Rebuilding of pont Saint-Jacques and Diversion of the Haut Saint-Pierre Collector Sewer
Work Description
March 17, 2015
![Page 2: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/2.jpg)
NDG-Westmount neighborhood committee
� The Turcot neighborhood committee aims to:� Maintain contact with residents in the area during the
construction� Update the population on the upcoming work� Adress the preoccupations of residents, businesses
and organizations in the area� Find common solutions
� Meetings will be held every six to eight weeks
2
![Page 3: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/3.jpg)
Presentation Plan
1. Background2. Work description3. Mitigation measures / Work on the collector 4. Network and detours / Work on the collector 5. Noise management / Work on the collector6. Resume7. Maintenance work scheduled in 20158. Communications
3
![Page 4: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/4.jpg)
1. BackgroundSaint-Jacques overpass� The Saint-Jacques overpass, which spans over autoroute Décarie,
must be rebuilt as part of preparatory work.Haut Saint-Pierre collector sewer� Advanced deterioration of the section running under the rue Saint-
Jacques overpass.� Impossible to reinforce it, except in localized zones
4
![Page 5: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/5.jpg)
1. BackgroundHaut Saint-Pierre collector sewer� Infrastructure belongs to the City of Montréal built in 1930� Conveys wastewater (rainwater and domestic water)� Serves 140 000 households� Is located at a depth of 30 metres under rue Saint-Jacques� Inside dimensions of 3 metres by 4 metres, shaped like a
horse-shoe� Volume of 40 m3/s during heavy rains
5
![Page 6: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/6.jpg)
2. Work DescriptionRoadwork location
6
Work in the existing Haut Saint-Pierre collector sewerSection of the existing collector sewer that must be abandoned Work to divert the Haut Saint-Pierre collector sewer
![Page 7: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/7.jpg)
2. Work DescriptionSchedule� Work to reinforce the collector sewer: Nov. 2014 to March 2015� Diversion of the collector sewer: March 2015 to end of 2015� Demolition and reconstruction of the Saint-Jacques overpass:
winter/spring 2016 to fall 2017
7
![Page 8: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/8.jpg)
2. Work Description
8
![Page 9: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/9.jpg)
CUSM
Turcot interchange
2. Work Description
![Page 10: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/10.jpg)
10
OPENING OF EXIT OF THE A-15 SOUTH FOR ACCESS TO BOUL. DE MAISONNEUVE
TEMPORARY RESERVED LANE ON RUE SHERBROOKE
OPENING OF THE U-TURN FACILITYON SHERBROOKE
TEMPORARY RESERVED LANE ON CHEMIN UPPER-LACHINE
LEFT-TURN LANE ON SHERBROOKE EAST FOR ACCESS TO THE A-15 NORTH
3. Mitigation Measures / Work on the Collector
ADDINGTON
PRUD’HOMME
PERMANENT RESERVED LANE ON RUE SHERBROOKE EAST & WESTBETWEEN AVENUES GIROUARD AND TRENHOLME
![Page 11: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/11.jpg)
11
Opening of the avenue Girouard access ramp to the A -15 south (October 2013)
3. Mitigation Measures / Work on the Collector
![Page 12: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/12.jpg)
Addition of a right-turn lane on chemin de la Côte-Saint-Luc (May 2014)
3. Mitigation Measures / Work on the Collector
12
![Page 13: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/13.jpg)
3. Mitigation Measures / Work on the CollectorOpening of the exit on the A-15 South to access bo ulevard de Maisonneuve (August 2014)
13
![Page 14: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/14.jpg)
U-turn facility opened on rue Sherbrooke since Augus t 2014(réouverture pour le 21 mars)
3. Mitigation Measures / Work on the Collector
14
![Page 15: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/15.jpg)
Addition of permanent and temporary reserved lanes on rue Sherbrooke (June 2014)
15
PERMANENT RESERVED LANE ONRUE SHERBROOKE EAST & WEST BETWEEN AVENUES GIROUARD AND TRENHOLME
TEMPORARY RESERVED LANEON RUE SHERBROOKE EAST
LEFT-TURN LANE ON SHERBROOKE EAST FOR ACCESS TO THE A-15 NORTH
3. Mitigation Measures / Work on the Collector
![Page 16: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/16.jpg)
Modifications to traffic lights in the sector
16
3. Mitigation Measures / Work on the Collector
![Page 17: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/17.jpg)
17
3. Mitigation Measures / Work on the Collector
ADDINGTON
PRUD’HOMME
Temporary reserved lane on chemin Upper-Lachine (Mar ch 21, 2015)
![Page 18: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/18.jpg)
18
� Mitigation measures allow:� A wider range of possible routes on the road network � Greater capacity on rue Sherbrooke East at the entrance to
the A-15 North� More efficient public transportation services with the addition
of reserved lanes
� All preferential measures for buses promote modal t ransfer
� Simulations indicate that the impacts in the territ ory of the Sud-Ouest borough will be minimal
3. Mitigation Measures / Work on the Collector
![Page 19: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/19.jpg)
Pedestrian access on the Saint-Jacques overpass
19
4. Network and Detours / Work on the Collector
![Page 20: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/20.jpg)
Detour for trucks and automobiles
20
4. Network and Detours / Work on the Collector
LocalTrafficOnly
![Page 21: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/21.jpg)
Sound walls between rue Addington and avenue Girouar d
21
5. Noise Management / Work on the Collector
![Page 22: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/22.jpg)
22
� March 21, 2015� Closure of rue Saint-Jacques and deviation of the collector� Pedestrian access maintained� Local traffic permitted on rue Saint-Jacques towards/from
Addington and Prud’homme
� End of 2015� End of the deviation of the collector� Complete closure of rue Saint-Jacques (for pedestrians and
local traffic)
� Winter/spring 2016� Demolition of the Saint-Jacques bridge
6. Summary
![Page 23: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/23.jpg)
Two ramps will be closed for 13 weeks in spring 201 5
23
7. Maintenance Work Scheduled in 2015
![Page 24: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/24.jpg)
� NDG-Westmount neighbourhood committee� April 22� June
� Sud-Ouest neighbourhood committee� March 18� May 13� July 8
� Website dedicated to the project: www.turcot.gouv.qc.ca� Twitter @MTQ_Turcot� Monthly electronic bulletins (subscribe via the Turcot website)� Dedicated telephone line: 514 873-1372� Turcot email: [email protected]
8. Communications
![Page 25: Rebuilding of pont Saint-Jacques and Diversion of the Haut ...€¦ · Presentation Plan 1. Background 2. Work description 3. Mitigation measures / Work on the collector 4. Network](https://reader035.fdocuments.in/reader035/viewer/2022071210/6021208665965e0f3b09d09b/html5/thumbnails/25.jpg)
Questions?
25