Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of...

21
146 Yuma Street Denver, CO 80223 1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone 303.428.2011 phone 303.202.0466 facsimile 303.202.0466 facsimile www.weifieldcontracting.com COMMERCIAL & INDUSTRIAL Weifield Group has a broad range of current and past project experience. Our portfolio includes education, healthcare, transportation, offices, U.S. military, hotels/ hospitality, government/service, and more. We are also a leader in Leadership in Energy and Environmental Design (LEED) standards, completing Denver’s first netzero energy building and the first LEED Platinum office building built in Colorado. The following is a summary of Weifield Group’s current and past experience by industry type. We’ve included specific contact information for the owners/partners we’ve worked with so you may contact them about our performance. About Weifield Group Contracting Weifield Group Contracting is a fullservice, privately held electrical company. We have a diverse portfolio of experience in the western electrical business region. Weifield Group prides ourselves in our attention to detail, and our ability to deliver the highest level of customer satisfaction. Whatever the need – electrical remodeling, new construction, maintenance for wholesale, retail, telecom, nonprofit businesses, or industrial— Weifield Group can help. We are confident our experience, communication, innovative ideas and costeffective approach will deliver significant value to your critical project. www.weifieldcontracting.com A Focus on Safety We ensure the safety of our workers, contractors, and the public through diligent planning, training, and resources. Our employees are certified to use the equipment they operate, and are governed by OSHA regulations. Regular safety inspections are administered by our fulltime safety manager, and safety training is an ongoing scheduled activity.

Transcript of Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of...

Page 1: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                                                    

       146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

 

COMMERCIAL & INDUSTRIAL                

  Weifield Group has a broad range of current and past project experience.  Our  portfolio  includes  education,  healthcare, transportation,  offices,  U.S.  military,  hotels/  hospitality, government/service,  and  more.  We  are  also  a  leader  in Leadership  in  Energy  and  Environmental  Design  (LEED) standards, completing Denver’s first net‐zero energy building and the first LEED Platinum office building built in Colorado.  The following is a summary of Weifield Group’s current and past  experience  by  industry  type. We’ve  included  specific contact  information for the owners/partners we’ve worked with so you may contact them about our performance. 

 

            

   

About Weifield Group Contracting 

 Weifield Group Contracting is a  

full‐service, privately held electrical company. We have a diverse portfolio of experience in the western electrical business 

region.  

Weifield Group prides ourselves in our attention to detail, and our ability to deliver the highest level of customer satisfaction.  

 Whatever the need – 

electrical remodeling, new construction, maintenance for wholesale, retail, telecom, non‐profit businesses, or industrial—Weifield Group can help. We are 

confident our experience, communication, innovative ideas and cost‐effective 

approach will deliver significant value to your critical project. www.weifieldcontracting.com 

   

A Focus on Safety We ensure the safety of our workers, contractors, and the public through 

diligent planning, training, and resources. Our employees are certified to use the equipment they operate, and are governed by OSHA regulations. Regular safety inspections are administered by our full‐time safety manager, and 

safety training is an ongoing scheduled activity. 

Page 2: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

PROJECTS IN PROCESS                

T IC  CORPORATE  TRAIN ING  CENTER   |  AURORA,  CO  The Industrical Company (TIC) | Owner   FCI Constructors, Inc. | General Contractor | Dax Diaz | 970.535.4725 Davis Partnerships | Architect | Nicolas Allan  MV Consulting | Electrical Engineer | Dan Kozisek | 303.325.3271 PROJECT DURATION:  May 2015 – Mar. 2016 |  PROJECT CONTRACT:  $1.2M PROJECT MANAGER AND FOREMAN: Kevin Knox and Lance Davis  This design‐assist project includes furnishing and installing complete mechanical (HVAC and plumbing) and electrical systems required for the new TIC corporate training facility in Aurora, Colorado. Project includes approximately 26,000 sq. ft. of single‐story conventional construction of an administration building and 25,000 sq. ft. of pre‐engineered metal buildings. The project will be developed on approximately 11 acres of TIC/Kiewit’s 59‐acre site.  

 RUNYON  ELEMENTARY  SCHOOL  |  L ITTLETON,  CO  Littleton Public Schools District | Owner | 303.347.4365 GH Phipps | General Contractor  Yon Tanner | Architect | Roy E. Tanner | 303.691.8000 MEP | Electrical Engineer | Clara Muller | 303.936.1633 PROJECT DURATION:  June 2015 – Mar. 2016  PROJECT CONTRACT:  $868K PROJECT MANAGER AND FOREMAN: Tristan Covington and Mark Bogle  The project scope includes removal of the existing wood structure roof, and replacing it with a new steel superstructure and roof. Weifield will also install all lighting, lighting controls, branch wiring, and fire alarm systems.  All electrical systems installed overhead in the existing building will be new.   

 FORT  MORGAN  MIDDLE  SCHOOL  |  FT .  MORGAN,  CO  Ft. Morgan School District | Owner  Haselden Construction | General Contractor  Wold Architects and Engineers and Larson Incitti Architects| Architect  ME Group | Electrical Engineer  PROJECT DURATION:  May 2015 – Aug. 2016  PROJECT CONTRACT:  $2.1M PROJECT MANAGER AND FOREMAN: Tristan Covington, FS ‐ TBD  Design‐build project that will consist of a new 114,632 sq. ft. K‐8 school located in Fort Morgan, Colorado, that will replace the existing nearly century‐old middle school. The Project will be designed and constructed via high performance building standards with a desired goal to achieve Leadership in Energy and Environmental Design‐Gold (LEED Gold) rating designation within the Project budget and schedule parameters. 

 PLATTE  VALLEY  MEDICAL  CENTER  MOB#2  |  BR IGHTON,  CO  Platte Valley Medical Center | Owner  GH Phipps | General Contractor | Jason Foisset | 303‐389‐3718 WHR Architects | Architect  Cator Ruma & Associates | Electrical Engineer | Marc Valerius | 303‐232‐6200  PROJECT DURATION:  Jan. 2015 – Feb. 2016  PROJECT CONTRACT:  $1.1M PROJECT MANAGER AND FOREMAN: Russell Tafoya, John Ehrens  Design‐build project that will consist of a new 60,000SF 3‐story Core & Shell MOB, 3,000SF connection between MOB #2 and the existing MOB, and 150,000SF of new surface parking lots located to the south of the new MOB.  

Page 3: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

 LARAMIE  HIGH  SCHOOL  |  LARAMIE ,  WY  Albany County School District #1 | Owner  Haselden Construction | General Contractor | Ben Barella | 307‐234‐7991  Lantz‐Boggio | Architect | 303‐773‐0436 MKK Engineers | Electrical Engineer | 307‐634‐7647 PROJECT DURATION:  Oct. 2014 – Aug. 2016  PROJECT CONTRACT:  $10M PROJECT MANAGER AND FOREMAN: Russell Tafoya, James Sammon  This project  consists of  a new 300,000SF high  school  located  in  Laramie, WY. Weifield was originally contracted to complete the new electrical infrastructure for the high school and then was awarded the high school contract. The new high school will be comprised of classroom wings, a swimming pool, orchestra pit, gymnasiums and associated locker rooms, soccer field, football stadium with grandstands on the east and west sides, tennis courts, and parking areas.  

 CNR  CONF IDENT IAL  DATA  CENTERS  |CHEYENNE ,  WY  Private Client | Owner  Hensel Phelps | General Contractor |  Confidential | Architect  Confidential | Engineer |  PROJECT DURATION: Dec 2014 – June 2015   PROJECT CONTRACT: $4M PROJECT MANAGER AND FOREMAN: Dustin Tafoya & Matt Flinn Electrical build out to four 7,800 ft² data center buildings. Each building has a 2000KW generator, (2) 1200A Main Switchboards (for redundancy), 350KW UPS, 4000A DC Plant.  Each building also includes high security (card readers, biometric readers).

 17  WEWATTA  |  DENVER ,  CO  Holland Partners | Owner  Holland Construction | General Contractor | Michael Callahan | 303.520.4452  Shears Adkins Rockmore| Architect | Andy Rockmore | 303.436.9551 MV Consulting | Electrical Engineer | Marcus Vahling | 303.325.3271 PROJECT DURATION:  Sep. 2014 – Apr. 2017  PROJECT CONTRACT:  $11.7M PROJECT MANAGER AND FOREMAN: Dustin Tafoya, Nick Bull The Project consists of a phased mixed‐use building on an 87,350 square  foot vacant site in the Union Station Master Plan development bounded by Wewatta Street, Chestnut Street, 17th Street, and 18th Street  in Denver, Colorado. The building will be Type I construction, and will include one level of underground parking for approximately 200 spaces, a ground level consisting of approximately 85,000 square feet of retail space, services, and residential lobbies; a partial mezzanine level parking  deck;  two  levels  of  above‐grade  parking  for  approximately  400  spaces;  a  fourth  floor  podium  level  amenity  space, complete with swimming pool and deck, landscaping, shade structures, and, a common amenity structure including space for a fitness center, theater, game room, lounge, clubhouse and other amenities; levels 4 – 13 are residential apartments constructed in three towers as described herein. Total GSF for the project is approximately 934,000. 

       

Page 4: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

COUNTRY  CLUB  TOWERS  |  DENVER ,  CO  BROE Real Estate Services| Owner  Swinerton Builders | General Contractor | Aaron Townsend | 970.535.4725  Shears Adkins Rockmore| Architect | Andy Rockmore | 303.436.9551 MV Consulting | Electrical Engineer | Marcus Vahling | 303.325.3271 PROJECT DURATION:  Sep. 2014 – Apr. 2017  PROJECT CONTRACT:  $12.3M PROJECT MANAGER AND FOREMAN: Russell Tafoya, Scott Buckey The Country Club Towers II & III project consists of 495 luxury residential for‐rent apartment units, three levels of below grade parking, four levels of above grade parking, a large amenity deck, and associated common space for leasing offices and resident amenities. The residential high‐rise component consists of two (2), 30 story towers. The residential and  interior common spaces total approximately 623,000sf of heated space. Design‐Build project consisting of just under 1 million gross square feet. 

 L IMON  K ‐12  SCHOOL  |  L IMON,  CO  Limon School District| Owner  Haselden Construction LLC | General Contractor | Bob Fox | 303.751.1478 klipp| Architect | Jay Ireland | 303.893.1990 x5216 Me Group | Electrical Engineer | Omar Tlamcani | 303.382.1920 x 4119 PROJECT DURATION:  Jun. 2014 – Oct. 2015  PROJECT CONTRACT:  $1.7M PROJECT MANAGER AND FOREMAN: Tristan Covington The  project  is  a  new  best  grant  K‐12  school  for  the  Limon,  Colorado  School District.  The  project  consists  of  85,500  square  feet  of  new  classroom, minor upgrades to the existing gymnasium and auditorium, connections to temporary classrooms, and site renovations.  

 TERUMO  BCT  HEADQUARTERS  |  LAKEWOOD,  CO  Terumo | Owner | 303.231.4576 Swinerton Builders | General Contractor | John Spight | 303.418.5300 Gensler | Architect | 303.893.7159 Cator Ruma | Electrical Engineer | 303‐232.6200 PROJECT DURATION:  Apr. 2014‐ Feb. 2015  PROJECT CONTRACT:  $2.1M PROJECT MANAGER AND FOREMAN: Dustin Tafoya, Chris Schreffler The  three  story building will have 40,000 SF  floor plates comprising a  total of 120,000 SF total and will integrate into Terumo BCT’s campus. It is the intent of Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately 10,000 SF on the first floor. The remainder of the first floor will be constructed for future conversion to office, initially utilized for parking. The approximately 7 acre site will include surface parking to retain a campus parking ratio of 2/1000. 

 COLORADO  SCHOOL  OF  MINES  ATHLET IC  CENTER  |  GOLDEN,  CO  Colorado School of Mines | Owner | 303.273.3000 GH Phipps | General Contractor | Mike Hester | 719.499.7444 Heery International Inc. | Architect | 404.881.9880 BCER | Electrical Engineer | 303‐936‐1633 PROJECT DURATION:  Apr. 2014‐ July 2015  PROJECT CONTRACT:  $2.7M PROJECT MANAGER AND FOREMAN: Russell Tafoya, Scott Buckey  The project will include construction of a new 54,800 GSF Athletic Center, a 5,500 GSF  North  Side/Visitor  Facility,  a  7,300  GSF  Soccer  Facility  and  a  1,700  GSF Concessions  Building.    These  facilities  include  locker  rooms,  training  rooms, strength  and  conditioning  spaces,  offices, meeting  rooms,  concession  areas, stadium seating, field lighting, parking lots, and landscape. LEED Silver 

 

Page 5: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

HAMPDEN  HE IGHTS  ELEMENTARY  |  DENVER ,  CO  Denver Public Schools | Owner | 720‐423‐3200 GH Phipps | General Contractor | Ted Laszlo | 303‐571‐5377 Anderson Mason Dale | Architect | 303‐294‐9448 MEP | Electrical Engineer | 303‐936‐1633 PROJECT DURATION:  Feb 2014‐ Dec 2014  PROJECT CONTRACT:  $1.8M PROJECT MANAGER AND FOREMAN: Tristan Covington, Lance Davis  Hampden Heights Elementary will be a new 73k square foot facility for Early Child education up  to  fifth  grade  that will  accommodate 550 Denver Public  School students.   Weifield will be  installing a complete electrical system that  includes interior and exterior lighting, fire alarm, lightning protection, public address, wireless clock, CCTV, A/V, and security systems.    ROCKY  MOUNTAIN  DEAF  SCHOOL  |  DENVER ,  CO  Wember | Owner | 970‐402‐0382 FCI | General Contractor | Terry Hutton | 970‐535‐4725 Anderson Mason Dale | Architect | 303‐294‐9448 BCER | Electrical Engineer | 303‐422‐7400 PROJECT DURATION:  Jan 2014 – Sept 2014  PROJECT CONTRACT:  $1M PROJECT MANAGER AND FOREMAN: Russell Tafoya, Jake Lopez   46,000 ft² new K‐12 school specifically designed for deaf students. It will be more visually friendly and will have a gym and large playground and accommodate 130 students.  

  

CSU  ANIMAL  SC IENCES  EXPANS ION  |  FORT  COLL INS ,  CO  Colorado State University | Owner  GH Phipps | General Contractor  Bennett Wagner Grody Architects | Architect  Cator, Ruma & Associates | Electrical Engineer  PROJECT DURATION:  Feb 2013 – Feb 2015  PROJECT CONTRACT:  $700k PROJECT MANAGER AND FOREMAN: Dustin Tafoya, James Sammon Design‐build  project  that  will  include  extensive  remodels  to  the  1959  built building,  41,400  ft²  total,  and  convert  classrooms  to  laboratories.  2  building expansions for an additional 13,000 ft² will include a 170 person lecture hall. LEED Gold. 

  

   

Page 6: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

UNION  STAT ION  BLOCK  A  |DENVER ,  CO  RECAP/Holland Union Station | Owner  Holland Partners | General Contractor | Orville Hinerman | 720‐398‐2210 Shears Adkins Rockmore | Architect | 303‐436‐9551 MEP/Weifield Group | Electrical Engineer PROJECT DURATION:  October 2012 – Mar 2015  PROJECT CONTRACT:  $5M PROJECT MANAGER AND FOREMAN: Dustin Tafoya and Nick Bull Design Build 404,077  ft² new 21  story high  rise  apartment building  atop  a 2‐story below‐grade parking structure. 

Page 7: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

PAST PROJECTS            

 

LEED PROJECTS  

13 t h  CAB  ASB  HANGAR  |  FT  CARSON,  CO  Army Corps of Engineers Omaha Dist | Owner | Edward Jackson | (402) 995‐2087 Hensel Phelps | General Contractor | Paul O’Donnell, Chad Carlson | 970‐346‐7327 Jacobs Engineering Group | Electrical Engineer | 817‐735‐6000 PROJECT DURATION:  Nov 2012 –April 2014  PROJECT CONTRACT:  $4M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Matt Hartman Design Assist New 120,500 ft² 14 bay aircraft operations and maintenance hangar at Ft Carson Air Force Base. Net Zero, LEED Gold  

 CSU  LORY  STUDENT  CENTER  REV ITAL IZAT ION  |  FT  COLL INS ,  CO  Colorado State University | Owner | 970‐491‐4284 Saunders Construction | General Contractor | Kay Rasmussen | 303‐617‐6514  Aller|Lingle|Massey Architects P.C. | Architect | 970‐223‐1820 Cator Ruma & Assoc | Electrical Engineer | Justin Hafer | 303‐232‐6200 PROJECT DURATION:  Dec 2012 – Aug 2014  PROJECT CONTRACT:  $6M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Troy Grant Design Build 3 level 140,000 ft² building remodel with two new additions. LEED Gold.   COMMUNITY  COLLEGE  OF  DENVER  SLEB/CONFLUENCE  |DENVER ,  CO  |  LEED  GOLD  Community College of Denver | Owner |  GH Phipps | General Contractor | Mike Robinson | 303‐517‐5377  Oz Architecture | Architect | ME Group Design | Electrical Engineer | 303‐382‐1920 PROJECT DURATION:  December 2011 – March 2013  PROJECT CONTRACT:  $3M PROJECT MANAGER AND FOREMAN: Russell Tafoya and John Ahrens New  87,186  ft²  student  Learning  and  Engagement  Building  on  the  Auraria  Higher Education Campus. The facility will include classrooms, computer labs, testing centers, meeting facilities, and faculty and administrative offices. 

 WAYNE  ASP INALL  FEDERAL  BUILD ING  |  GRAND   JUNCT ION,  CO  |  NET  ZERO  GSA Public Building Service| Owner  The Beck Group | Todd Berry | 303‐466‐9665 | General Contractor & Architect WRL Architects | Engineer | 216‐522‐1350 PROJECT DURATION: January 2011 – December 2012        PROJECT CONTRACT:  $1.2M PROJECT MANAGER AND FOREMAN:  Mike Megara, James Selecky & Nate Anderson First GSA historic net zero remodel! This design‐build remodel transformed the 1939‐built structure into a sustainable facility. 

    

Page 8: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

MARQUEZ  HALL  |  GOLDEN,  CO  |  LEED  S I LVER  Petroleum Engineering Department of Colorado School of Mines| Owner  Adolfson & Peterson Construction | Erik Dimmick | 303‐363‐7101| General Contractor  Shaffer Baucom Engineering | 303‐986‐8200 | MEP Engineer Anderson Mason Dale Architects | 303‐294‐9448 | Architect  PROJECT DURATION:  January 2011 – June 2012  PROJECT CONTRACT:  $2.7M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Troy Grant  A state‐of‐the‐art $25 million  facility  for pioneering  teaching,  research and service on  the Colorado School of Mines campus. 60,000 ft² will include offices, classrooms, and laboratories with audio‐visual and visualization technologies.   

 NAT IONAL  SECUR ITY  SPACE   INST ITUTE  |  COLORADO  SPR INGS ,  CO  |  LEED  S I LVER  Peterson Air Force Base | Owner  PCL Construction | General Contractor | Jason Danek | 303‐365‐6500 Benham an SAIC company | Architect | 405‐478‐5353 Benham an SAIC company | Engineer | 405‐478‐5353 PROJECT DURATION:  December 2010 ‐ February 2012              PROJECT CONTRACT:  $2.2M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Matt Hartman The NSSI project is a 53,000 ft² two‐story building located at Peterson Air Force Base.  It includes new lighting, lighting control, distribution, duct banks, power, fire alarm, systems, and cable tray.   

 RESEARCH  SUPPORT  FAC I L I TY   I I  |  GOLDEN,  CO  |  NET ‐ZERO  National Renewable Energy Laboratory | Owner Haselden | General Contractor | Derek Oliver | 303‐751‐1478 RNL | Architect | Michael Simpson | 303‐575‐8458 Stantec | Electrical Engineer | David Knoll | 916‐569‐2537 PROJECT DURATION:  December 2010 ‐ October 2011   PROJECT CONTRACT:  $4M PROJECT MANAGER AND FOREMAN: Mike Osborne and Nick Bull 190,000 ft² office building, an added wing building to the RSF I. The RSF II has a proposed energy  design  of  35  kBtu/sq  ft/year.    The  project  is  design‐build  with  a  1.2 MW photovoltaic system and 13.2 kv infrastructures to support the RSF I, II, and future campus expansions.  Weifield Group carried all subsystems,  including  telecommunications, audio/visual,  fire alarm, security, and  intercom. All systems are  tied  in  to  the campus’ existing communications and security.   

NREL  PARK ING  GARAGE  |  DENVER ,  CO  |  NET  ZERO  National Renewable Energy Laboratory | Brian Larsen | Owner | 303‐275‐3000  Haselden | General Contractor | Christine Hartman| 303‐751‐1478 RNL | Architect | Tony Thornton| 303‐292‐0845 ME Group | Electrical Engineer | Scott Payne | 303‐382‐1920 PROJECT DURATION:  April 2011 ‐ November 2011   PROJECT CONTRACT: $2.6M  PROJECT MANAGER AND FOREMAN:  Mike Osborne and Nick Bull The parking structure will include a minimum of 1,500 parking spaces for NREL staff. Following NREL's mission to walk‐the‐talk, the new parking structure will be highly energy efficient, feature a photovoltaic canopy on the top level, and have plug‐in stations for electric vehicle recharging. Design‐Assist. 

  

Page 9: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

FREDER ICK  HIGH  SCHOOL  |  FREDER ICK ,  CO  |  LEED  S I LVER  St Vrain School District | Owner Haselden | General Contractor | Ryan Sculthorpe | 303‐751‐1478 Klipp | Architect | Greg Cromer | 303‐893‐1990 Cator Ruma | Electrical Engineer | Justin Hafer | 303‐232‐6200 PROJECT DURATION: December 2009 ‐ August 2011     PROJECT CONTRACT:  $2.7M       PROJECT MANAGER AND FOREMAN:  Jon Griffis and Dave Fontaine St. Vrain High School  is a new 188,000 ft² high school,  including athletic fields, three baseball fields, football fields, two tennis courts, site parking, and emergency generator.   

 RESEARCH  SUPPORT  FAC I L ITY   I  |  GOLDEN,  CO  |  NET  ZERO  |  LEED  PLAT INUM  National Renewable Energy Laboratory | Owner Haselden | General Contractor | Derek Oliver | 303‐751‐1478 RNL | Architect | Michael Simpson | 303‐575‐8458 Stantec | Electrical Engineer | David Knoll | 916‐569‐2537 PROJECT DURATION: Jan 2009 ‐ June 2010    PROJECT CONTRACT: $9.5M PROJECT MANAGER AND FOREMAN: Mike Osborne and Nick Bull The National Renewable Energy Laboratory’s Research Support Facility is a 220,000 ft² office building with a 20,000  ft² data center.   This office building  is one of  the most energy  efficient  buildings  in  the world,  performing  at  33  kBtu/sq.  ft./year.    This  project was  design‐build with  a  1.2 MW photovoltaic system and 13.2 kv  infrastructure to support the RSF and future campus expansions.   Weifield Group carried all subsystems,  including telecommunications, audio/visual, fire alarm, security, and  intercom.   The systems are tied  in with the campus communications and alarm systems.  Bonded $9.4M. 

 JO INT  FORCES  READINESS  TRAIN ING  CENTER  |  CHEYENNE ,  WY  |  LEED  S I LVER  Wyoming National Guard | Owner | CPT James Edington | 307‐631‐0640 FCI Constructors | General Contractor | Rob Price | 970‐535‐4725 Coover‐Clark & Associates | Architect | 303‐783‐0040 MKK Consulting Engineers | Electrical Engineer | 303‐796‐6000 PROJECT DURATION: Sept. 2008 ‐ June 2010          PROJECT CONTRACT: $3.4M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Matt Flinn The Joint Forces Readiness Training Center is located on the Warren Air Force Base in Cheyenne, Wyoming.  The project consists of a 145,000 ft² office building and a 28,000 ft² maintenance facility. Bonded Project. 

  

CASEY  MIDDLE  SCHOOL  |  BOULDER ,  CO  |  LEED  PLAT INUM  Boulder Valley School District | Lou Novak | Owner | 720‐561‐5157  Saunders Construction | General Contractor | Marv Bachman | 303‐419‐0481 RB + B Architects, Inc. | Architect | Derek Young | 970‐484‐0117 MKK, Inc. | Electrical Engineer | Ruben Rodriguez | 303‐796‐6000 COMPLETION DATE:  April 2010        PROJECT CONTRACT: $1.9M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Aubrey Cundall This 110,000 ft² middle school has two original walls that were salvaged, and the new school was constructed around these two existing walls.  Design included a 26.78 kW photovoltaic array to assist with onsite power generation. First LEED Platinum School in Colorado! 

  

Page 10: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

CSU  ACADEMIC   INSTRUCT ION  BUILD ING  |  FT .  COLL INS ,  CO  |  LEED  GOLD  Colorado State University | Owner | Norm Laurence | 970‐491‐0160 Pinkard | General Contractor | Jim Adams | 303‐986‐4555 Bennett, Wagner, & Grody | Architect | Matthew Bartels | 303‐623‐7323 Beaudin Ganze | Electrical Engineer | Rochelle Mellott | 970‐221‐5691 PROJECT DURATION:   April 2009 ‐ June 2010    PROJECT CONTRACT:  $2M PROJECT MANAGER AND FOREMAN:  Russell Tafoya and Arnie Trujillo The  CSU  Academic  Instruction  Building  is  a  90,000  ft²  four‐story  academic  office building.    The  building  includes  full  electrical  build‐out,  fire  alarm  and  15.75  kw photovoltaic system for classroom and auditoriums.  This project was awarded at 50% DDs, and Weifield worked with the design team to complete the design‐assist GMP.  

 S IGNATURE  CENTRE  AT  DENVER  WEST  |  GOLDEN,  CO  |  LEED  PLAT INUM  Aardex Corporation | Owner Aardex | General Contractor | Richard Janssen | 303‐987‐9000 Aardex | Architect | Richard Janssen | 303‐987‐9000 Alber Engineering | Electrical Engineer| Jerry Alber | 303‐985‐3260 COMPLETION DATE:  July 2007     PROJECT CONTRACT:  $730K PROJECT MANAGER AND FOREMAN:  Jerry Zeller and Jason Kizer Core and shell of a 279,506 ft² five‐story office building, including three story garage, and  full  electrical  build‐out  of  two  levels.   Owner  provided  equipment  and  special system subcontractors.  

 LARAMIE  COUNTY  L IBRARY  |  CHEYENNE ,  WY  |  LEED  GOLD  Laramie County | Owner FCI Constructors | General Contractor | Becket Hinson | 970‐535‐4725 AndersonMasonDale | Architect | 303‐294‐9448 Cator Ruma | Electrical Engineer| 303‐232‐6200 DURATION:  October 2005 ‐ July 2007     PROJECT CONTRACT:  $1.3M PROJECT MANAGER AND FOREMAN:  Dustin Tafoya and Steve Williams  Complete electrical build‐out of new  three‐story  library with site  lighting. This LEED Gold  library  is the first LEED‐certified public building  in Wyoming and was voted the 2008 Library of the Year by Library Journal/Gale 

 ROUTT  COUNTY   JUST ICE  CENTER  |  STEAMBOAT  SPR INGS ,  CO  |  LEED  GOLD  Routt County | Owner FCI Constructors | General Contractor | Rob Lawrence | 970‐535‐4725 HLM | Architect | 720‐946‐0276 HLM | Electrical Engineer| 720‐946‐0276 DURATION:  April 2006 ‐ September 2007   PROJECT CONTRACT:  $1.2M PROJECT MANAGER AND FOREMAN:  Dustin Tafoya and John Bolton  Complete electrical build‐out of a  jail addition with attached  tunnel and new  justice center. The project  includes  lighting control system, security, 26.25 KW photovoltaic system and fire alarm.  

    

 

Page 11: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

OFFICE BUILDINGS  

INTERVENT ION  COMMUNITY  CORRECT IONS  SERV ICES  ( I CCS  WEST)  |  LAKEWOOD,  CO  Intervention, Inc | Owner | Kelly Sengenberger | 303‐450‐6000  FCI Constructors, Inc. | General Contractor | Tony Seidling | 970‐535‐4725 Reilly Johnson Architecture | Architect | Stephen Graziano | 303‐832‐9111 COMPLETE:     December 2010 – August 2011  PROJECT CONTRACT:  $425K PROJECT MANAGER AND FOREMAN: Jon Griffis, Troy Grant 4 Story 26,000 ft² new medical rehabilitation facility. 

 LOCKHEED  MARTIN  CAFETER IA  REMODEL    |  L ITTLETON,  CO  Lockheed Martin| Owner Pinkard Construction | General Contractor | 303‐986‐4555 COMPLETE:  May 2011           PROJECT CONTRACT:  $532K PROJECT MANAGER AND FOREMAN: Russell Tafoya and Russell VanPeursem Renovation of existing cafeteria into a meeting center. Included addition of dimming, auto‐controlled and LED lighting. Installed fire alarm and teledata. 

 

WEBROOT  |  BROOMFIELD ,  CO  Webroot | Owner | 720‐842‐3628 i2 Construction | General Contractor | Nate Kugler | 303‐574‐1118 IA Architects | Architect  | 303‐672‐8500 BCER Engineering | Electrical Engineer | 303‐422‐7400 PROJECT DURATION:  September 2010 ‐ January 2011  PROJECT CONTRACT:  $1M PROJECT MANAGER AND FOREMAN: Russell Tafoya and John Ahrens The Webroot project is a 100,000 ft² interior tenant finish in a newly constructed office building.   This project  includes 5,000  ft²  Lab/MDF, CRAC units, 225kva UPS and 400kw generator back up. Negotiated  for  i2 Construction. 

 

ACADEMIC  OFF ICE  WEST  |  AURORA,  CO  University of Colorado at Denver Health Sciences Center | Owner  Weitz | General Contractor | Richard DeLuccie | 303‐326‐0332 AndersonMasonDale | Architect | 303‐294‐9448 RMH Group | Electrical Engineer| 303‐239‐0909 COMPLETION DATE:  June 2007    PROJECT CONTRACT:  $2.7M 

PROJECT MANAGER AND FOREMAN:  Russell Tafoya and Jim Hall Complete electrical build out of nine story office building totaling 206,100 ft², including high voltage. Located on UCD’s Anschutz Medical Campus.   

J EFFERSON  COUNTY  OFF ICE  AND  WORKFORCE  BUILD ING  |  GOLDEN,  CO  Jefferson County | Owner  Haselden | General Contractor | Bret Bemiller | 720‐341‐7955 RNL | Architect | 303‐295‐1717 BCER | Electrical Engineer| 303‐422‐7400 COMPLETION DATE:  June 2006    PROJECT CONTRACT:  $1.7M 

PROJECT MANAGER AND FOREMAN:  Russell Tafoya and Mike Watkins 

Page 12: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

Complete design‐assist electrical build out of a new 133,200 ft² building, including site lighting and communication conduits.  

MULTI‐FAMILY RESIDENTIAL & HOSPITALITY  

MONROE  POINTE  OF  CHERRY  CREEK  |  DENVER ,  CO  AT Development | Owner | Bruce Rifkin | 303‐242‐5829 Swinerton | General Contractor | Kerry Swain | 303‐423‐9242 Davis Partnership | Architect | 303‐861‐8555 M‐E Engineers | Electrical Engineer | 303‐421‐6655 COMPLETION DATE:  December 2007    PROJECT CONTRACT:  $2.5M 

PROJECT MANAGER AND FOREMAN:  Russell Tafoya and Arnie Trujillo Complete electrical build‐out of new eight‐story residential high‐end lofts.   

DENVER  CONVENTION  CENTER  HOTEL  |  DENVER ,  CO  

Hyatt and Faulkner USA | Owner  Hensel Phelps | General Contractor | Joel Douglass Klipp Cohussy Jenks Dubois | Architect | 303‐893‐1990 Jon Tseu | Electrical Engineer | Dan Montez | 303‐893‐0528 COMPLETION DATE:  November 2005   PROJECT CONTRACT:  $1.2 M PROJECT MANAGER AND FOREMAN:  Seth Anderson, Andrew Sena & Matt Flinn   Low‐voltage conduit  installation for backbone and guest rooms  in 33 story high‐rise hotel.  

 MIXED USE/RETAIL/COMMUNITY 

 

PHIL IP  S  MILLER  PARK  |  CASTLEROCK ,  CO  Town of Castlerock | Owner | Jeff Smullen | 303‐814‐7458 Turner Construction | General Contractor | Matt Kunz, Brian Peterson | 303‐944‐0605 Sink Combs Dethiefs | Architect | 303‐308‐0200 RMH Group | Electrical Engineer | 303‐239‐0909 PROJECT DURATION:  September 2013 – July 2014  PROJECT CONTRACT:  $1.2M PROJECT MANAGER AND FOREMAN: Tristan Covington, Marke Bogle   225‐acre  new  park  to  include  50,000  ft²  fieldhouse,  pool,  athletic  fields, playgrounds, trails and an outdoor amphitheater. Design Assist. 

 CHERRY  CREEK  MALL  |  DENVER ,  CO  The Taubman Company | Owner | 248‐258‐6800 The Weitz Co. | General Contractor | Dan Raber, Bret Rankin | 303‐860‐6685  Neumann/Smith Architecture | Architect | 248‐352‐8310 Swanson Rink | Electrical Engineer | 303‐832‐2666 PROJECT DURATION:  Feb 2013 ‐ Nov 2013  PROJECT CONTRACT:  $2M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Lee Wilson New lighting throughout the mall including new “light blades” at mall courts. Weifield won this project due to our successful performance on the Cherry Creek Mall Garage project. 

   

Page 13: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

CHERRY  CREEK  MALL  GARAGE  |DENVER ,  CO  The Taubman Company | Owner | 248‐258‐6800 The Weitz Co. | General Contractor | Dan Raber, Bret Rankin | 303‐860‐6685  Neumann/Smith Architecture | Architect | 248‐352‐8310 Swanson Rink | Electrical Engineer | 303‐832‐2666 PROJECT DURATION:  June 2012 – December 2012  PROJECT CONTRACT:  $1.7M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Lee Wilson lighting upgrade for Cherry Creek Mall garage entrances that hold 5,000 spaces. 

  CHERRY  CREEK  NORTH   IMPROVEMENTS  |  DENVER ,  CO  Cherry Creek North Business Improvement District | Owner | 303‐394‐2904 Nolte Associates, Brett Koth | Project Consultant | 303‐220‐6400 Weitz | General Contractor | Joe Osttmeyer | 303‐860‐6628 Design Workshop | Urban Design Architect | Jamie Fogle | 303‐323‐5186 Roos Szynski | Electrical Engineer | Charlotte Szynski | 303‐696‐2602 PROJECT DURATION: Phase I: May 2010 ‐ November 2010,  

Phase II: February 2011 ‐July 2011    PROJECT CONTRACT: $4.3M       PROJECT MANAGER AND FOREMAN: Russell Tafoya and Lance Davis Weifield Group’s scope of work on this project includes 336 new pedestrian pole lights, 79 custom amenity poles, 22 custom directories, 53 custom stop signs, and 5 custom  illuminated monuments.   The project required 12,000  linear  feet of custom extruded aluminum. The light pole bases are hidden from view by custom precast pieces weighing a total of 198,600 pounds.  87 cubic yards of soil were un‐invasively removed to pour new poles by hydro‐vacuuming.  Also, 78,000 feet of holiday LED light strands have been provided.  Lighting accents have also been added to 13 trees to enhance the nightscape. Bonded Project. 

 GARDENS  AT  HAVANA  |  AURORA,  CO   

Miller Weingarten Realty | Owner | 303‐799‐6300 Saunders | General Contractor | Scott Duckworth | 720‐384‐5329 O’Brien & Associates | Architect | 303‐799‐6300 MEP | Electrical Engineer | 303‐936‐1633 COMPLETION DATE:  November 2008   PROJECT CONTRACT:  $989K PROJECT MANAGER AND FOREMAN:  Dustin Tafoya and John Grosch Complete high end site lighting package, including signs at Mississippi and Havana. 

 

ROCKY  MOUNTAIN  CHRIST IAN  CHURCH  |  FREDER ICK ,  CO  Rocky Mountain Christian Church | Owner | Alan Algrim | 303‐772‐2229 Pinkard | General Contractor | Jack Quandt | 303‐345‐2854 The Larson Group | Architect | 719‐471‐7676 Consulting Engineers, Inc. | Electrical Engineer| 719‐594‐0022 COMPLETION DATE:  August 2008   PROJECT CONTRACT:  $1.2 M PROJECT MANAGER AND FOREMAN:  Matthew Tarr and Jason Kizer Complete electrical build‐out of new 66,000 ft² church and classrooms. Project includes site  lighting,  complete  lighting  control  system,  security,  fire  alarm,  audio  visual  and phone. 

   MARKETPLACE  AT  AUST IN  BLUFFS  |  COLORADO  SPR INGS ,  CO  

Page 14: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

United Properties | Owner  Adolfson & Peterson | General Contractor | Chad Jelinek | 303‐363‐7101 RTA Inc. | Architect | 719‐471‐7566 Farnsworth Group | Electrical Engineer | 719‐590‐9194 COMPLETION DATE:  June 2008    PROJECT CONTRACT:  $1.04M PROJECT MANAGER AND FOREMAN:  Dustin Tafoya and Aubrey Cundall Complete electrical site and shop remodel of an existing shopping mall.  

 RALPH  SCHOMP  BMW  |  HIGHLANDS  RANCH,  CO  Lisa Schomp | Owner  Adolfson & Peterson | General Contractor | Kyle Kennett | 303‐363‐7101 Wagner Architectural Group | Architect | 760‐729‐0533 IES | Electrical Engineer | 303‐988‐9305 COMPLETION DATE:  May 2008     PROJECT CONTRACT:  $1.4M  

PROJECT MANAGER AND FOREMAN:  Dustin Tafoya and James Selecky Complete  electrical  build‐out  of  new  high  end  BMW  dealership.  Includes  complete lighting control system, security, fire alarm, theater lighting control, sound, paging, and phone systems. 

 SOUTHLANDS  MALL  –  HIGH  VIS IB I L I TY  BUILD INGS  |  PARKER ,  CO  Alberta Development | Owner  Saunders | General Contractor | Chad Jelinek | 303‐944‐1672 SEM Architects, Inc. | Architect | 303‐220‐8900 Fasnacht & Nelson, P.C. | Electrical Engineer | 913‐648‐0905 COMPLETION DATE:  September 2005    PROJECT CONTRACT:  $800K PROJECT MANAGER AND FOREMAN:  Russell Tafoya and Jason Kizer  Five electrical build outs and eleven tenant finish buildings, including site lighting and communication conduits. 

 

LOWE’S  |  GLENWOOD  SPR INGS ,  CO  Lowe’s | Owner  McWhorter & Co | General Contractor  Kurt D. Reed & Associates | Architect | 480‐941‐1440 Page Interworks | Electrical Engineer | 336‐667‐4225 COMPLETION DATE:  August 2005   PROJECT CONTRACT:  $600K PROJECT MANAGER AND FOREMAN:  Russell Tafoya and Matt Flinn Complete electrical build‐out for 100,000 ft² national supply warehouse on a fast‐track five month schedule.   

 LOWE’S  |  PARKER ,  CO  Lowe’s | Owner  Summit Builders | General Contractor | Bill Breen | 602‐840‐7700 Kurt D. Reed & Associates | Architect | 480‐941‐1440 COMPLETION DATE:   January 2004     PROJECT CONTRACT:  $800K PROJECT MANAGER AND FOREMAN:  Seth Anderson and Pete Farreny  Complete  electrical  build‐out  and  site  lighting  for  138,000  ft²  national  supply warehouse on a fast track five month schedule.   

EDUCATIONAL  

Page 15: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

HI ‐PLA INS  SCHOOL  |  VONA,  CO  Hi‐Plains School District R‐23 | Owner | Steve McCracken, Superintendent | 970‐664‐2636 CBRE | Owner’s Agent | Ryan Smelker | 303‐806‐2037  FCI | General Contractor | Dax Diaz | (970) 535‐4725 Klipp | Architect | Tim McKay, PM | 303‐893‐1990  MKK | Electrical Engineer | PROJECT DURATION:  July 2013 – August 2014  PROJECT CONTRACT:  $1M PROJECT MANAGER AND FOREMAN: Tristan Covington/Russell Tafoya,   Design‐build, phased project  for new LEED Gold PK‐12 school. School will be a new 51,268  ft²  building  on  a  new  site.  Building  is  to  include  all  necessary  educational spaces, administration space, new athletic fields, and a multi‐purpose gymnasium.  

 DPS  DOWNTOWN  CAMPUS  1860  L INCOLN  |  DENVER ,  CO  Denver Public Schools | Owner | Katheryn Zeeb, Project Manager| 720‐424‐5488 PCL | General Contractor | Bryan Sakuoka | 303‐365‐6500  SLATERPAULL Architects | Architect  MKK Consulting Engineers | Electrical Engineer | John Jansons | 303‐796‐6004  PROJECT DURATION:  March 2013 – July 2014  PROJECT CONTRACT:  $6M PROJECT MANAGER AND FOREMAN: Russell Tafoya, Nate Anderson  Design‐build project that will include moving existing high school, technical college, a charter school and administrative offices to a new downtown campus. 

 UCD  ACADEMIC  BUILD ING  1  PHASE   I  |  DENVER ,  CO  University of Colorado at Denver | Owner |  Saunders | General Contractor | Cynthia Fluhr‐Nodich | 303‐699‐9000 AndersonMasonDale| Architect | 303‐294‐9448 Cator, Ruma & Associates | Electrical Engineer | 303‐232‐6200 PROJECT DURATION:  March 2013 – September 2013  PROJECT CONTRACT:  $500k PROJECT MANAGER AND FOREMAN: Tristan Covington, Scott Buckey  Underground work for new academic building on Auraria Campus.  

 UNIVERS ITY  OF  COLORADO  DENVER  SCHOOL  OF  DENTAL  MEDIC INE  |  AURORA,  CO  University of Colorado| Owner  Haselden Construction| Jason DeWolfe | (303) 728‐3744 | General Contractor  Anderson Mason Dale | David Pfeifer| 303‐294‐9448| Architect  Cator Ruma & Associates | Mike Meints | 303‐232‐6200 | Engineer  PROJECT DURATION: February 2011 ‐ October 2011  PROJECT CONTRACT:  $450K PROJECT MANAGER AND FOREMAN:  Dustin Tafoya and Lance Davis 20,612  ft²  expansion  to  the University  of Denver  School  of Dental Medicine.  LEED Certified.   

      

Page 16: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

COLUMBINE  ELEMENTARY  |  BOULDER ,  CO  Boulder Valley School District | Owner  Adolfson & Peterson | General Contractor | Mario Cappella | 303‐363‐7101 Bennett, Wagner, & Grody | Architect | Anne Weber | 303‐623‐7323 Cator Ruma | Electrical Engineer | Marcus Valerius | 303‐462‐8457 COMPLETE:  May 2011         PROJECT CONTRACT:  $714K        PROJECT MANAGER AND FOREMAN: Russell Tafoya and Michael Hart New 68,400  ft² elementary school with athletic fields, parking lots, solar lighting, and 30 KW generator.  

SMOKY  HILL  HIGH  SCHOOL  |  AURORA,  CO  Cherry Creek School District #5 | Owner Haselden | General Contractor | Theron Skidmore | 303‐751‐1478 H + L  Architecture | Architect | Robert Rody | 303‐295‐1792 CEI | Electrical Engineer | Roger MacFarland | 719‐594‐0022 PROJECT DURATION: February 2010 ‐ October 2010         PROJECT CONTRACT: $1.2M PROJECT MANAGER AND FOREMAN: Jon Griffis and Matt Hartman Complete lighting retrofit of Smoky Hill High School.  Half the lights had to be replaced and half retrofitted.  Demo and wire new pools, timing system for pools, sound system, and teledata drops. Retrofit fire alarm system.   

 

C IMARRON  MIDDLE  SCHOOL  |  PARKER ,  CO  Douglas County School District | Owner | Sharon Lambdin | 303‐387‐0313 JHL Constructors | General Contractor | Kristy Payne | 303‐741‐6116 Christiansen, Reece, & Partners | Architect | Bob Snow | 719‐633‐5901 Consulting Engineers, Inc. | Electrical Engineer | 719‐594‐0022 PROJECT DURATION:  Jan 2009 ‐ Nov 2009      PROJECT CONTRACT: $1.8M PROJECT MANAGER AND FOREMAN: Mike Osborne and Heath DeJager Cimarron Middle School is a new 133,000 ft² middle school with clock, alarm and tele/data systems.    

BROOMFIELD  HIGH  SCHOOL  |  BROOMFIELD ,  CO  

Boulder Valley School District RE‐2 | Owner | Steve Schumacher | 303‐447‐5081 Haselden | General Contractor | Russell Welch | 303‐751‐1478 AndersonMasonDale | Architect | Keith Boyd | 303‐294‐9448 MEP | Electrical Engineer | 303‐936‐1633 COMPLETION DATE:   August 2009        PROJECT CONTRACT:  $1.5M PROJECT MANAGER AND FOREMAN:  Russell Tafoya and James Sammon Weifield Group remodeled electrical in portions of the existing facility, upgraded fire alarm, installed new wireless clock system, and completed electrical build out of two story 50,000 ft² wing.    

FOOTHILL  ELEMENTARY  |  BOULDER ,  CO  

Boulder Valley School District RE‐2 | Owner | Steve Schumacher | 303‐447‐5081 Haselden | General Contractor | Russell Welch | 303‐751‐1478 Larson‐Incitti | Architect | Nora Brooks | 303‐292‐4304 Consulting Engineers, Inc. | Electrical Engineer | 719‐594‐0022 COMPLETION DATE:  July 2009          PROJECT CONTRACT:  $735K PROJECT  MANAGER  AND  FOREMAN:    Russell  Tafoya  and  John  Bolton The project consists of 53,500 ft² classroom remodel and 22,742 ft² addition.  Systems include; electrical, lighting control, fire alarm, security, audio visual, site lighting, paging, clocks and communications.   

 

Page 17: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

BOULDER  HIGH  SCHOOL  |  BOULDER ,  CO  Boulder Valley School District RE‐2 | Owner | Tom Blahak | 303‐447‐5081 Pinkard | General Contractor | Jack Quandt | 303‐986‐4555 Klipp | Architect | Greg Cromer | 303‐893‐1990 R.J. McNutt | Electrical Engineer | 970‐330‐3266 COMPLETION DATE:   January 2009       PROJECT CONTRACT:  $950K 

PROJECT MANAGER AND FOREMAN:  Dustin Tafoya and Aubrey Cundall Construction of a new 20,000 ft² main gym and locker rooms, a 2,700 ft² office addition and  a 2,000  ft²  stagecraft  area,  as well  as extensive  remodeling of  classrooms  and offices. Upgraded fire alarm, clock and other low voltage systems.    

LEGEND  HIGH  SCHOOL  |  CASTLE  ROCK ,  CO  Douglas County School District | Owner | Sharon Lambdin | 303‐387‐0100 JHL Construction | General Contractor | Kristy Payne | 303‐741‐6116 H + L and LKA Partners JV | Architect | Roger Hamilton | 303‐295‐1792 Consulting Engineers, Inc. | Electrical Engineer | 719‐594‐0022 PROJECT DURATION:   June 2006 ‐ August 2008    PROJECT CONTRACT:  $5.8M 

PROJECT MANAGER AND FOREMAN:  Russell Tafoya and Pete Farreny Complete electrical build‐out of new 256,487 ft² school. Includes science and computer labs, complete lighting control system, security, fire alarm, theater lighting control, theater sound, paging, phone and clock systems.  

STEAMBOAT  SCHOOLS  PROJECTS  |  STEAMBOAT  SPR INGS ,  CO  Steamboat Springs School District | Owner | Rick Denny | 970‐871‐3195 Haselden | General Contractor | Christian Eckstrom | 303‐751‐1478 Christiansen, Reece, & Partners | Architect | Bob Snow | 719‐633‐5901 Consulting Engineers, Inc. | Electrical Engineer | 719‐594‐0022 COMPLETION DATE:   June 2008     PROJECT CONTRACT:  $2.8M 

PROJECT MANAGER AND FOREMAN:  Russell Tafoya and Matt Flinn Complete electrical build‐out remodel, addition and new construction of three schools and one new ground up elementary school. Schools include complete lighting control system, security, fire alarm, sound, paging, phone and clock systems. 

 MESA  MIDDLE  SCHOOL  |  CASTLE  ROCK ,  CO  Douglas County School District RE‐1 | Owner | Margaret Anderson | 303‐387‐0313 W.O. Danielson | General Contractor | Scott Prestien | 303‐788‐1500 Christiansen, Reece, & Partners, P.C. | Architect | Bob Snow | 719‐633‐5901 Consulting Engineers, Inc. | Electrical Engineer | 719‐594‐0022 COMPLETION DATE:   June 2008     PROJECT CONTRACT:  $2.2M 

PROJECT MANAGER AND FOREMAN:  Dustin Tafoya and Lance Davis Complete electrical build‐out of new 132,400  ft²  school.  Including  complete  lighting control system, security and fire alarm. 

 

       

Page 18: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

AURORA  WEST  MIDDLE  SCHOOL  |  AURORA,  CO   

Aurora Public Schools | Owner  Haselden | General Contractor | Jarrod Fugate | 303‐751‐1478 Klipp | Architect | 303‐893‐1990 Alber Engineering | Electrical Engineer | 303‐985‐3260 COMPLETION DATE:   February 2007     PROJECT CONTRACT:  $1.7M 

PROJECT MANAGER AND FOREMAN:  Russell Tafoya and Matt Flinn Electrical remodel of three existing buildings and electrical construction for one new addition.  Project is 120,000 ft² and includes site lighting and communication conduits.  

STAPLETON  K ‐8  SCHOOL  |  DENVER ,  CO  Denver Public Schools | Owner | Tom Blahak | 303‐245‐5791 FCI Constructors | General Contractor | Steve Conklin | 303‐886‐0605 M+O+A Architectural Partnership | Architect | Joseph Doyle | 303‐308‐1190 Alber Engineering | Electrical Engineer | 303‐985‐3260 COMPLETION DATE:   May 2006      PROJECT CONTRACT:  $1.9M PROJECT MANAGER AND FOREMAN:  Russell Tafoya and Andrew Sena Complete  electrical  build‐out  of  new  103,000  ft²  public  school.  Includes  complete lighting control system, customer fixtures, security, telephones and fire alarm. 

 

ACADEMY  OF  CHARTER  SCHOOL  |  WESTMINSTER ,  CO  Academy of Charter Schools | Owner | Mike Burrell Haselden | General Contractor | Bryan Sculthorpe | 303‐728‐3773 Slaterpaull | Architect | Gwen Gilley | 303‐607‐0977 Alber Engineering | Electrical Engineer | 303‐985‐3260 COMPLETION DATE:   August 2005     PROJECT CONTRACT:  $1.1M PROJECT MANAGER AND FOREMAN:  Russell Tafoya and Pete Farreny Complete  electrical  build‐out  of  new  126,000  ft²  charter  school.  Includes  complete lighting control system, customer fixtures, security and fire alarm.  

GOVERNMENT & MUNICIPAL  

47 t h  BCT  PARK ING,  ROADS ,  AND  UTIL IT I ES  |  FT .  CARSON,  CO  Army Corps of Engineers | Owner | Diana Vanderzanden | 402‐995‐2066 Bryan Construction | General Contractor | Brian Hogan | 719‐632‐5355 Army Corps of Engineers | Electrical Engineer DURATION:  June 2009 ‐ March 2010        PROJECT CONTRACT: $2.4M PROJECT MANAGER AND FOREMAN: Mike Osborne and James Sammon Project includes high voltage, telecommunications and fiber optic infrastructure along a two mile stretch of road at Ft. Carson.   Project includes 27 manholes, 12 high voltage tap boxes, 75 KW generator, and lift station with controls  

BRAC   INFRASTRUCTURE  SUPPORT  |  AURORA,  CO  

U.S. Air Force | Owner | Diana Vanderzanden/Frank Comley | 402‐995‐2066 Kiewit | General Contractor | Nathan Mares | 303‐921‐8901 Army Corps of Engineers | Architect AES Group, Inc. | Electrical Engineer | J. Russ Odum | 303‐841‐3922 PROJECT DURATION:  Oct 2008 ‐ May 2009         PROJECT CONTRACT:  $871K PROJECT MANAGER AND FOREMAN:  Mike Osborne and Lance Davis The  BRAC  Infrastructure  support  project  consists  of  medium  voltage  duct  bank, manholes, communications duct bank and street lighting on Buckley Air Force Base. 

Page 19: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

USPS  EXPANS ION  |  DENVER ,  CO  

Gray Construction | General Contractor | Brad Piatt | 859‐281‐9399 Gray Construction | Architect | Brad Piatt | 859‐281‐9399 Weifield Group/JBA Engineering | Electrical Engineer | 303‐985‐3250 COMPLETION DATE:  January 2009      PROJECT CONTRACT:  $2.2M PROJECT MANAGER AND FOREMAN:  Russell Tafoya and Lance Davis Complete electrical build out of a 163,000  ft² design‐build project housing  five new sorters.  Project includes medium voltage distribution, fire alarm, CCTV, tele/data, fiber optics, and security.   

WING  HEADQUARTERS  |  BUCKLEY  AFB ,  AURORA,  CO  

Army Corps of Engineers | Owner  Weitz | General Contractor | Jack Lambert/Mike Sullivan | 303‐860‐6600 COMPLETION DATE:  February 2005     PROJECT CONTRACT:  $1.6M PROJECT MANAGER AND FOREMAN:  Seth Anderson and James Selecky Complete  electrical  build‐out  of  110,000  ft²  three  story  corporate  office  building, including high‐voltage, site lighting and communication duct banks. 

 INDUSTRIAL/MANUFACTURING  

PEARL   I ZUMI  COLORADO  HEADQUARTERS  |  LOUISV I LLE ,  CO  Pearl Izumi | Owner  Haselden | General Contractor  ZGF Architects | Architect |  Buro Happold Consulting Eng | Electrical Engineer |  PROJECT DURATION:  Dec 2012 – Nov 2013  PROJECT CONTRACT:  $1.1M PROJECT MANAGER AND FOREMAN: Tristan Covington and Lance Davis  Design Assist 55,000 ft² new construction project consisting of office space, workshops, material testing areas, conference rooms, fitness center, warehouse, and amenity spaces. High sustainability plan.  

 LONG  HAUL  ENTERPR ISES  |  CHEYENNE ,  WY  Long Haul Enterprises | Owner  Richardson Construction | General Contractor | Doug Mainwaring | 307‐635‐6166  Vaught Frye Larson Architects | Architect | Justin Larson | 307.635.5710 AVI PC | Electrical Engineer | 307‐637‐6017  PROJECT DURATION:  Sept 2012‐ Oct 2013  PROJECT CONTRACT:  $1.6M PROJECT MANAGER AND FOREMAN: Dustin Tafoya and Matt Flinn Design Build providing electrical (power and lighting) design for a new 189,860 ft² steel tubing manufacturing facility. 25Kv distribution feeding 3‐480volt 4000amp services.  

       

Page 20: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

CONTROLLABLE  GRID   INTERFACE  |  BOULDER ,  CO    National Renewable Energy Laboratory | Owner | Brian Larsen | 303‐275‐3000  ACS Inc | General Contractor | Mike Daugird| 608‐663‐1590 FLAD Architect | Architect | 608‐238‐2661 AEI | Electrical Engineer | 608‐238‐2616 PROJECT DURATION:  October 2011 – Jan 2013 PROJECT CONTRACT: $1.2M  PROJECT MANAGER AND FOREMAN:  Dustin Tafoya and Nick Bull Design‐build electrical services for a dynamometer and grid simulator construction project that assessed the design, fabrication, and testing of a wind turbine analysis system at NREL’s National Wind Technology Center. The CGI is the first test facility in the United States that has fault simulation capabilities and allows manufacturers and system operators to conduct the tests required for  certification  in  a  controlled  laboratory  environment.  It  is  the only  system  in  the world  that  is  fully  integrated with  two dynamometers and has the capacity to extend that integration to turbines in the field and to a matrix of electronic and mechanical storage devices. Total electrical service was 5MW for the project. 

 LEPR INO  WASTEWATER  TREATMENT  FAC I L ITY  |  GREELEY ,  CO  Leprino Foods Company | Owner  Glacier Construction Company | Brian Kerschen | 303‐221‐5383 | General Contractor  Symbiont | Engineer & Architect | Christopher Lockett | 414‐291‐8840 PROJECT DURATION:  Phase I: March 2011 ‐ June 2011; Phase II: June 2011 ‐ Jan 2012  PROJECT CONTRACT:  $2.7M PROJECT MANAGER AND FOREMAN: Russell Tafoya, John Abling Underground  electrical  conduit  system  for  the  new Wastewater  Treatment  Facility which will support the Leprino Foods mozzarella plant.  

 FRUITA  WASTEWATER  RECLAMATION  |  FRUITA ,  CO  City of Fruita | Owner Garney Construction | General Contractor | Keith Hinds | 303‐791‐3600 Tetra Tech RTW | Architect | Bob Orsatti | 303‐825‐5999 PROJECT DURATION:  December 2009 ‐ February 2012 PROJECT CONTRACT: $2.1M PROJECT MANAGER AND FOREMAN: Russell Tafoya and James Selecky This project includes a new operations building, explosion proof headwork building, 2 clarifiers,  2  oxidation  sitches,  aolids  building  and  a  complete  redundant  electrical system including radial loop infrastructure.   

 

MEDICAL  

CANYON  VIEW  MOB  |  GRAND   JUNCT ION,  CO  Development Solutions Group | Owner | Sarah Allen, RSW Partners | 970‐257‐4583 GH Phipps | General Contractor   Boulder Associates Architects | Architect  CCRD | Electrical Engineer  PROJECT DURATION:  December 2012‐Nov 2013  PROJECT CONTRACT:  $1M PROJECT MANAGER AND FOREMAN: James Selecky Design‐assist, new 88,000 ft² medical office building will include a small atrium as well as facilities for tenants that include an ambulatory surgery center, imaging center, women’s health center, orthopedics practice, primary care practice, and an urgent care facility 

  

Page 21: Recent & Past Projects 02.26 - University of Colorado Boulder · Terumo BCT to occupy 90,000 SF of the building including all of floors 2 and 3 plus approximately ... PAST PROJECTS

                                                                                                                                                                

146 Yuma Street Denver, CO 80223                                                                                    1270 Automation Dr., Ste. 500, Windsor CO 80550 303.428.2011 phone                                                                                                               303.428.2011 phone 303.202.0466 facsimile                                                                                                         303.202.0466 facsimile                                                www.weifieldcontracting.com  

CASTLEROCK  MEDICAL  OFF ICE  BUILD ING  |CASTLEROCK ,  CO  Frauenshuh | Owner | Chris Lambrecht GE Johnson | General Contractor | Todd Estry | 303‐221‐1249  R.T.A | Architect | Mark Pierson  SSG MEP | Electrical Engineer  PROJECT DURATION:  Sept 2012 – June 2013      PROJECT CONTRACT:  $500k 60,000  sq  ft  ‐ 3  floors of  core and  shell medical office building at Adventist Health Campus 

 CENTER  AT  L INCOLN  SK I L LED  NURS ING  FAC I L ITY  |PARKER ,  CO  Development Solutions Group | Owner | Alan Main | 303‐909‐4990 GH Phipps | General Contractor | Jason Foisset | 303‐389‐3718  HDR Architecture | Architect | David Gebel | 608‐662‐1806 HDR Architecture | Electrical Engineer | Scott Lind | 608‐332‐6827 PROJECT DURATION:  October 2011 – Sept 2012  PROJECT CONTRACT:  $1.5M PROJECT MANAGER AND FOREMAN: Russell Tafoya and Scott Buckey Core/Shell, Site work and TI for 120,000 ft² new building. Patient and nursing rooms, medical lobby, and nursing stations  

LUXURY RESIDENTIAL  SOLV ITA  PHASE   I  |  CHERRY  HILLS  VILLAGE ,  CO  Single family private residence | Owner MG Partners | Sarah Kell | 805‐383‐7500 | General Contractor Kevin A. Clark, Inc. | 805‐646‐0181 | Architect Truax Design Group, Inc. | 707‐829‐8188 | Electrical Engineer PROJECT DURATION:  July 2011 – Jan 2012  PROJECT CONTRACT:  $600K PROJECT MANAGER AND FOREMAN: Russell Tafoya and Matt Flinn   LED and custom lighting for a 30,000 ft² residential property at 4600 S Monroe Lane in Cherry Hills Village, CO.  

DATA CENTERS  1547  GREEN  HOUSE  DATA  CENTER  |  CHEYENNE ,  WY  1547 Green House Data | Owner | Corey Welp| [email protected] The Martin Group | Developer | Patrick Hynes | 732‐441‐0006 PROJECT DURATION:  Jan 2014 – July 2014  PROJECT CONTRACT:  $1.5M PROJECT MANAGER AND FOREMAN: Dustin Tafoya, Matt Flinn   This  project  will  include  constructing  a  new  colocation  facility  approximately 38,000 square  feet. Roughly 30,000  ft² of the building  is a single story pre‐cast concrete  construction  which  houses  the  data  center  floors,  associated infrastructure space, and loading dock. The other 8,000 square feet is single story office space (full site, core, shell, and office construction). The data center space consists of four equally sized pods; a full fit out of one data center pod, and a partial fit out of a second pod.