Life Cycle Design of Products
- opportunity for manufacturing enterprises
- modality of CE Design ± Automated analysis idealization control
- CE in optimal structural design
- Real time constraints
UNIT III
![Page 2: Real Time Constraints](https://reader031.fdocuments.in/reader031/viewer/2022021215/577d353f1a28ab3a6b8fe9ed/html5/thumbnails/2.jpg)
8/8/2019 Real Time Constraints
http://slidepdf.com/reader/full/real-time-constraints 2/16
Real time Constraints
on design of products and
processes.
![Page 3: Real Time Constraints](https://reader031.fdocuments.in/reader031/viewer/2022021215/577d353f1a28ab3a6b8fe9ed/html5/thumbnails/3.jpg)
8/8/2019 Real Time Constraints
http://slidepdf.com/reader/full/real-time-constraints 3/16
Product Design Constraints
and Requirements
Design Engineers must consider a multitude of technical, economic, social, environmental,
and political constraints when they design
products and processes.
![Page 4: Real Time Constraints](https://reader031.fdocuments.in/reader031/viewer/2022021215/577d353f1a28ab3a6b8fe9ed/html5/thumbnails/4.jpg)
8/8/2019 Real Time Constraints
http://slidepdf.com/reader/full/real-time-constraints 4/16
Effect of Constraints
Better Designs
Design Changes
Design
Changes
ConstraintLimits
![Page 5: Real Time Constraints](https://reader031.fdocuments.in/reader031/viewer/2022021215/577d353f1a28ab3a6b8fe9ed/html5/thumbnails/5.jpg)
8/8/2019 Real Time Constraints
http://slidepdf.com/reader/full/real-time-constraints 5/16
Functional Constraints Overall Geometry ± size, width, space, arrangement
Motion of parts ± type, direction, velocities, acceleration,kinematics
Forces involved ± load direction, magnitude, load, impact
Energy needed ± heating, cooling, conversion, pressure
Materials to be used ± flow, transport, properties
Control system ± electrical, hydraulic, mechanical,pneumatic
Information flow ± inputs, outputs, form, display
![Page 6: Real Time Constraints](https://reader031.fdocuments.in/reader031/viewer/2022021215/577d353f1a28ab3a6b8fe9ed/html5/thumbnails/6.jpg)
8/8/2019 Real Time Constraints
http://slidepdf.com/reader/full/real-time-constraints 6/16
Safety Constraints
Operational ± direct, indirect, hazard
elimination
Human ± warnings, training
Environmental ± land, sea, air, noise, light,radiation, reaction, transport
![Page 7: Real Time Constraints](https://reader031.fdocuments.in/reader031/viewer/2022021215/577d353f1a28ab3a6b8fe9ed/html5/thumbnails/7.jpg)
8/8/2019 Real Time Constraints
http://slidepdf.com/reader/full/real-time-constraints 7/16
Quality Constraints
Quality assurance ± regulations,
standards, codes
Quality control ± inspection, testing,
labeling Reliability ± design life, failures, statistics
![Page 8: Real Time Constraints](https://reader031.fdocuments.in/reader031/viewer/2022021215/577d353f1a28ab3a6b8fe9ed/html5/thumbnails/8.jpg)
8/8/2019 Real Time Constraints
http://slidepdf.com/reader/full/real-time-constraints 8/16
Manufacturing Constraints
Production of components ± factory limitations,
means of production, wastes
Purchase of components ± supplier quality, reliability,
quality control, inspection
Assembly ± installation, foundations, bolting, welding
Transport ± material handling, clearance, packaging
![Page 9: Real Time Constraints](https://reader031.fdocuments.in/reader031/viewer/2022021215/577d353f1a28ab3a6b8fe9ed/html5/thumbnails/9.jpg)
8/8/2019 Real Time Constraints
http://slidepdf.com/reader/full/real-time-constraints 9/16
Timing Constraints Design schedule ± project planning, project control Development schedule ± design detailing, compliance
tests
Production schedule ± manufacture, assembly, packing,
transport
Delivery schedule ± delivery date, distribution network,supply chains
![Page 10: Real Time Constraints](https://reader031.fdocuments.in/reader031/viewer/2022021215/577d353f1a28ab3a6b8fe9ed/html5/thumbnails/10.jpg)
8/8/2019 Real Time Constraints
http://slidepdf.com/reader/full/real-time-constraints 10/16
Economic Constraints Marketing analysis ± size of market, distribution, market
segments Design costs ± design team computing, information retrieval
Development costs ± design detailing, supplier costs, testing
costs
Manufacturing cost - tooling, labor, overhead, assembly,
inspection
Distribution costs - packing, transport, service centers, spare
parts, warranty
Resources ± time, budget, labor, capital, machines, material
$
![Page 11: Real Time Constraints](https://reader031.fdocuments.in/reader031/viewer/2022021215/577d353f1a28ab3a6b8fe9ed/html5/thumbnails/11.jpg)
8/8/2019 Real Time Constraints
http://slidepdf.com/reader/full/real-time-constraints 11/16
Ergonomic Constraints User needs ± type of operation, instructions, warnings Ergonomic design ± man-machine relationships,
operation, height, layout, comfort, lighting
Cybernetic design ± controls, layout, clarity,
interactions
![Page 12: Real Time Constraints](https://reader031.fdocuments.in/reader031/viewer/2022021215/577d353f1a28ab3a6b8fe9ed/html5/thumbnails/12.jpg)
8/8/2019 Real Time Constraints
http://slidepdf.com/reader/full/real-time-constraints 12/16
Ecological Constraints General environmental impact ± impact on natural
resources, social resources
Sustainability ± political and commercial
consequences, implications for following
generations Material selection ±solid, liquid, gas, stability, protection,
toxicity
Working fluid selection ± fluid, gas, flammability, toxicity
![Page 13: Real Time Constraints](https://reader031.fdocuments.in/reader031/viewer/2022021215/577d353f1a28ab3a6b8fe9ed/html5/thumbnails/13.jpg)
8/8/2019 Real Time Constraints
http://slidepdf.com/reader/full/real-time-constraints 13/16
Aesthetic Constraints Customer appeal ± shape, color, texture, form, feel,
smell, surprise and delight features
Fashion ± culture, history, trends
Future expectations ± rate of change in technology,
trends, produ
ct families
![Page 14: Real Time Constraints](https://reader031.fdocuments.in/reader031/viewer/2022021215/577d353f1a28ab3a6b8fe9ed/html5/thumbnails/14.jpg)
8/8/2019 Real Time Constraints
http://slidepdf.com/reader/full/real-time-constraints 14/16
Life-Cycle Constraints Distribution ± means of transport, nature and conditions
of dispatch, rules, regulations
Operation ± quietness, wear, special uses, working
environments
Maintenance ± servicing intervals, inspection, exchangeand repair, cleaning, diagnostics
Disposal ± recycle, scrap
![Page 15: Real Time Constraints](https://reader031.fdocuments.in/reader031/viewer/2022021215/577d353f1a28ab3a6b8fe9ed/html5/thumbnails/15.jpg)
8/8/2019 Real Time Constraints
http://slidepdf.com/reader/full/real-time-constraints 15/16
Legal/Ethical Constraints Regulations ± OSHA, F AA, FDA Ethics ± public safety, health, welfare and integrity
Intellectual Property ± patents, trademarks, copyrights
![Page 16: Real Time Constraints](https://reader031.fdocuments.in/reader031/viewer/2022021215/577d353f1a28ab3a6b8fe9ed/html5/thumbnails/16.jpg)
8/8/2019 Real Time Constraints
http://slidepdf.com/reader/full/real-time-constraints 16/16
Conclusion
In any successful design project there will
be clear evidence that maximum number
of constraints that are real time and
relevant to the product are addressed.