Re: Emerging Contaminants Groundwater Sampling Work Plan ... Plan.BCP.C915… · 4/20/2018  ·...

4
Strong Advocates, Effective Solutions, Integrated Implementation B nvironme tal ngineering c ence, i n 2558 Hamburg Turnpike, Suite 300 | Buffalo, NY 14218 phone: (716) 856-0599 | fax: (716) 856-0583 www.benchmarkees.com April 19, 2018 Mr. Ben McPherson NYSDEC Division of Environmental Remediation 270 Michigan Avenue Buffalo, NY 14203 Re: Emerging Contaminants Groundwater Sampling Work Plan Moog 170 Jamison Road Site, Elma, NY (Site) NYSDEC Site No. 915315 Dear Mr. McPherson: On behalf of our client, Moog Inc. (Moog), Benchmark Environmental Engineering and Science, PLLC (Benchmark) has prepared this emerging contaminants groundwater sampling work plan for the above referenced Site. Moog received a letter from the Department requiring the Site be sampled as part of the State-wide initiative to better understand the risk posed by 1,4-dioxane and per- and polyfluoroalkyl substances (PFAS). Benchmark proposes to conduct the emerging contaminant sampling in April 2018. The emerging contaminants sampling will be completed in four monitoring wells within the overburden/bedrock interface flow regime: MW-17 (upgradient), MW-13 and MW-11 (proximate Building 1, former potential source area) and MW-6 (downgradient) as shown on Figure 1 attached. Sampling Preparation Sampling equipment, components, and containers will be handled to avoid contact with aluminum foil, low density polyethylene (LDPE), glass, or polytetrafluoroethylene (PTFE, aka. teflon) materials including sample bottle cap liners with a Teflon layer. Clothing to be worn by sampling personnel will be laundered multiple times and will not contain PTFE material (including GORE-TEX®) or that which has been waterproofed with perfluorinated compounds (PFC) materials. Many food and drink packaging materials contain PFCs. If consumption of food and drink occurs prior to and/or during the sampling event, sample personnel will use a standard two (2) step decontamination procedure using detergent and clean water rinse to wash hands prior to starting and/or resuming sampling.

Transcript of Re: Emerging Contaminants Groundwater Sampling Work Plan ... Plan.BCP.C915… · 4/20/2018  ·...

Page 1: Re: Emerging Contaminants Groundwater Sampling Work Plan ... Plan.BCP.C915… · 4/20/2018  · april 2018 rfl to be disclosed or reproduced in any form for the benefit of parties

S t r o n g A d v o c a t e s , E f f e c t i v e S o l u t i o n s , I n t e g r a t e d I m p l e m e n t a t i o n

Bn v i ronme talng i neeri n gc ence,i

n

2558 Hamburg Turnpike, Suite 300 | Buffalo, NY 14218 phone: (716) 856-0599 | fax: (716) 856-0583

www.benchmarkees.com

April 19, 2018 Mr. Ben McPherson NYSDEC Division of Environmental Remediation 270 Michigan Avenue Buffalo, NY 14203 Re: Emerging Contaminants Groundwater Sampling Work Plan Moog 170 Jamison Road Site, Elma, NY (Site) NYSDEC Site No. 915315 Dear Mr. McPherson: On behalf of our client, Moog Inc. (Moog), Benchmark Environmental Engineering and Science,

PLLC (Benchmark) has prepared this emerging contaminants groundwater sampling work plan for

the above referenced Site. Moog received a letter from the Department requiring the Site be sampled

as part of the State-wide initiative to better understand the risk posed by 1,4-dioxane and per- and

polyfluoroalkyl substances (PFAS).

Benchmark proposes to conduct the emerging contaminant sampling in April 2018. The emerging

contaminants sampling will be completed in four monitoring wells within the overburden/bedrock

interface flow regime: MW-17 (upgradient), MW-13 and MW-11 (proximate Building 1, former

potential source area) and MW-6 (downgradient) as shown on Figure 1 attached.

Sampling Preparation

Sampling equipment, components, and containers will be handled to avoid contact with aluminum

foil, low density polyethylene (LDPE), glass, or polytetrafluoroethylene (PTFE, aka. teflon) materials

including sample bottle cap liners with a Teflon layer. Clothing to be worn by sampling personnel will

be laundered multiple times and will not contain PTFE material (including GORE-TEX®) or that

which has been waterproofed with perfluorinated compounds (PFC) materials.

Many food and drink packaging materials contain PFCs. If consumption of food and drink occurs

prior to and/or during the sampling event, sample personnel will use a standard two (2) step

decontamination procedure using detergent and clean water rinse to wash hands prior to starting

and/or resuming sampling.

Page 2: Re: Emerging Contaminants Groundwater Sampling Work Plan ... Plan.BCP.C915… · 4/20/2018  · april 2018 rfl to be disclosed or reproduced in any form for the benefit of parties

Emerging Contaminates Groundwater Sampling Work Plan April 19, 2018 Moog 170 Jamison Road BCP Site Page 2 of 3

Sampling Procedures

Prior to well purge sample collection, static water levels will be measured and recorded. The

groundwater wells will be developed using a plastic submersible pump (containing nitrile seals) and

PVC tubing prior to sampling the groundwater at the sample locations, starting with the upgradient

location first (MW-17). The wells will be purged using low-flow sampling techniques to minimize

water level draw down within the well until groundwater quality parameters (pH, temperature,

turbidity, DO, ORP, specific conductance) stabilize or at least a minimum of one (1) well volume has

been removed.

In general, stability is defined as variation between field measurements of 10 percent or less and no

overall upward or downward trend in the measurements. Upon stabilization of field parameters,

groundwater samples for the emergent contaminants will be collected from the submersible pump

and PVC tubing. Sampling personnel will wear nitrile gloves while handling empty sample containers,

filling sample containers, sealing sample containers, and placement into sample coolers. Samples will

be placed on ice prior to transportation to the laboratory.

If sampling equipment and/or sampling personnel’s hands come in contact with PFC materials, a

standard two (2) step decontamination process using detergent and clean water rinse will be performed

on the equipment prior to reuse or the sampling personnel’s hands prior to continuing with the

sampling. Clean nitrile gloves will be worn while handling sample containers, during the groundwater

sampling, and sealing/placement of samples into the laboratory supplied cooler.

Sample Analysis

Groundwater samples will be analyzed by an Environmental Laboratory Accreditation Program

(ELAP) certified laboratory which will provide a Category B deliverable package for preparation of a

Data Validation Usability Summary Report (DUSR) by a third party data validator.

Samples collected for 1,4-dioxane analysis will be collected into laboratory provided containers: two

(2) 500 milliliter (ml) unpreserved amber bottles for each well location. The samples will be analyzed

via EPA Method 8270 Selective Ion Monitoring (SIM) mode. The method detection limit (MDL) for

the 1,4-dioxane analysis will be no higher than 0.28 micrograms per liter (μg/l), assuming there is no

sample matrix interference. The samples have a holding time of 7 days till extraction and 40 days for

the extract. Standard turnaround time will be used for the analysis.

Page 3: Re: Emerging Contaminants Groundwater Sampling Work Plan ... Plan.BCP.C915… · 4/20/2018  · april 2018 rfl to be disclosed or reproduced in any form for the benefit of parties

Emerging Contaminates Groundwater Sampling Work Plan April 19, 2018 Moog 170 Jamison Road BCP Site Page 3 of 3

Samples collected for PFAS analysis will be collected into laboratory provided containers: three (3)

250 ml plastic bottles preserved with Trizma for each well location. The samples will be analyzed via

a modified EPA Method 537 to achieve reporting limits of 2 nanograms per liter (ng/l). The samples

have a holding time of 14 days for analysis. Standard turnaround time will be used for the analysis.

Field-specific quality assurance/quality control (QA/QC) samples will be collected and analyzed to

ensure the reliability of the generated data and to support the required third-party data usability

assessment effort. QA/QC samples will include an equipment blank, and a field blank.

Sample Reporting

The sample results will be tabulated and included as a separate table within the RI/IRM/AA Report.

An electronic data deliverable (EDD) will also be provided to NYSDEC. The detection limits will be

provided within the table in lieu of “non-detect” or “ND” reporting. Any matrix interferences

reported for the sampling will also be noted.

Please contact us if you have any questions or require additional information.

Sincerely,

BENCHMARK ENVIRONMENTAL ENGINEERING AND SCIENCE, PLLC

Mike A. Lesakowski Sr. Project Manager File: 0400-017-001

Page 4: Re: Emerging Contaminants Groundwater Sampling Work Plan ... Plan.BCP.C915… · 4/20/2018  · april 2018 rfl to be disclosed or reproduced in any form for the benefit of parties

BUILDING

No. 3

BUILDING

No. 1

BUILDING

No. 4

MW-6

OS-SSV/IA-1

OA

OS-OA-1

MW-10

MW-7

MW-14

MW-9

MW-13

MW-12

MW8

MW-16

MW-17

MW-18

MW-19

MW-20

MW-21

MW-22

MW-11

MW-23

OS-IA-2

OS-SSV-2

OA

OS-OA-2

BUILDING

No. 1A

BUILDING

No. 3A

BUILDING

No. 4A

FOUNTAIN

S

E

N

E

C

A

S

T

R

E

E

T

J

A

M

I

S

O

N

R

O

A

D

JAMISON ROAD

J

A

M

I

S

O

N

R

O

A

D

LEGEND:

BCP SITE BOUNDARY

BUILDING ADDITION

RI MONITORING OB/TOBR WELL

NOTES:

1. OVERBURDEN/TOP OF BEDROCK WELL (OB-TOBR).

MW-16

MONITORING WELL TO BE SAMPLED FOR EMERGING CONTAMINANTSMW-13

0'

SCALE IN FEET

(approximate)

100' 100' 200'

SCALE: 1 INCH = 100 FEET

N

DR

AF

TE

D B

Y:

DA

TE

:

PR

EP

AR

ED

F

OR

JO

B N

O.:

Ct

ENCH

MAR

Ki

vn

EB SE

ie

c

ig

n

L

la

n

ne

mn

or

re

en

,e

c

gn

i

LP

DIS

CL

AIM

ER

:

PR

OP

ER

TY

O

F B

EN

CH

MA

RK

E

NV

IR

ON

ME

NT

AL

E

NG

IN

EE

RIN

G &

S

CIE

NC

E, P

LL

C. IM

PO

RT

AN

T: T

HIS

D

RA

WIN

G P

RIN

T IS

L

OA

NE

D F

OR

M

UT

UA

L A

SS

IS

TA

NC

E A

ND

A

S S

UC

H IS

S

UB

JE

CT

T

O R

EC

AL

L A

T A

NY

T

IM

E. IN

FO

RM

AT

IO

N C

ON

TA

IN

ED

H

ER

EO

N IS

N

OT

TO

B

E D

IS

CL

OS

ED

O

R R

EP

RO

DU

CE

D IN

A

NY

F

OR

M F

OR

T

HE

B

EN

EF

IT

O

F P

AR

TIE

S O

TH

ER

T

HA

N N

EC

ES

SA

RY

S

UB

CO

NT

RA

CT

OR

S &

S

UP

PL

IE

RS

W

IT

HO

UT

T

HE

W

RIT

TE

N C

ON

SE

NT

O

F B

EN

CH

MA

RK

E

NV

IR

ON

ME

NT

AL

E

NG

IN

EE

RIN

G &

S

CIE

NC

E, P

LL

C.

AP

RIL

2

01

8

RF

L

FIGURE 1

MO

OG

IN

C.

17

0 JA

MIS

ON

R

OA

D S

IT

E

EL

MA

, N

EW

Y

OR

K

RI-IR

M-A

AR

R

EP

OR

T

EM

ER

GIN

G C

ON

TA

MIN

AN

TS

PL

AN

NE

D G

RO

UN

DW

AT

ER

S

AM

PL

E L

OC

AT

IO

NS

04

00

-0

17

-0

01

F:\C

AD

\B

en

ch

mark\M

oo

g\170 Jam

iso

n R

oad

\C

orresp

on

den

ce\N

YSD

EC

\Em

erg

in

g C

on

tam

in

an

ts\Fig

ure 1; P

lan

ned

Sam

ple Lo

catio

ns.d

wg

, D

WG

To

P

DF.p

c3

AutoCAD SHX Text
SUITE 300
AutoCAD SHX Text
BUFFALO, NY 14218
AutoCAD SHX Text
(716) 856-0599
AutoCAD SHX Text
2558 HAMBURG TURNPIKE