Rebuilding of pont Saint-Jacques and Diversion of the Haut Saint-Pierre Collector Sewer Work Description March 17, 2015

Transcript of Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1....

Page 1: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

Rebuilding of pont Saint-Jacques and Diversion of the Haut Saint-Pierre Collector Sewer

Work Description

March 17, 2015

Page 2: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

NDG-Westmount neighborhood committee

� The Turcot neighborhood committee aims to:� Maintain contact with residents in the area during the

construction� Update the population on the upcoming work� Adress the preoccupations of residents, businesses

and organizations in the area� Find common solutions

� Meetings will be held every six to eight weeks

2

Page 3: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

Presentation Plan

1. Background2. Work description3. Mitigation measures / Work on the collector 4. Network and detours / Work on the collector 5. Noise management / Work on the collector6. Resume7. Maintenance work scheduled in 20158. Communications

3

Page 4: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

1. BackgroundSaint-Jacques overpass� The Saint-Jacques overpass, which spans over autoroute Décarie,

must be rebuilt as part of preparatory work.Haut Saint-Pierre collector sewer� Advanced deterioration of the section running under the rue Saint-

Jacques overpass.� Impossible to reinforce it, except in localized zones

4

Page 5: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

1. BackgroundHaut Saint-Pierre collector sewer� Infrastructure belongs to the City of Montréal built in 1930� Conveys wastewater (rainwater and domestic water)� Serves 140 000 households� Is located at a depth of 30 metres under rue Saint-Jacques� Inside dimensions of 3 metres by 4 metres, shaped like a

horse-shoe� Volume of 40 m3/s during heavy rains

5

Page 6: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

2. Work DescriptionRoadwork location

6

Work in the existing Haut Saint-Pierre collector sewerSection of the existing collector sewer that must be abandoned Work to divert the Haut Saint-Pierre collector sewer

Page 7: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

2. Work DescriptionSchedule� Work to reinforce the collector sewer: Nov. 2014 to March 2015� Diversion of the collector sewer: March 2015 to end of 2015� Demolition and reconstruction of the Saint-Jacques overpass:

winter/spring 2016 to fall 2017

7

Page 8: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

2. Work Description

8

Page 9: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

CUSM

Turcot interchange

2. Work Description

Page 10: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

10

OPENING OF EXIT OF THE A-15 SOUTH FOR ACCESS TO BOUL. DE MAISONNEUVE

TEMPORARY RESERVED LANE ON RUE SHERBROOKE

OPENING OF THE U-TURN FACILITYON SHERBROOKE

TEMPORARY RESERVED LANE ON CHEMIN UPPER-LACHINE

LEFT-TURN LANE ON SHERBROOKE EAST FOR ACCESS TO THE A-15 NORTH

3. Mitigation Measures / Work on the Collector

ADDINGTON

PRUD’HOMME

PERMANENT RESERVED LANE ON RUE SHERBROOKE EAST & WESTBETWEEN AVENUES GIROUARD AND TRENHOLME

Page 11: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

11

Opening of the avenue Girouard access ramp to the A -15 south (October 2013)

3. Mitigation Measures / Work on the Collector

Page 12: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

Addition of a right-turn lane on chemin de la Côte-Saint-Luc (May 2014)

3. Mitigation Measures / Work on the Collector

12

Page 13: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

3. Mitigation Measures / Work on the CollectorOpening of the exit on the A-15 South to access bo ulevard de Maisonneuve (August 2014)

13

Page 14: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

U-turn facility opened on rue Sherbrooke since Augus t 2014(réouverture pour le 21 mars)

3. Mitigation Measures / Work on the Collector

14

Page 15: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

Addition of permanent and temporary reserved lanes on rue Sherbrooke (June 2014)

15

PERMANENT RESERVED LANE ONRUE SHERBROOKE EAST & WEST BETWEEN AVENUES GIROUARD AND TRENHOLME

TEMPORARY RESERVED LANEON RUE SHERBROOKE EAST

LEFT-TURN LANE ON SHERBROOKE EAST FOR ACCESS TO THE A-15 NORTH

3. Mitigation Measures / Work on the Collector

Page 16: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

Modifications to traffic lights in the sector

16

3. Mitigation Measures / Work on the Collector

Page 17: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

17

3. Mitigation Measures / Work on the Collector

ADDINGTON

PRUD’HOMME

Temporary reserved lane on chemin Upper-Lachine (Mar ch 21, 2015)

Page 18: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

18

� Mitigation measures allow:� A wider range of possible routes on the road network � Greater capacity on rue Sherbrooke East at the entrance to

the A-15 North� More efficient public transportation services with the addition

of reserved lanes

� All preferential measures for buses promote modal t ransfer

� Simulations indicate that the impacts in the territ ory of the Sud-Ouest borough will be minimal

3. Mitigation Measures / Work on the Collector

Page 19: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

Pedestrian access on the Saint-Jacques overpass

19

4. Network and Detours / Work on the Collector

Page 20: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

Detour for trucks and automobiles

20

4. Network and Detours / Work on the Collector

LocalTrafficOnly

Page 21: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

Sound walls between rue Addington and avenue Girouar d

21

5. Noise Management / Work on the Collector

Page 22: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

22

� March 21, 2015� Closure of rue Saint-Jacques and deviation of the collector� Pedestrian access maintained� Local traffic permitted on rue Saint-Jacques towards/from

Addington and Prud’homme

� End of 2015� End of the deviation of the collector� Complete closure of rue Saint-Jacques (for pedestrians and

local traffic)

� Winter/spring 2016� Demolition of the Saint-Jacques bridge

6. Summary

Page 23: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

Two ramps will be closed for 13 weeks in spring 201 5

23

7. Maintenance Work Scheduled in 2015

Page 24: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

� NDG-Westmount neighbourhood committee� April 22� June

� Sud-Ouest neighbourhood committee� March 18� May 13� July 8

� Website dedicated to the project: www.turcot.gouv.qc.ca� Twitter @MTQ_Turcot� Monthly electronic bulletins (subscribe via the Turcot website)� Dedicated telephone line: 514 873-1372� Turcot email: [email protected]

8. Communications

Page 25: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network

Questions?