Rebo folder 2014-05

12
“REBO terminal Oostende, the ideal hub for offshore wind activities in the North Sea” easy access | priority for offshore installation vessels | no locks | >150.000 m² installation & storage area | dedicated O&M | pontoons 201405 www.reboostende.be

description

Rebo terminal in the Port of Oostende is the ideal hub for offshore wind activities in the North Sea

Transcript of Rebo folder 2014-05

Page 1: Rebo folder 2014-05

“REBO terminal Oostende, the ideal hub for offshore wind activities in the North Sea”

easy access | priority for offshore installation vessels | no locks | >150.000 m² installation & storage area | dedicated O&M | pontoons

201405

www.reboostende.be

Page 2: Rebo folder 2014-05

REBO is ...a good location for actual and future wind farms in a 200 km radius.

REBO transformed ...the port of Oostende into an offshore terminal for handling, storage, assembling and transportation of present and future offshore components and structures.

REBO aims ...at specialized project developers, manufacturers and contractors in the offshore energy sector.

REBO offers ...127 hectares: 4 sites (Zeewezendok, Halve Maan, Visserijdok, Vlotdok).

800 m adapted heavy quay capacity up to 20 T/m².

prepared surfaces over 10 T/m² for storage of foundations, nacelles, hubs, towers and blades.

fully equipped offices, covered and open storage possibilities for project management and O&M.

a dedicated team to help project developers and suppliers with their activity in the energy port of Oostende.

offshore support services.public

private

SHARE HOLDERS

REBO: Renewable Energy Base Oostende

www.reboostende.be

15%15%

15%

15%

40%

Page 3: Rebo folder 2014-05

200 km

map: La Tene maps

Page 4: Rebo folder 2014-05

EASY ACCESSThe Port of Oostende, situated in Europe’s busiest maritime area (51°14’ N - 2° 56’ E), is a versatile short sea port.

It can accommodate all types of coastal maritime traffic, including RORO, bulk and project cargo. In addition to its seaport, Oostende is also home to an international freight and passenger airport.

The multi-modal function is further emphasized by the presence of comprehensive railroad infrastructure, of a canal leading up to the European inland waterway network and of course the motorway A10-E40 linked directly to the port terminals.

ENERGY PORT OOSTENDEThe port has recently been modernised in both infrastructure and organisation and is now the leading force in the industrialisation of the hinterland.

The port gives priority to vessels active for the offshore wind industry.

CITYOostende is a medium-sized Belgian city, which has all the assets of a large town.

imagearrival of blades for C-Power wind farm, by

bardge and by road

www.portofoostende.bewww.visitoostende.be

Page 5: Rebo folder 2014-05

Mul

titec

hCM

I

o�ce

FalckFabricom

pontoon

Mul

titec

h

grin

d bed

new

H

20T/m²

Alstom

Parkwind

Senv

ion

GeoSea

ReboB

Flansea

C-Power

crew changes& refueling

SCIENCE PARK

PLASSENDALE 1

E40 - Brussels

VLOTDOK

VISSERIJDOK

ZEEWEZENDOK

HALVE MAAN

HAVENGEUL

Greenbridge incubation centre

sani

tary

co

mpl

exVestas

OOSTENDE

ZEEBRUGGE

ZONES RESERVED FOR WIND FARMS

29 km

Thorntonbank

Blighbank

LodewijkbankNORTHER: 350 MW

TOTAL: 2 120 MW

C-POWER: 325 MW

RENTEL: 288 - 312 MW

NORTHWIND: 216 MW

SEASTAR: 246 - 432 MW

BELWIND: 330 MW

449 - 490 MW

MERMAID

NORTHWESTERN II

72 x 41-62 x

24 x

36-78 x

49-73 x

20 x

55 x

30 x

NORTH SEA

connection to Oostende

connection to Zeebrugge

future Stevin connection

Halve maan- site prepared for offshore wind works- surface: 5 ha- quay length: 100 m- quay capacity: 10 T/m²- draught: -8 TAW

Zeewezendok- site prepared for offshore wind works- surface: 10-15 ha- quay length: 600 m- quay capacity: 4 T/m² to 20 T/m²- draught: - 8m TAW

Vlotdok- site prepared for berthing & refueling- length: 800 m berthing places

Visserijdok- terminal extension area- surface: 7 ha

assembly & storage area with direct access to open sea

offices & storage

assembly & storage area behind the locks

BELGIAN WIND FARMS The wind farms in the North Sea make an important contribution to achieving the Belgian renewable energy targets. The various offshore wind farms (once fully operational) have an installed capacity of some 2,200 MW and an annual electricity output of 7,700,000 MWH.

This is equivalent to:- 9% of total electricity consumption in Belgium (80 85 TWh)- 46% of Belgian households- All necessary energy for the 66 largest cities of Belgium (5.082 million inhabitants).

Besides supply, offshore wind in Belgium creates direct and indirect jobs (+ / - 20,000 jobs) in an innovative technology with export potential. Belgium is, to installed capacity (380 MW), currently among the European top three in the offshore wind business.

operational

ongoing

in preparation

Page 6: Rebo folder 2014-05

503

502

602

603

604

605

501

Page 7: Rebo folder 2014-05

FUTURE

FUTURE

FUTURE

FUTURE

Page 8: Rebo folder 2014-05

INSTALLATIONRebo terminal in the port of Oostende is ideal for installation of windmills because:

... easy access by road, by railway, by vessel

... 127 ha available in the port of Oostende for renewable energy activities… quays with a capacity able to handle from 4T/m2 to 20 T/m2

… 10 Ha of terminal surfaces (with heavy lift capacity) and with capacity of extension... the port gives priority to vessels active for the offshore wind industry

Page 9: Rebo folder 2014-05

OPERATIONS & MAINTENANCEThe Rebo terminal is equiped with:

- 4 pontoons and 2 cranes for service vessels- technical services: welding, construction, diving works, offshore transport & crew, .... www.multitech-oostende.be- storage, offices & sanitary complex for crew changes- easy and fast access to open sea on site infrastructure & services for O&M

Page 10: Rebo folder 2014-05

NEW & RENOVATED OFFICES

RENEWABLE ENERGy COMPANIES PRESENT IN OOSTENDE

Falck Safety Services - Cofely FabricomSenvion - Technum - OWA - Flidar - eCoast

MHI Vestas - Alstom - Parkwind - GeoSea

Page 11: Rebo folder 2014-05

REFERENCES

C-Power I - construction (Halve Maan)

C-Power II & III- construction (Zeewezendok)

C-Power I - operational (6 x Senvion 5 MW) © C

-Pow

er N

.V.,

foto

graa

f Tom

D’H

aene

ns©

C-P

ower

N.V

., fo

togr

aaf T

om D

’Hae

nens

C-Power II & III - operational (48 x Senvion 6 MW)©

Nor

thw

ind

© B

elw

ind

Alstom Haliade 6MW - construction (Zeewezendok)

Northwind - under construction (72 x MHI Vestas 3 MW)

Belwind - operational (55 x MHI Vestas 3 MW)

Page 12: Rebo folder 2014-05

REBO nvSlijkensesteenweg 2

BE 8400 Oostende+32 59 34 07 11

www.reboostende.betwitter: @reboostende

Emmanuël [email protected]

+ 32 475 42 48 85

© R

ober

t Piro

tte