Report run on: March 15, 2013 11:01 AM
RECAPP Facility Evaluation Report
Cedarbrae Elementary SchoolB2571ACalgary
Calgary School District #19
Report run on: March 15, 2013 11:01 AM Page 2 of 40
B2571ABuilding Id:
Cedarbrae Elementary SchooBuilding Name:
CalgaryLocation:10631 Oakfield Drive S. W. Address:
2,852.30Gross Area (sq. m): $8,397,000Replacement Cost:1976Construction Year:
Evaluation Date: August 15 2012
ARUP DATTA ARCHITECT LTD.Evaluation Company:
Brian DennisEvaluator Name:
2852.3 m2 school building constructed in 1976. Official opening was April, 1977. Student capacity 204. General Summary:
Structural Summary:Concrete slab on grade, steel and masonry columns supporting beams and open web steel joists with metal roof decking. No major work is recommmended. Overall the structure is in Good Condition.
Envelope Summary:Brick masonry veneer over wood studs, stucco accent panels at windows and stucco perimeter wall panel separatingmasonry from soffit. Pre-finished metal fascias and gym upper wall cladding.There are aluminum windows withdouble-pane units. Doors are painted hollow metal doors set in pressed steel frames. BUR roofing has been replacedwith SBS roofing in 2011. Doors were painted recently. Major work recommended: - Replace caulking around door openings. - Replace door access to the roof. Overall the envelope is in Acceptable Condition.
Interior Summary:Demountable wall finishes throughout, painted concrete masonry walls in corridors, gymnasium, boiler room andwashroom areas. Carpet in classrooms and offies/library have been replaced with new resilient tile flooring in 2011.VCT tile flooring in corridors and service rooms. Quarry tile flooring in washrooms/changerooms and some entrancelobbies. Acoustic suspended ceilings throughout classrooms and corridors. Exposed structure ceiling in Library withsprayed acoustic cellulose to structural elements and roof deck. Exterior doors were painted recently. Major work recommended : - Re-finish wood floor in ancillary room. - Re-paint concrete floor in boiler room and gymnasium storage. Overall the interior is in Acceptable Condition.
Mechanical Summary:This facility has two hot water boilers with three circulating pumps to reheat coils, forced flow units and heating coils inthe Air handling units. Main air handling unit complete with return air/ outside and relief. The gym has its own airhandling unit complete with return air / outside air and relief, plus reheat coils. The following actions are recommended: -replace reheat coil control valves Overall the mechanical systems is in acceptable condition.
27.13%5 year Facility Condition Index (FCI):
Facility Details Evaluation Details
Total Maintenance Events Next 5 years: $2,278,367
Calgary - Cedarbrae Elementary School (B2571A)
Report run on: March 15, 2013 11:01 AM Page 3 of 40
Electrical Summary:Main distribution is a CEB board with 1000 amps to a MDP section with panel feeders . 120/208 3 phase. Mainlyfluorescent T12 lighting with mercury vapor in the gym. Exit lights are LED. Emergency light system is Lumacell. Cat5e cable runs throughout and there is a fiber link. 1- Replace Main MDP and Breaker. 2- Replace distribution panels in the building. 3- Replace interior lighting. 4- Remove Mercury vapor light fixtures in the Gym. Overall the electrical system is in marginal condition.
Calgary - Cedarbrae Elementary School (B2571A)
Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.
Rating Guide
5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.
Report run on: March 15, 2013 11:01 AM Page 4 of 40
A1010 Standard Foundations*
A1030 Slab on Grade*
A2020 Basement Walls (& Crawl Space)*
4 - Acceptable
4 - Acceptable
3 - Marginal
Rating
Rating
Rating
1976
1976
1976
Installed
Installed
Installed
0
0
0
Design Life
Design Life
Design Life
FEB-08
FEB-08
MAR-13
Updated
Updated
Updated
Investigate the issue of water leakage
Repair the damaged area based on study report
Study
Repair
2013
2013
$4,500
$15,000
High
High
Water seepage in basement occurred few years ago.
After resolving the issue of leakage repair/ refinish damagedarea based on study.
Concern:
Concern:
Investigate the reason of water seepage issue.
After resolving the issue of leakage repair/ refinish damagedarea based on study.
Recommendation:
Recommendation:
Calgary - Cedarbrae Elementary School (B2571A)S1 STRUCTURAL
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Concrete perimeter strip footings and frost wall.
Concrete slab on grade for classrooms and Boiler room
Concrete basement walls to the storage room below main floor level. Water seepage issue in basement.
Consequences of Deferral:May affect foundation wall.
Report run on: March 15, 2013 11:01 AM Page 5 of 40
B1010.01 Floor Structural Frame (Building Frame)*
B1010.02 Structural Interior Walls Supporting Floors (or Roof)*
B1010.03 Floor Decks, Slabs, and Toppings*
B1010.05 Mezzanine Construction*
B1010.09 Floor Construction Fireproofing*
B1010.10 Floor Construction Firestopping*
B1020.01 Roof Structural Frame*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
Rating
1976
1976
1976
1976
1976
1976
1976
Installed
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
FEB-08
FEB-08
FEB-08
FEB-08
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Calgary - Cedarbrae Elementary School (B2571A)
Concrete basement walls to storage room under general office. Wood joist framed fan room floor over gym storage.
Concrete masonry supporting walls to wood framed penthouse fan room floor over gym storage.
Concrete structural slab floor over Basement storage room. Plywood floor deck to mechanical penthouse fan room
Plywood sheathed wood joist framing to Mechanical penthouse fan room
Concrete slab over basement storage room. Fire proofing is integral in the concrete slab.
Voids and gaps around mechanical and electrical through-slab conduit penetrations are sealed with a fire rated sealant.
Metal deck supported by open web steel joists (OWSJ) or steel beams on masonry bearing walls.
Report run on: March 15, 2013 11:01 AM Page 6 of 40
B1020.04 Canopies*
B1020.06 Roof Construction Fireproofing*
4 - Acceptable
4 - Acceptable
Rating
Rating
1976
1976
Installed
Installed
0
0
Design Life
Design Life
MAR-13
MAR-13
Updated
Updated
Calgary - Cedarbrae Elementary School (B2571A)
School roof extensions over recessed entrance doors.
No fire proofing installed to roof which is exposed metal deck on steel structure
Report run on: March 15, 2013 11:01 AM Page 7 of 40
B2010.01.02.01 Brick Masonry: Ext. Wall Skin*
B2010.01.06.03 Metal Siding**
B2010.01.08 Cement Plaster (Stucco): Ext. Wall*
B2010.01.09 Expansion Control: Ext. Wall*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1976
1976
1976
1976
Installed
Installed
Installed
Installed
0
40
0
0
Design Life
Design Life
Design Life
Design Life
FEB-08
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Replace Metal Siding (BOE 800 sqm.)
Lifecycle Replacement 2016 $290,000 Unassigned
Calgary - Cedarbrae Elementary School (B2571A)S2 ENVELOPE
Event:
Type Year Cost Priority
Updated: MAR-13
Brick veneer masonry to perimeter of school
Pre-finished corrugated type metal siding fascia to the perimeter of building and wall cladding of gymnasium at upperlevel.
Accent panels at windows. There were cracks observed to the north stucco panel of library. Should be monitored. Stuccopanels below windows were painted recently.
Full height expansion joints at window openings Expansion joint is primarily through flexible caulk at masonry control joints. Refer to B2010.01.11 Joint Sealers(caulking): Ext. Wall.
Report run on: March 15, 2013 11:01 AM Page 8 of 40
B2010.01.11 Joint Sealers (caulking): Ext. Wall**
B2010.01.13 Paints (& Stains): Ext. Wall**
3 - Marginal
4 - Acceptable
Rating
Rating
1976
1976
Installed
Installed
20
15
Design Life
Design Life
MAR-13
MAR-13
Updated
Updated
Remove Existing and Replace with New Caulking(BOE 60 lm.)
Replace Caulking around Windows, Stucco Panelsand at Control Joints (BOE 300 lm.)
Repaint Exterior Stucco Panels and Woodsoffits(BOE 150 sqm.)
Failure Replacement
Lifecycle Replacement
Lifecycle Replacement
2013
2016
2016
$2,000
$10,000
$6,300
Low
Unassigned
Unassigned
Caulking around door openings have failed.Concern:
Remove existing caulking and replace with new caulking.Recommendation:
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Caulking is applied around exterior windows, stucco panels & doors and at the control joints.
Stucco panels and wood soffits are painted.
Consequences of Deferral:Potential water infiltration.
Report run on: March 15, 2013 11:01 AM Page 9 of 40
B2010.01.13 Paints (& Stains): Ext. Wall** - 2009
B2010.02.01 Cast-in-place Concrete: Ext. Wall Const*
B2010.02.03 Masonry Units: Ext. Wall Const.*
B2010.02.05 Wood Framing: Ext. Wall Const.*
B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation*
B2010.06 Exterior Louvers, Grilles, and Screens*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
2009
1976
1976
1976
1976
1976
Installed
Installed
Installed
Installed
Installed
Installed
15
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
FEB-08
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Updated
Re-paint exterior Doors and Door Frames (BOE 160sqm.)
Lifecycle Replacement 2024 $7,000 Unassigned
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Type Year Cost Priority
Updated: MAR-13
Exterior metal doors and woods side lights were painted recently, was reported by school representative.
Cast-in-place concrete wall at lower portion of of building. There was exposed rebar observed along north side concretewall. Should be monitored.
Concrete masonry backup walls
wood stud framing
Assuming, air vapour membrane applied to concrete masonry walls. Poly vapour barrier on wood frame walls
Clear anodized aluminum louvers and grilles at fan room and boiler room.
Report run on: March 15, 2013 11:01 AM Page 10 of 40
B2010.09 Exterior Soffits*
B2020.01.01.02 Aluminum Windows (Glass & Frame)**
B2020.04 Other Exterior Windows*
B2030.01.02 Steel-Framed Storefronts: Doors**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1976
1976
1976
1976
Installed
Installed
Installed
Installed
0
40
0
30
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Replace Exterior Windows (BOE 25 sqm.)
Replace Steel Framed Storefront Doors (BOE 7Doors and 10 sqm. sidelights and transoms)
Lifecycle Replacement
Lifecycle Replacement
2016
2016
$30,000
$30,000
Unassigned
Unassigned
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Painted plywood soffits. For painting refer to B2010.01.13 Paints (&Satins): Ext. Wall.
Aluminum framed windows with double pane glass units. Some windows have integral venetian blinds between panes.
Glass block in Boy's and Girl's washrooms. One glass unit was broken. Requires to replace as part of maintenance item.Estimated cost is less than $1000.
Painted hollow metal doors in pressed steel frames. Panic hardware, kick plates some doors include painted woodsidelights and glazed transoms. For painting refer to B2010.01.13 Paints (& Stains).
Report run on: March 15, 2013 11:01 AM Page 11 of 40
B2030.02 Exterior Utility Doors** - Metal
B2030.02 Exterior Utility Doors** - Wood
B3010.01 Deck Vapour Retarder and Insulation*
4 - Acceptable
2 - Poor
4 - Acceptable
Rating
Rating
Rating
1976
1976
1976
Installed
Installed
Installed
40
40
0
Design Life
Design Life
Design Life
MAR-13
MAR-13
FEB-08
Updated
Updated
Updated
Replace Exterior Utility Doors (BOE 9 Doors & 5sqm wood Sidelights)
Replace Exterior Utility Doors (BOE 1 Door)
Lifecycle Replacement
Failure Replacement
2016
2013
$16,000
$1,500
Unassigned
High
Rotted wood door and wood frameConcern:
Replace with metal door along with metal frame.Recommendation:
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Painted hollow metal doors in pressed steel frames to the gymnasium, ancillary rooms exits, library exit and E.C.S roomexit. Some doors include painted wood sidelights. Weather stripping to some doors were missing. Should be repaired.For painting refer to B2010.01.13 Paints (& Stains): Ext. Wall.
Painted wood door access to the roof.
Vapour retarder under asphalt roofing.
Consequences of Deferral:Accelerated deterioration and possible bacterial growth.
Report run on: March 15, 2013 11:01 AM Page 12 of 40
B3010.04.04 Modified Bituminous Membrane Roofing (SBS)**
B3020.01 Skylights**
5 - Good
4 - Acceptable
Rating
Rating
2011
1976
Installed
Installed
25
25
Design Life
Design Life
MAR-13
MAR-13
Updated
Updated
Replace SBS Roofing (BOE 2750 sqm.)
Replace Skylight (BOE 2 sqm.) )
Lifecycle Replacement
Lifecycle Replacement
2036
2016
$578,000
$1,500
Unassigned
Unassigned
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Modified bituminous roofing membrane (SBS) assembly. No roof leaks were reported.
One skylight. Damaged sealant were observed; requires to be reseal.
Report run on: March 15, 2013 11:01 AM Page 13 of 40
C1010.01 Interior Fixed Partitions*
C1010.02 Interior Demountable Partitions*
C1010.03 Interior Operable Folding Panel Partitions** - 2000
C1010.03 Interior Operable Folding Panel Partitions** - Accordion (1976)
4 - Acceptable
4 - Acceptable
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
1976
1976
2000
1976
Installed
Installed
Installed
Installed
0
0
30
30
Design Life
Design Life
Design Life
Design Life
MAR-13
FEB-08
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Replace Gym Divider (BOE 150 sqm.)
Replace Accordion Style Folding Partition (BOE 20sqm.)
Lifecycle Replacement
Lifecycle Replacement
2030
2016
$121,674
$18,000
Unassigned
Unassigned
Calgary - Cedarbrae Elementary School (B2571A)S3 INTERIOR
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Concrete masonry blocks partitions
Vinyl clad demountable partitions to general office and classrooms
Electric roll-up gym divider curtain - fabric and mesh
Ceiling track supported Accordion style folding partitions between staff room and work room.
Report run on: March 15, 2013 11:01 AM Page 14 of 40
C1010.03 Interior Operable Folding Panel Partitions** - Accordion (2000)
C1010.03 Interior Operable Folding Panel Partitions** - Wooden Folding Door/ Screen
C1010.05 Interior Windows*
C1010.07 Interior Partition Firestopping*
C1020.01 Interior Swinging Doors (& Hardware)*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
2000
1976
1976
1976
1976
Installed
Installed
Installed
Installed
Installed
30
30
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
FEB-08
MAR-13
Updated
Updated
Updated
Updated
Updated
Replace Accordion Style Folding Panel Partitions(BOE 50 sqm.)
Replace Folding Door/ Screen (BOE 2 sqm.)
Lifecycle Replacement
Lifecycle Replacement
2030
2016
$47,000
$2,500
Unassigned
Unassigned
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Ceiling track supported Accordion style folding partitions between classroom 18 (rm no. 127) & lunchroom and betweenclassroom 3 & 5 (rm 148 &149 as per CBE plan).
Wooden folding door/screen in kitchen.
Interior windows are located in general offices, library, between some classrooms. Windows consist of single glazed setin pressed steel frame. Display type windows in corridors.
Pipe and duct penetration caulking
Stained wood doors in aluminum frames. Knob hardware. Panic hardware on egress to exits
Report run on: March 15, 2013 11:01 AM Page 15 of 40
C1020.03 Interior Fire Doors*
C1030.01 Visual Display Boards**
C1030.02 Fabricated Compartments (Toilets/Showers)**
C1030.08 Interior Identifying Devices*
C1030.10 Lockers**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1976
1976
1976
1976
1976
Installed
Installed
Installed
Installed
Installed
0
20
30
0
30
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Replace Visual Display Boards (BOE 25whiteboards, 35 tackboars)
Replace Toilets Compartments (BOE 17 partitions)
Lifecycle Replacement
Lifecycle Replacement
2016
2016
$42,000
$22,000
Unassigned
Unassigned
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Rated doors and frames to Basement storage, Boiler room, Janitor room. Rolling fire shutter between library work roomand library.
Whiteboards, tackboards in classrooms and other rooms; smartboards in some classrooms and tackboards in corridors.
Pre-finished metal toilet and shower partitions. Now shower areas are being used as storage space. Shower partitionsare not considered in Basis of Estimate calculation.
Plastic name plates and wall mounted floor plans.
44 pre-finished metal lockers (stacked in two) in gym change rooms. Now the lockers are not being used. There is noreplacement costs considered for lockers.
Report run on: March 15, 2013 11:01 AM Page 16 of 40
C1030.12 Storage Shelving*
C1030.14 Toilet, Bath, and Laundry Accessories*
C2010 Stair Construction*
C2020.05 Resilient Stair Finishes**
C2020.08 Stair Railings and Balustrades*
C2020.10 Stair Painting*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1976
1976
1976
1976
1976
1976
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
20
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
FEB-08
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Updated
Replace Resilient Stair Finish (BOE 5 sqm.)
Lifecycle Replacement 2016 $1,100 Unassigned
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Type Year Cost Priority
Updated: MAR-13
Metal cabinets in several locations.
Soap, Towel, paper dispensers. Waste receptacles
Three sets of concrete stairs lead to ancillary rooms and to the basement.
Two sets of stairs leading to the ancillary rooms have textured resilient finish on treads and vinyl risers.
Metal handrails on stairs from auxiliary gym to stage. Handrail to basement stair.
Stair leading to the basement has paint finish.
Report run on: March 15, 2013 11:01 AM Page 17 of 40
C3010.06 Tile Wall Finishes**
C3010.09 Acoustical Wall Treatment**
C3010.11 Interior Wall Painting*
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1976
1976
1976
Installed
Installed
Installed
40
20
0
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Replace Mosaic Tile Wall Finish (BOE 12 sqm.)
Replace Acoustic Wall Panels (BOE 225 sqm.)
Lifecycle Replacement
Lifecycle Replacement
2016
2016
$3,500
$60,000
Unassigned
Unassigned
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Mosaic tile finish at urinals. Some damaged tiles were observed at urinals. Ceramic Tile to the wall of shower areas. The shower areas are no longer used as shower, now these areas are being used as storage space. These areas are notconsidered in Basis of Estimate calculation.
Perforated hardboard panels as wall surface on upper walls of gym
Concrete masonry block walls, demountable partitions have paint finish.
Report run on: March 15, 2013 11:01 AM Page 18 of 40
C3020.01.02 Painted Concrete Floor Finishes*
C3020.02 Tile Floor Finishes** - Mosaic Tile
C3020.02 Tile Floor Finishes** - Quarry Tile
3 - Marginal
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1976
1976
1976
Installed
Installed
Installed
0
50
50
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Repaint concrete floors (BOE 115 sqm.)
Replace Mosaic Tile Floor Finish (BOE 5 sqm.)
Replace Quarry Tile Flooring (BOE 230 sqm.)
Failure Replacement
Lifecycle Replacement
Lifecycle Replacement
2013
2026
2026
$4,500
$1,100
$74,000
Low
Unassigned
Unassigned
Paint worn off concrete substrateConcern:
Repaint floorRecommendation:
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Painted concrete floor finish in boiler room floor and gym storage.
Mosaic tile floor finish in shower areas and in front of urinals. Shower areas are no longer in use, these areas are beingused as storage space. Mosaic tile flooring in shower areas are not considered in Basis of Estimate calculation.
Quarry tile flooring in Boy's and girl's washrooms and dressing rooms, some entrance lobbies and quarry tile base insame areas.
Consequences of Deferral:Excessive maintenance
Report run on: March 15, 2013 11:01 AM Page 19 of 40
C3020.04 Wood Flooring**
C3020.07 Resilient Flooring** - Tile (1976)
C3020.07 Resilient Flooring** - Sheet
3 - Marginal
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1976
1976
2011
Installed
Installed
Installed
30
20
20
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Refinish Hard wood Flooring (BOE 37 sqm.)
Replace gym Hard Wood Flooring (BOE 742 sqm.)
Replace Resilient Tile Flooring (BOE 400 sqm.)
Replace Resilient Sheet Floor Finish (BOE 86sqm.)
Failure Replacement
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2013
2016
2016
2031
$3,000
$226,000
$24,000
$8,200
Low
Unassigned
Unassigned
Unassigned
Hardwood flooring in stage is worn.Concern:
Refinish hard wood flooring.Recommendation:
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Event:
Event:
Event:
Type
Type
Type
Type
Year
Year
Year
Year
Cost
Cost
Cost
Cost
Priority
Priority
Priority
Priority
Updated:
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
MAR-13
Wood strip vented gym floor and non-vented wood strip flooring to stage. Stage flooring currently in need of refinishing.
VCT flooring in corridors, Nurse room, computer room, storage, Auxiliary gym and gym kitchen.
Resilient sheet flooring in ancillary room (rm 17).
Consequences of Deferral:Accelerated deterioration and poor visual image.
Report run on: March 15, 2013 11:01 AM Page 20 of 40
C3020.07 Resilient Flooring** - Tile (2011)
C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)**
C3030.07 Interior Ceiling Painting*
C3030.09 Other Ceiling Finishes*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
2011
1976
1976
1976
Installed
Installed
Installed
Installed
20
25
0
0
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
FEB-08
Updated
Updated
Updated
Updated
Replace Resilient Tile Flooring (BOE 1120 sqm.)
Replace Suspended T-bar Ceiling Tiles (BOE 1600sqm.)
Lifecycle Replacement
Lifecycle Replacement
2031
2016
$69,000
$85,000
Unassigned
Unassigned
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Resilent tile flooring in general offices, library, library, lunchroom and classrooms. As per previous report carpet flooringhave been replaced with new resilient tiles in these rooms.
2'x4' Suspended T-Bar acoustic ceiling tiles in classrooms, Ancillary rooms, corridors, offices, dressing rooms andwashrooms. Some stained and damaged ceiling tiles were observed in several locations. Should be replaced as part ofmaintenance item.
Painted gypsum ceilings in storage rooms, shower areas.
Sprayed acoustic cellulose to underside of library roof deck and to open web steel joists and to upper portion of walls inAuxiliary gym
Report run on: March 15, 2013 11:01 AM Page 21 of 40
D2010.04 Sinks**
D2010.05 Showers**
D2010.08 Drinking Fountains/Coolers**
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1976
1976
1976
Installed
Installed
Installed
30
30
35
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Replace Sinks BOE (32)
Replace Showers BOE (10)
Replace Drinking Fountains BOE (6)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2016
2016
2016
$50,400
$15,800
$9,400
Unassigned
Unassigned
Unassigned
Calgary - Cedarbrae Elementary School (B2571A)S4 MECHANICAL
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Stainless steel sinks are located in classrooms and staff rooms, janitor sinks located in service areas.
There is boys gang showers and girls stall showers just off the gym,not in use. Two other stand alone showers in smallrooms off the gym also not in use
Porcelain wall mount fountains in corridors
Report run on: March 15, 2013 11:01 AM Page 22 of 40
D2010.10 Washroom Fixtures (WC, Lav, Urnl)**
D2020.01.01 Pipes and Tubes: Domestic Water*
D2020.01.02 Valves: Domestic Water**
D2020.01.03 Piping Specialties (Backflow Preventers)** - 1996
4 - Acceptable
6 - Excellent
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1976
2010
1976
1996
Installed
Installed
Installed
Installed
35
0
40
20
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Replace Washroom Fixtures BOE (20) WC, (18)LAV, (8) Urnl.
Replace Valves: Domestic Water BOE (20)
Replace Backflow BOE (2)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2016
2016
2016
$68,200
$22,900
$6,200
Unassigned
Unassigned
Unassigned
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Porcelain wall mount lavs / floor mount water closets with flushometers and stand-up urinals in the washrooms.
New primary water supply. There is copper piping throughout
Brass globe / gate and ball valves
Backflow on main line and humidifier.
Report run on: March 15, 2013 11:01 AM Page 23 of 40
D2020.01.03 Piping Specialties (Backflow Preventers)** - 2004
D2020.01.03 Piping Specialties (Backflow Preventers)** - 2011
D2020.02.02 Plumbing Pumps: Domestic Water**
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
2004
2011
2002
Installed
Installed
Installed
20
20
20
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Replace Backflow Preventor BOE (2)
Replace Backflow Preventer BOE (1)
Replace Plumbing Pumps: Domestic Water BOE(1)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2024
2031
2022
$6,200
$3,100
$1,200
Unassigned
Unassigned
Unassigned
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Backflow Preventer on irrigation line and boiler line.
Backflow preventer on the Fire line.
Recir. Pump for domestic hot water
Report run on: March 15, 2013 11:01 AM Page 24 of 40
D2020.02.06 Domestic Water Heaters**
D2020.03 Water Supply Insulation: Domestic*
D2030.01 Waste and Vent Piping*
D2040.01 Rain Water Drainage Piping Systems*
D2040.02.04 Roof Drains*
D3010.02 Gas Supply Systems*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
2002
1976
1976
1976
1976
1976
Installed
Installed
Installed
Installed
Installed
Installed
20
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
FEB-08
FEB-08
MAR-13
FEB-08
FEB-08
Updated
Updated
Updated
Updated
Updated
Updated
Replace Domestic Water Heaters BOE (1)
Lifecycle Replacement 2022 $1,900 Unassigned
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Type Year Cost Priority
Updated: MAR-13
John Wood gas fired heater 42,000 btu 189 litre storage
Generally all piping is insulated
Cast and copper
Cast piping throughout to city systems.
Cast drains and domes
Natural gas to boilers and water heater, black iron piping
Report run on: March 15, 2013 11:01 AM Page 25 of 40
D3020.02.01 Heating Boilers and Accessories: H.W.**
D3020.02.02 Chimneys (& Comb. Air): H.W. Boiler**
D3020.02.03 Water Treatment: H. W. Boiler*
D3030.06.02 Refrigerant Condensing Units**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1976
1976
1976
1976
Installed
Installed
Installed
Installed
35
35
0
25
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
FEB-08
MAR-13
Updated
Updated
Updated
Updated
Replace Heating Boilers BOE (2)
Replace Chimneys (&Comb. Air): H.W. Boiler BOE(12m)
Replace Refrigerant Condensing Units BOE (1)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2016
2016
2016
$90,900
$7,900
$18,200
Unassigned
Unassigned
Low
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Two Bryan hot water boilers 1,800,000 BTU each, Model CL180
Galvanized breeching and B vent through the roof.
The chemical treatment is by a pot feeder and filter
Carrier Model 38AE054400 Condensing unit on the roof. Unit is charged with R-22
Report run on: March 15, 2013 11:01 AM Page 26 of 40
D3040.01.01 Air Handling Units: Air Distribution**
D3040.01.03 Air Cleaning Devices: Air Distribution*
D3040.01.04 Ducts: Air Distribution*
D3040.01.07 Air Outlets & Inlets: Air Distribution*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1976
1976
1976
1976
Installed
Installed
Installed
Installed
30
0
0
0
Design Life
Design Life
Design Life
Design Life
MAR-13
FEB-08
FEB-08
FEB-08
Updated
Updated
Updated
Updated
Replace Air Handling Units: Air Distribution BOE(2)
Lifecycle Replacement 2016 $89,400 Unassigned
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Type Year Cost Priority
Updated: MAR-13
Mark Hot Supply fan model WC 802-1 and Mark hot return fan, complete with outside air and relief air. Gym has its ownMark Hot unit with return and outside air, relief is separate dampers and hood on the roof.
Fibreglass filters in return air
Galvanized ductwork throughout
Metal supply air diffuses and grilles throughout
Report run on: March 15, 2013 11:01 AM Page 27 of 40
D3040.03.01 Hot Water Distribution Systems**
D3040.04.01 Fans: Exhaust**
D3040.04.03 Ducts: Exhaust*
3 - Marginal
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1976
1976
1976
Installed
Installed
Installed
40
30
0
Design Life
Design Life
Design Life
MAR-13
MAR-13
FEB-08
Updated
Updated
Updated
Replace Hot Water Distribution Systems BOE(2852m2/gfa)
Replace failed Control Valves BOE (10% of2852m2/gfa)
Replace Fans: Exhaust BOE (6)
Lifecycle Replacement
Failure Replacement
Lifecycle Replacement
2016
2013
2016
$310,700
$3,285
$11,000
Unassigned
Medium
Unassigned
Heating Control Valves have been leaking and causing ceilingdamage.
Concern:
Replace the control valves that serve the reheat coilsRecommendation:
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Three Ebare circulating pumps to reheat coils and radiation. Black iron piping.
Dome exhaust fans for washrooms. Exhaust fans for shower areas have been shut-off as areas are not used.
Galvanized exhaust ducts throughout
Report run on: March 15, 2013 11:01 AM Page 28 of 40
D3040.04.05 Air Outlets and Inlets: Exhaust*
D3050.03 Humidifiers**
D3050.05.02 Fan Coil Units**
D3050.05.03 Finned Tube Radiation**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1976
1976
1976
1976
Installed
Installed
Installed
Installed
0
25
30
40
Design Life
Design Life
Design Life
Design Life
FEB-08
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Replace Humidifiers BOE (1)
Replace Fan Coil Units BOE (2)
Replace Finned Tube Radiation BOE (2852m2/gfa)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2016
2016
2016
$11,400
$10,600
$153,000
Unassigned
Unassigned
Unassigned
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-13
MAR-13
MAR-13
Metal Exhaust grilles throughout
Water pan with pump and sprays in air Handling unit.
Forced flow heaters in some entrance ways
Perimeter radiation throughout
Report run on: March 15, 2013 11:01 AM Page 29 of 40
D3060.02.02 Pneumatic Controls**
D4010 Sprinklers: Fire Protection*
D4020 Standpipes*
D4030.01 Fire Extinguisher, Cabinets and Accessories*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1976
1976
1976
1976
Installed
Installed
Installed
Installed
40
0
0
0
Design Life
Design Life
Design Life
Design Life
MAR-13
FEB-08
FEB-08
FEB-08
Updated
Updated
Updated
Updated
Replace HVAC Instrumentation and Controls BOE(2852m2/gfa)
Lifecycle Replacement 2016 $47,800 Unassigned
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Type Year Cost Priority
Updated: MAR-13
Pneumatic controls with DDC monitoring and remote control
Sprinklers in stage area and fire hose cabinets throughout
Standpipes to fire hose cabinets
Hand held extinguishers throughout
Report run on: March 15, 2013 11:01 AM Page 30 of 40
D5010.01.02 Main Electrical Transformers (Utility Owned)*
D5010.03 Main Electrical Switchboards (Main Distribution)**
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**
4 - Acceptable
3 - Marginal
3 - Marginal
Rating
Rating
Rating
1976
1976
1976
Installed
Installed
Installed
0
40
30
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Replace 1000 Amp MDP and related breakers.
Replace 8 Electrical Branch Circuit Panelboards
Failure Replacement
Failure Replacement
2013
2013
$57,785
$24,000
Medium
Medium
Equipment have exceeded its theoretical life. Spare parts notavailable.
Obsolete technology. Spare parts not available.
Concern:
Concern:
Replace 1000 Amp MDP and related breakers.
Replace 8 panels and related breakers.
Recommendation:
Recommendation:
Calgary - Cedarbrae Elementary School (B2571A)S5 ELECTRICAL
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Pad mounted transformer located on West side of school.. S/N 195-148.
1000 Amp, 120/208 volt three phase CEB MDP. 80% full.
8 CEB panels with NQB breakers, size is 36- 42 circuit. The fill is 80% and the panels are in various locations through outthe school.
Consequences of Deferral:
Consequences of Deferral:
High operating and maintenance costs.
High maintenance and operating costs.
Report run on: March 15, 2013 11:01 AM Page 31 of 40
D5010.07.02 Motor Starters and Accessories**
D5020.01 Electrical Branch Wiring*
D5020.02.01 Lighting Accessories: Interior (Lighting Controls)*
D5020.02.02.02 Interior Fluorescent Fixtures**
4 - Acceptable
4 - Acceptable
4 - Acceptable
3 - Marginal
Rating
Rating
Rating
Rating
1976
1976
1976
1976
Installed
Installed
Installed
Installed
30
0
0
30
Design Life
Design Life
Design Life
Design Life
MAR-13
FEB-08
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Replace 4 Motor Starters
Replace interior lighting with new T8 light fixturesfor (2852.3 m²/gfa).
Lifecycle Replacement
Failure Replacement
2016
2013
$2,000
$181,398
Unassigned
Medium
Lenses are yellow and brittle. Obsolete technology. Highoperating costs.
Concern:
Replace with new T8 light fixtures.Recommendation:
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
4 Allen Bradley motor starters.
Branch wiring consist of wire in conduit, armored cable to local devices.
Line voltage switching located as required.
T12 light fixtures of different styles located throughout the school.
Consequences of Deferral:High maintenance and operating costs.
Report run on: March 15, 2013 11:01 AM Page 32 of 40
D5020.02.02.05 Other Interior Fixtures*
D5020.02.03.02 Emergency Lighting Battery Packs**
D5020.02.03.03 Exit Signs*
D5020.03.01.04 Exterior H.P. Sodium Fixtures*
3 - Marginal
5 - Good
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
1976
2012
2012
1976
Installed
Installed
Installed
Installed
0
20
0
0
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Replace with 30 MH light fixtures
Replace 20 Emergency Lighting Battery Packs
Failure Replacement
Lifecycle Replacement
2013
2032
$15,000
$12,317
Medium
Unassigned
High maintenance. Obsolete technology.Concern:
Replace with 30 Metal halide light fixtures.Recommendation:
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
30 Mercury Vapor light fixtures in the Gym with remote ballasts located in the Penthouse.
Lumacell central battery packs and remote heads installed as required.
Lumacell LED exit signs.
Wall packs located around perimeter of school.
Consequences of Deferral:Obsolete technology.
Report run on: March 15, 2013 11:01 AM Page 33 of 40
D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*
D5030.01 Detection and Fire Alarm**
D5030.02.02 Intrusion Detection**
D5030.03 Clock and Program Systems*
D5030.04.01 Telephone Systems*
4 - Acceptable
5 - Good
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1976
2012
2008
1998
1976
Installed
Installed
Installed
Installed
Installed
0
25
25
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Replace Detection and Fire Alarm for (2852.3m²/gfa).
Replace Intrusion Detection for (2852.3 m²/gfa).
Lifecycle Replacement
Lifecycle Replacement
2037
2033
$56,600
$33,310
Unassigned
Unassigned
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Photocell controlled.
Notifier NFS 320C addressable panel with related initiating devices and horn strobes installed as required.
Silent Knight and regency Control panel. Card swipe access system. Motion sensors located as required.
Clock system is a simplex 2000 series.
Meridian telephone system. Handsets in classrooms. Tied to public address system.
Report run on: March 15, 2013 11:01 AM Page 34 of 40
D5030.04.05 Local Area Network Systems*
D5030.05 Public Address and Music Systems**
4 - Acceptable
4 - Acceptable
Rating
Rating
2005
1976
Installed
Installed
0
20
Design Life
Design Life
MAR-13
MAR-13
Updated
Updated
Replace Public Address and Music Systems for(2852.3 m²/gfa).
Lifecycle Replacement 2016 $13,699 Unassigned
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Type Year Cost Priority
Updated: MAR-13
4 Nortel and CISCO switches. 3 AMP hubs. Cat 5e cabling. WIFI and Supernet in school.
50 Channel Bogen Amplifier c/w radio, tape and CD players. Tied to telephone system.
Report run on: March 15, 2013 11:01 AM Page 35 of 40
E1090.04 Residential Equipment*
E1090.07 Athletic, Recreational, and Therapeutic Equipment*
E2010.02 Fixed Casework**
E2010.03.01 Blinds**
E2020.02.03 Furniture*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1976
1976
1976
1976
1976
Installed
Installed
Installed
Installed
Installed
0
0
35
30
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Updated
Updated
Replace Fixed Casework (BOE 150 lm.)
Replace Blinds (BOE 25 sqm)
Lifecycle Replacement
Lifecycle Replacement
2016
2016
$150,000
$3,500
Unassigned
Unassigned
Calgary - Cedarbrae Elementary School (B2571A)S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
Fridge,dishwasher, microwave, coffee machine
Climbing wall, basketball backstops (sidewall and electric fold down).
Fixed wooden casework with laminate counter tops with stained/ painted wood cabinets/ drawers, laminate counter topswith stained/ painted wood shelves, stained/ painted wood overhead cabinets in classrooms, kitchen and staff room.Chemical resistant counter top in science room and science preparation room. Painted wood coat racks with coat hooksare provided in corridors and some classrooms. Stained/ painted wood shelves in copy room and storages. Laminate topstained/ painted wood book shelves in library. In science preparation room damaged nosing of counter top were missing.
Horizontal slats venetian blinds to windows some of them are integral between panes.
Moveable furnishings in the school generally consist of desks and chairs for students and teaching staff and office desksin general office area.
Report run on: March 15, 2013 11:01 AM Page 36 of 40
E2020.04 Moveable Multiple Seating*
F1030.05 Other Special Construction Systems*
4 - Acceptable
4 - Acceptable
Rating
Rating
1976
1976
Installed
Installed
0
0
Design Life
Design Life
MAR-13
MAR-13
Updated
Updated
Calgary - Cedarbrae Elementary School (B2571A)
4 portable riser seating unit is located in the Ancillary Room. Wood benches are provided in gymnasium.
Kiln is located in basement storage.
Report run on: March 15, 2013 11:01 AM Page 37 of 40
K4010.01 Barrier Free Route: Parking to Entrance*
K4010.02 Barrier Free Entrances*
K4010.03 Barrier Free Interior Circulation*
4 - Acceptable
2 - Poor
4 - Acceptable
Rating
Rating
Rating
1976
1976
1976
Installed
Installed
Installed
0
0
0
Design Life
Design Life
Design Life
FEB-08
MAR-13
MAR-13
Updated
Updated
Updated
Install automatic entrance
Barrier Free Access Upgrade 2013 $3,943 Low
No automatic door operatorConcern:
Install automatic operatorRecommendation:
Calgary - Cedarbrae Elementary School (B2571A)S8 SPECIAL ASSESSMENT
Event:
Type Year Cost Priority
Updated: MAR-13
Grade level entry and sidewalk from parking to Main entrance
No automatic entrance
Corridors and classrooms accessible. Two sets of stairs lead to two ancillary rooms.
Consequences of Deferral:Limited accessibility
Report run on: March 15, 2013 11:01 AM Page 38 of 40
K4010.04 Barrier Free Washrooms*
K4030.01 Asbestos*
K4030.02 PCBs*
2 - Poor
3 - Marginal
4 - Acceptable
Rating
Rating
Rating
1976
1976
1976
Installed
Installed
Installed
0
0
0
Design Life
Design Life
Design Life
MAR-13
MAR-13
MAR-13
Updated
Updated
Updated
Install Barrier Free Washroom
replace counter tops with plastic lam finish BOE 16lm
Barrier Free Access Upgrade
Hazardous MaterialsAbatement
2013
2013
$13,519
$10,000
Low
High
No accessible washroom
Counter tops and teachers counter have transit finish withdeteriorating joints and edges. Safety issue
Concern:
Concern:
Install accessible washroom
Remove (as required for hazardous material) and replacecounter tops with new plastic laminate finish
Recommendation:
Recommendation:
Calgary - Cedarbrae Elementary School (B2571A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-13
MAR-13
No barrier free washroom
The CBE has conducted testing and maintains a Facility Asbestos Management Binder on site. The science room has existing transit counter tops to the side cabinets and the teachers counter. Edges are damaged.
No PCBs known or reported
Consequences of Deferral:
Consequences of Deferral:
Limited accessibility
Potential of further damage and loose material, safetyconcern
Report run on: March 15, 2013 11:01 AM Page 39 of 40
K4030.04 Mould*
K4030.09 Other Hazardous Materials*
K5010.01 Site Documentation*
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1976
1976
2012
Installed
Installed
Installed
0
0
0
Design Life
Design Life
Design Life
FEB-08
FEB-08
MAR-13
Updated
Updated
Updated
Calgary - Cedarbrae Elementary School (B2571A)
No mould known or reported
No other hazardous materials known or reported
The prime consultant is ARUP DATTA ARCHITECT LTD. The evaluation date was August 15, 2012 Site description:: The school building is located on 10631 Oakfield Drive S.W. with asphalt parking lot to the south. The main entrancefaces east and is accessed form the municipal sidewalk by a concrete entrance walkway. The fields are contained withina chain link fence. Asphalt play field to the west & north and gravel play field to the the north. Grassed play fields areshared with the city. The site is relatively flat. Drainage is generally away from the building to the west and south.
Google site view
Report run on: March 15, 2013 11:01 AM Page 40 of 40
K5010.02 Building Documentation*
4 - AcceptableRating
2012Installed
0Design Life
MAR-13Updated
Calgary - Cedarbrae Elementary School (B2571A)
The prime consultant is ARUP DATTA ARCHITECT LTD. The evaluation date was August 15, 2012 The entire building was evaluated B2571A Cedarbrae Elementary School is located at 10631 Oakfield Drive S.W. The school is a 1976 Single storey, slabon grade, 2852 m2. Brick veneer clad concrete masonry building with open web steel joists supporting metal deck.