REA May 2019 print - NERPC May 2019.pdf · Title: REA May 2019_print.xls Author: user Created Date:...
Transcript of REA May 2019 print - NERPC May 2019.pdf · Title: REA May 2019_print.xls Author: user Created Date:...
भारत सरकार Government of India
व युत मं ालय Ministry of Power
उ तर पूव े ीय व युत स म त North Eastern Regional Power Committee
एन ई आर पी सी कॉ ले स, ड ग पारमाओ, लापालाङ, श ल ग-७९३००६, मेघालय
NERPC Complex, Dong Parmaw, Lapalang, Shillong - 793006, Meghalaya
Ph. No: 0364 – 2534039 Fax No: 0364 - 2534040 Website: www.nerpc.nic.in
No. NERPC/COM/REA/2019/1200-1245 10th June, 2019
To 1. CMD, TSECL, Bidyut Bhawan, Agartala – 799 001 2. Director (Distribution), MePDCL, Lumjingshai, S.R. Road, Shillong – 793 001 3. Engineer-in-Chief (P&E), P&E Dept., Govt. of Mizoram, Aizawl – 796 001 4. Chief General Manager (Comml), APDCL, Bijulee Bhawan, Paltan Bazar, Guwahati – 781 001 5. Chief Engineer (E Zone), Dept. of Power, Govt. of Arunachal Pradesh, Itanagar – 791 111 6. Managing Director, MSPDCL, Keishampat, Imphal-795 001. 7. Chief Engineer (Power), Dept. of Power, Govt. of Nagaland, Kohima – 797 001 8. Chief Engineer, Loktak HE Project, Vidyut Vihar, Komkeirap, Manipur – 795 124 9. Executive Director (Comml.), NEEPCO Ltd., Lower New Colony, Shillong – 793 003 10. Executive Director, NERTS, POWERGRID, Lapalang, Shillong – 793 006 11. Managing Director, OTPC, 6th Floor, IFCI Tower, 61 Nehru Place, New Delhi – 110 019 12. GM (Comml.), NTPC, 3rd Floor OLIC building, Plot No.N.17/2, Nayapalli, Bhubaneshwar-12 वषय: मई 2019 का एबीती आधा रत आर. ई. ए । Sub: ABT based REA for May, 2019. महोदय, Sir,
मई 2019 माह का एबीती आधा रत े ीय उजा लेखा (आर.ई.ए) क त आव यक करवाई के लए संल न है । आर.ई.ए लेखा उ.पू. .े व.स क वेबसाईट www.nerpc.nic.in पर भी उपल ध करा दया गया है ।
A copy of ABT based Regional Energy Accounting (REA) for the month of May, 2019 is enclosed herewith for necessary action. The REA is also available in NERPC website www.nerpc.nic.in. संघटक अपने अवलोकन / ट प णयां य द कोई हो तो आर.ई.ए के जार होने के 15 दन के अंदर भेज द । य द संघटको से कोई प यवहार नह होता है तो जार कया गया आर.ई.ए को अं तम माना जाएगा ।
Constituents may send their observation/ comments, if any on the same within 15 days from the date of issue of REA. In case no communication is received from constituents, the REA as issued would be treated as final REA. Bilateral transactions will be issued separately. संल नक : उपरो तानुसार Encl.: As above. भवद य / Yours faithfully,
ब. ल ंगखोइ / B. Lyngkhoi नदेशक / Director अधी ण अ भयंता / Superintending Engineer वा ण य / Commercial
Copy forwarded to: 1. CE (G. M.), CEA, SewaBhawan, R.K.Puram, New Delhi – 110 066. 2. G. M., NERLDC, Lower Nongrah, Dongtieh, Lapalang, Shillong - 6. 3. C.G.M (SLDC ) AEGCL, Kahelipara, Guwahati. 4. Gen. Manager (Comml.), NHPC Ltd., NHPC Office complex, Sector –33, Faridabad-121003. 5. G.M (Commercial) APDCL, Bijulee Bhawan, Paltan Bazar, Guwahati - 781 001. 6. General Manager, Ranganadi HEP, NEEPCO, Yazlee, Ar. Pradesh 7. Project Manager, Doyang HEP, NEEPCO, Nagaland 8. Project Manager, AGBPP, NEEPCO Ltd., No. –III, Vill. Bokuloni, Dibrugarh, Assam. 9. Project Manager, AGTPP, NEEPCO Ltd., Ramchandranagar, Agartala, Tripura West- 799008. 10. Dy. G. M (Elect.), Kopili HEP, NEEPCO Ltd., Umrangso, N.C. Hills, Assam. 11. Supdt. Engr. (System Management) MeECL, Lumjingshai, Short Round Road, Shillong. 12. Supdt. Engr. (Commercial) Deptt. of Electricity, Govt.of Manipur, Keisampet, Imphal. 795001 13. Executive Engineer, MSLDC, P & E Dept., Chaltlang, Aizawl- 796012. 14. Supdt. Engr. Dimapur Sub-station Deptt. of Power, Govt.of Nagaland, Dimapur. 15. Dy. G. M. (Commercial) NERTS, Lower Nongrah, Dongtieh, Lapalang, Shillong - 6. 16. Dy. General Manager (ER), POWERGRID, Boring Road, Alankar Place, Patna - 800 001 17. DGM (Comml), OTPC, 6th Floor, IFCI Tower, 61 Nehru Place, New Delhi – 110 019 18. DGM (Comml.), NTPC, 3rd Floor OLIC building, Plot No.N.17/2, Nayapalli, Bhubaneshwar-12 19. AGM (Comml.), NTPC, Bongaigaon Thermal Power Project, P.O Salakati, Kokrajhar-783369 20. Addl. General Manager,Comml & Sys.Opn., TSECL,Banamalipur,Agartala.-799001. 21. Ex. Engr., SLDC, Deptt. of Power, Itanagar, Ar. Pradesh – 791 111 22. CEO, NVVNLtd., 7th Floor, Scope Complex, Lodhi Road, N.Delhi- 110 003 23. Power Trading Corpn. of India Ltd., 2nd Floor, NBCC Tower, 15-Bhikaji Cama Place, New Delhi – 66. 24. DGM (Power Trading),Adani Exports Ltd,13 Palam Marg ,Vasant Vihar, New Delhi- 110057. 25. ED,TPTCL,Block ‘A’,34,Sant Tukaram Road,Carnac Bunder,Mumbai-400 009. 26. Member Secretary, NRPC,18-A,Shaheed Jeet Singh Marg,Katwaria Sarai, NewDelhi-110016. 27 Member Secretary, ERPC,14, Golf Club Road, Kolkata- 700 033. 28. Member Secretary, WRPC, Plot No F-3,MIDC Area, Opp Seepz,Marol,Andheri (E), Mumbai-400 093. 29. Member Secretary, SRPC, 29, Race Course Road, Bangalore- 560009. 30. Lanco Electric Utility Limited, LANCO House,141, Avenue,8, Banjara Hills, Hyderabad-500 034 31. Reliance Energy Trading Ltd., Reliance Energy Centre, Santa Cruz (E), Mumbai-400 055 32.Vice President, Indian Energy Exchange Limited, 10th Floor, B Wing, Statesman House, Barakhamba Road, Connought Place, New Delhi - 110 001. 33. LANCO Electric Utility Ltd, Plot No 229, Udyog Vihar, Phase-1, Gurgaon, Haryana – 122 016. 34. RPTCL, Agrawal House, 2, St. George’s Gate Road, 6th Floor, Kolkata – 700 022.
ब. लंगखोइ / B. Lyngkhoi
नदेशक / Director अधी ण अ भयंता / Superintending Engineer वा ण य / Commercial
NORTH EASTERN REGIONAL POWER COMMITTEE REGIONAL ENERGY ACCOUNT FOR THE MONTH OF MAY 2019
Sr. No. Units Figure1 MW 2002 in % 13 in % 794 GWh 1186.14 #5 in % 126 MU 1043.8037 in ₹ Cr. 120.2764 #
8 KWh 0.582
9 kWh 125258943.6
10 KWh 15133350.00
11 KWh 11012559412 in ₹ 5622438413 MWh 146721.9214 in % 93.1115 in % 90.6216 in ₹ 60198891
Beneficiaries
Share allocation for the current month (%)
Capacity Charge Payble by
beneficiaries (in ₹)
Ar. Pradesh 5.19100 3124924 6550.69563 6550.69563Assam 53.45500 32179317 67395.94280 59829.26780
Manipur 7.39500 4451708 9327.97888 9327.97888Meghalaya 17.39500 10471597 7566.67500 0.00000Mizoram 4.61000 2775169 5813.72863 5813.72863Nagaland 6.14700 3700426 7749.72303 7749.72303
Tripura 5.80700 3495750 7334.07718 7334.07718HVDC 0.00000 0 0.00000 0.00000
REG MEG 14372.42888Total 100.00000 60198891 126111.25000 96605.47113
# As per CERC order dated 13.01.2016 in petition No 46/GT/2015
Cumulative scheduled energy including current monthPlant Availability Factor achieved during the month (PAFM)Cumulative Plant Availability Factor achieved upto the month
Energy Charge Rate (ECR) on ex-PP basis
Scheduled energy (ex-bus) for the month
A. HYDEL POWER STATIONS
1: KOPILI StationDetails
Installed CapacityAuxiliary Energy Consumption (AUX)Normative Plant Availability Factor (NAPAF)Annual Design Energy (DE) Free Energy for Home State (FEHS)
BILLING STATEMENT
Energy Charge payable by beneficiaries in ₹
Billing Schedule of Beneficiaries
MWH
Drawal Schedule of Beneficiaries
MWH
Saleable Energy (ex-PP) of the month
Annual Saleable Energy
Total Energy Charge payable for the month
Capacity charge inclusive of incentive payble for the month
Free Energy (ex-PP) of the month
Annual Fixed Charges
45103394268433
0
56224384
3812505348206345428884
03383590
DATE: 6/10/2019 Page 1 of 14
NORTH EASTERN REGIONAL POWER COMMITTEE REGIONAL ENERGY ACCOUNT FOR THE MONTH OF MAY 2019
Sr. No. Units Figure1 MW 252 in % 13 in % 694 GWh 86.3 #5 in % 126 MU 75.9447 in ₹ Cr. 12.2577 #
8 KWh 0.815
9 kWh 1469851310 KWh 176971511 KWh 1292879812 in ₹ 965447013 MWh 1696214 in % 85.5715 in % 81.7016 in ₹ 6455357
Beneficiaries
Share allocation for the current month (%)
Capacity Charge Payble by
beneficiaries (in ₹)
Ar. Pradesh 5.99200 386805
Assam 52.35500 3379702Manipur 6.94500 448325
Meghalaya 13.67500 882770Mizoram 6.04000 389904Nagaland 5.73500 370215
Tripura 9.25800 597637HVDC 0.00000 0
REG MEGTotal 100.00000 6455357
# As per CERC order dated 22.02.2016 in ORDER NO. 45/GT/2015
1131.93450
1024.27684884.85750890.75655845.72201
1365.684640.00000
Details
883.71900
Free Energy (ex-PP) of the monthSaleable Energy (ex-PP) of the monthTotal Energy Charge payable for the month
Installed CapacityAuxiliary Energy Consumption (AUX)Normative Plant Availability Factor (NAPAF)Annual Design Energy (DE) Free Energy for Home State (FEHS)Annual Saleable Energy Annual Fixed Charges
14747.62500
6835.816461024.27684
0.00000890.75655845.72201
1365.684640.00000
7720.67396
11845.97550
720231
5571190834786
0725967689263
11130330
883.71900
Energy Charge Rate (ECR) on ex-PP basis
Scheduled energy (ex-bus) for the month
9654470
Drawal Schedule of Beneficiaries
MWH
Billing Schedule of Beneficiaries
MWH
Energy Charge payable by beneficiaries in ₹
2: KOPILI II Station
Cumulative scheduled energy including current monthPlant Availability Factor achieved during the month (PAFM)Cumulative Plant Availability Factor achieved upto the monthCapacity charge inclusive of incentive payble for the month
BILLING STATEMENT
DATE: 6/10/2019 Page 2 of 14
NORTH EASTERN REGIONAL POWER COMMITTEE REGIONAL ENERGY ACCOUNT FOR THE MONTH OF MAY 2019
Sr. No. Units Figure1 MW 502 in % 13 in % 694 GWh 277.61 #5 in % 126 MU 244.29687 in ₹ Cr. 40.4858#
8 KWh 0.837
9 kWh 30402511.36
10 KWh 3665447
11 KWh 2673706412 in ₹ 1961609813 MWh 3414014 in % 87.415 in % 75.3116 in ₹ 21777293
Beneficiaries
Share allocation for the current month (%)
Capacity Charge Payble by
beneficiaries (in ₹)
Ar. Pradesh 4.19400 913340Assam 56.28500 12257350
Manipur 6.55500 1427502Meghalaya 16.90500 3681451Mizoram 3.94000 858025Nagaland 6.65300 1448843
Tripura 5.46800 1190782HVDC 0.00000 0
REG MEGTotal 100.00000 21777293
# As per CERC order dated 13.01.2016 in petition No 42/GT/2015.
Total Energy Charge payable for the monthCumulative scheduled energy including current month
Drawal Schedule of
Beneficiaries MWH
Billing Schedule of Beneficiaries
MWH
Saleable Energy (ex-PP) of the month
12811719120021833120320321672
03331
30545
3: KHANDONG StationDetails
Installed CapacityAuxiliary Energy Consumption (AUX)Normative Plant Availability Factor (NAPAF)Annual Design Energy (DE) Free Energy for Home State (FEHS)Annual Saleable Energy Annual Fixed Charges
Energy Charge Rate (ECR) on ex-PP basis
Scheduled energy (ex-bus) for the month
Free Energy (ex-PP) of the month
Energy Charge payable by beneficiaries in ₹
1281
Cumulative Plant Availability Factor achieved upto the monthPlant Availability Factor achieved during the month (PAFM)
Capacity charge inclusive of incentive payble for the monthBILLING STATEMENT
153582002
01203
1067302127930771668069
0
20321672
0
23549
100250616926871392456
0
19616098
DATE: 6/10/2019 Page 3 of 14
NORTH EASTERN REGIONAL POWER COMMITTEE REGIONAL ENERGY ACCOUNT FOR THE MONTH OF MAY 2019
Sr. No. Units Figure1 MW 4052 in % 13 in % 854 GWh 1509.69#5 in % 126 MU 1328.52727 in ₹ Cr. 272.6449#
8 KWh 1.037
9 kWh 16119597710 KWh 799270011 KWh 15320327712 in ₹ 13048138713 MWh 16931914 in % 99.6515 in % 52.8416 in ₹ 135735857
Beneficiaries
Share allocation for the current month (%)
Capacity Charge Payble by
beneficiaries (in ₹)
Ar. Pradesh 18.46200 25059554
Assam 43.32800 58811632Manipur 8.37300 11365163
Meghalaya 11.50500 15616410Mizoram 5.70000 7736944Nagaland 5.33500 7241508
Tripura 7.29700 9904645HVDC 0.00000 0
REG MEGTotal 100.00000 135735857
# As per CERC order dated 05.01.2016 and corrigendum 07.03.2016 in petition No.40/GT/2015.
4: RANGANADI StationDetails
Installed CapacityAuxiliary Energy Consumption (AUX)Normative Plant Availability Factor (NAPAF)Annual Design Energy (DE) Free Energy for Home State (FEHS)Annual Saleable Energy Annual Fixed Charges
Drawal Schedule of
Beneficiaries MWH
Billing Schedule of Beneficiaries
MWH
Energy Charge payable by beneficiaries in ₹
Energy Charge Rate (ECR) on ex-PP basis
Scheduled energy (ex-bus) for the monthFree Energy (ex-PP) of the monthSaleable Energy (ex-PP) of the monthTotal Energy Charge payable for the monthCumulative scheduled energy including current monthPlant Availability Factor achieved during the month (PAFM)
66606
97242529081774
12556339
189730 0 0
Cumulative Plant Availability Factor achieved upto the monthCapacity charge inclusive of incentive payble for the month
2715
BILLING STATEMENT
6731 130481387
5024682500
8862 570 11056638
20309 3805 73758935
5521
648
04027 738 14303450
0
3699
DATE: 6/10/2019 Page 4 of 14
NORTH EASTERN REGIONAL POWER COMMITTEE REGIONAL ENERGY ACCOUNT FOR THE MONTH OF MAY 2019
Sr. No. Units Figure1 MW 752 in % 13 in % 734 GWh 227.24#5 in % 126 MU 199.97127 in ₹ Cr. 108.4121#
8 KWh 2.738
9 kWh 3458621.17
10 KWh 426996
11 KWh 303162512 in ₹ 744991413 MWh 4983.46514 in % 41.5615 in % 32.4016 in ₹ 26210136
Beneficiaries
Share allocation for the current month (%)
Capacity Charge Payble by
beneficiaries (in ₹)
Ar. Pradesh 6.85200 1795918Assam 43.80800 11482136
Manipur 7.86500 2061427Meghalaya 11.45500 3002371Mizoram 5.25000 1376032Nagaland 17.96700 4709175
Tripura 6.80300 1783076HVDC 0.00000 0.00000
REG MEGTotal 100.00000 26210136
# As per CERC order dated 13.01.2016 and corrigendum dtd. 07.03.16 in petition No 43/GT/2015.
Plant Availability Factor achieved during the month (PAFM)
Saleable Energy (ex-PP) of the monthTotal Energy Charge payable for the monthCumulative scheduled energy including current month
7449914
0.00000
2720.93267
7738360
511488574236703244
0410.37133
3558.30000
282.628360.00000
186.81075209.72838256.84601
5: DOYANG StationDetails
Installed CapacityAuxiliary Energy Consumption (AUX)Normative Plant Availability Factor (NAPAF)Annual Design Energy (DE) Free Energy for Home State (FEHS)Annual Saleable Energy Annual Fixed Charges
Energy Charge Rate (ECR) on ex-PP basis
Scheduled energy (ex-bus) for the month
Free Energy (ex-PP) of the month
0.00000
Cumulative Plant Availability Factor achieved upto the monthCapacity charge inclusive of incentive payble for the month
BILLING STATEMENT
Drawal Schedule of Beneficiaries MWH
Billing Schedule of Beneficiaries
MWH
Energy Charge payable by beneficiaries in ₹
282.628360.00000
186.81075636.72438256.84601
248.416291536.50289
248.416291536.50289
6801644206945
DATE: 6/10/2019 Page 5 of 14
NORTH EASTERN REGIONAL POWER COMMITTEE REGIONAL ENERGY ACCOUNT FOR THE MONTH OF MAY 2019
Sr. No. Units Figure1 MW 1052 in % 13 in % 854 GWh 448.00#5 in % 126 MU 394.247 in ₹ Cr. 150.2829#
8 KWh 1.925
9 kWh 3842897510 KWh 461147711 KWh 3381749812 in ₹ 6509868413 MWh 6874014 in % 88.0415 in % 91.8916 in ₹ 66101225
Beneficiaries
Share allocation for the current month (%)
Capacity Charge Payble by
beneficiaries (in ₹)
Ar. Pradesh 4.94000 3265401
Assam 29.44500 19463506Manipur 42.50800 28098309
Meghalaya 0.00000 0Mizoram 5.02000 3318282Nagaland 6.43500 4253614
Tripura 11.65200 7702115HVDC 0.00000 0Total 100.00000 66101225
# As per CERC order dated 18.09.2015 in Order no. 228/GT/2014
0371702447443768683256
065098684
3676799
2168745922589770
0.0000038428.97500
1930.921622464.610994510.78212
0.0000033817.49800
Plant Availability Factor achieved during the month (PAFM)
Total Energy Charge payable for the month
4510.78212
1910.02528
11266.2125711734.94541
0.00000
Drawal Schedule of Beneficiaries MWH
Cumulative Plant Availability Factor achieved upto the monthCapacity charge inclusive of incentive payble for the month
1910.02528
11266.2125716346.42241
0.000001930.921622464.61099
Annual Design Energy (DE) Free Energy for Home State (FEHS)Annual Saleable Energy Annual Fixed Charges
Billing Schedule of Beneficiaries
MWH
Energy Charge payable by beneficiaries in ₹
Energy Charge Rate (ECR) on ex-PP basis
Scheduled energy (ex-bus) for the monthFree Energy (ex-PP) of the monthSaleable Energy (ex-PP) of the month
Cumulative scheduled energy including current month
BILLING STATEMENT
6: LOKTAK StationDetails
Installed CapacityAuxiliary Energy Consumption (AUX)Normative Plant Availability Factor (NAPAF)
DATE: 6/10/2019 Page 6 of 14
NORTH EASTERN REGIONAL POWER COMMITTEE REGIONAL ENERGY ACCOUNT FOR THE MONTH OF MAY 2019
Sr. No. Units Figure1 MW 1102 in % 123 kWh 543007144 KWh 73364275 KWh 469642876 MWh 609767 in % 101.01
8 in % 75.07
Beneficiaries
Ar. PradeshAssam
ManipurMeghalayaMizoramNagaland
Tripura
HVDC
REG MEGTotal 41569.976867
5.765005.400007.76750
0.00000
3322.57206022820.5199194720.054686
0.000000
56434.05249
3253.4231273042.4492324410.957843
0.000000
0.000003253.42313
4410.95784
7527.64880
3042.44923
100.00000
DetailsInstalled CapacityFree Energy for Home State (FEHS)
Billing Schedule of Beneficiaries MWH
BILLING STATEMENT
Scheduled energy (ex-bus) for the monthFree Energy (ex-PP) of the monthSaleable Energy (ex-PP) of the month
Share allocation for the current month
(%)
Drawal Schedule of Beneficiaries MWH
4720.05469
7: PARE Station
Cumulative scheduled energy including current monthPlant Availability Factor achieved during the month (PAFM)
Cumulative Plant Availability Factor achieved upto the month
40.510008.35500
13.33000
18.87250 10658.9988822820.51992
DATE: 6/10/2019 Page 7 of 14
NORTH EASTERN REGIONAL POWER COMMITTEE REGIONAL ENERGY ACCOUNT FOR THE MONTH OF MAY 2019
B. THERMAL POWER STATIONS
DATE: 6/10/2019 Page 8 of 14
NORTH EASTERN REGIONAL POWER COMMITTEE REGIONAL ENERGY ACCOUNT FOR THE MONTH OF MAY 2019
Sr. No. Units Figure1 in % 72.702 in % 69.843 in % 72.004 in % 64.465 in % 61.486 in % 85.00
Beneficiaries Wt. Schedule Energy for
current month (MWh)
Ar. Pradesh 5.694000 5742.959283
Assam 56.50300079544.42575
Manipur 8.105000 9321.093823Meghalaya 11.815000 0Mizoram 5.410000 7557.704802Nagaland 5.805000 6603.243366
Tripura 6.668000 8096.18798REG MEG 18085.29848
Total 100.000000 134950.913477 18119.33652
3038.12344
16371.16377002.342587251.306125723.395723
3244.4997873250.09086
33880.9222231372.55415255463.5778
2971.924242
6944.9674273085.298377
0723.395723
2282.436209
13435.27001
147117.901516449.056012562.21928
14930.1417313551.92156
2111.31454516044.51359
1: AGBPP StationDetails
Plant Availability Factor for current month
Normative Plant Availability Factor (NAPAF)Cum. Plant Availability Factor upto current
NAPLF
Plant Load Factor for current monthCum. Plant Load Factor upto current month
Cum. Schedule Energy upto
current month (MWh)
Unrequisitioned Energy for current
month (MWh)
Cum. Unrequisitioned
Energy upto current month
(MWh)
DATE: 6/10/2019 Page 9 of 14
NORTH EASTERN REGIONAL POWER COMMITTEE REGIONAL ENERGY ACCOUNT FOR THE MONTH OF MAY 2019
Sr. No. Units Figure1 in % 75.392 in % 68.933 in % 85.004 in % 65.045 in % 59.276 in % 85.00
Beneficiaries Wt. Schedule Energy for
current month (MWh)
Ar. Pradesh 6.702000 3637.955399Assam 43.720000 24877.38971
Manipur 8.225000 4992.468675Meghalaya 12.633000 0Mizoram 6.000000 4072.023517Nagaland 5.737000 3246.073999
Tripura 16.983000 10165.45035REG MEG 8958.345500
Total 100.000000 59949.707152 19948.128214
2: AGTCCPP Station
Cum. Plant Availability Factor upto currentPlant Availability Factor for current month
Details
10963.292848
1168.07649112529.6144481903.099389144.235600187.543736
1047.5561942968.002356
1113.8079016128.603890839.771825
0.000000182.756483822.298601
1876.054148
107640.161786
Cum. Schedule Energy upto
current month
Unrequisitioned Energy for current
month (MWh)
Cum. Unrequisitioned
Energy upto
7467.7536646272.391404
18697.12682914584.933363
Cum. Plant Load Factor upto current month
Normative Plant Availability Factor (NAPAF)Plant Load Factor for current month
NAPLF
7381.33559843257.4090408590.3595761388.852312
DATE: 6/10/2019 Page 10 of 14
NORTH EASTERN REGIONAL POWER COMMITTEE REGIONAL ENERGY ACCOUNT FOR THE MONTH OF MAY 2019
Sr. No. Units Figure1 in % 89.652 in % 86.803 in % 85.004 in % 85.415 in % 81.656 in % 85.00
Beneficiaries Wt. Schedule Energy
for current month (MWh)
Ar. Pradesh 3.030303 5978.639051
Assam 33.057851 151677.988713
Manipur 5.785124 24608.421211Meghalaya 10.881543 47374.284519Mizoram 3.030303 13148.557366Nagaland 3.719008 10813.029855
Tripura 26.997245 119630.398219HVDC 0.000000 0.000000Total 86.501377 373231.318934
18262.71244
280523.1942
43712.4711391524.6122125487.3066724956.58622
711815.9629
3619.2377281052.1697776615.13416
227349.080
7942.3658365635.678972
2502.058293
32134.89411
8222.088133
3239.034812
6885.1712050
Unrequisitioned Energy for current
month (MWh)
Cum. Unrequisitioned Energy upto current
month (MWh)
3: PALATANA StationDetails
Plant Availability Factor for current monthCum. Plant Availability Factor upto currentNormative Plant Availability Factor (NAPAF)Plant Load Factor for current monthCum. Plant Load Factor upto current month
1569.9885298250.09213313706.82341
060546.83108
NAPLF
8794.582829
14647.29937
Cum. Schedule Energy upto
current month (MWh)
DATE: 6/10/2019 Page 11 of 14
NORTH EASTERN REGIONAL POWER COMMITTEE REGIONAL ENERGY ACCOUNT FOR THE MONTH OF MAY 2019
Sr. No. Units Figure1 in % 89.522 in % 93.303 in % 85.004 in % 63.615 in % 74.516 in % 85.00
Beneficiaries Wt. Schedule Energy
for current month (MWh)
Ar. Pradesh 5.1325 18700.67601Assam 57.420000 201165.483739
Manipur 7.505000 23283.275928Meghalaya 11.480000 0.000000Mizoram 5.415000 13843.911066Nagaland 4.930000 13552.799831
Tripura 7.617500 22293.451825HVDC BNC 0.500000 667.364308
REG. MEG 0.000000 52358.703292
Total 100.000000 345865.666000 207190.0719
DetailsPlant Availability Factor for current monthCum. Plant Availability Factor upto currentNormative Plant Availability Factor (NAPAF)Plant Load Factor for current month
Unrequisitioned Energy for current
month (MWh)
19059.942881709.19088
0
4: BGTPP NTPC Station
Cum. Schedule Energy upto
current month
NAPLFCum. Plant Load Factor upto current month
13109.55241
Cum. Unrequisitioned Energy upto current
month (MWh)
8608.94005611957.01938831.139787
0
156043.2873
4683.577639124914.936
27955.056770
15757.8153532352.343751189.5886
1364.689578
107401.8388
4374.339214
714972.0531
56957.3528210456.5577752358.7032910499.23497
42647.57774404584.843641253.90737
034177.26372
DATE: 6/10/2019 Page 12 of 14
NORTH EASTERN REGIONAL POWER COMMITTEE REGIONAL ENERGY ACCOUNT FOR THE MONTH OF MAY 2019
Sl No. Farakka I & II Farakka III Kahalgaon I Kahalgaon II Talcher1 Ar.Pradesh 0.191917 0.000000 0.191747 0.000000 0.1968982 Assam 2.455737 0.000000 2.104847 5.093479 2.0954193 Manipur 0.000000 0.000000 0.000000 0.000000 0.0000004 Meghalaya 0.000000 0.000000 0.000000 0.000000 0.0000005 Mizoram 0.141736 0.000000 0.141610 0.000000 0.1417366 Nagaland 0.429803 0.000000 0.424460 0.000000 0.424823
7Assam (NVVN Coal Power)
0.091912 0.091912 0.091912 0.091912 0.091912
in MW in (%) in MW in (%) in MW in (%)Ar. Pradesh 193.1318 7.6502 6.6503 3.5842 199.7821 7.3719Assam* 1182.6980 46.8484 159.3289 85.8710 1342.0269 49.5201Manipur 227.6861 9.0190 0.0000 0.0000 227.6861 8.4015Meghalaya 304.4122 12.0582 0.0000 0.0000 304.4122 11.2327Mizoram 124.2713 4.9226 4.8747 2.6272 129.1459 4.7654Nagaland 141.1428 5.5909 14.6905 7.9175 155.8334 5.7502Tripura 348.6769 13.8116 0.0000 0.0000 348.6769 12.8660HVDC 2.5000 0.0990 0.0000 0.0000 2.5000 0.0922Total 2524.5190 100.0000 185.5444 100.0000 2710.0634 100.0000*Includes entitlement for bundling with solar power.
D. WEIGHTED AVERAGE ENTITLEMENT OF THE BENEFICIARIES FOR THE MONTH
Beneficiaries
Weighted Average Entitlement for the current
month of ISGS in NER
Weighted Average Entitlement for the current month of ISGS outside NER
Total Entitlement for the current month of ISGS
C. SHARE ALLOCATIONS % IN CS STATIONS FROM EASTERN REGION
DATE: 6/10/2019 Page 13 of 14
NORTH EASTERN REGIONAL POWER COMMITTEE REGIONAL ENERGY ACCOUNT FOR THE MONTH OF MAY 2019
CONCLUDED
DATE: 6/10/2019 Page 14 of 14