RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The...

31
STATE OF CONNECTICUT CONNECTICUT SITING COUNCIL RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 PURSUANT TO C.G.S. §4-181a(b) FOR : JURISDICTIONAL NATURAL GAS-FIRED : ELECTRIC GENERATING FACILITIES : UNDER C.G.S. § 16-50i(a)(3) AND C.G.S. § : 16-50k(a) : NOVEMBER 15, 2010 PPL WALLINGFORD ENERGY LLC'S INTERROGATORY RESPONSES TO CONNECTICUT SITING COUNCIL'S FIRST SET OF INTERROGATORIES PPL Wallingford Energy LLC ("PPL Wallingford") submits these the following interrogatory responses to the Connecticut Siting Council's first set of interrogatories dated October 28, 2010. INTERROGATORY RESPONSES: Ql. If the facility has already been constructed, what versions of the NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials included in Siting Council Petition 451, and is the subject of the responses to these interrogatories. When constructed, the Facility obtained permits in accordance with state and local building codes in existence at the time of its construction. The "BOCA National Building Code/1996 as amended, altered or deleted by the State Building Code — 1999 Connecticut Supplement dated May 1, 1999" ("State Code") was utilized to construct the Facility. Various NFPA standards are referenced in the State Code. The NFPA standards that applied to the Facility

Transcript of RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The...

Page 1: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

STATE OF CONNECTICUT CONNECTICUT SITING COUNCIL

RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 PURSUANT TO C.G.S. §4-181a(b) FOR : JURISDICTIONAL NATURAL GAS-FIRED : ELECTRIC GENERATING FACILITIES : UNDER C.G.S. § 16-50i(a)(3) AND C.G.S. § : 16-50k(a) : NOVEMBER 15, 2010

PPL WALLINGFORD ENERGY LLC'S INTERROGATORY RESPONSES TO CONNECTICUT SITING COUNCIL'S FIRST SET OF INTERROGATORIES

PPL Wallingford Energy LLC ("PPL Wallingford") submits these the

following interrogatory responses to the Connecticut Siting Council's first set of

interrogatories dated October 28, 2010.

INTERROGATORY RESPONSES:

Ql. If the facility has already been constructed, what versions of the NFPA standards were utilized?

Al. The PPL Wallingford Facility (the "Facility") is described more fully in the

materials included in Siting Council Petition 451, and is the subject of the

responses to these interrogatories. When constructed, the Facility obtained

permits in accordance with state and local building codes in existence at the time

of its construction.

The "BOCA National Building Code/1996 as amended, altered or deleted

by the State Building Code — 1999 Connecticut Supplement dated May 1, 1999"

("State Code") was utilized to construct the Facility. Various NFPA standards are

referenced in the State Code. The NFPA standards that applied to the Facility

Page 2: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

were the versions of NFPA Sections 10, 14, 15, 24, 26, 30, 54, 70, 71, 72, 101,

850, 1961, 1962 and 1963 found in the State Code referenced above.

2

Page 3: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

02. If the facility has yet to be constructed, what versions of the NFPA standards will be utilized?

A2. The PPL Wallingford Facility is fully constructed, and there are no plans

for significant modifications to the Facility at this time.

3

Page 4: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

03. How would recommendation #6, "Recommendation as to adoption of codes" in the Thomas Commission Executive Report affect the facility?

A3. PPL Wallingford does not believe that recommendation #6, as to the

adoption of revised building codes, should have any impact on the PPL

Wallingford Facility because PPL Wallingford does not read the Thomas

Commission Report as requiring the retroactive application of building codes to

existing facilities, particularly in light of the fact that no member of the public was

permitted to provide comments to the draft of the Thomas Commission Report

before it became final, and that no formal rulemaking procedures have been

initiated with respect to such retroactive application of building codes.

The PPL Wallingford Facility is a fully constructed, permitted power plant

that has been in existence for nearly ten years. PPL Wallingford sees nothing in

the Thomas Commission's Report which would suggest that the Thomas

Commission meant to retroactively apply building code standards to existing

facilities. For the Thomas Commission to do so would be a substantial departure

from customary practice for how building codes are developed in this State and

in the industry.

Ordinarily, a project receives its building permits and is responsible for

building a facility in accordance with the standards that were in effect at the time

the building permit was issued. Such standards would include any applicable

NFPA standards, as adopted by Connecticut or local regulation at the time the

building permits were issued. If new construction were to take place at the PPL

Wallingford Facility, it would obviously need to be done in accordance with

4

Page 5: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

applicable building codes at the time of permitting, however, no such construction

is anticipated by PPL Wallingford at this time.

5

Page 6: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

Q4. How would the following codes affect construction or modification of the facility:

a. NFPA 37 (2010 edition); b. NFPA 54 (2009 edition); C. NFPA 54 Temporary Interim Amendment 09-3 (August 25,

2010); d. NFPA 850 (2010 edition); e. NFPA 853 (2010 edition); f. ASME B31; and g. ASME B31.1 Appendices IV and V.

A4. The PPL Wallingford Facility is not currently under construction, nor is any

modification of the facility currently contemplated. PPL Wallingford therefore

does not believe that these new codes would have any impact on its facility. If

PPL Wallingford wishes to modify its facility in the future, the scope of the

modification will likely determine the extent, if any, of the effect of

implementation of the codes listed above. It should be noted, however, that the

PPL Wallingford Facility was constructed in accordance with the ASME

standards referenced in subsection f. and g. of this Interrogatory. In addition, as

NFPA standard 853 applies to fuel cell facilities only, it would not apply to the

PPL Wallingford Facility.

6

Page 7: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

Q5. What is useful lifespan of the natural gas piping/pipelines located • within and to the facility?

A5. For Interrogatories 5-13, PPL Wallingford only has knowledge concerning

the 1468 linear feet of natural gas piping/pipelines that PPL Wallingford owns

and/or controls. Accordingly, the answers to Interrogatories 5-13 will be limited

to such piping/pipelines only.

The PPL Wallingford Facility was designed for a 25 year life span. With

proper inspection and maintenance, the lifespan of the piping/pipelines should be

significantly beyond this period.

7

Page 8: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

Q6. Would the natural gas piping/pipelines within and to the facility need

to be replaced during the life of the facility?

A6. The natural gas piping/pipelines within and to the PPL Wallingford Facility

are anticipated to have, at a minimum, the same useful life as the rest of the

Facility. Accordingly, it is not anticipated that any natural gas piping/pipelines

would need to be replaced during the life of the Facility. Moreover, as described

above, the Facility was constructed pursuant to the standards found in ASME

B31.1, 1998 edition. Section 102.2.3 of that standard states that "A piping

system shall be considered safe for operation if the maximum sustained

operating pressure and temperature , which may act on any part or component of

the system does not exceed the maximum pressure and temperature allowed by

this code for that particular part or component."

8

Page 9: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

Q7. Do you foresee any circumstances that would require replacement of a section of natural gas piping/pipeline within and to the facility?

A7. The natural gas piping/pipelines within and to the PPL Wallingford Facility

are anticipated to have, at a minimum, the same useful life as the rest of the

Facility. Accordingly, replacement of the natural gas piping/pipeline is not

anticipated at this time.

However, if the PPL Wallingford Facility were to be expanded and/or

modified, it is possible that natural gas piping/pipelines would need to be added

and/or replaced. Were such an expansion or modification to happen, however,

PPL Wallingford would be subject to review of such expansion or modification in

accordance with all applicable laws and regulations in force at the time of such

expansion or modification.

9

Page 10: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

Q8. If so, would a new section of natural gas piping/pipeline within and to the facility be installed and require cleaning?

A8. If the PPL Wallingford Facility were to be expanded or modified, and if

such expansion or modification included the addition or replacement of natural

gas piping/pipelines, such piping/pipelines would need to be cleaned in

accordance with the specifications of the manufacturers of the equipment utilizing

such natural gas, as well as applicable state and federal regulatory requirements

that are in place at the time of expansion/modification. PPL Wallingford is

mindful of the fact that pursuant to the Governor's Executive Order Number 45

(dated Septe ber 22, 2010), natural gas is no longer permitted to be used to

clean such piping/pipelines, and if such cleaning were necessary, PPL

Wallingford would utilize a method of cleaning permitted by the State of

Connecticut and applicable standards.

10

Page 11: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

Q9. What type of material is the natural gas piping/pipeline within and to the facility composed of?

A9. The natural gas piping/pipeline within and to the PPL Wallingford Facility

is composed of 600 pound carbon steel ASTM A53 Grade B, 600 pound

stainless steel ASTM A312 type 304, and 150 pourid carbon steel ASTM A53

grade B (domestic gas service).

11

Page 12: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

Q10. How many linear feet of natural gas piping/pipeline are located within and to the facility?

M O. There are approximately 1468 linear feet of natural gas pipes located

within and to the PPL Wallingford Facility.

12

Page 13: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

Q11. What is operating pressure (psig) of the natural gas piping/pipeline within and to the facility?

A11. The natural gas pipes located within and to the PPL Wallingford Facility

operate at various approximate pressures, including 700 psig, and 15 psig

(domestic gas service).

13

Page 14: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

Q12. What is the nominal pipe size in inches within and to the facility?

Al2. The natural gas pipes located have a variety of diameters, including 4

inches, 6 inches, 8 inches, 10 inches and 12 inches.

14

Page 15: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

Q13. What is the length in feet of piping/pipeline that requires/required purging within and to the facility?

A13. Approximately 1468 linear feet of piping/pipeline within the PPL

Wallingford Facility required cleaning prior to the introduction of gas to the

combustion turbines. No further cleaning is anticipated at this time.

Respectfully Submitted, PPL Wallingford Energy LLC

By: 1,„ Lee D. Hoffman, sq. Pullman & Comley, LLC 90 State House Square Hartford, CT 06103 Telephone: (860) 4244300 Facsimile: (860) 424-4370 lhoffmanpullcom.com Its Attorneys

15

Page 16: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

CERTIFICATE OF SERVICE

I hereby certify that on this day a copy of the foregoing was delivered by electronic mail and/or U.S. Mail, first class postage prepaid, to all parties and intervenors of record as follows:

LIST OF PARTIES AND INTERVENORS SERVICE LIST

Status Granted

Document Service

Status Holder (name, address & phone

number)

Representative (name, address & phone

number)

Applicant Dockets 54

and 54A

O'Brien Energy Systems, Inc.

Chief Executive Officer Resource Management International, Inc. 335 West Baltimore Avenue Media, PA 19063

FYI U.S. Mail

Applicant Docket 59

El U.S. Mail

Capitol District Energy Center Cogeneration Associates

Plant Manager Capitol District Energy Center Cogeneration Associates 490 Capitol Avenue Hartford, CT 06106 (860) 293-1990 ext. 222 [email protected]

Applicant Dockets 60

and 60A

El U.S. Mail

The Energy Network (co-generation facility at Hartford Hospital)

Kerry Kerr Director of Engineering Hartford Hospital 80 Seymour Street Hartford, CT 06102

16

Page 17: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

LIST OF PARTIES AND INTERVENORS SERVICE LIST

Status Granted

Document Service

Status Holder (name, address & phone

number)

Representative (name, address & phone

number)

Applicant El U.S. Chief Executive Officer Chief Executive Officer Dockets64,

64A and 64B Mail Advanced

Manufacturing Independent Energy Corporation 255 Main Street, 51h Floor

. C.H. Dexter Division Hartford, CT 06106 The Dexter Corporation One Elm Street Chief Executive Officer Windsor Locks, CT Environmental Risk, LTD 06096 120 Mountain Avenue

Bloomfield, CT 06002

Duncan MacKay, Esq. Legal Department Northeast Utilities Service Company P.O. Box 270 Hartford, CT 06141-0270

Applicant Lake Road Generating Andrew W. Lord, Esq. C. U.S. Docket 189 Mail Company, L.P. Murtha Cullina LLP

CityPlace I, 29th Floor 185 Asylum Street Hartford, CT 06103-3469 (860) 240-6180 (860) 240-5723 — fax alordmurthalaw.com

Christopher Curtis, Plant Manager Lake Road Generating Co., L.P. 56 Alexander Parkway Dayville, CT 06241

Donna Poresky Senior Vice President, General Counsel Equipower Resources Corporation One Constitution Plaza, 9th Floor

\ Hartford, CT 06103 860 656-0814 (860) 655-9523 - cell

. DPoreskveqpwr.com

17

Page 18: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

LIST OF PARTIES AND INTERVENORS SERVICE LIST

Status Granted

Document Service

Status Holder (name, address & phone

number)

Representative (name, address & phone

number)

Applicant Docket 192

DD U.S. Mail

Towantic Energy, LLC John W. Cannavino Cummings & Lockwood LLC Six Landmark Square Stamford, CT 06901 (203) 351-4447 (203) 708-3849 —fax icannavinoci-law.com

Party Docket 192

Citizens for Defense of Oxford

Jay Halpern — CDO 58 Jackson Cove Road Oxford, CT 06478 h: 203-888-4976

13 U.S. Mail

Intervenor Docket 192

El U.S. Mail

Town of Middlebury Richard G. Montville Administrative Aide to First Selectman Town of Middlebury 1212 Whittemore Road P.O. Box 392 Middlebury, CT 06762 w: (203) 758-2439 f: (203) 758-8629

18

Page 19: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

LIST OF PARTIES AND INTERVENORS SERVICE LIST

Status Granted

Document Service

Status Holder (name, address & phone

number)

Representative (name, address & phone

number)

Intervenor The Connecticut Light & Stephen GibeIli, Esq. 0 E-mail Docket 192 Power Company Associate General Counsel

The Connecticut Light & Power Co. P.O. Box 270 Hartford, CT 06141-0270 (860) 665-5513 (860) 665-5504 — fax qibelsnu.corn

John R. Morissette Manager — Transmission Siting and Permitting Northeast Utilities Service Co. P.O. Box 270 Hartford, CT 06141-0270 [email protected]

Christopher R. Bernard Manager, Regulatory Policy (Transmission) The Connecticut Light & Power Co. P.O. Box 270 Hartford, CT 06141-0270 (860) 665-5967 (860) 665-3314 — fax bernacrnu.com

Stella Pace Transmission Interconnection Northeast Utilities Service Co. P.O. Box 270 Hartford, CT 06141-0270 860-665-5426 860-665-2820

Party El U.S. Town of Oxford The Honorable Mary Ann Docket 192 Mail Drayton-Rogers

First Selectman Town of Oxford 486 Oxford Road, Route 67 Oxford, CT 06478-1298 w: (203) 888-2543 f: (203) 888-2136

19

Page 20: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

LIST OF PARTIES AND INTERVENORS SERVICE LIST

Status Granted

Document Service

Status Holder (name, address & phone

number)

Representative (name, address & phone

number)

Intervenor Docket 192

Eg E-mail Yankee Gas Services Company

John R. Morissette Manager — Transmission Siting and Permitting Northeast Utilities Service Co. P.O. Box 270 Hartford, CT 06141-0270 [email protected]

Party Docket 192

Naugatuck Valley Chapter Trout Unlimited

Albin Weber, President Naugatuck Valley Chapter Trout Unlimited 584 South Britain Road Southbury, CT 06488 w: (203) 262-8558 f: (203) 264-1976

r4 U.S. Mail

Intervenor DO 192

GE Energy Financial Services, Inc.

Jay F. Malcynsky The Law Offices of Jay F. Malcynsky, P.C. l

One Liberty Square New Britain, CT 06051 (860) 229-0301 (860) 225-4627 — fax Jmalcvnskvgaffneybennett.com pclarkeqbact.com

Intervenor Docket 192

Z U.S. Mail

Town of Southbury The Honorable H. Williams Davis, Jr., First Selectman Southbury Town Hall 501 Main Street South Southbury, CT 06488-2295 w: (203) 796-5000 f: (203) 264-9762

Party Docket 192

Z U.S. Mail

Pomperaug River Watershed Coalition

Marc J. Taylor, MD Pomperaug River Watershed Coalition P.O. Box 814 Southbury, CT 06488-0814 w: (203) 264-5098 f: (203) 264-6332

20

Page 21: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

• LIST OF PARTIES AND INTERVENORS SERVICE LIST

Status Granted

Document Service

Status Holder (name, address & phone

number)

Representative (name, address & phone

number)

Petitioner Petition 352

The Connecticut Light & Power Company

Stephen GibeIli, Esq. Associate General Counsel The Connecticut Light and Power Company P.O. Box 270 Hartford, CT 06141-0270 (860) 665-5513 (860) 665-5504 — fax [email protected]

,... E-mail

Petitioner Petition 451

[EI U.S. Mail

PPL Wallingford Energy, LLC

Lee Hoffman, Esq. Pullman & Comley, LLC 90 State House Square Hartford, CT 06103-3702 (860) 424-4315 (860) 424-4370 lhoffmanapullcom.com

Petitioner Petition 546

Pratt & Whitney Kenneth C. Baldwin, Esq. Robinson & Cole LLP' 280 Trumbull Street Hartford, CT 06103-3597 860-275-8299 860-275-8345 kbaldwinarc.com

LI E-mail

Petitioner Petition 902

IZ E-mail •

Pratt & Whitney Kenneth C. Baldwin, Esq. Robinson & Cole LLP' 280 Trumbull Street Hartford, CT 06103-3597 860-275-8299 860-275-8345 kbaldwinarc.corn

Petitioner Petition 563

The Torrington Company

Philip M. Small Brown Rudnick Freed & Gesmer CityPlace I, Floor 38 185 Asylum Street Hartford, CT 06103-3402 (860) 509-6500 (860) 509-6501 — fax psmallabrownrudnick.com

r1 E-mail

2 1

Page 22: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

LIST OF PARTIES AND INTERVENORS SERVICE LIST

Petitioner Petition 778

El U.S. Mail

Connecticut Municipal Electric Energy Cooperative (CMEEC)

Philip L. Sussler, Esq. General Counsel, Connecticut Municipal Electric Energy Cooperative 30 Stott Avenue Norwich, CT 06360 psusslercmeec.orq

Petitioner Petition 805

Ansonia Generation, LLC

Philip M. Small, Esq. Michael E. Kozlik, Esq. Brown Rudnick Berlack lsraels LLP CityPlace I, 185 Asylum Street Hartford, CT 06103-3402 (860) 509-6500 (860) 509-6501 — fax psmallabrownrudnick.com

E-mail

mkozlikabrownrudnick.com

Raymond McGee Ansonia Copper & Brass, Inc. Ansonia Generation LLC 75 Liberty Street Ansonia, CT 06401 (203) 732-6673 (203) 735-3787 fax rmcqeeansoniacb.com

Ted W. Verrill Sasco River Advisors LLC 75 Sasco River Lane .

Southport, CT 06890 (203) 292-3798 (636) 594-3798 fax tverrillomail.com

Party Petition 805

IZI E-mail The United Illuminating Company

Bruce L. McDermott, Esq. Wiggin and Dana LLP One Century Tower P.O. Box 1832 New Haven, CT 06508-1832 (203) 498-4340 (203) 782-2889 — fax bmcdermottAwiogin.com

22

Page 23: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

LIST OF PARTIES AND INTERVENORS SERVICE LIST

Status Granted

Document Service

Status Holder (name, address & phone

number)

Representative (name, address & phone

number)

Petitioner Petition 813

Z E-mail Kimberly-Clark Corporation

Kenneth C. Baldwin, Esq. Robinion & Cole LLP 280 Trumbull Street Hartford, CT 06103-3597 (860) 275-8200 (860) 275-8299 fax kbaldwinrc.com

Charles L. Smith Maintenance & Engineering Team Leader New Milford Facility 58 Pickett District Road New Milford, CT 06776

Petitioner Petition 831

,

El E-mail Waterbury Generation, LLC

Joey Lee Miranda, Esq. Kenneth C. Baldwin, Esq. Robinson & Cole LLP 280 Trumbull Street Hartford, CT 06103-3597 (860) 275-8200 (860) 275-8299 fax kbaldwinrc.com imirandarc.com

Intervenor Petition 831

El E-mail The Connecticut Light & Power Company

Robert S. Golden Jr. Carmody & Torrance LLP P.O. Box 1110 Waterbury, CT 06721 203-573-1200 203-575-2600 rgoldencarmodylaw.com

23

Page 24: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

LIST OF PARTIES AND INTERVENORS SERVICE LIST

Status Granted

Document Service

Status Holder (name, address & phone

number)

Representative (name, address & phone

number)

Intervenor Petition 831

ED E-mail The Connecticut Light & Power Company

Robert Carberry, P.E. Manager, Transmission Siting and Permitting Northeast Utilities Service Co. P.O. Box 270 Hartford, CT 06141-0270 P: 860-665-6774 carberenu.com

Eg U.S. Stella Pace Mail Transmission Interconnection

Northeast Utilities Service Co. P.O. Box 270 Hartford, CT 06141-0270 860-665-5426 860-665-2820

Vincent P. Pace Senior Counsel

El U.S. Northeast Utilities Service Co. Mail P.O. Box 270

Hartford, CT 06141-0270 860-665-5426 860-665-5504

Petitioner EZI U.S. Bridgeport Energy II, D. Blake Wheatley Petition 841 Mail LLC General Manager

LS Power Development 400 Chesterfield Center, Ste 110 St. Louis, MS 63017 636-532-2200

Mark R. Sussman, Esq. Murtha Cullina LLP CityPlace I, 29 in Floor 185 Asylum Street Hartford, CT 06103-3469 860-240-6180-p 860-240-61504 msussmanmurthalaw.com

24

Page 25: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

LIST OF PARTIES AND INTERVENORS SERVICE LIST

Status Granted

Document Service

Status Holder (name, address & phone

number)

Representative (name, address & phone

number)

Party Petition 841

[21 U.S. Mail

60 Main Street, et al Julie Kohler, Esq. Cohen and Wolf, P.C. 1115 Broad Street Bridgeport, CT 06604 203-368-0211 ikohleracohenwolf.com

Intervenor Petition 841

The United Illuminating Company

,

Bruce L. McDermott Wiggin and Dana LLP . One Century Tower New Haven, CT 06508-1832 203-498-4340 203-782-2889 requIatorvawiqqin.com

E-mail

IZI E-mail

VI U.S.

Linda L. Randell Senior Vice President General Counsel and Corporate Secretary UIL Holdings Corporation P.O. Box 1564 New Haven, CT 06506-0901 203-499-2575 Linda.randelauinet.com

John J. Prete Vice President of Transmission Business The United Illuminating Company P.O. Box 1564 New Haven, CT 06506-0901 john.preteuinet.com

Mail

Party Petition 841

Michael Mauzerall M&M Fence & Wire Works

Robert T. Rosati, Esq. Rosati & Rosati 3241 Main Street Stratford, CT 06614 203-377-6187 203-386-9570

1 U.S. Mail

25

Page 26: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

LIST OF PARTIES AND INTERVENORS SERVICE LIST

Status Granted

Document Service

Status Holder (name, address & phone

number)

Representative (name, address & phone

number)

Petitioner Z U.S. NRG Energy, Inc. Andrew W. Lord, Esq. Petition 843 Mail Murtha Cullina LLP

CityPlace I, 29th Floor 185 Asylum Street Hartford, CT 06103-3469 (860) 240-6180 (860) 240-5723 — fax alordmurthalaw.com

Julie L. Friedberg General Counsel — Northeast Region NRG Energy, Inc. 211 Carnegie Center Princeton, NJ 08540-6213 (609) 524-5232 (609) 240-1160 - cell (609) 524-4941 - fax Julie.friedberg©nrgenergy.com

Petitioner LEI U.S. The Hartford Steam Andrew W. Lord, Esq. Petition 870 Mail Company Murtha Cullina LLP

CityPlace I, 29th Floor 185 Asylum Street Hartford, CT 06103-3469 (860) 240-6180 (860) 240-5723 — fax alord(murthalaw.com derekruddAhartfordsteam.com

26

Page 27: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

LIST OF PARTIES AND INTERVENORS SERVICE LIST

Status Granted

Document Service

Status Holder (name, address & phone

number)

Representative (name, address & phone

number)

Petitioner GenConn Energy, LLC Andrew W. Lord, Esq. Fr4 U.S. Petition 875 Mail Murtha Cullina LLP

CityPlace I, 29th Floor 185 Asylum Street Hartford, CT 06103-3469 (860) 240-6180 (860) 240-5723 — fax alordmurthalaw.com

Julie L. Friedberg General Counsel — Northeast Region NRG Energy, Inc. 211 Carnegie Center Princeton, NJ 08540-6213 (609) 524-5232 (609) 240-1160 - cell (609) 524-4941 - fax [email protected]

E E Mail Petitioner PSEG Power Stephen J. Humes, Esq.

Petition 925 Connecticut, LLC McCarter & English, LLP CityPlace I, 185 Asylum Street 36 Floor Hartford, CT 06103 (860) 275-6761 (860) 560-5955 — fax shurnesaniccartercom

IZ U.S. Leilani M. Holgado, Esq. Mail Assistant General

Environmental Counsel PSEG Services Corporation 80 Park Plaza, T5C Newark, NJ 07102 (973) 430-5521 (973) 802-1267 — fax Leilani.holgadoapseq.com

Stephen J. Maginnis r4 U.S. Mail Project Manager

PSEG Power LLC 80 Park Plaza Newark, NJ 07102 (973) 430-8920 [email protected]

27

Page 28: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

LIST OF PARTIES AND INTERVENORS SERVICE LIST

Status Granted

Document Service

Status Holder (name, address & phone

number)

Representative (name, address & phone

number)

Petitioner Petition 482

HEC, Inc. Anthony M. Fitzgerald, Esq. Carmody & Torrance, LLP P.O. Box 1950 New Haven, CT 06509 (203) 777-5501 [email protected]

61 U.S. Mail

Petitioner Petition 553

Eg U.S. Mail

Town of South Windsor Lynn Banis, Esq. UTC Fuel Cells, LLC 195 Governor's Highway South Windsor, CT 06074

Petitioner Petition 598

Yale University Mr. Viktor Boed, C.E.M., Manager Yale University Office of Facilities/Plant Engineering 2 Whitney Avenue P.O. Box 208297 New Haven, CT 06520-8297

... U.S. Mail

Petitioner Petition 619

El U.S. Mail

Select Energy Services, Inc.

Stephen GibeIli, Esq. Associate General Counsel The Connecticut Light and Power Company P.O. Box 270 Hartford, CT 06141-0270 (860) 665-5513 (860) 665-5504 — fax [email protected]

Petitioner Petition 657

Nxegen, Inc. Brad N. Malicki, Esq. Nxegen, Inc. 362 Industrial Park Road, Suite 7 Middletown, CT 06457

r4 U.S. Mail

Petitioner Petition 696

El U.S. Mail

Johnson Controls, Inc. James C. Brisbin Sr. Project Manager Johnson Controls Inc. 21 Griffin road North, Suite 4 Windsor, CT 06095

28

Page 29: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

LIST OF PARTIES AND INTERVENORS SERVICE LIST

Status Granted

Document Service

Status Holder (name, address & phone

number)

Representative (name, address & phone

number)

Petitioner Petition 711

PPL Energy Services Holding, LLC

John J. Mazzali Project Engineer PPL Distributed Generation LLC 50 Inwood Road Rocky Hill, CT 06067

CR U.S. Mail

Petitioner Petition 785

IZI U.S. Mail

Bridgeport Fuel Cell Park

John A. DeTore, Esq. Rubin and Rudman LLP 50 Rowes Wharf Boston, MA 02110

Party Petition 785

Z U.S. Mail

City of Bridgeport Melanie J. Howlett, Esq. Associate City Attorney Office of the City Attorney 999 Broad Street Bridgeport, CT 06604-4328 (203) 576-7647 (860) 576-8252

Intervenor Petition 785

El U.S. Mail

The United Illuminating Company

Richard Reed The United Illuminating Company 801 Bridgeport Avenue Shelton, CT 06484 (203) 926-4500 (203) 926-4457 rich.reeduinet.com

Bruce L. McDermott, Esq. Cecile M. Fraser, Esq. Wiggin and Dana, LLP One Century Tower New Haven, CT 06508-1832 (203) 498-4322 (203) 782-2889 [email protected]

• E-Mail

Petitioner Petition 957

1E1 U.S. Mail

Bridgeport Fuel Cell Park, LLC

_

Joey Lee Miranda, Esq. Robinson & Cole LLP 280 Trumbull Street Hartford, CT 06103-3597 (860) 275-8200 (860) 275-8299 fax [email protected]

29

Page 30: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

LIST OF PARTIES AND INTERVENORS SERVICE LIST

Status Granted

Document Service

Status Holder (name, address & phone

number)

Representative (name, address & phone

number)

Petitioner Petition 810

C. U.S. Mail

City of Middletown Jennifer D. JaneIle, Esq. Shipman & Goodwin LLP One Constitution Plaza Hartford, CT 06103-1919 .

Petitioner Petition 828

El U.S. Mail

DFC-ERG Milford, LLC Joey Lee Miranda, Esq. Robinson & Cole LLP 280 Trumbull Street Hartford, CT 06103-3597 (860) 275-8200 (860) 275-8299 fax [email protected]

Petitioner Petition 847

El U.S. Mail

Pepperidge Farm, Inc. Thomas E. Rieth, Manager Infrastructure and Environmental Engineering Pepperidge Farm, Inc. 595 Westport Avenue Norwalk, CT 06851-4482

Petitioner Petition 921

DFC-ERG CT, LLC Joey Lee Miranda, Esq. Robinson & Cole LLP 280 Trumbull Street Hartford, CT 06103-3597 (860) 275-8200 (860) 275-8299 fax [email protected]

4. E-Mail

Petitioner Petition 922

[El E-Mail DFC-ERG CT, LLC

-

Joey Lee Miranda, Esq. Robinson & Cole LLP 280 Trumbull Street Hartford, CT 06103-3597 (860) 275-8200 . (860) 275-8299 fax [email protected]

Petitioner Petition 923

IZI E-Mail Fuel Cell Energy, Inc. Joey Lee Miranda, Esq. Robinson & Cole LLP 280 Trumbull Street Hartford, CT 06103-3597 (860) 275-8200 (860) 275-8299 fax [email protected]

30

Page 31: RE-OPENING OF FINAL DECISIONS : DOCKET NT-2010 ...€¦ · NFPA standards were utilized? Al. The PPL Wallingford Facility (the "Facility") is described more fully in the materials

LIST OF PARTIES AND INTERVENORS SERVICE LIST

Status Granted

Document Service

Status Holder (name, address & phone

number)

Representative (name, address & phone

number)

Petitioner Petition 943

UTC Power Corporation Michael 0. Brown Vice President Governmental Affairs & General Counsel UTC Power Corporation 195 Governor's Highway South Windsor, CT 06074 [email protected]

0 U.S. Mail

Petitioner Petition 948

El U.S. Mail

UTC Power Corporation Michael 0. Brown Vice President Governmental Affairs & General Counsel UTC Power Corporation 195 Governor's Highway South Windsor, CT 06074 [email protected]

Petitioner Petition 949

El U.S. • Mail

UTC Power Corporation Michael 0. Brown Vice President Governmental Affairs & General Counsel UTC Power Corporation 195 Governor's Highway South Windsor, CT 06074 [email protected]

Petitioner Petition 953

El u . S. Mail

UTC Power Corporation Michael 0. Brown Vice President Governmental Affairs & General Counsel UTC Power Corporation 195 Governor's Highway South Windsor, CT 06074 [email protected]

Petitioner Petition 961

UTC Power Corporation Michael 0. Brown Vice President Governmental Affairs & General Counsel UTC Power Corporation 195 Governor's Highway South Windsor, CT 06074 [email protected]

CI U.S. Mail

ACTIVE/57762.15/LHOFFMAN/22948920

31