be new.
FORT MORGAN MIDDLE SCHOOL | FT . MORGAN, CO Ft. Morgan School District | Owner Haselden Construction | General Contractor Wold Architects and Engineers and Larson Incitti Architects| Architect ME Group | Electrical Engineer PROJECT DURATION: May 2015 – Aug. 2016 PROJECT CONTRACT: $2.1M PROJECT MANAGER AND FOREMAN: Tristan Covington, FS ‐ TBD Design‐build project that will consist of a new 114,632 sq. ft. K‐8 school located in Fort Morgan, Colorado, that will replace the existing nearly century‐old middle school. The Project will be designed and constructed via high performance building standards with a desired goal to achieve Leadership in Energy and Environmental Design‐Gold (LEED Gold) rating designation within the Project budget and schedule parameters.
PLATTE VALLEY MEDICAL CENTER MOB#2 | BR IGHTON, CO Platte Valley Medical Center | Owner GH Phipps | General Contractor | Jason Foisset | 303‐389‐3718 WHR Architects | Architect Cator Ruma & Associates | Electrical Engineer | Marc Valerius | 303‐232‐6200 PROJECT DURATION: Jan. 2015 – Feb. 2016 PROJECT CONTRACT: $1.1M PROJECT MANAGER AND FOREMAN: Russell Tafoya, John Ehrens Design‐build project that will consist of a new 60,000SF 3‐story Core & Shell MOB, 3,000SF connection between MOB #2 and the existing MOB, and 150,000SF of new surface parking lots located to the south of the new MOB.
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
LARAMIE HIGH SCHOOL | LARAMIE , WY Albany County School District #1 | Owner Haselden Construction | General Contractor | Ben Barella | 307‐234‐7991 Lantz‐Boggio | Architect | 303‐773‐0436 MKK Engineers | Electrical Engineer | 307‐634‐7647 PROJECT DURATION: Oct. 2014 – Aug. 2016 PROJECT CONTRACT: $10M PROJECT MANAGER AND FOREMAN: Russell Tafoya, James Sammon This project consists of a new 300,000SF high school located in Laramie, WY. Weifield was originally contracted to complete the new electrical infrastructure for the high school and then was awarded the high school contract. The new high school will be comprised of classroom wings, a swimming pool, orchestra pit, gymnasiums and associated locker rooms, soccer field, football stadium with grandstands on the east and west sides, tennis courts, and parking areas.
CNR CONF IDENT IAL DATA CENTERS |CHEYENNE , WY Private Client | Owner Hensel Phelps | General Contractor | Confidential | Architect Confidential | Engineer | PROJECT DURATION: Dec 2014 – June 2015 PROJECT CONTRACT: $4M PROJECT MANAGER AND FOREMAN: Dustin Tafoya & Matt Flinn Electrical build out to four 7,800 ft² data center buildings. Each building has a 2000KW generator, (2) 1200A Main Switchboards (for redundancy), 350KW UPS, 4000A DC Plant. Each building also includes high security (card readers, biometric readers).
17 WEWATTA | DENVER , CO Holland Partners | Owner Holland Construction | General Contractor | Michael Callahan | 303.520.4452 Shears Adkins Rockmore| Architect | Andy Rockmore | 303.436.9551 MV Consulting | Electrical Engineer | Marcus Vahling | 303.325.3271 PROJECT DURATION: Sep. 2014 – Apr. 2017 PROJECT CONTRACT: $11.7M PROJECT MANAGER AND FOREMAN: Dustin Tafoya, Nick Bull The Project consists of a phased mixed‐use building on an 87,350 square foot vacant site in the Union Station Master Plan development bounded by Wewatta Street, Chestnut Street, 17th Street, and 18th Street in Denver, Colorado. The building will be Type I construction, and will include one level of underground parking for approximately 200 spaces, a ground level consisting of approximately 85,000 square feet of retail space, services, and residential lobbies; a partial mezzanine level parking deck; two levels of above‐grade parking for approximately 400 spaces; a fourth floor podium level amenity space, complete with swimming pool and deck, landscaping, shade structures, and, a common amenity structure including space for a fitness center, theater, game room, lounge, clubhouse and other amenities; levels 4 – 13 are residential apartments constructed in three towers as described herein. Total GSF for the project is approximately 934,000.
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
COUNTRY CLUB TOWERS | DENVER , CO BROE Real Estate Services| Owner Swinerton Builders | General Contractor | Aaron Townsend | 970.535.4725 Shears Adkins Rockmore| Architect | Andy Rockmore | 303.436.9551 MV Consulting | Electrical Engineer | Marcus Vahling | 303.325.3271 PROJECT DURATION: Sep. 2014 – Apr. 2017 PROJECT CONTRACT: $12.3M PROJECT MANAGER AND FOREMAN: Russell Tafoya, Scott Buckey The Country Club Towers II & III project consists of 495 luxury residential for‐rent apartment units, three levels of below grade parking, four levels of above grade parking, a large amenity deck, and associated common space for leasing offices and resident amenities. The residential high‐rise component consists of two (2), 30 story towers. The residential and interior common spaces total approximately 623,000sf of heated space. Design‐Build project consisting of just under 1 million gross square feet.
L IMON K ‐12 SCHOOL | L IMON, CO Limon School District| Owner Haselden Construction LLC | General Contractor | Bob Fox | 303.751.1478 klipp| Architect | Jay Ireland | 303.893.1990 x5216 Me Group | Electrical Engineer | Omar Tlamcani | 303.382.1920 x 4119 PROJECT DURATION: Jun. 2014 – Oct. 2015 PROJECT CONTRACT: $1.7M PROJECT MANAGER AND FOREMAN: Tristan Covington The project is a new best grant K‐12 school for the Limon, Colorado School District. The project consists of 85,500 square feet of new classroom, minor upgrades to the existing gymnasium and auditorium, connections to temporary classrooms, and site renovations.
TERUMO BCT HEADQUARTERS | LAKEWOOD, CO Terumo | Owner | 303.231.4576 Swinerton Builders | General Contractor | John Spight | 303.418.5300 Gensler | Architect | 303.893.7159 Cator Ruma | Electrical Engineer | 303‐232.6200 PROJECT DURATION: Apr. 2014‐ Feb. 2015 PROJECT CONTRACT: $2.1M PROJECT MANAGER AND FOREMAN: Dustin Tafoya, Chris Schreffler The three story building will have 40,000 SF floor plates comprising a total of 120,000 SF total and will integrate into Terumo BCT’s campus. It is the intent of Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately 10,000 SF on the first floor. The remainder of the first floor will be constructed for future conversion to office, initially utilized for parking. The approximately 7 acre site will include surface parking to retain a campus parking ratio of 2/1000.
COLORADO SCHOOL OF MINES ATHLET IC CENTER | GOLDEN, CO Colorado School of Mines | Owner | 303.273.3000 GH Phipps | General Contractor | Mike Hester | 719.499.7444 Heery International Inc. | Architect | 404.881.9880 BCER | Electrical Engineer | 303‐936‐1633 PROJECT DURATION: Apr. 2014‐ July 2015 PROJECT CONTRACT: $2.7M PROJECT MANAGER AND FOREMAN: Russell Tafoya, Scott Buckey The project will include construction of a new 54,800 GSF Athletic Center, a 5,500 GSF North Side/Visitor Facility, a 7,300 GSF Soccer Facility and a 1,700 GSF Concessions Building. These facilities include locker rooms, training rooms, strength and conditioning spaces, offices, meeting rooms, concession areas, stadium seating, field lighting, parking lots, and landscape. LEED Silver
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
HAMPDEN HE IGHTS ELEMENTARY | DENVER , CO Denver Public Schools | Owner | 720‐423‐3200 GH Phipps | General Contractor | Ted Laszlo | 303‐571‐5377 Anderson Mason Dale | Architect | 303‐294‐9448 MEP | Electrical Engineer | 303‐936‐1633 PROJECT DURATION: Feb 2014‐ Dec 2014 PROJECT CONTRACT: $1.8M PROJECT MANAGER AND FOREMAN: Tristan Covington, Lance Davis Hampden Heights Elementary will be a new 73k square foot facility for Early Child education up to fifth grade that will accommodate 550 Denver Public School students. Weifield will be installing a complete electrical system that includes interior and exterior lighting, fire alarm, lightning protection, public address, wireless clock, CCTV, A/V, and security systems. ROCKY MOUNTAIN DEAF SCHOOL | DENVER , CO Wember | Owner | 970‐402‐0382 FCI | General Contractor | Terry Hutton | 970‐535‐4725 Anderson Mason Dale | Architect | 303‐294‐9448 BCER | Electrical Engineer | 303‐422‐7400 PROJECT DURATION: Jan 2014 – Sept 2014 PROJECT CONTRACT: $1M PROJECT MANAGER AND FOREMAN: Russell Tafoya, Jake Lopez 46,000 ft² new K‐12 school specifically designed for deaf students. It will be more visually friendly and will have a gym and large playground and accommodate 130 students.
CSU ANIMAL SC IENCES EXPANS ION | FORT COLL INS , CO Colorado State University | Owner GH Phipps | General Contractor Bennett Wagner Grody Architects | Architect Cator, Ruma & Associates | Electrical Engineer PROJECT DURATION: Feb 2013 – Feb 2015 PROJECT CONTRACT: $700k PROJECT MANAGER AND FOREMAN: Dustin Tafoya, James Sammon Design‐build project that will include extensive remodels to the 1959 built building, 41,400 ft² total, and convert classrooms to laboratories. 2 building expansions for an additional 13,000 ft² will include a 170 person lecture hall. LEED Gold.
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
UNION STAT ION BLOCK A |DENVER , CO RECAP/Holland Union Station | Owner Holland Partners | General Contractor | Orville Hinerman | 720‐398‐2210 Shears Adkins Rockmore | Architect | 303‐436‐9551 MEP/Weifield Group | Electrical Engineer PROJECT DURATION: October 2012 – Mar 2015 PROJECT CONTRACT: $5M PROJECT MANAGER AND FOREMAN: Dustin Tafoya and Nick Bull Design Build 404,077 ft² new 21 story high rise apartment building atop a 2‐story below‐grade parking structure.
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
PAST PROJECTS
LEED PROJECTS
13 t h CAB ASB HANGAR | FT CARSON, CO Army Corps of Engineers Omaha Dist | Owner | Edward Jackson | (402) 995‐2087 Hensel Phelps | General Contractor | Paul O’Donnell, Chad Carlson | 970‐346‐7327 Jacobs Engineering Group | Electrical Engineer | 817‐735‐6000 PROJECT DURATION: Nov 2012 –April 2014 PROJECT CONTRACT: $4M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Matt Hartman Design Assist New 120,500 ft² 14 bay aircraft operations and maintenance hangar at Ft Carson Air Force Base. Net Zero, LEED Gold
CSU LORY STUDENT CENTER REV ITAL IZAT ION | FT COLL INS , CO Colorado State University | Owner | 970‐491‐4284 Saunders Construction | General Contractor | Kay Rasmussen | 303‐617‐6514 Aller|Lingle|Massey Architects P.C. | Architect | 970‐223‐1820 Cator Ruma & Assoc | Electrical Engineer | Justin Hafer | 303‐232‐6200 PROJECT DURATION: Dec 2012 – Aug 2014 PROJECT CONTRACT: $6M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Troy Grant Design Build 3 level 140,000 ft² building remodel with two new additions. LEED Gold. COMMUNITY COLLEGE OF DENVER SLEB/CONFLUENCE |DENVER , CO | LEED GOLD Community College of Denver | Owner | GH Phipps | General Contractor | Mike Robinson | 303‐517‐5377 Oz Architecture | Architect | ME Group Design | Electrical Engineer | 303‐382‐1920 PROJECT DURATION: December 2011 – March 2013 PROJECT CONTRACT: $3M PROJECT MANAGER AND FOREMAN: Russell Tafoya and John Ahrens New 87,186 ft² student Learning and Engagement Building on the Auraria Higher Education Campus. The facility will include classrooms, computer labs, testing centers, meeting facilities, and faculty and administrative offices.
WAYNE ASP INALL FEDERAL BUILD ING | GRAND JUNCT ION, CO | NET ZERO GSA Public Building Service| Owner The Beck Group | Todd Berry | 303‐466‐9665 | General Contractor & Architect WRL Architects | Engineer | 216‐522‐1350 PROJECT DURATION: January 2011 – December 2012 PROJECT CONTRACT: $1.2M PROJECT MANAGER AND FOREMAN: Mike Megara, James Selecky & Nate Anderson First GSA historic net zero remodel! This design‐build remodel transformed the 1939‐built structure into a sustainable facility.
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
MARQUEZ HALL | GOLDEN, CO | LEED S I LVER Petroleum Engineering Department of Colorado School of Mines| Owner Adolfson & Peterson Construction | Erik Dimmick | 303‐363‐7101| General Contractor Shaffer Baucom Engineering | 303‐986‐8200 | MEP Engineer Anderson Mason Dale Architects | 303‐294‐9448 | Architect PROJECT DURATION: January 2011 – June 2012 PROJECT CONTRACT: $2.7M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Troy Grant A state‐of‐the‐art $25 million facility for pioneering teaching, research and service on the Colorado School of Mines campus. 60,000 ft² will include offices, classrooms, and laboratories with audio‐visual and visualization technologies.
NAT IONAL SECUR ITY SPACE INST ITUTE | COLORADO SPR INGS , CO | LEED S I LVER Peterson Air Force Base | Owner PCL Construction | General Contractor | Jason Danek | 303‐365‐6500 Benham an SAIC company | Architect | 405‐478‐5353 Benham an SAIC company | Engineer | 405‐478‐5353 PROJECT DURATION: December 2010 ‐ February 2012 PROJECT CONTRACT: $2.2M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Matt Hartman The NSSI project is a 53,000 ft² two‐story building located at Peterson Air Force Base. It includes new lighting, lighting control, distribution, duct banks, power, fire alarm, systems, and cable tray.
RESEARCH SUPPORT FAC I L I TY I I | GOLDEN, CO | NET ‐ZERO National Renewable Energy Laboratory | Owner Haselden | General Contractor | Derek Oliver | 303‐751‐1478 RNL | Architect | Michael Simpson | 303‐575‐8458 Stantec | Electrical Engineer | David Knoll | 916‐569‐2537 PROJECT DURATION: December 2010 ‐ October 2011 PROJECT CONTRACT: $4M PROJECT MANAGER AND FOREMAN: Mike Osborne and Nick Bull 190,000 ft² office building, an added wing building to the RSF I. The RSF II has a proposed energy design of 35 kBtu/sq ft/year. The project is design‐build with a 1.2 MW photovoltaic system and 13.2 kv infrastructures to support the RSF I, II, and future campus expansions. Weifield Group carried all subsystems, including telecommunications, audio/visual, fire alarm, security, and intercom. All systems are tied in to the campus’ existing communications and security.
NREL PARK ING GARAGE | DENVER , CO | NET ZERO National Renewable Energy Laboratory | Brian Larsen | Owner | 303‐275‐3000 Haselden | General Contractor | Christine Hartman| 303‐751‐1478 RNL | Architect | Tony Thornton| 303‐292‐0845 ME Group | Electrical Engineer | Scott Payne | 303‐382‐1920 PROJECT DURATION: April 2011 ‐ November 2011 PROJECT CONTRACT: $2.6M PROJECT MANAGER AND FOREMAN: Mike Osborne and Nick Bull The parking structure will include a minimum of 1,500 parking spaces for NREL staff. Following NREL's mission to walk‐the‐talk, the new parking structure will be highly energy efficient, feature a photovoltaic canopy on the top level, and have plug‐in stations for electric vehicle recharging. Design‐Assist.
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
FREDER ICK HIGH SCHOOL | FREDER ICK , CO | LEED S I LVER St Vrain School District | Owner Haselden | General Contractor | Ryan Sculthorpe | 303‐751‐1478 Klipp | Architect | Greg Cromer | 303‐893‐1990 Cator Ruma | Electrical Engineer | Justin Hafer | 303‐232‐6200 PROJECT DURATION: December 2009 ‐ August 2011 PROJECT CONTRACT: $2.7M PROJECT MANAGER AND FOREMAN: Jon Griffis and Dave Fontaine St. Vrain High School is a new 188,000 ft² high school, including athletic fields, three baseball fields, football fields, two tennis courts, site parking, and emergency generator.
RESEARCH SUPPORT FAC I L ITY I | GOLDEN, CO | NET ZERO | LEED PLAT INUM National Renewable Energy Laboratory | Owner Haselden | General Contractor | Derek Oliver | 303‐751‐1478 RNL | Architect | Michael Simpson | 303‐575‐8458 Stantec | Electrical Engineer | David Knoll | 916‐569‐2537 PROJECT DURATION: Jan 2009 ‐ June 2010 PROJECT CONTRACT: $9.5M PROJECT MANAGER AND FOREMAN: Mike Osborne and Nick Bull The National Renewable Energy Laboratory’s Research Support Facility is a 220,000 ft² office building with a 20,000 ft² data center. This office building is one of the most energy efficient buildings in the world, performing at 33 kBtu/sq. ft./year. This project was design‐build with a 1.2 MW photovoltaic system and 13.2 kv infrastructure to support the RSF and future campus expansions. Weifield Group carried all subsystems, including telecommunications, audio/visual, fire alarm, security, and intercom. The systems are tied in with the campus communications and alarm systems. Bonded $9.4M.
JO INT FORCES READINESS TRAIN ING CENTER | CHEYENNE , WY | LEED S I LVER Wyoming National Guard | Owner | CPT James Edington | 307‐631‐0640 FCI Constructors | General Contractor | Rob Price | 970‐535‐4725 Coover‐Clark & Associates | Architect | 303‐783‐0040 MKK Consulting Engineers | Electrical Engineer | 303‐796‐6000 PROJECT DURATION: Sept. 2008 ‐ June 2010 PROJECT CONTRACT: $3.4M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Matt Flinn The Joint Forces Readiness Training Center is located on the Warren Air Force Base in Cheyenne, Wyoming. The project consists of a 145,000 ft² office building and a 28,000 ft² maintenance facility. Bonded Project.
CASEY MIDDLE SCHOOL | BOULDER , CO | LEED PLAT INUM Boulder Valley School District | Lou Novak | Owner | 720‐561‐5157 Saunders Construction | General Contractor | Marv Bachman | 303‐419‐0481 RB + B Architects, Inc. | Architect | Derek Young | 970‐484‐0117 MKK, Inc. | Electrical Engineer | Ruben Rodriguez | 303‐796‐6000 COMPLETION DATE: April 2010 PROJECT CONTRACT: $1.9M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Aubrey Cundall This 110,000 ft² middle school has two original walls that were salvaged, and the new school was constructed around these two existing walls. Design included a 26.78 kW photovoltaic array to assist with onsite power generation. First LEED Platinum School in Colorado!
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
CSU ACADEMIC INSTRUCT ION BUILD ING | FT . COLL INS , CO | LEED GOLD Colorado State University | Owner | Norm Laurence | 970‐491‐0160 Pinkard | General Contractor | Jim Adams | 303‐986‐4555 Bennett, Wagner, & Grody | Architect | Matthew Bartels | 303‐623‐7323 Beaudin Ganze | Electrical Engineer | Rochelle Mellott | 970‐221‐5691 PROJECT DURATION: April 2009 ‐ June 2010 PROJECT CONTRACT: $2M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Arnie Trujillo The CSU Academic Instruction Building is a 90,000 ft² four‐story academic office building. The building includes full electrical build‐out, fire alarm and 15.75 kw photovoltaic system for classroom and auditoriums. This project was awarded at 50% DDs, and Weifield worked with the design team to complete the design‐assist GMP.
S IGNATURE CENTRE AT DENVER WEST | GOLDEN, CO | LEED PLAT INUM Aardex Corporation | Owner Aardex | General Contractor | Richard Janssen | 303‐987‐9000 Aardex | Architect | Richard Janssen | 303‐987‐9000 Alber Engineering | Electrical Engineer| Jerry Alber | 303‐985‐3260 COMPLETION DATE: July 2007 PROJECT CONTRACT: $730K PROJECT MANAGER AND FOREMAN: Jerry Zeller and Jason Kizer Core and shell of a 279,506 ft² five‐story office building, including three story garage, and full electrical build‐out of two levels. Owner provided equipment and special system subcontractors.
LARAMIE COUNTY L IBRARY | CHEYENNE , WY | LEED GOLD Laramie County | Owner FCI Constructors | General Contractor | Becket Hinson | 970‐535‐4725 AndersonMasonDale | Architect | 303‐294‐9448 Cator Ruma | Electrical Engineer| 303‐232‐6200 DURATION: October 2005 ‐ July 2007 PROJECT CONTRACT: $1.3M PROJECT MANAGER AND FOREMAN: Dustin Tafoya and Steve Williams Complete electrical build‐out of new three‐story library with site lighting. This LEED Gold library is the first LEED‐certified public building in Wyoming and was voted the 2008 Library of the Year by Library Journal/Gale
ROUTT COUNTY JUST ICE CENTER | STEAMBOAT SPR INGS , CO | LEED GOLD Routt County | Owner FCI Constructors | General Contractor | Rob Lawrence | 970‐535‐4725 HLM | Architect | 720‐946‐0276 HLM | Electrical Engineer| 720‐946‐0276 DURATION: April 2006 ‐ September 2007 PROJECT CONTRACT: $1.2M PROJECT MANAGER AND FOREMAN: Dustin Tafoya and John Bolton Complete electrical build‐out of a jail addition with attached tunnel and new justice center. The project includes lighting control system, security, 26.25 KW photovoltaic system and fire alarm.
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
OFFICE BUILDINGS
INTERVENT ION COMMUNITY CORRECT IONS SERV ICES ( I CCS WEST) | LAKEWOOD, CO Intervention, Inc | Owner | Kelly Sengenberger | 303‐450‐6000 FCI Constructors, Inc. | General Contractor | Tony Seidling | 970‐535‐4725 Reilly Johnson Architecture | Architect | Stephen Graziano | 303‐832‐9111 COMPLETE: December 2010 – August 2011 PROJECT CONTRACT: $425K PROJECT MANAGER AND FOREMAN: Jon Griffis, Troy Grant 4 Story 26,000 ft² new medical rehabilitation facility.
LOCKHEED MARTIN CAFETER IA REMODEL | L ITTLETON, CO Lockheed Martin| Owner Pinkard Construction | General Contractor | 303‐986‐4555 COMPLETE: May 2011 PROJECT CONTRACT: $532K PROJECT MANAGER AND FOREMAN: Russell Tafoya and Russell VanPeursem Renovation of existing cafeteria into a meeting center. Included addition of dimming, auto‐controlled and LED lighting. Installed fire alarm and teledata.
WEBROOT | BROOMFIELD , CO Webroot | Owner | 720‐842‐3628 i2 Construction | General Contractor | Nate Kugler | 303‐574‐1118 IA Architects | Architect | 303‐672‐8500 BCER Engineering | Electrical Engineer | 303‐422‐7400 PROJECT DURATION: September 2010 ‐ January 2011 PROJECT CONTRACT: $1M PROJECT MANAGER AND FOREMAN: Russell Tafoya and John Ahrens The Webroot project is a 100,000 ft² interior tenant finish in a newly constructed office building. This project includes 5,000 ft² Lab/MDF, CRAC units, 225kva UPS and 400kw generator back up. Negotiated for i2 Construction.
ACADEMIC OFF ICE WEST | AURORA, CO University of Colorado at Denver Health Sciences Center | Owner Weitz | General Contractor | Richard DeLuccie | 303‐326‐0332 AndersonMasonDale | Architect | 303‐294‐9448 RMH Group | Electrical Engineer| 303‐239‐0909 COMPLETION DATE: June 2007 PROJECT CONTRACT: $2.7M
PROJECT MANAGER AND FOREMAN: Russell Tafoya and Jim Hall Complete electrical build out of nine story office building totaling 206,100 ft², including high voltage. Located on UCD’s Anschutz Medical Campus.
J EFFERSON COUNTY OFF ICE AND WORKFORCE BUILD ING | GOLDEN, CO Jefferson County | Owner Haselden | General Contractor | Bret Bemiller | 720‐341‐7955 RNL | Architect | 303‐295‐1717 BCER | Electrical Engineer| 303‐422‐7400 COMPLETION DATE: June 2006 PROJECT CONTRACT: $1.7M
PROJECT MANAGER AND FOREMAN: Russell Tafoya and Mike Watkins
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
Complete design‐assist electrical build out of a new 133,200 ft² building, including site lighting and communication conduits.
MULTI‐FAMILY RESIDENTIAL & HOSPITALITY
MONROE POINTE OF CHERRY CREEK | DENVER , CO AT Development | Owner | Bruce Rifkin | 303‐242‐5829 Swinerton | General Contractor | Kerry Swain | 303‐423‐9242 Davis Partnership | Architect | 303‐861‐8555 M‐E Engineers | Electrical Engineer | 303‐421‐6655 COMPLETION DATE: December 2007 PROJECT CONTRACT: $2.5M
PROJECT MANAGER AND FOREMAN: Russell Tafoya and Arnie Trujillo Complete electrical build‐out of new eight‐story residential high‐end lofts.
DENVER CONVENTION CENTER HOTEL | DENVER , CO
Hyatt and Faulkner USA | Owner Hensel Phelps | General Contractor | Joel Douglass Klipp Cohussy Jenks Dubois | Architect | 303‐893‐1990 Jon Tseu | Electrical Engineer | Dan Montez | 303‐893‐0528 COMPLETION DATE: November 2005 PROJECT CONTRACT: $1.2 M PROJECT MANAGER AND FOREMAN: Seth Anderson, Andrew Sena & Matt Flinn Low‐voltage conduit installation for backbone and guest rooms in 33 story high‐rise hotel.
MIXED USE/RETAIL/COMMUNITY
PHIL IP S MILLER PARK | CASTLEROCK , CO Town of Castlerock | Owner | Jeff Smullen | 303‐814‐7458 Turner Construction | General Contractor | Matt Kunz, Brian Peterson | 303‐944‐0605 Sink Combs Dethiefs | Architect | 303‐308‐0200 RMH Group | Electrical Engineer | 303‐239‐0909 PROJECT DURATION: September 2013 – July 2014 PROJECT CONTRACT: $1.2M PROJECT MANAGER AND FOREMAN: Tristan Covington, Marke Bogle 225‐acre new park to include 50,000 ft² fieldhouse, pool, athletic fields, playgrounds, trails and an outdoor amphitheater. Design Assist.
CHERRY CREEK MALL | DENVER , CO The Taubman Company | Owner | 248‐258‐6800 The Weitz Co. | General Contractor | Dan Raber, Bret Rankin | 303‐860‐6685 Neumann/Smith Architecture | Architect | 248‐352‐8310 Swanson Rink | Electrical Engineer | 303‐832‐2666 PROJECT DURATION: Feb 2013 ‐ Nov 2013 PROJECT CONTRACT: $2M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Lee Wilson New lighting throughout the mall including new “light blades” at mall courts. Weifield won this project due to our successful performance on the Cherry Creek Mall Garage project.
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
CHERRY CREEK MALL GARAGE |DENVER , CO The Taubman Company | Owner | 248‐258‐6800 The Weitz Co. | General Contractor | Dan Raber, Bret Rankin | 303‐860‐6685 Neumann/Smith Architecture | Architect | 248‐352‐8310 Swanson Rink | Electrical Engineer | 303‐832‐2666 PROJECT DURATION: June 2012 – December 2012 PROJECT CONTRACT: $1.7M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Lee Wilson lighting upgrade for Cherry Creek Mall garage entrances that hold 5,000 spaces.
CHERRY CREEK NORTH IMPROVEMENTS | DENVER , CO Cherry Creek North Business Improvement District | Owner | 303‐394‐2904 Nolte Associates, Brett Koth | Project Consultant | 303‐220‐6400 Weitz | General Contractor | Joe Osttmeyer | 303‐860‐6628 Design Workshop | Urban Design Architect | Jamie Fogle | 303‐323‐5186 Roos Szynski | Electrical Engineer | Charlotte Szynski | 303‐696‐2602 PROJECT DURATION: Phase I: May 2010 ‐ November 2010,
Phase II: February 2011 ‐July 2011 PROJECT CONTRACT: $4.3M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Lance Davis Weifield Group’s scope of work on this project includes 336 new pedestrian pole lights, 79 custom amenity poles, 22 custom directories, 53 custom stop signs, and 5 custom illuminated monuments. The project required 12,000 linear feet of custom extruded aluminum. The light pole bases are hidden from view by custom precast pieces weighing a total of 198,600 pounds. 87 cubic yards of soil were un‐invasively removed to pour new poles by hydro‐vacuuming. Also, 78,000 feet of holiday LED light strands have been provided. Lighting accents have also been added to 13 trees to enhance the nightscape. Bonded Project.
GARDENS AT HAVANA | AURORA, CO
Miller Weingarten Realty | Owner | 303‐799‐6300 Saunders | General Contractor | Scott Duckworth | 720‐384‐5329 O’Brien & Associates | Architect | 303‐799‐6300 MEP | Electrical Engineer | 303‐936‐1633 COMPLETION DATE: November 2008 PROJECT CONTRACT: $989K PROJECT MANAGER AND FOREMAN: Dustin Tafoya and John Grosch Complete high end site lighting package, including signs at Mississippi and Havana.
ROCKY MOUNTAIN CHRIST IAN CHURCH | FREDER ICK , CO Rocky Mountain Christian Church | Owner | Alan Algrim | 303‐772‐2229 Pinkard | General Contractor | Jack Quandt | 303‐345‐2854 The Larson Group | Architect | 719‐471‐7676 Consulting Engineers, Inc. | Electrical Engineer| 719‐594‐0022 COMPLETION DATE: August 2008 PROJECT CONTRACT: $1.2 M PROJECT MANAGER AND FOREMAN: Matthew Tarr and Jason Kizer Complete electrical build‐out of new 66,000 ft² church and classrooms. Project includes site lighting, complete lighting control system, security, fire alarm, audio visual and phone.
MARKETPLACE AT AUST IN BLUFFS | COLORADO SPR INGS , CO
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
United Properties | Owner Adolfson & Peterson | General Contractor | Chad Jelinek | 303‐363‐7101 RTA Inc. | Architect | 719‐471‐7566 Farnsworth Group | Electrical Engineer | 719‐590‐9194 COMPLETION DATE: June 2008 PROJECT CONTRACT: $1.04M PROJECT MANAGER AND FOREMAN: Dustin Tafoya and Aubrey Cundall Complete electrical site and shop remodel of an existing shopping mall.
RALPH SCHOMP BMW | HIGHLANDS RANCH, CO Lisa Schomp | Owner Adolfson & Peterson | General Contractor | Kyle Kennett | 303‐363‐7101 Wagner Architectural Group | Architect | 760‐729‐0533 IES | Electrical Engineer | 303‐988‐9305 COMPLETION DATE: May 2008 PROJECT CONTRACT: $1.4M
PROJECT MANAGER AND FOREMAN: Dustin Tafoya and James Selecky Complete electrical build‐out of new high end BMW dealership. Includes complete lighting control system, security, fire alarm, theater lighting control, sound, paging, and phone systems.
SOUTHLANDS MALL – HIGH VIS IB I L I TY BUILD INGS | PARKER , CO Alberta Development | Owner Saunders | General Contractor | Chad Jelinek | 303‐944‐1672 SEM Architects, Inc. | Architect | 303‐220‐8900 Fasnacht & Nelson, P.C. | Electrical Engineer | 913‐648‐0905 COMPLETION DATE: September 2005 PROJECT CONTRACT: $800K PROJECT MANAGER AND FOREMAN: Russell Tafoya and Jason Kizer Five electrical build outs and eleven tenant finish buildings, including site lighting and communication conduits.
LOWE’S | GLENWOOD SPR INGS , CO Lowe’s | Owner McWhorter & Co | General Contractor Kurt D. Reed & Associates | Architect | 480‐941‐1440 Page Interworks | Electrical Engineer | 336‐667‐4225 COMPLETION DATE: August 2005 PROJECT CONTRACT: $600K PROJECT MANAGER AND FOREMAN: Russell Tafoya and Matt Flinn Complete electrical build‐out for 100,000 ft² national supply warehouse on a fast‐track five month schedule.
LOWE’S | PARKER , CO Lowe’s | Owner Summit Builders | General Contractor | Bill Breen | 602‐840‐7700 Kurt D. Reed & Associates | Architect | 480‐941‐1440 COMPLETION DATE: January 2004 PROJECT CONTRACT: $800K PROJECT MANAGER AND FOREMAN: Seth Anderson and Pete Farreny Complete electrical build‐out and site lighting for 138,000 ft² national supply warehouse on a fast track five month schedule.
EDUCATIONAL
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
HI ‐PLA INS SCHOOL | VONA, CO Hi‐Plains School District R‐23 | Owner | Steve McCracken, Superintendent | 970‐664‐2636 CBRE | Owner’s Agent | Ryan Smelker | 303‐806‐2037 FCI | General Contractor | Dax Diaz | (970) 535‐4725 Klipp | Architect | Tim McKay, PM | 303‐893‐1990 MKK | Electrical Engineer | PROJECT DURATION: July 2013 – August 2014 PROJECT CONTRACT: $1M PROJECT MANAGER AND FOREMAN: Tristan Covington/Russell Tafoya, Design‐build, phased project for new LEED Gold PK‐12 school. School will be a new 51,268 ft² building on a new site. Building is to include all necessary educational spaces, administration space, new athletic fields, and a multi‐purpose gymnasium.
DPS DOWNTOWN CAMPUS 1860 L INCOLN | DENVER , CO Denver Public Schools | Owner | Katheryn Zeeb, Project Manager| 720‐424‐5488 PCL | General Contractor | Bryan Sakuoka | 303‐365‐6500 SLATERPAULL Architects | Architect MKK Consulting Engineers | Electrical Engineer | John Jansons | 303‐796‐6004 PROJECT DURATION: March 2013 – July 2014 PROJECT CONTRACT: $6M PROJECT MANAGER AND FOREMAN: Russell Tafoya, Nate Anderson Design‐build project that will include moving existing high school, technical college, a charter school and administrative offices to a new downtown campus.
UCD ACADEMIC BUILD ING 1 PHASE I | DENVER , CO University of Colorado at Denver | Owner | Saunders | General Contractor | Cynthia Fluhr‐Nodich | 303‐699‐9000 AndersonMasonDale| Architect | 303‐294‐9448 Cator, Ruma & Associates | Electrical Engineer | 303‐232‐6200 PROJECT DURATION: March 2013 – September 2013 PROJECT CONTRACT: $500k PROJECT MANAGER AND FOREMAN: Tristan Covington, Scott Buckey Underground work for new academic building on Auraria Campus.
UNIVERS ITY OF COLORADO DENVER SCHOOL OF DENTAL MEDIC INE | AURORA, CO University of Colorado| Owner Haselden Construction| Jason DeWolfe | (303) 728‐3744 | General Contractor Anderson Mason Dale | David Pfeifer| 303‐294‐9448| Architect Cator Ruma & Associates | Mike Meints | 303‐232‐6200 | Engineer PROJECT DURATION: February 2011 ‐ October 2011 PROJECT CONTRACT: $450K PROJECT MANAGER AND FOREMAN: Dustin Tafoya and Lance Davis 20,612 ft² expansion to the University of Denver School of Dental Medicine. LEED Certified.
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
COLUMBINE ELEMENTARY | BOULDER , CO Boulder Valley School District | Owner Adolfson & Peterson | General Contractor | Mario Cappella | 303‐363‐7101 Bennett, Wagner, & Grody | Architect | Anne Weber | 303‐623‐7323 Cator Ruma | Electrical Engineer | Marcus Valerius | 303‐462‐8457 COMPLETE: May 2011 PROJECT CONTRACT: $714K PROJECT MANAGER AND FOREMAN: Russell Tafoya and Michael Hart New 68,400 ft² elementary school with athletic fields, parking lots, solar lighting, and 30 KW generator.
SMOKY HILL HIGH SCHOOL | AURORA, CO Cherry Creek School District #5 | Owner Haselden | General Contractor | Theron Skidmore | 303‐751‐1478 H + L Architecture | Architect | Robert Rody | 303‐295‐1792 CEI | Electrical Engineer | Roger MacFarland | 719‐594‐0022 PROJECT DURATION: February 2010 ‐ October 2010 PROJECT CONTRACT: $1.2M PROJECT MANAGER AND FOREMAN: Jon Griffis and Matt Hartman Complete lighting retrofit of Smoky Hill High School. Half the lights had to be replaced and half retrofitted. Demo and wire new pools, timing system for pools, sound system, and teledata drops. Retrofit fire alarm system.
C IMARRON MIDDLE SCHOOL | PARKER , CO Douglas County School District | Owner | Sharon Lambdin | 303‐387‐0313 JHL Constructors | General Contractor | Kristy Payne | 303‐741‐6116 Christiansen, Reece, & Partners | Architect | Bob Snow | 719‐633‐5901 Consulting Engineers, Inc. | Electrical Engineer | 719‐594‐0022 PROJECT DURATION: Jan 2009 ‐ Nov 2009 PROJECT CONTRACT: $1.8M PROJECT MANAGER AND FOREMAN: Mike Osborne and Heath DeJager Cimarron Middle School is a new 133,000 ft² middle school with clock, alarm and tele/data systems.
BROOMFIELD HIGH SCHOOL | BROOMFIELD , CO
Boulder Valley School District RE‐2 | Owner | Steve Schumacher | 303‐447‐5081 Haselden | General Contractor | Russell Welch | 303‐751‐1478 AndersonMasonDale | Architect | Keith Boyd | 303‐294‐9448 MEP | Electrical Engineer | 303‐936‐1633 COMPLETION DATE: August 2009 PROJECT CONTRACT: $1.5M PROJECT MANAGER AND FOREMAN: Russell Tafoya and James Sammon Weifield Group remodeled electrical in portions of the existing facility, upgraded fire alarm, installed new wireless clock system, and completed electrical build out of two story 50,000 ft² wing.
FOOTHILL ELEMENTARY | BOULDER , CO
Boulder Valley School District RE‐2 | Owner | Steve Schumacher | 303‐447‐5081 Haselden | General Contractor | Russell Welch | 303‐751‐1478 Larson‐Incitti | Architect | Nora Brooks | 303‐292‐4304 Consulting Engineers, Inc. | Electrical Engineer | 719‐594‐0022 COMPLETION DATE: July 2009 PROJECT CONTRACT: $735K PROJECT MANAGER AND FOREMAN: Russell Tafoya and John Bolton The project consists of 53,500 ft² classroom remodel and 22,742 ft² addition. Systems include; electrical, lighting control, fire alarm, security, audio visual, site lighting, paging, clocks and communications.
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
BOULDER HIGH SCHOOL | BOULDER , CO Boulder Valley School District RE‐2 | Owner | Tom Blahak | 303‐447‐5081 Pinkard | General Contractor | Jack Quandt | 303‐986‐4555 Klipp | Architect | Greg Cromer | 303‐893‐1990 R.J. McNutt | Electrical Engineer | 970‐330‐3266 COMPLETION DATE: January 2009 PROJECT CONTRACT: $950K
PROJECT MANAGER AND FOREMAN: Dustin Tafoya and Aubrey Cundall Construction of a new 20,000 ft² main gym and locker rooms, a 2,700 ft² office addition and a 2,000 ft² stagecraft area, as well as extensive remodeling of classrooms and offices. Upgraded fire alarm, clock and other low voltage systems.
LEGEND HIGH SCHOOL | CASTLE ROCK , CO Douglas County School District | Owner | Sharon Lambdin | 303‐387‐0100 JHL Construction | General Contractor | Kristy Payne | 303‐741‐6116 H + L and LKA Partners JV | Architect | Roger Hamilton | 303‐295‐1792 Consulting Engineers, Inc. | Electrical Engineer | 719‐594‐0022 PROJECT DURATION: June 2006 ‐ August 2008 PROJECT CONTRACT: $5.8M
PROJECT MANAGER AND FOREMAN: Russell Tafoya and Pete Farreny Complete electrical build‐out of new 256,487 ft² school. Includes science and computer labs, complete lighting control system, security, fire alarm, theater lighting control, theater sound, paging, phone and clock systems.
STEAMBOAT SCHOOLS PROJECTS | STEAMBOAT SPR INGS , CO Steamboat Springs School District | Owner | Rick Denny | 970‐871‐3195 Haselden | General Contractor | Christian Eckstrom | 303‐751‐1478 Christiansen, Reece, & Partners | Architect | Bob Snow | 719‐633‐5901 Consulting Engineers, Inc. | Electrical Engineer | 719‐594‐0022 COMPLETION DATE: June 2008 PROJECT CONTRACT: $2.8M
PROJECT MANAGER AND FOREMAN: Russell Tafoya and Matt Flinn Complete electrical build‐out remodel, addition and new construction of three schools and one new ground up elementary school. Schools include complete lighting control system, security, fire alarm, sound, paging, phone and clock systems.
MESA MIDDLE SCHOOL | CASTLE ROCK , CO Douglas County School District RE‐1 | Owner | Margaret Anderson | 303‐387‐0313 W.O. Danielson | General Contractor | Scott Prestien | 303‐788‐1500 Christiansen, Reece, & Partners, P.C. | Architect | Bob Snow | 719‐633‐5901 Consulting Engineers, Inc. | Electrical Engineer | 719‐594‐0022 COMPLETION DATE: June 2008 PROJECT CONTRACT: $2.2M
PROJECT MANAGER AND FOREMAN: Dustin Tafoya and Lance Davis Complete electrical build‐out of new 132,400 ft² school. Including complete lighting control system, security and fire alarm.
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
AURORA WEST MIDDLE SCHOOL | AURORA, CO
Aurora Public Schools | Owner Haselden | General Contractor | Jarrod Fugate | 303‐751‐1478 Klipp | Architect | 303‐893‐1990 Alber Engineering | Electrical Engineer | 303‐985‐3260 COMPLETION DATE: February 2007 PROJECT CONTRACT: $1.7M
PROJECT MANAGER AND FOREMAN: Russell Tafoya and Matt Flinn Electrical remodel of three existing buildings and electrical construction for one new addition. Project is 120,000 ft² and includes site lighting and communication conduits.
STAPLETON K ‐8 SCHOOL | DENVER , CO Denver Public Schools | Owner | Tom Blahak | 303‐245‐5791 FCI Constructors | General Contractor | Steve Conklin | 303‐886‐0605 M+O+A Architectural Partnership | Architect | Joseph Doyle | 303‐308‐1190 Alber Engineering | Electrical Engineer | 303‐985‐3260 COMPLETION DATE: May 2006 PROJECT CONTRACT: $1.9M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Andrew Sena Complete electrical build‐out of new 103,000 ft² public school. Includes complete lighting control system, customer fixtures, security, telephones and fire alarm.
ACADEMY OF CHARTER SCHOOL | WESTMINSTER , CO Academy of Charter Schools | Owner | Mike Burrell Haselden | General Contractor | Bryan Sculthorpe | 303‐728‐3773 Slaterpaull | Architect | Gwen Gilley | 303‐607‐0977 Alber Engineering | Electrical Engineer | 303‐985‐3260 COMPLETION DATE: August 2005 PROJECT CONTRACT: $1.1M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Pete Farreny Complete electrical build‐out of new 126,000 ft² charter school. Includes complete lighting control system, customer fixtures, security and fire alarm.
GOVERNMENT & MUNICIPAL
47 t h BCT PARK ING, ROADS , AND UTIL IT I ES | FT . CARSON, CO Army Corps of Engineers | Owner | Diana Vanderzanden | 402‐995‐2066 Bryan Construction | General Contractor | Brian Hogan | 719‐632‐5355 Army Corps of Engineers | Electrical Engineer DURATION: June 2009 ‐ March 2010 PROJECT CONTRACT: $2.4M PROJECT MANAGER AND FOREMAN: Mike Osborne and James Sammon Project includes high voltage, telecommunications and fiber optic infrastructure along a two mile stretch of road at Ft. Carson. Project includes 27 manholes, 12 high voltage tap boxes, 75 KW generator, and lift station with controls
BRAC INFRASTRUCTURE SUPPORT | AURORA, CO
U.S. Air Force | Owner | Diana Vanderzanden/Frank Comley | 402‐995‐2066 Kiewit | General Contractor | Nathan Mares | 303‐921‐8901 Army Corps of Engineers | Architect AES Group, Inc. | Electrical Engineer | J. Russ Odum | 303‐841‐3922 PROJECT DURATION: Oct 2008 ‐ May 2009 PROJECT CONTRACT: $871K PROJECT MANAGER AND FOREMAN: Mike Osborne and Lance Davis The BRAC Infrastructure support project consists of medium voltage duct bank, manholes, communications duct bank and street lighting on Buckley Air Force Base.
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
USPS EXPANS ION | DENVER , CO
Gray Construction | General Contractor | Brad Piatt | 859‐281‐9399 Gray Construction | Architect | Brad Piatt | 859‐281‐9399 Weifield Group/JBA Engineering | Electrical Engineer | 303‐985‐3250 COMPLETION DATE: January 2009 PROJECT CONTRACT: $2.2M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Lance Davis Complete electrical build out of a 163,000 ft² design‐build project housing five new sorters. Project includes medium voltage distribution, fire alarm, CCTV, tele/data, fiber optics, and security.
WING HEADQUARTERS | BUCKLEY AFB , AURORA, CO
Army Corps of Engineers | Owner Weitz | General Contractor | Jack Lambert/Mike Sullivan | 303‐860‐6600 COMPLETION DATE: February 2005 PROJECT CONTRACT: $1.6M PROJECT MANAGER AND FOREMAN: Seth Anderson and James Selecky Complete electrical build‐out of 110,000 ft² three story corporate office building, including high‐voltage, site lighting and communication duct banks.
INDUSTRIAL/MANUFACTURING
PEARL I ZUMI COLORADO HEADQUARTERS | LOUISV I LLE , CO Pearl Izumi | Owner Haselden | General Contractor ZGF Architects | Architect | Buro Happold Consulting Eng | Electrical Engineer | PROJECT DURATION: Dec 2012 – Nov 2013 PROJECT CONTRACT: $1.1M PROJECT MANAGER AND FOREMAN: Tristan Covington and Lance Davis Design Assist 55,000 ft² new construction project consisting of office space, workshops, material testing areas, conference rooms, fitness center, warehouse, and amenity spaces. High sustainability plan.
LONG HAUL ENTERPR ISES | CHEYENNE , WY Long Haul Enterprises | Owner Richardson Construction | General Contractor | Doug Mainwaring | 307‐635‐6166 Vaught Frye Larson Architects | Architect | Justin Larson | 307.635.5710 AVI PC | Electrical Engineer | 307‐637‐6017 PROJECT DURATION: Sept 2012‐ Oct 2013 PROJECT CONTRACT: $1.6M PROJECT MANAGER AND FOREMAN: Dustin Tafoya and Matt Flinn Design Build providing electrical (power and lighting) design for a new 189,860 ft² steel tubing manufacturing facility. 25Kv distribution feeding 3‐480volt 4000amp services.
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
CONTROLLABLE GRID INTERFACE | BOULDER , CO National Renewable Energy Laboratory | Owner | Brian Larsen | 303‐275‐3000 ACS Inc | General Contractor | Mike Daugird| 608‐663‐1590 FLAD Architect | Architect | 608‐238‐2661 AEI | Electrical Engineer | 608‐238‐2616 PROJECT DURATION: October 2011 – Jan 2013 PROJECT CONTRACT: $1.2M PROJECT MANAGER AND FOREMAN: Dustin Tafoya and Nick Bull Design‐build electrical services for a dynamometer and grid simulator construction project that assessed the design, fabrication, and testing of a wind turbine analysis system at NREL’s National Wind Technology Center. The CGI is the first test facility in the United States that has fault simulation capabilities and allows manufacturers and system operators to conduct the tests required for certification in a controlled laboratory environment. It is the only system in the world that is fully integrated with two dynamometers and has the capacity to extend that integration to turbines in the field and to a matrix of electronic and mechanical storage devices. Total electrical service was 5MW for the project.
LEPR INO WASTEWATER TREATMENT FAC I L ITY | GREELEY , CO Leprino Foods Company | Owner Glacier Construction Company | Brian Kerschen | 303‐221‐5383 | General Contractor Symbiont | Engineer & Architect | Christopher Lockett | 414‐291‐8840 PROJECT DURATION: Phase I: March 2011 ‐ June 2011; Phase II: June 2011 ‐ Jan 2012 PROJECT CONTRACT: $2.7M PROJECT MANAGER AND FOREMAN: Russell Tafoya, John Abling Underground electrical conduit system for the new Wastewater Treatment Facility which will support the Leprino Foods mozzarella plant.
FRUITA WASTEWATER RECLAMATION | FRUITA , CO City of Fruita | Owner Garney Construction | General Contractor | Keith Hinds | 303‐791‐3600 Tetra Tech RTW | Architect | Bob Orsatti | 303‐825‐5999 PROJECT DURATION: December 2009 ‐ February 2012 PROJECT CONTRACT: $2.1M PROJECT MANAGER AND FOREMAN: Russell Tafoya and James Selecky This project includes a new operations building, explosion proof headwork building, 2 clarifiers, 2 oxidation sitches, aolids building and a complete redundant electrical system including radial loop infrastructure.
MEDICAL
CANYON VIEW MOB | GRAND JUNCT ION, CO Development Solutions Group | Owner | Sarah Allen, RSW Partners | 970‐257‐4583 GH Phipps | General Contractor Boulder Associates Architects | Architect CCRD | Electrical Engineer PROJECT DURATION: December 2012‐Nov 2013 PROJECT CONTRACT: $1M PROJECT MANAGER AND FOREMAN: James Selecky Design‐assist, new 88,000 ft² medical office building will include a small atrium as well as facilities for tenants that include an ambulatory surgery center, imaging center, women’s health center, orthopedics practice, primary care practice, and an urgent care facility
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com
CASTLEROCK MEDICAL OFF ICE BUILD ING |CASTLEROCK , CO Frauenshuh | Owner | Chris Lambrecht GE Johnson | General Contractor | Todd Estry | 303‐221‐1249 R.T.A | Architect | Mark Pierson SSG MEP | Electrical Engineer PROJECT DURATION: Sept 2012 – June 2013 PROJECT CONTRACT: $500k 60,000 sq ft ‐ 3 floors of core and shell medical office building at Adventist Health Campus
CENTER AT L INCOLN SK I L LED NURS ING FAC I L ITY |PARKER , CO Development Solutions Group | Owner | Alan Main | 303‐909‐4990 GH Phipps | General Contractor | Jason Foisset | 303‐389‐3718 HDR Architecture | Architect | David Gebel | 608‐662‐1806 HDR Architecture | Electrical Engineer | Scott Lind | 608‐332‐6827 PROJECT DURATION: October 2011 – Sept 2012 PROJECT CONTRACT: $1.5M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Scott Buckey Core/Shell, Site work and TI for 120,000 ft² new building. Patient and nursing rooms, medical lobby, and nursing stations
LUXURY RESIDENTIAL SOLV ITA PHASE I | CHERRY HILLS VILLAGE , CO Single family private residence | Owner MG Partners | Sarah Kell | 805‐383‐7500 | General Contractor Kevin A. Clark, Inc. | 805‐646‐0181 | Architect Truax Design Group, Inc. | 707‐829‐8188 | Electrical Engineer PROJECT DURATION: July 2011 – Jan 2012 PROJECT CONTRACT: $600K PROJECT MANAGER AND FOREMAN: Russell Tafoya and Matt Flinn LED and custom lighting for a 30,000 ft² residential property at 4600 S Monroe Lane in Cherry Hills Village, CO.
DATA CENTERS 1547 GREEN HOUSE DATA CENTER | CHEYENNE , WY 1547 Green House Data | Owner | Corey Welp| [email protected] The Martin Group | Developer | Patrick Hynes | 732‐441‐0006 PROJECT DURATION: Jan 2014 – July 2014 PROJECT CONTRACT: $1.5M PROJECT MANAGER AND FOREMAN: Dustin Tafoya, Matt Flinn This project will include constructing a new colocation facility approximately 38,000 square feet. Roughly 30,000 ft² of the building is a single story pre‐cast concrete construction which houses the data center floors, associated infrastructure space, and loading dock. The other 8,000 square feet is single story office space (full site, core, shell, and office construction). The data center space consists of four equally sized pods; a full fit out of one data center pod, and a partial fit out of a second pod.