RCW CONSTRUCTION & DEVELOPMENT · PDF filercw construction & development corporation ... pcab...

110
RCW CONSTRUCTION & DEVELOPMENT CORPORATION INTERIOR FINISHING CONTRACTORS Rm 508 Jovan Condominium Shaw Blvd cor Samat St Mandaluyong City Metro Manila Philippines Tel (63 2) 5337020 Fax (63 2) 5333438 E-mail [email protected] www.rcw.com.ph

Transcript of RCW CONSTRUCTION & DEVELOPMENT · PDF filercw construction & development corporation ... pcab...

Page 1: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

RCW CONSTRUCTION & DEVELOPMENT CORPORATION INTERIOR FINISHING CONTRACTORS

Rm 508 Jovan Condominium Shaw Blvd cor

Samat St Mandaluyong City

Metro Manila Philippines

Tel (63 2) 5337020 Fax (63 2) 5333438

E-mail [email protected]

www.rcw.com.ph

Page 2: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

INTRODUCTION

From vision to reality... Designer’s Perspective (courtesy of Steven J. Leach, Jr. + Associates Manila) and completed view of the Main Banking Hall, Philippine Bank of Communications Head Office in Manila.

In this diverse and dynamic industry, we specialize in problem solving. The complexity of the building process often derails the integrity of the conceptualized design. Through our part-nership with the Designer, the Architect, Suppliers, Product and Equipment Manufacturers, and the Customer, we continually strive to develop effective solutions to these otherwise in-tractable problems. The idea of partnership lies at the very heart of RCW CONSTRUC-TION’s corporate philosophy. Each component in the building process, from the Customer to our engineers to the various trade specialists to the Designer and Architect, is a two-, three or four-way partnership in building a cost effective, technically competent and aesthetically enduring structure. In a broad range of applications, from elegant corporate interiors to industrial buildings to humble residences, we unceasingly stress value engineering, innovation, and above all, in-tegrity—cornerstones in any successful project delivery. In the light of this underlying philosophy, we eagerly look forward to continuing this partner-ship through the coming years.

Page 3: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

COMPANY PROFILE

COMPANY NAME : RCW CONSTRUCTION & DEVELOPMENT CORP.

ADDRESS : Rm. 508 5/F Jovan condominium, Shaw Blvd. cor Samat St., Mandaluyong City

TELEPHONES : 533-7020 Trunkline 533-3438 Fax No.

DATE ESTABLISHED : April 29, 1987

SEC REGISTRATION NO. : 140302

TAX ACCT NO. : 041-000-060-411

SSS REGISTRATION NO. : 03-8786073-0

PCAB CONSTRUCTOR’S LICENSE : Constructor’s License No. 11737 Issued April 24, 1989

: Category “B” Classification

General Building (Principal) General Engineering Sp-Electrical Works

PRINCIPALS : MICHAEL A.T. CHUA, Architect

CARLOS N. ROXAS, Civil Engineer

MANAGING OFFICERS : Michael A.T. Chua - President Carlos N. Roxas - Vice_President – Operation

BANK REFERENCES : METROBANK & TRUST CO. Greenhills Crossroad Branch

Greenhills Commercial Center San Juan, Metro Manila

: PHILIPPINE BANK OF COMMUNICATION San Miguel Avenue Branch G101 OMM CITRA Condominium, San Miguel Ave.

Pasig City

-000

Page 4: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

ENGINEERING/SPECIALTY

CONSULTANTS

: ENGR. HENRY FERNANDEZ / ENGR. LORENZO S.DY

Structural Engineer

: ERLINDA G. MENDOZA

Sanitary Engineer

: MANOLET ALCANTARA

Electrical Engineer

: GODOFREDO LIMBO

Geodetic Engineer

: Advance Geotechnical Eng’g. Services/

:RICHARD C. TAN

Soil/Geotechnical Investigations

: EFREN S. CARLOS, JR.

Electrical Engineer

Certified Fire and Explosions Investigators (USA)

Certified Safety Practitioner – Dept. of Labor & Employment

Director – Phil. Society of Safety Engineers

: LYNDON MAGSINO

Safety Engineer

Page 5: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :
Page 6: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :
Page 7: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :
Page 8: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

EQUIPMENT LISTING

1. PUMPS :a. 1 Unit Submersible Pump/Electric Motor 1 Hpb. 1 unit Waterpump/Gasoline Engine, 3 Hp/Briggs & Stratonc. 1 unit Hydrostatic Pump

2. CONCRETE MIXERS/VIBRATORS :a. 1 unit Concrete Mixer/1-Bagger/Gasoline Engine BRIGGS & STRATONb. 1 unit Concrete Mixer/1-Bagger/Gasoline Engine HONDA 7Hpc. 2 units 8 Hp Gasoline Engine/BRIGGS & STRATONd. 1 unit Concrete Mixer/1-Bagger/3 Hp Electric Motore. 1 unit Electric Concrete Vibrator w/ 1-1/4” x 20” Vibrating Head/FURIKIf. 1 unit Concrete Vibrator/Gasoline Engine/MIKASA

3. STEEL BAR CUTTERS :a. 2 units Bar Cutters 28mm diameter/MUBEA

4. DEMOLITION HAMMER :a. 1 unit MAKITA HM 1201/2000 BPM/1130 watts

5. POWER PLANER :a. 2 units MAKITA 1900B

6. ELECTRIC SAW :a. 1 unit CIRCULAR SAW MAKITA 5601Nb. 1 unit CIRCULAR SAW MAKITA 5800Nc. 1 unit CIRCULAR SAW 13” 5103Nd. 1 unit MITER SAW LS1030 (10”)e. 1 unit JIG SAW 43008Vf. 1 unit STEEL CUTTER SAW – PORTABLE CUTg. 1 unit RADIAL ARM SAW 250M

7. POWER DRILLS :a. 2 units MAKITA 6301

8. ORBITAL SANDERS :a. 2 units MAKITA 9035 Finishing Sander

9. CONCRETE MIXER :

a. 1 unit Concrete Mixer/1-Bagger/Gasoline EngineROBIN EY28-B #1325572

10. POWER DRILLS :

a. 3 units AEG SB2-10b. 1 unit AEG SB2-16Nc. 1 unit MAKITA 5800Nd. 3 units MAKITA SCREW DRIVER 6821e. 3 units MAKITA POLISHER 9218PB2

Page 9: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

11. TILE CUTTER :

a. 3 units TILE CUTTER

12. ELECTRIC BREAKER :

a. 1 unit ELECTRIC BREAKER HM1400

13. PISTON TOOL :

a. 1 unit TS750 PISTON TOOL 90MM X 9MM BARREL (RAMSET)

14. ROUTER :

a. 1 unit MAKITAb. 2 units MAKITA ROUTER 3601Bc. 1 unit ROUTER 3600H

15. GRINDER :

a. 1 unit MAKITA 4”

16. WELDING MACHINE :

a. 1 unit YAMATO 200mA

17. TRUCK :

1 unit ISUZU Elf 4-wheeler truck 3800 Gross Weight

18. CONCRETE MIXER & GASOLINE ENGINES :

a. 3 units ROBIN Gasoline Engine EY28-B

b. 2 units Concrete Mixer/1-Bagger Capacity/ROBINgasoline engine EY28-B

19. WATER PUMPS & MOTORS :

a. 2 units TSURUMI water pump : 3” suction capacity driven by EY20 ROBINgasoline engine complete with 20’ suction/discharge hose with 3” dia. flexible discharge hose.

b. 2 units Centrifugal water pump 3”dia. driven by ROBIN EY20 gasoline enginecomplete with 20’ suction hose.

20. BAR CUTTER :

a. 1 unit MUBEA 28mm bar cutter

21. CHEMICAL/PESTICIDE SPRAYER :

a. 2 units B&G Sprayer (1-gal. capacity)

Page 10: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

OTHER EQUIPMENTS & TOOLS

1 unit “Vita” Multi-Boring Machine Model ALFA 21R – Italy 220V 60Hz Single Face

1 unit Panel Saw Z3200

1 unit Edge Bonding Machine Model EP – 9

1 unit Tinth Roller Model 0100

1 unit Shipping Machine Model T-120

2 units Press Drill – Taiwan

3 units Stud Crimper for Stud & Track Fastening

3 units Makita Drill Gun 63079

7 units Laser leveller

2 units Blum minidrilhinge drill art m51n105150

Page 11: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

A PORTFOLIO OF COMPLETED PROJECTS

RCW CONSTRUCTION

Page 12: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

SC Reservations Philippines Inc. RCW CONSTRUCTION

SC Reservations Philippines Inc. is the call center for the Inter-Continental Hotels Group, a lead-ing global hospitality group, with over 3,300 hotels across nearly 100 countries and territories. The call center primarily services its hotel reservations system and oc-cupies about 2,000 square meters at their new offices located at the 28 and 29th floors of Tower 2 of the RCBC Plaza located along Ay-ala Avenue. The project is designed and proj-ect managed by the firm of Del Rosario Design Group.

Page 13: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

SITEL (Philippines), Inc. RCW CONSTRUCTION

SITEL is a global call center company with offices in Omaha, Canada, India and the Philippines. The facility in the Philippines occupies the 25th and 26th floors of the Cyber One Bldg. Located Eastwood Cyberpark, Quezon City. With a total floor area of 2,400 square meters, the project was completed in 2 phases beginning in April to May 2004 for the 25/F and August to October 2004 for the 26/F with a combined project cost of P 40M. The pro-ject was designed by Adrianse Group Philippines, Inc.

Page 14: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

Ambergris Solutions @ Market! Market! RCW CONSTRUCTION

Located at the 5/F of the Market! Market! Mall in Bonifacio Global City, this call center facility has a total floor area of 3,300 square meters and accommodates 726 call agent seats. The project was completed in 2 phases from August-November 2004 (Phase 1) and January to March 2005 (Phase 2) The combined project cost amounted to P 40.16M.

Page 15: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

Ambergris Solutions is a call center located 7, 18, and 30th floors of the Raf-fles Corporate Center on Emerald Avenue, Orti-gas Center, Pasig City. With a combined floor area of 3,600 square me-ters, the facility houses 750 seats. Combined project cost is about P 31.7M and was completed in phases from October 2003 to May 2004.

Ambergris Solutions, Inc. RCW CONSTRUCTION

Page 16: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

The GT Tower Pent-house was envisioned to service high profile func-tions of the MetroBank Group. Located at the penthouse level of the GT Tower along Ayala Ave-nue in Makati City, the project was designed by WV Coscolluela & Asso-ciates and project man-aged by Federal Land.

GT Tower Penthouse RCW CONSTRUCTION

Page 17: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

Ogilvy & Mather Philippines RCW CONSTRUCTION

Designed by Davenport Campbell Philipppines, the new offices of re-nowned advertising multinational Ogilvy & Mather which in turn is part of the WPP group, occupies the fifteenth floor of the Philamlife Tower.. Noted for its play-ful colors and striking design elements, the fit-out aims to achieve an informal yet creative environment.

Page 18: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

RCW CONSTRUCTION Ogilvy & Mather Philippines

Page 19: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

Occupying the 18th floor of the Philamlife Tower, Regus opened its 23rd business center in the Asia Pacific region, offer-ing fully furnished, staffed and equipped offices in a professionally designed working environment. Design and project man-agement was commis-sioned to the firm of Goudie Associates. The design is characterized by the designer’s use of stainless steel and filmed glass accented with natu-rally stained maple ve-neers.

Regus Centres, Inc. RCW CONSTRUCTION

Page 20: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

Chase Manhattan Bank RCW CONSTRUCTION

Designed by Group 3 Design Studio, headed by Architect Edwin Gumila, the new offices of Chase Manhattan Bank oc-cupies the thirty first floor of the Philamlife Tower located at the Makati Business Dis-trict. The design uti-tlized plasma filled glass for the meeting rooms and chief ex-ecutive office which can be switched from clear to opaque. Proj-ect management was by GSPM Hong Kong, headed by Mr. Gerry Shirley.

Page 21: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

RCW CONSTRUCTION Chase Manhattan Bank

Page 22: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

Marsman Drysdale RCW CONSTRUCTION

The corporate head offices of Marsman Drysdale is located at the 45/f of the Philamlife Tower along Paseo de Roxas in Makati City. The project was ompleted in November 2002 and project cost amounted to P 8M. Design by ADD+ Consor-tium.

Page 23: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

J. Walter Thompson Company, Inc. RCW CONSTRUCTION

J. Walter Thompson is a major multinational advertising firm which is part of the WPP Group (UK), occupying the 29th and 30th floors of the Enterprise Center. The inte-rior architecture is by BDG McColl (HK) headed by John Scade and Judith Rainford and project management is by Jones Lang LaSalle (HK). The design is characterized by its use of colored glass, stainless steel, cherry veneers and refreshing forms that highlight the company‘s crea-tive role.

Page 24: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

RCW CONSTRUCTION J. Walter Thompson Company, Inc.

Page 25: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

ANZ Bank

Page 26: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

Telus

Page 27: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

Telus

Page 28: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

JPMorgan

Page 29: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

JPMorgan

Page 30: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

Baxter

Page 31: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

ANZ Banking Group Limited

Page 32: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :
Page 33: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

LIST OF ON – GOING PROJECTS 2015

ARVATO CORPORATION

PROPOSED OFFICE FIT-OUT PROJECT (July 15-August 31, 2015)

Project Cost : P 24,700,438.40 ($ 546,867.71 ) Location : 6F E Plaza, Northgate, Cyberzone, Filinvest City, Alabang Design By : Team Asterisk Contact Person : Aeroin Dayo Area : 1,500 Sqm

FIRST IMEX

PROPOSED OFFICE FIT-OUT PROJECT (July 13-August 30, 2015)

Project Cost : P 5,000,000.00 ($110,700.00 ) Location : Unit 1607, One World Place Corporate Offices, 32nd St., Bonifacio Global City Design By : Maximus Built Solutions Inc. Contact Person : Mr. Jommel Macabagdal Area : 200 Sqm

LIZARDBEAR TASKING INC.

PROPOSED OFFICE FIT-OUT PROJECT (June 15-July 31, 2015)

Project Cost : P 14,000,000.00 ($309,960.00 ) Location : 19F Twenty Four Seven Mckinley Bldg., 7th Ave. Cor. 24th St. BGC Taguig Design By : Mr. Francis Arollado Contact Person : Mr. Marvin Hernandez Area : 980 Sqm

PRU LIFE U.K

PROPOSED OFFICE FIT-OUT PROJECT (April 23-June 05, 2015 )

Project Cost : P 3,300,000.00 ($73,062.00 ) Location : 5F Kingston Tower Block 2, Lot 1, Acacia Ave., Ayala Alabang Muntinlupa Design By : Aeroin Dayo Contact Person : Beneleo Parumog Area : 105 Sqm

PRU LIFE U.K

PROPOSED OFFICE FIT-OUT PROJECT (June 01-July 31, 2015)

Project Cost : P 5,000,000.00 ($110,700.00 ) Location : 2F Sterling Bank Barangay Uno, Crossing, Calamba City, Laguna Design By : Aeroin Dayo Contact Person : Simoni Cruz Area : 150 Sqm

Page 34: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

VIKINGS

PROPOSED OFFICE FIT-OUT PROJECT (June 29-October 26, 2015)

Project Cost

Location Design By

: P 11,222,221.49 ($248,459.98 ) : Bldg. A, SM By The Bay, Seaside Blvd. SM Mall of Asia Complex, Pasay City Aranda & Dalid Associates, Inc.

Contact Person : Mr. Joel Aranda Area : 1,373.13 Sqm

BRITISH EDUCTION INC.

PROPOSED OFFICE FIT-OUT PROJECT (June 22-August 07, 2015)

Project Cost : P 16,000,000.00 ($354,240.00 )

Location : 36th St. University Park, Bonifacio Global City, Taguig Design By : Rchitects Contact Person : Jose Pedro C. Recio Area : 1585.82 Sqm

Page 35: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

LIST OF COMPLETED PROJECTS 2015

DELTEK SYSTEMS ( PHILIPPINES ) LTD.

PROPOSED OFFICE FIT-OUT PROJECT (May 11- June 30,2015)

Project Cost : P 9,728,713.68 ($221,107.12) Location : 16F The Enterprise Center Ayala Ave., cor. Paseo de Roxas, Makati City Design By : Work Architecture Contact Person : Mr. Joseph Infante/Ms. Dezzie Isaac Area : 1,052 Sqm

PROCTER & GAMBLE INTERNATIONAL OPERATIONS SA-ROHQ

PROPOSED OFFICE FIT-OUT PROJECT ( March 15 – June 30, 2015)

Project Cost : P 93,000,000.00 ($ 320,519.18 ) Location : 10F & 15F Net Park Plaza, Net One Crescent Park, BGC, Taguig City Design By : Orbit/Design Idea Contact Person : Mr. Bomer Macaranas Area : 3,240 Sqm

CHINA ONLINE INNOVATIONS, INC.

PROPOSED OFFICE FIT-OUT PROJECT ( January 24 – March 15, 2015)

Project Cost : P 14,199,000.00 ($ 320,519.18 ) Location : 8F Robinson Cyberscape Alpha Garnet & Sapphire Rd., Ortigas Ctr. Pasig City Design By : Arollado & Partners Inc. Contact Person : Mr. Nelson Tan Area : 1,700 Sqm

ANZ GLOBAL SERVICES AND OPERATIONS (MANILA), INC.

PROPOSED OFFICE FIT-OUT PROJECT (February 22 – April 20, 2015 )

Project Cost : P 48,100,000.00 ($ 2,130,830.00 ) Location : 20th & 21st Flr. MDC100 Bldg., Eastwood Bagumbayan, Quezon City Design By : Adrianse Group Contact Person : Arch. Karen Palma Area : 3,464 Sqm

SOPHOS COMPUTER SECURITY PTE. LTD.

PROPOSED OFFICE FIT-OUT PROJECT ( April 27 – July 12,2015 )

Project Cost : P 10,000,000.00 ($ 225,733.63 ) Location : Unit 1-2 17F Zuellig Bldg. Makati Ave. cor. Paseo de Roxas, Makati City Design By : DB&B Phils. Contact Person : Mr. Ronald Bacal Area : 532 Sqm

Page 36: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

TASKUS COM LTD. INC.

PROPOSED OFFICE FIT-OUT PROJECT ( March 6 May 15, 2015 )

Project Cost : P 44,000,000.00 ($ 993,227.99 ) Location : 17F & 18F Twenty Four Seven Mckinley Bldg. BGC Taguig CIty Design By : Mr. Francis Arollado Contact Person : Mr. George G. Hayes Area : 1,940 Sqm

QBE GROUP SHARED SERVICES LTD. PHIL. BRANCH

PROPOSED OFFICE FIT-OUT PROJECT (February 15 – March 03, 2015 )

Project Cost : P 13,467,221.45 ($304,000.48 ) Location : Level A Skyrise Alpha Bldg. Samar Loop, Ayala Business Park, Cebu City Design By : HBO + EMTB Contact Person : Mr. Jommel Macapagal Area : 1,600 Sqm

EXLService Philippines Inc.

PROPOSED OFFICE FIT-OUT PROJECT (March 15,2015-April 30,2015 )

Project Cost : P 16,558,000.00 ($ 373,769.75 ) Location : 11F 2 Quad Bldg. Cardianl Rosales Ave., cor. Sumilon Road, 600 Philippines Design By : Interics Contact Person : Ms. Marilou Comia Area : 1,800 Sqm

Regus Philippines Fort Bonifacio, Inc.

PROPOSED OFFICE FIT-OUT PROJECT (March 26 - April 30, 2015 )

Project Cost : P 29,515,067.16 ($ 666,028.60 ) Location : 35/F & 36F Penthouse Unit 1,2 and 4 ECO Tower Bldg. 32nd St., cor. 9th Ave.,

BGC, Taguig City Design By : Desimat Contact Person : Arch. Leonardo Sioco Area : 1,342.19 Sqm

Page 37: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

LIST OF COMPLETED PROJECTS 2014

TXvia PHILIPPINES, INC.

PROPOSED OFFICE FIT-OUT PROJECT (August 1, 2014 – October 31, 2014 )

Project Cost : P 7,287,250.00 ($ 163,758.43 ) Location : 26F Picadilly Star Bldg. 4th Avenue cor. 27th Street, BGC Taguig City Design By : M Moser Associates Contact Person : Mr. Jayson Guerero Area : 1,800 Sqm

ATLASSIAN PHILIPPINES

PROPOSED OFFICE FIT-OUT PROJECT (September 22 – November 30, 2014)

Project Cost : P 21,500,000.00 ($ 488,636.36 ) Location : 2F B3 Bonifacio High Street Central East, 9th Ave. BGC, Taguig City Design By : Jones Lang LaSalle Phils., Inc. Contact Person : Mr. Kiko Abarquez / Mr. rey Agustin Area : 882 Sqm

QBE SHARED SERVICES

PROPOSED OFFICE FIT-OUT PROJECT (August 1, 2014 – October 31, 2014)

Project Cost : P 15,000,000.00 ($ 337,078.65 ) Location : Level 14 W Fifth Bldg. 32nd St. cor 5th Ave. BGC Taguig City Design By : HBO + EMTB Contact Person : Mr. Douglas Coote Area : 1,480 Sqm

FWD LIFE INSURANCE CORP.

PROPOSED OFFICE FIT-OUT PROJECT (August 1, 2014 – September 24, 2014 )

Project Cost : P 7,769,188.00 ($ 174,588.50 ) Location : GF/Mezzanine Floors W-Fifth Ave. Bldg. BGC Taguig City Design By : PDM International Contact Person : Ms. Jenny San Diego Area : 200 Sqm

BRITISH EDUCATION, INC.

PROPOSED OFFICE FIT-OUT PROJECT (July 30, 2014 – August 11, 2014 )

Project Cost : P 8,290,000.00 ($ 186,292.14) Location : Lot 1 Block 21 36th St., University Park, BGC Taguig City Design By : R Chitects, Inc. Contact Person : Ms. Maita Borromeo Area : 1,165 Sqm

Page 38: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

MSCI HONGKONG LIMITED (PHASE 2)

PROPOSED OFFICE FIT-OUT PROJECT (September 01, 2014 – October 31, 2014)

Project Cost : P 3,635,069,13 ($ 81,686.95) Location : 29F Zuellig Bldg., Makati Ave. cor. Paseo de Roxas, Makati City Design By : Goudie Associates Contact Person : Ms. Sally Magalang Area : 600 Sqm

H&M HENNES & MAURITZ (SHANGHAI) COMMERCIAL CO. LTD.

PROPOSED OFFICE FIT-OUT PROJECT (May 10 – August 30, 2014 )

Project Cost : P 103,992,984.00 ($ 2,363,476.91 ) Location : GF-3F Bldg. A SM Megamall, Ortigas Center, Mandaluyong City Design By : Goudie Associates Contact Person : Arch. Carlos De Castro Area : 3,900 Sqm

MADRIGAL BAYOT DEVELOPMENT CORP.

PROPOSED OFFICE FIT-OUT PROJECT (March 1 – June 30, 2014)

Project Cost : P 4,235,000.00 ($ 96,250.00) Location : Unit 30A0, The Address at Wack Wack, Mandaluyong City Design By : ICC Interior Design Consultancy Contact Person : Ms. Ivy C. Crisostomo Area : 230 Sqm

MADRIGAL BAYOT DEVELOPMENT CORP.

PROPOSED OFFICE FIT-OUT PROJECT (May 26 – July 31, 2014)

Project Cost : P 4,000,000.00 ($ 90,909.09) Location : Unit Penthouse D, The Address at Wack Wack, Mandaluyong City Design By : ICC Interior Design Consultancy Contact Person : Ms. Ivy C. Crisostomo Area : 200 Sqm

ORACLE (PHILIPPINES) CORPORATION

PROPOSED OFFICE FIT-OUT PROJECT (June 16 – July 30, 2014)

Project Cost : P 20,500,000.00 ($ 465,909.91) Location : 32F & 33F Zuellig Bldg., Makati Ave. cor. Paseo de Roxas, Makati City Design By : Work Architecture Contact Person : Arch. Joseph Infante Area : 1,300 Sqm

ARVATO CORPORATION

PROPOSED OFFICE FIT-OUT PROJECT (June 6 – July 28, 2014)

Project Cost : P 54,359,876.73 ($ 1,235,451.74) Location : GF & 5F Plaza E – Building, Northgate Cyberzone, Filinvest City, Alabang Design By : Asterisk Contact Person : Mr. Aeroin Dayo Area : 2,400 Sqm

Page 39: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

PHL CENTRE NO. 12 (REGUS)

PROPOSED OFFICE FIT-OUT PROJECT (March 15 – May 20, 2014)

Project Cost : P 14,600,000.00 ($ 331,818.18 ) Location : 4F Unit 2C One E-Com Ctr., Ocean Drive Mall Of Asia Complex, Pasay City Design By : FVA International Ltd. Contact Person : Mr. Romain Duval Area : 850 Sqm.

ANZ GLOBAL SERVICES AND OPERATIONS (MANILA), INC.

PROPOSED OFFICE FIT-OUT PROJECT (March 04 – April 28, 2014)

Project Cost : P 26,600,000.00 ($ 604,545.45) Location : 25F MDC100 Building, Eastwood Bagumbayan, Quezon City Design By : Adrianse Group Philippines, Inc. Contact Person : Ms. Karen Palma Area : 1,700 Sqm.

VIVENTES SEARCH ASIA, INC.

PROPOSED OFFICE FIT-OUT PROJECT (March 01 – May 01, 2014)

Project Cost : P 13,000,000.00 ($ 295,454.54 ) Location : 6F The Mercure Hotel Bldg. 45, San Miguel Ave., Ortigas Center, Pasig City Design By : 3D Design Contact Person : Yu Ming Chin Area : 580 Sqm.

PRULIFE UK ( Phase 1)

PROPOSED OFFICE FIT-OUT PROJECT (March 05 – April 30, 2014)

Project Cost : P 3,004,808.80 ($ 68,291.10) Location : 2F B3 Bonifacio High St., Bonifacio Global City, Taguig City Design By : Team Asterisk Contact Person : BJ Paromog Area : 824 Sqm.

PRULIFE UK ( Phase 2)

PROPOSED OFFICE FIT-OUT PROJECT (December 15, 2013 – February 15, 2014)

Project Cost : P 4,141,235.73 ($ 94,118.99 ) Location : 14F B3 SSHG Building, Paseo de Roxas, Makati City Design By : Team Asterisk Contact Person : BJ Paromog Area : 832 Sqm.

QBE GROUP SHARED SERVICES LIMITED

PROPOSED OFFICE FIT-OUT PROJECT (March 07 – December 31, 2014)

Project Cost : P 50,000,000.00 ($1,136,363.64) Location : Level 10,11 & 12F, Skyrise, Alpha Building, Samar Loop Cebu Businesss Park Cebu City Design By : HBO + EMTB Contact Person : Mr. Douglas Coote Area : 5,700 Sqm.

Page 40: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

EXL SERVICES PHILIPPINES, INC. PROPOSED OFFICE FIT-OUT PROJECT (March 07 – May 15, 2014)

Project Cost : P 16,800,000.00 ($ 381,818.18 ) Location : 10F 2Quad Bldg., Cardinal Rosales Ave., Sumilon Rd, Cebu City Business Park, Cebu City Design By : Interics Contact Person : Ms. Malou Comia Area : 2,100 Sqm.

MCE LEISURE (PHILIPPINES)CORPORATION

PROPOSED OFFICE FIT-OUT PROJECT (November 23, 2013 – February 28, 2014)

Project Cost : P 110,000,000.00 ($ 2,500,000.00 ) Location : 9F SM MAAX Arena Annex Bldg. Coral Way, JW Diokno Blvd. Pasay City Design By : Arollado Partner Inc. Contact Person : Ms. Anne Lao Area : 4,000 Sqm.

MCKINSEY & COMPANY

PROPOSED OFFICE FIT-OUT PROJECT (January 20 – March 20, 2014)

Project Cost : P 42,000,000.00 ($ 954,545.45) Location : 7F Zuellig Bldg., Paseo de Roxas, Makati City, Philippines Design By : Adrianse Group Philippines Contact Person : Ms. Tina Capillo Area : 1,850 Sqm.

MSCI HONGKONG LIMITED

PROPOSED OFFICE FIT-OUT PROJECT (January 07 – March 14, 2014 )

Project Cost : P 17,472,000.00 ($ 397,091.00) Location : 29F Zuellig Bldg., Paseo de Roxas, Makati City, Philippines Design By : Goudie Associates Contact Person : Ms. Tina Capillo Area : 900 Sqm.

ARVATO CORPORATION

PROPOSED OFFICE FIT-OUT PROJECT (October 1, 2013 – January 20, 2014 )

Project Cost : P 43,396,915.68 ($ 986,293.53) Location : 5F SM City Clark, BPO Building 4 M.A. Roxas Avenue, Angeles City Design By : Team Asterisk Contact Person : Mr. Norbito Trinidad Area : 2,900 Sqm.

CWC DEVELOPMENT INC.

PROPOSED OFFICE FIT-OUT PROJECT (September 02, 2013 – January 30, 2014 )

Project Cost : P 7,158,077.02 ($ 162,683.57) Location : No. 2 Zaragosa St. cor. Palanza St., Brgy. Dona Imelda, Quezon City Design By : Oyek Design Contact Person : Mr. John David Oyek Area : 1,283 Sqm.

Page 41: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

JTKC LAND INC./DISCOVERY PRIMEA PUBLIC AREAS

PROPOSED OFFICE FIT-OUT PROJECT (July 15 – December 30, 2013)

Project Cost : P 14,500,000.00 ($ 332,950.00) Location : GF Level 6749 Ayala Avenue, Makati City Design By : Design Coordinates Inc. Contact Person : Ms. Badjie Guinto Area : 1,500 Sqm.

JTKC LAND INC./DISCOVERY PRIMEA – BASEMENT GLAZING WORKS

PROPOSED OFFICE FIT-OUT PROJECT (October 13, 2013 – January 30, 2014 )

Project Cost : P 2,700,000.00 ($ 61,363.64 ) Location : 6749 Ayala Avenue, Makati City Design By : Design Coordinates Inc. Contact Person : Ms. Badjie Guinto Area : 120 Sqm.

JTKC LAND INC./DISCOVERY PRIMEA – 2ND

FLOOR

PROPOSED OFFICE FIT-OUT PROJECT (October 04, 2013 – January 30, 2014)

Project Cost : P 13,000,000.00 ($ 295,454.55) Location : 2nd Floor 6749 Ayala Avenue, Makati City Design By : Design Coordinates Inc. Contact Person : Ms. Badjie Guinto Area : 1,200 Sqm.

JTKC LAND INC./DISCOVERY PRIMEA – 3RD

LEVEL

PROPOSED OFFICE FIT-OUT PROJECT (October 14, 2013 – March 30, 2014)

Project Cost : P 24,404,269.76 ($ 554,642.50 ) Location : 3rd Level 6749 Ayala Avenue, Makati City Design By : Design Coordinates Inc. Contact Person : Ms. Badjie Guinto Area : 1,000 Sqm.

INFOR PHILIPPINE SOLUTIONS & SERVICE CENTER INC.

PROPOSED OFFICE FIT-OUT PROJECT (October 15- November 15, 2013)

Project Cost : P 5,000,000.00 ($ 113,636.36) Location : 14F Net Square Bldg. Taguig City Design By : Adrianse Contact Person : Ms. Karen Palma Area : 1,300 Sqm.

MCE LEISURE (PHILIPPINES) CORPORATION (SM MAAX)

PROPOSED OFFICE FIT-OUT PROJECT (November 27, 2013 – February 28, 2014)

Project Cost : P 110,000,000.00 ($ 2,500,000.00 ) Location : 9F SM Maax Arena Annex Building, Coral Way JW Diokno Blvd. Pasay City, Philippines Design By : Arallado Partners Inc. Contact Person : Ms. Anne Kristine Lao Area : 3,900 Sqm.

Page 42: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

PARAMOUNT LIFE GENERAL INSURANCE CORPORATION

PROPOSED OFFICE FIT-OUT PROJECT (September 7 – December 31, 2013)

Project Cost : P 3,500,000.00 ($ 79,545.45) Location : 8F Sage House, VA Rufino Tower, Legaspi Village, Makati City Design By : Arch. Jun V. Bros Contact Person : Ms. Sheila Sabado Area : 300 Sqm.

PHILIPPINE SCIENCE HIGH SCHOOL

PROPOSED OFFICE FIT-OUT PROJECT (November 25- December 25, 2013 )

Project Cost : P 2,963,732.80 ($ 67,357.56) Location : Agham Road, Diliman Quezon City Design By : Team Asterisk Contact Person : Aeroin Dayo Area : 100 Sqm.

PRU LIFE INSURANCE CORPORATION OF U.K.

PROPOSED OFFICE FIT-OUT PROJECT (November 05- December 15, 2013 )

Project Cost : P 3,004,808.80 ($ 68,291.11) Location : 14F All Asia Capital Centre, 105 Paseo de Roxas, Makati City Design By : DB & B Philippines Contact Person : Mr. Rey Agustin / Jones Lang La Salle Area : 700 Sqm.

QBE GROUP SHARED SERVICES LIMITED

PROPOSED OFFICE FIT-OUT PROJECT (December 1-13, 2013)

Project Cost : P 1,205,901.00 ($ 27,406.84) Location : L2, 20, 21, 22, 23 & 24 QBE Net Cube, 30th St. cor 3rd Avenue Crescent Park West, Bonifacio Globa City, Taguig City Design By : CBRE Philippines Contact Person : Mr. Jommel Macabagdal Area : 700 Sqm.

SAMSUNG ELECTRONICS PHILIPPINES CORPORATION

PROPOSED OFFICE FIT-OUT PROJECT (October 21 – December 31, 2013)

Project Cost : P 108,673,000.00 ($ 2,469,840.91) Location : 7F – 10F Hanjin Phil. Bldg. No. 1128 University Parkway, North Bonifacio Global City, Taguig City Design By : Goudie Associates Contact Person : Ms. Susan Mistica Area : 8,000 Sqm.

FAMOUS CITY HOLDINGS LIMITED (STARCRUISE)

PROPOSED OFFICE FIT-OUT PROJECT (November 20 – December 20, 2013)

Project Cost : P 6,586,606.40 ($ 149,695.60) Location : 3F & 4F Starcruises Centre, 100 Andrews Avenue, Newport City, Pasay City Design By : AddPlus Solution Contact Person : Ms. Lanie Gomos Area : 464 Sqm.

Page 43: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

PMFTC INC. – BEETLE PROOFING

(January - July 2012 ) Project Cost : P 21,889,051.52 ($ 509,047.71) Location : Mira Hills, Vigan City, Ilocos Sur Design By : Adriane T. Chua & Associates Contact Person : Mr. Alex Manalig / Arch. Adriane Chua Area : 60,690 Sqm.

PMFTC INC. – PRINTSHOP BUILDING UPGRADE

(Septermber 2011 – April 2012) Project Cost : P 60,434,976.21 ($ 1,405,464.60) Location : Champaca St., Fortune Avenue, Brgy. Fortune, Parang Marikina City Design By : Adriane T. Chua & Associates Contact Person : Arch. Adriane T. Chua Area :

PMFTC INC. – NTM/FG AREA IMPROVEMENT & DOCKING

(November 2011 – March 2012) Project Cost : P 18,400,000.00 ($ 427,906.98 ) Location : Champaca St., Fortune Avenue, Brgy. Fortune, Parang Marikina City Design By : Adriane T. Chua & Associates Contact Person : Arch. Adriane Chua Area : 1,200Sqm.

PMFTC INC. – FLOOR AND WALL IMPROVEMENT IN VIGAN

PROPOSED OFFICE FIT-OUT PROJECT (January – April 2012 )

Project Cost : P 48,110,948.48 ($ 1,118,859.50 ) Location : Mira Hills, Vigan City, Ilocos Sur Design By : Adriane T. Chua & Associates Contact Person : Mr. Alex Manalang Area : Sqm.

Page 44: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

LIST OF COMPLETED PROJECTS 2013

TELSTRA PHILIPPINES INC.

PROPOSED OFFICE FIT-OUT PROJECT (October 07 – November 20, 2013)

Project Cost : P 7,033,434.00 ($ 159,850.77)

Location : 22F PBCOM Tower I 6819 Ayala Avenue, Makati City Design By : AddPlus Solution Contact Person : Mr. Alex Jueno Area : 180 Sqm.

ANZ GLOBAL SERVICES AND OPERATIONS (MANILA), INC.

PROPOSED OFFICE FIT-OUT PROJECT (July 20, 2013 – September 18, 2013)

Project Cost : P 24,316,610.34 ($ 565,502.56 ) Location : 26F MDC100 Bldg. E. Rodrigues Jr. Ave., cor. Eastwood Libis, Q.C. Design By : Adrianse Group Philippines, Inc. Contact Person : Ms. Karen Palma Area : 1,685 Sqm.

ABBOTT LABORATORIES PHILIPPINES

PROPOSED OFFICE FIT-OUT PROJECT (September 01 – November 30, 2013 )

Project Cost : P 85,000,000.00 ($ 1,976,744.19) Location : 8F & 9F Venice Corporate Center, Turin St., Mckinley Hill Cyberpark, Taguig Design By : Cushman & Wakefield Contact Person : Engr. Gerald Datario Area : 4,314.58 Sqm.

CASTROL PHILIPPINES, INC.

PROPOSED OFFICE FIT-OUT PROJECT (September 02 – October 31, 2013 )

Project Cost : P 11,000,000.00 ($ 255,813.95) Location : 32F LKG Tower, Ayala Avenue, Makati City Design By : Spacematrix Design Consultant Pte. Ltd. Contact Person : Mr. Gary Taylor Area : 403.37 Sqm.

APEX8 STUDIOS, INC.

PROPOSED OFFICE FIT-OUT PROJECT (October 10 – November 20, 2013)

Project Cost : P 4,100,000.00 ($93,181.81) Location : 37F PBCOM Tower, Ayala Avenue cor. Rufino St., Makati City Design By : DPC Contact Person : Mr. Jun Vergara Area : 600 Sqm.

VISA WORLDWIDE SINGAPORE PTE. LTD.

PROPOSED OFFICE FIT-OUT PROJECT (August 02 – September 08, 2013 )

Project Cost : P 15,486,000.00 ($ 360,139.53) Location : 5F, 6F, 23F, The Zuellig Building, Makati City Design By : 3 Design Asia Incorporated Contact Person : Mr. Jairus Requillo Area : 409.68 Sqm.

Page 45: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

CITISECURITIES, INC.

PROPOSED OFFICE FIT-OUT PROJECT (June 1 – August 30, 2013 )

Project Cost : P 12,085,915.13 ($ 277,518.14) Location : 23rd Floor Tektite Tower PSE Ortigas, Pasig City Design By : Oyek Design Contact Person : Mr. Edward Lee Area : 650 Sqm.

MCE LEISURE (PHILIPPINES) CORP.

PROPOSED OFFICE FIT-OUT PROJECT (June 14 – November 30, 2013)

Project Cost : P 108,568,587.00 ($ 2,492,964.11) Location : Aseana Ave. cor. Roxas Blvd. Brgy. Tambo, Paranaque City Design By : AnD Associates Contact Person : Mr. Joel Aranda Area : 4,500 Sqm.

ECOTECHLAND, INC.

PROPOSED OFFICE FIT-OUT PROJECT (July 1 – August 30, 2013)

Project Cost : P 2,800,000.00 ($ 64,293.91) Location : 2305 Chino Roces Avenue, Extension, Makati City Design By : Superprime Holdings, Inc. Contact Person : Mr. Ramon Tiu Area : 1,000 Sqm.

EXL SERVICES PHILIPPINES, INC.

PROPOSED OFFICE FIT-OUT PROJECT (June 1 – July 15, 2013)

Project Cost : P 7,168,793.57 ($ 164,610.64) Location : 16th Floor The Link J.M. del Mar Ave., cor. Salinas Drive, Cebu IT Park Design By : Goudie Associates Contact Person : Arch. Carlos de Castro Area : 1,200 Sqm.

JTKC LAND INC./DISCOVERY PRIMEA RESIDENTIAL AREAS

PROPOSED OFFICE FIT-OUT PROJECT (January 19 - August 31, 2013)

Project Cost : P 5,148,059.00 ($ 118,210.30) Location : GF Level 6749 Ayala Avenue, Makati City Design By : Design Coordinates Inc. Contact Person : Ms. Badjie Guinto Area : 760 Sqm.

MACQUARIE OFFSHORE SERVICES PTY. LTD – PHILIPPINE BRANCH

PROPOSED OFFICE FIT-OUT PROJECT (August 6, 2013 – October 01, 2013)

Project Cost : P 19,170,000.00 ($ 440,183.70) Location : L32 & 33rd Floor The Enterprise Center, Tower 1, Paseo de Roxas, Makati Design By : Goudie Associates Contact Person : Mr. Jairus Requillo Area : 2,400 Sqm.

Page 46: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

WIDUS TOWER 2 – ARCHITECTURAL WORKS

PROPOSED OFFICE FIT-OUT PROJECT (April 1 – August 17, 2013)

Project Cost : P 61,000,000.00 ($ 1,487,804.88) Location : M.A Roxas Avenue, Freeport Zone, Clark, Pampanga Design By : RMDA/JCL Contact Person : Engr. James Leido Area : 5,605 Sqm.

WYNSUM LEISURE HOTELIERS, INC.

PROPOSED OFFICE FIT-OUT PROJECT (April 22 – October 31, 2013 )

Project Cost : P 21,500,000.00 ($ 524,390.24)

Location : Mercure Hotel,45 San Miguel Avenue, Pasig City

Contact Person : Mr. Darryl Lewington Area : 3,879 Sqm

ANZ GLOBAL SERVICES AND OPERATIONS (MANILA), INC.

PROPOSED OFFICE FIT-OUT PROJECT (June 15 - July 15, 2013)

Project Cost : P 2,527,896.60 ($ 58,045.85)

Location : 30th and 31st Floor MDC 100 Building E. Rodriguez Jr., Libis, Q.C. Design By : Adrianse Group Contact Person : Ms. Karen Palma Area : 500 Sqm.

ANZ GLOBAL SERVICES AND OPERATIONS (MANILA), INC.

PROPOSED OFFICE FIT-OUT PROJECT (February 15 – March 15, 2013 )

Project Cost : P 4,943,347.90 ($ 113,509.71)

Location : 27th and 30th Floor MDC 100 Building E. Rodriguez Jr., Libis, Q.C. Design By : Adrianse Group Contact Person : Ms. Karen Palma Area : 1,800 Sqm.

ECO TOWER

PROPOSED OFFICE FIT-OUT PROJECT (February – June 30, 2013)

Project Cost : P 24,700,000.00 ($ 602,439.00) Location : Lot 5 Blk. 2, 32nd St., cor. 9th Ave., Fort Bonifacio, Global City, Taguig City Design By : Steven J. Leach, Jr. + Associates Contact Person : Arch. Bob Sanchez Area : 4,250 Sqm

SEAOIL PHILIPPINES, INC.

PROPOSED OFFICE FIT-OUT PROJECT (February – May 30, 2013)

Project Cost : P 12,800,000.00 ($ 312,195.12 )

Location : 19F, The Taipan Place F. Ortigas Jr., Road, Ortigas Center, Pasig City Design By : Team Asterisk Contact Person : Arch. Aeroin Dayo Area : 1,025.48

Page 47: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

REGUS PHILIPPINES CENTRE THREE INC. - CEBU PROPOSED OFFICE FIT-OUT PROJECT (March 15 – May 31, 2013)

Project Cost : P 23,000,000.00 ($ 560,975.61) Location : 10F Apple One Condominium Ayala, Cebu Business Park, Cebu City Design By : FVA International Contact Person : Mr. Romain Duval Area : 920 Sqm

QBE GROUP SHARED SERVICES LTD. (PHILIPPINE BRANCH)

PROPOSED OFFICE FIT-OUT PROJECT (March 18 - May 30, 2013)

Project Cost : P 43,431,655.02 ($ 1,059,308.66) Location : Level 19 to 24, QBE Net Cube, 30th St., cor. 3rd Ave., Cresent Park West, Bonifacio Global City

Design By : HBO Contact Person : Mr. Jommel Macapagal Area : 7,400 Sqm

THE BANK OF NEW YORK

PROPOSED OFFICE FIT-OUT PROJECT (April 12 – May 30, 2013 )

Project Cost : P 2,268,718.03 ($ 55,334.59)

Location : 10th Floor Philamlife Tower, Paseo de Roxas Avenue, Makati City Design By : Adrianse Group Contact Person : Ms. Cris Trinidad Area : 150 Sqm

PARAMOUNT LIFE AND GENERAL INSURANCE CORPORATION

PROPOSED OFFICE FIT-OUT PROJECT (May 15 – July 15, 2013)

Project Cost : P 5,300,000.00 ($ 129,268.29) Location : Unit E&F 5th Floor, W Global Center, 30th Street, corner 9th Ave., Bonifacio Global City, Taguig City

Design By : Team Asterisk Contact Person : Arch . Aeroin Dayo Area : 621 Sqm

STEEL ASIA

PROPOSED OFFICE FIT-OUT PROJECT (April 18 – May 30, 2013)

Project Cost : P 1,774,886.40 ($ 43,289.91) Location : 2F, B2 Bonifacio High Street, the Fort, Taguig City Design By : Engr. Lyra Santos Contact Person : Ms. Tina Y. Yu Area : 130 Sqm

CITIBANK N.A PHILIPPINE BRANCH

PROPOSED OFFICE FIT-OUT PROJECT (February 04 – March 14, 2013)

Project Cost : P 2,000,000.00 ($ 48,780.49) Location : 22F Net Lima Building, Bonifacio Global City, Taguig City Design By : Contact Person : Area : 1,200 Sqm

Page 48: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

WIDUS TOWER 2 – STRUCTURAL WORKS

PROPOSED OFFICE FIT-OUT PROJECT (December 2012 – April 28, 2013)

Project Cost : P 46,000,000.00 ($ 1,121,951.22) Location : M.A Roxas Avenue, Freeport Zone, Clark, Pampanga Design By : RMDA/JCL Contact Person : Engr. James Leido Area : 5,605 Sqm.

SMB PRESTIGE CORPORATION

PROPOSED OFFICE FIT-OUT PROJECT (July 02, 2012 – April 26, 2013)

Project Cost : P 53,000,000.00 ($ 1,292,682.93 )

Location : #13 Buenaventura St.,Bagong Ilog, Pasig City Design By : Steven J. Leach, Jr. + Associates Contact Person : Arch. Bob Sanchez Area : 4,000.00

ANZ MDC – PHASE 2

PROPOSED OFFICE FIT-OUT PROJECT (January 15 – March 30, 2013)

Project Cost : P 25,000,000.00 ($ 609,756.10)

Location : Level 31v MDC100 Building E. Rodriguez Jr., Libis Quezon City Design By : Adrianse Group Contact Person : Arch. Karen Palma Area : 1,610 Sqm

EXL SERVICE PHILIPPINES, INC.

PROPOSED OFFICE FIT-OUT PROJECT (February 14 - April 14, 2013)

Project Cost : P 2,200,000.00 ($ 53,658,000.54 ) Location : 17th Floor The Link J.M. del Mar Ave., cor. Salinas Drive, Cebu IT Park, Apas 6000 Phils. Design By : Goudie Associates Contact Person : Mr. Owen Dizon Area : 100 Sqm

AU BEAU BLANC (SUAVIS INC.)

PROPOSED OFFICE FIT-OUT PROJECT (April 20 – May 20, 2013)

Project Cost : P 1,666,506.80 ($ 40,646.50)

Location : Unit B-11 Basement 1 SM Aura Premier, Fort Bonifacio, Taguig City Design By : Magi Nation Contact Person : Ms. Suzette Cocuaco Area : 36 Sqm

EXL SERVICE PHILIPPINES, INC.

PROPOSED OFFICE FIT-OUT PROJECT (March 01 – May 15, 2013)

Project Cost : P 14,836,056.70 ($ 361,855.04 )

Location : 11th Floor Two E-com Center., Harbor Drive, Pasay City Philippines Design By : Goudie Associates Contact Person : Mr. Owen Dizon Area : 3,000 Sqm

Page 49: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

SONY GLOBAL BUSINESS SERVICES, INC.

PROPOSED OFFICE FIT-OUT PROJECT (December 2012 – February 2013)

Project Cost : P 14,748,675.00 ($ 379,723.78 ) Location : Net Lima Bldg. 5th Avenue cor. 26th St., Bonifacio Global City, Pasig City Design By : DPC Contact Person : Mr. JhonVergara Area : 1,200Sqm.

WIDUS TOWER 2

PROPOSED FIVE (5) STOREY BUILDING (December 2012 – April 26, 2013 )

Project Cost : P 46,000,000.00 ($ 1,121,951.22 ) Location : M.A. Roxas Avenue, Freeport Zone, Clark, Pampanga Design By : RMDA Contact Person : Mr. James Leido (JCL) Area : 6,000 Sqm.

PLATFORM 3 INC.

PROPOSED OFFICE FIT-OUT PROJECT (December 2012 - January 2013 )

Project Cost : P 2,477,867.50 ($ 60,435.79) Location : Unit 7, 21st Floor Zuellig Building, Makati City Design By : Team Asterisk Contact Person : Mr. AeroinDayo Area : 188.55Sqm.

PRU LIFE U.K.

PROPOSED OFFICE FIT-OUT PROJECT (September 27, 2012 – January 2013 )

Project Cost : P 2,000,000.00 ($48,780.48 ) Location : SQA Corporate Center, National Highway, Crossing, Calamba Laguna Design By : Team Asterisk Contact Person : Mr. AeroinDayo Area : 156.45 Sqm.

PRU LIFE U.K.

PROPOSED OFFICE FIT-OUT PROJECT (November 12, 2012 – February 15, 2013)

Project Cost : P 9,879,000.00 ($ 240,951.22) Location : G/F SSHG 105 Paseo de Roxas, Makati City Design By : DB&B Contact Person : Mr. LitoAriola/CBRE Area : 600 Sqm.

REGUS PHILIPPINES CENTRE TWO, INC.

PROPOSED OFFICE FIT-OUT PROJECT (November 2012 – January 2013)

Project Cost : P 24,846,858.00 ($ 606,020.00) Location : 27F BPI Centre, Makati City Design By : FVA International, Ltd. Contact Person : Mr. Tony Yu Area : 1,174.38 Sqm.

Page 50: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :
Page 51: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

LIST OF COMPLETEDPROJECTS 2012

REGUS ZB GROUP INC.

PROPOSED OFFICE FIT-OUT PROJECT (November – December 2012)

Project Cost : P 32,041,428.57 ($ 781,498.25 ) Location : 20F Zuellig Bldg., Makati Ave. cor. Paseo de Roxas, Makati City Design By : FVA International, Ltd. Contact Person : Mr. Tony Yu Area : 1,174.38 Sqm.

MANILA GOLF AND COUNTRY CLUB

PROPOSED OFFICE FIT-OUT PROJECT (October – December 2012)

Project Cost : P 1,250,000.00 ($ 30,487.80) Location : Harvard Road, Forbes Park, Makati City Design By : Mr. Rene Orosa Contact Person : Mr. Rene Orosa / Mr. Al Alvina Area : 120 Sqm.

MACQUARIE OFFSHORE SERVICES PTY. LTD.

PROPOSED OFFICE FIT-OUT PROJECT (October – November 2012 )

Project Cost : P 16,000,000.00 ($ 390,243.90) Location : 14th& 15F The Enterprize Center Tower 2, Ayala cor. Paseo de Roxas, Makati Design By : Jones Lang Lasalle Contact Person : Mr. BomerMacaranas Area : 2,200 Sqm.

WIDUS RESTAURANT

PROPOSED RESTAURANT (September – December 2012)

Project Cost : P 9,300,000.00 ($ 226,829.00) Location : M.A. RoxasAvc., Freeport Zone, Clark, Pampanga Design By : RMDA Architects Contact Person : Mr. James Leido Area : 6000 Sqm.

REED ELSIEVER SHARED SERVICES

PROPOSED OFFICE FIT-OUT PROJECT (October – November 2012)

Project Cost : P 13,000,000.00 ($ 317,073.17 ) Location : 4F Building UP Technohub, Quezon City Design By : Adrianse Group Contact Person : Mr. Nelson Samson / DTSI Area : 2,454.91 Sqm.

Page 52: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

BRUMMER AND PARTNERS

PROPOSED OFFICE FIT-OUT PROJECT (October - November 2012 )

Project Cost : P 4,750,000.00 ($ 115,853.66 ) Location : 5F Zuellig Building, Makati City Design By : GSNP Contact Person : Ms. Ivy Area : 188.55 Sqm.

DELTEX SYSTEMS (PHILIPPINES) INC.

PROPOSED OFFICE FIT-OUT PROJECT (October – November 2012)

Project Cost : P 10,000,000.00 ($ 243,902.44 ) Location : 11F The Enterprise Center Building, Makati City Design By : Work Group Contact Person : Mr. Nigel Gayares Area : 1,100 Sqm

SUAVIS, INC. / AU BEAU BLANC

PROPOSED OFFICE FIT-OUT PROJECT (May – June 2012)

Project Cost : P 1,215,233.60 ($ 29,639.84 ) Location : 2F One Kennedy Plaza, Club Filipino Ave., Greenhills, San Juan City Design By : Magi Nation Contact Person : Ms. Suzette Cocuaco Area : 50 Sqm.

JP MORGAN CHASE BANK N.A. - PGSC

PROPOSED OFFICE FIT-OUT ( August 01 - November, 2012 )

Project Cost : P3,515,048.008 ($ 83,691.62) Location : 16F & 19F Net Plaza Building, Bonifacio Global City Design By : Adrianse Group Philippines, Inc. Contact Person : Mr. FudjieEsquadra Area : 2,000 Sqm.

PMFTC, Inc- Primary Building and Envelope

PROPOSED OFFICE FIT-OUT AND GLASS WORK AT PEREMITER WALL ( July 30, 2012 – January 2013 )

Project Cost : P24,500,000.00 ($ 583,333.33) Location : Plant C & D Champaca St., Brgy. Fortune Marikina City Design By : Adriane T. Chua & Associates Contact Person : Mr. Marjorie Chua Area : 1,400 Sqm.

ORACLE PHILIPPINES

PROPOSED OFFICE FIT-OUT PROJECT ( July 13 - September, 2012 )

Project Cost : P3,450,000.00 ($ 82,142.86) Location : 15F Net Square Center, Bonifacio Global City, Taguig City Design By : Work Architecture Contact Person : Mr. Joseph Infante Area : 600 Sqm.

Page 53: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

ANZ GLOBAL SERVICES AND OPERATIONS (MANILA), INC.

PROPOSED OFFICE FIT-OUT PROJECT (June 07 – July, 2012)

Project Cost : P 24,483,830.60 ($ 569,391.31 ) Location : 27F MDC100 Building, E. Rodriguez Ave. cor. Eastwood Ave. Libis Q.C. Design By : Ms. Karen Palma Contact Person : Adrianse Group Philippines, Inc. Area : 1,715 Sqm.

WIDUS INTERNATIONAL LEISURE, INC.

PROPOSED CONVENTION CENTRE (May 4 – August, 2012)

Project Cost : P 56,000,000.00 ($ 1,302,325.60 ) Location : M. A. Roxas Ave., Freeport Zone, Clark Pampanga Design By : Club 3 Asia Project Contact Person : Mr. James Leido Area : 2,200 Sqm.

STEEL ASIA

PROPOSED OFFICE FIT-OUT PROJECT (April – November, 2012)

Project Cost : P 3,652,812.80 ($ 84,949.13) Location : 2F B2 Bonifacio High St., The Fort, Taguig City Design By : AnD Design Associates Contact Person : Ms. Tina Yu Area : 320 Sqm.

TRANSCOM

PROPOSED OFFICE FIT-OUT PROJECT (May 2012 – July 2012)

Project Cost : P 19,500,000.00 ($ 453,488.37 ) Location : Transcom City Lope’s South Square Bldg. 4, Brgy. Tangub, Bacolod City Design By : Mr. Nigel Gayares Contact Person : Vanguard Interiors Pte. Ltd. Area : 2,400 Sqm.

NORASIAN ENERGY PHILS.INC. PROPOSED OFFICE FIT-OUT PROJECT (June 30, 2012 – August 02,2012)

Project Cost : P 8,771,379.00 ($ 203,985.56 ) Location : 32F Philamlife Tower, Paseo de Roxas, Makati City Design By : HBO + EMTB Contact Person : Mr. Pete Magtibay Area : 300 Sqm.

BEN LINE AGENCIES PHILIPPINES, INC.

PROPOSED OFFICE FIT-OUT PROJECT (February – May 2012 )

Project Cost : P 9,983,000.00 ($232,162.79 ) Location : 7F Tower A2 ECOM Central Mall of Asia Complex, Pasay City Design By : Adrianse Group Philippines, Inc. Contact Person : Ms. Karen Palma / Mr. Robert Chua Area : 778.88 Sqm.

Page 54: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

SEMA GROUP PHILIPPINES

PROPOSED OFFICE FIT-OUT PROJECT (February- March 2012)

Project Cost : P 2,406,700.00 ($55,969.76 ) Location : 7F Net 2 Bldg. Bonifacio Global City, Taguig City Design By : Team Asterisk Contact Person : Mr. Bong Mendoza Area : 500 Sqm.

BA CONTINUUM PHILIPPINES, INC.

PROPOSED OFFICE FIT-OUT PROJECT (January 24 -May 15, 2012)

Project Cost : P 31,982,376.40 ($ 743,776.20 ) Location : 25th , 26th& 27F Bonifacio One Technology Tower E-Square IT Park,

Global City Design By : Adrianse Group Philippines Contact Person : Mr. Mark Abu Area : 4,767Sqm.

HARTE HANKS PHILS., INC.

PROPOSED OFFICE FIT-OUT PROJECT (December2011 –May 2012)

Project Cost : P 2,011,702.50 ($ 46,783.80 ) Location : 4F market Market Mall, Fort Bonifacio Global City, Taguig City Design By : Goudie Associates Contact Person : Mr. Raymond Tuazon Area : 350 Sqm.

ONE GLOBAL SERVICES, INC.

PROPOSED OFFICE FIT-OUT PROJECT (December 2011 – February 2012)

Project Cost : P 3,179,000.00 ($ 73,930.23 ) Location : 10F One Global Place Fort Bonifacio, Global City, Taguig City Design By : DB & B Contact Person : Ms. Victoria Capote Salenga Area : 120 Sqm.

PMFTC INC. – CANTEEN PARK UPGRADE

PROPOSED OFFICE FIT-OUT PROJECT (February– May 15, 2012 )

Project Cost : P 5,855,000.00 ($ 136,162.7) Location : Champaca St., Fortune Avenue, Brgy. Fortune, Parang Marikina City Design By : Adriane T. Chua & Associates Contact Person : Arch. Adriane Chua Area : 320 Sqm.

PMFTC INC. – ADDITIONAL DOCK STATION

PROPOSED OFFICE FIT-OUT PROJECT (January – February 2012)

Project Cost : P 700,000.00 ($ 16,279.07 ) Location : Champaca St., Fortune Avenue, Brgy. Fortune, Parang Marikina City Design By : Adriane T. Chua & Associates Contact Person : Arch. Adriane Chua Area : 20 Sqm.

Page 55: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

PMFTC INC. – SECONDARY ENVELOPE BUILDING

PROPOSED OFFICE FIT-OUT PROJECT (November 2011 – February 2012)

Project Cost : P 9,000,000.00 ($ 209,302.33) Location : Champaca St., Fortune Avenue, Brgy. Fortune, Parang Marikina City Design By : Adriane T. Chua & Associates Contact Person : Arch. Adriane Chua Area : 1,000 Sqm.

Page 56: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :
Page 57: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

LIST OF COMPLETED PROJECTS 2011

PMFTC INC. – CONSTRUCTION OF OFFICE LOBBY PLANT C & D

PROPOSED OFFICE FIT-OUT PROJECT (November – December 2011)

Project Cost : P 4,800,000.00 ($ 111,627.91 ) Location : Champaca St., Fortune Avenue, Brgy. Fortune, Parang Marikina City Design By : Adriane T. Chua & Associates Contact Person : Arch. Adriane Chua Area : 60 Sqm.

PMFTC INC. – CENTRAL OFFICE ADDITIONAL WORKS

PROPOSED OFFICE FIT-OUT PROJECT (November – December 2011)

Project Cost : P 4,400,000.00 ($ 102,325.58 ) Location : Champaca St., Fortune Avenue, Brgy. Fortune, Parang Marikina City Design By : Adriane T. Chua & Associates Contact Person : Arch. Adriane Chua Area : 200 Sqm.

MANILA GOLF AND COUNTRY CLUB

PROPOSED OFFICE FIT-OUT PROJECT (December 2011 – February 2012)

Project Cost : P 5,400,000.00 ($ 125,581.40 ) Location : Harvard Road, Forbes Park, Makati City Design By : SLA Design / Rene Orosa Design Contact Person : Mr. Nigel Gayares Area : 350 Sqm.

PMFTC INC.

PROPOSED OFFICE FIT-OUT PROJECT (May – December 2011)

Project Cost : P83,540,000.00 ($1,898,636.40 ) Location : Champaca St., Fortune Ave. Brgy. Fortune, Marikina City Design By : Adrian T. Chua & Associates Contact Person : Mr. Adrian Chua Area : 7,200 Sqm.

EXL SERVICE PHILIPPINES, INC.

PROPOSED OFFICE FIT-OUT PROJECT (October – December 2011)

Project Cost : P 10,700,000.00 ($ 248,837.21 ) Location : 12th Floor, Two E-com Center, Harbor Drive SM iCity 2, Pasay City Design By : Asterisk Contact Person : AeroinDayo Area : 1,800 Sqm.

Page 58: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

ABACUS SECURITIES CORPORATION

PROPOSED OFFICE FIT-OUT PROJECT (July – December 2011)

Project Cost : P 5,580,000.00 ($ 129,767.44 ) Location : 29F East Tower, Tektite Tower, Exchange Road, Ortigas Centre, Pasig City Design By : Team Asterisk Contact Person : Mr. AeroinDayo Area : 600 Sqm.

BLUM SHOWROOM MANILA

PROPOSED OFFICE FIT-OUT PROJECT (November – December 2011)

Project Cost : P 1,600,000.00 ($ 37,209.30 ) Location : G/F Shangri-la Makati, Ayala Avenue, Makati City Design By : Team Asterisk Contact Person : Mr. AeroinDayo Area : 100 Sqm.

ANZ MDC100

PROPOSED OFFICE FIT-OUT PROJECT (October – December 2011)

Project Cost : P 52,196,920.00 ($ 1,213,881.00 ) Location : Level 12 Solaris One Bldg., 130 Dela Rosa St., Makati City Design By : Adrianse Group Contact Person : Ms. Karen Palma Area : 4,500 Sqm.

DIVERSIFIED TECHNOLOGY SOLUTIONS INT’L., INC – REED ELSEVIER

PROPOSED OFFICE FIT-OUT PROJECT (October – November 2011)

Project Cost : P 2,200,000.00 ($ 51,162.80 ) Location : 39F PBCom Tower 1226 , Makati City Design By : Adrianse Group Contact Person : Ms. Karen Palma / Mr. Mark Abu Area : 350 Sqm.

INSTITUTIONAL SHAREHOLDERS SERVICES, INC. (ISSI)

PROPOSED OFFICE FIT-OUT PROJECT (October – December 2011)

Project Cost : P 11,300,000.00 ($ 262,790.70 ) Location : 15F Solaris One Bldg. 130 Dela Rosa St., Makati City Design By : Goudie Associates Contact Person : Area : 668.83 Sqm.

Page 59: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

PERFETTI VAN MELLE PHILS, INC.

PROPOSED OFFICE FIT-OUT PROJECT ( October – December 2011)

Project Cost : P 12,728,541.79 ($ 296,012.60 ) Location : 16F Octagon Centre, San Miguel Ave., Ortigas Centre, Pasig City Design By : E.S. Calma Contact Person : Ms. Teresa Hong / Mr. HermieHermanos Area : 980 Sqm.

MACQUARIE OFFSHORE SERVICE PTY. LTD – MANILA BRANCH

PROPOSED OFFICE FIT-OUT PROJECT (October – December 2011 )

Project Cost : P5,300,000.00 ($ 123,255.81 ) Location : 33F, 6766 The Enterprise Center, Tower 1 Ayala cor. Paseo de Roxas, Makati Design By : Jones Lang LasalleLeechiu Contact Person : Mr. BomerMacaranas Area : 500 Sqm.

Y & R PHILIPPINES, INC.

PROPOSED OFFICE FIT-OUT PROJECT (May – July 2011)

Project Cost : P5,013,000.00 ($113,931.82 ) Location : 7F Equitable Bak Tower, 8751 Paseo de Roxas, Makati City Design By : The Team Asterisk Contact Person : Mr. AeroinDayo Area : 500 Sqm.

ABACUS SECURITIES CORPORATION

PROPOSED OFFICE FIT-OUT PROJECT (April – May 2011 )

Project Cost : P5,580,000.00 ($126,818.80 ) Location : 29F East Tower, Tektite Building, Exchange Road, Ortigas Center, Pasig City Design By : The Team Asterisk Contact Person : Mr. AeroinDayo Area : 360 Sqm.

LAFARGE CEMENT SERVICES (PHILIPPINES), INC.

PROPOSED OFFICE FIT-OUT PROJECT (April 25 - August 2011)

Project Cost : P7,500,000.00 ($170,454.55 ) Location : 20F Salcedo Tower, 169 HV dela Costa St., SalcedoVilalge, Makati City Design By : ANCJ Architects Contact Person : Mr. Dodgie Reyes Area : 800 Sqm.

WPP MARKETING COMMUNICATIONS – MILLWARD BROWN PHILS, INC.

PROPOSED OFFICE FIT-OUT PROJECT (March 17 - May 2011)

Project Cost : P8,246,000.00 ($187,409.09 ) Location : 8F Bank Tower 8751 Paseo de Roxas, Salcedo Village, Makati City Design By : The Team Asterisk Contact Person : Mr. AeroinDayo Area : 280 Sqm.

Page 60: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

YEW TREE SERVICES INC.

PROPOSED OFFICE FIT-OUT PROJECT (June – August 2011)

Project Cost : P13,000,000.00 ($295,454.55) Location : 20F Tower 2, RCBC Plaza, 6819 Ayala Ave., cor. Gil Puyat Ave., Makati City Design By : DPC, Inc. Contact Person : Mr. JhonVergara Area : 1,500 Sqm.

WPP MARKETING COMMUNICATIONS - JWT

PROPOSED OFFICE FIT-OUT PROJECT (April - June 2011)

Project Cost : P6,804,000.00 ($154,636.36 ) Location : 7F Bank Tower 8751 Paseo de Roxas, Salcedo Village, Makati City Design By : The Team Asterisk Contact Person : Mr. AeroinDayo Area : 500 Sqm.

ANZ GLOBAL SERVICES PHILIPPINES INC. 10TH& 14

TH FLOOR

PROPOSED OFFICE FIT-OUT PROJECT (January – May 2011 )

Project Cost : P40,222,582.00 ($914,149.59 ) Location : Solaris One Building, Dela Rosa St., Makati City Design By : Adrianse Group Philippines, Inc. Contact Person : Arch. Karen Palma Area : 3,807 Sqm.

SC RESERVATION (PHILIPPINES) INC.

PROPOSED OFFICE FIT-OUT PROJECT (February – March 2011)

Project Cost : P7,100,000.00 ($161,363.64 ) Location : 27F RCBC Plaza Tower 2 cor. Sen. Gil Puyat Ave., Makati City Design By : Del Rosario Design Group Contact Person : Arch. Fernando Del Rosario Area : 1,500 Sqm.

YAHOO! PHILIPPINES

PROPOSED OFFICE FIT-OUT PROJECT (MARCH 01 – 31, 2011 )

Project Cost : P16,148,000.00 ($367,000.00) Location : 20F Accralaw Tower, Bonifacio Global City, Taguig City Design By : Goudie Associates Contact Person : Arch. Fernando Del Rosario Area : 560 Sqm.

MACQUARIE OFFSHORE SERVICE PTY. LTD – MANILA BRANCH

PROPOSED OFFICE FIT-OUT PROJECT (FEBRUARY 21 – APRIL 2011)

Project Cost : P7,900,000.00 ($179,545.45) Location : 25F, 6766 The Enterprise Center, Tower 1 Ayala cor. Paseo de Roxas, Makati Design By : Jones Lang LasalleLeechiu Contact Person : Mr. BomerMacaranas Area : 1,100 Sqm.

Page 61: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

GOLDEN SPOON

PROPOSED OFFICE FIT-OUT PROJECT (January – March 2011)

Project Cost : P2,240,477.00 ($50,920.00 ) Location : Alabang Town Center Expansion, Alabang, Muntinlupa City Design By : Sylvia Heras Lopez Contact Person : Mr. Enrique Lopez Area : 42 Sqm.

CHEVRON PHILIPPINES, INC.

PROPOSED OFFICE FIT-OUT PROJECT (January – March 2011 )

Project Cost : P4,685,100.00 ($106,479.55 ) Location : 6th& 7th Floor, 6750 Bldg. Ayala Avenue, Makati City Design By : The Team Asterisk Contact Person : Mr. Patrich Gonzales Area : 600 Sqm.

QUINTILES

PROPOSED OFFICE FIT-OUT PROJECT (March – May 2011 )

Project Cost : P6,500,000.00 ($147,727.00) Location : 41st Floor Union Bank Bldg. Meralco Ave., Pasig City Design By : ADD+ Consortium Contact Person : Mr. Art Corbito Area : 700 Sqm.

PRU-LIFE UK

PROPOSED OFFICE FIT-OUT PROJECT (January – February 2011)

Project Cost : P2,575,497.14 ($58,534.00 ) Location : GF Marajo Tower, Fort Bonifacio Global City, Taguig City Design By : ADD+Consortium Contact Person : Mr. Art Corbito Area : 70 Sqm.

ASCENDAS WARMSHELL – VARIOUS FLOORS

PROPOSED OFFICE FIT-OUT PROJECT (January – March 2011 )

Project Cost : P31,500,000.00 ($715,909.00 ) Location : 8,9,10,11,12,14,15,16,17,18& 20th Floors Accralaw Fort Bonifacio, Taguig Design By : Ascendas Properties Management Corp. Contact Person : Mr. Orlando Yu Area : 7,785 Sqm.

BRITISH EMBASSY

PROPOSED OFFICE FIT-OUT PROJECT (February – April 2011 )

Project Cost : P2,568,410.00 ($58,373.00) Location : 120 Upper Mckinley Hills, Taguig City, Philippines Design By : The Team Asterisk Contact Person : Mr. AeroinDayo Area : 300 Sqm.

Page 62: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

VISTA PHARMA

PROPOSED OFFICE FIT-OUT PROJECT (March –April 2011)

Project Cost : P3,500,000.00 ($79,546.00) Location : Unit 1206 One Global Place Bldg. 5th Ave., cor. 25th St., BGC Bldg. Taguig Design By : Rchitects Inc. Contact Person : Ms. Angelita Lim Area : 120 Sqm.

PLDT BUSINESS CENTER

PROPOSED OFFICE FIT-OUT PROJECT (MAY – JUNE 2011)

Project Cost : P8,648,070.29 ($196,501.60) Location : GF 2nd Ave., cor. 30th St., Sapphire, Bonifacio Global City, Taguig Design By : Steven J. Leach + Associates Contact Person : Mr. Bob Sanchez Area : 200 Sqm.

LIST OF COMPLETED PROJECTS 2010

PRU – LIFE U.K.

PROPOSED OFFICE FIT-OUT PROJECT (August – October 2010)

Project Cost : P 25,400,000.00 ($ 590,697.67 ) Location : 19F, 20F & 20F Marajo Tower, 26th St. Bonifacio Global City, Taguig City Design By : CB Richard Ellis Contact Person : Mr. LitoIraola Area : 2,400 Sqm.

ANCHORLAND SHOWROOM

PROPOSED OFFICE FIT-OUT PROJECT (October 2010 – February 2011)

Project Cost : P 15,000,000.00 ($ 348,837.21 ) Location : Salazar St., Binondo, Manila Design By : AnD Associates Area : 700 Sqm.

ASCENDAS E-SQUARE PROPERTIES CORP. 16

TH, 17

TH, 18

TH& 20TH FLOORS

PROPOSED OFFICE FIT-OUT PROJECT (September - November 2010)

Project Cost : P 12,000,000.00 ($ 279,069.77 ) Location : ACCRALAW Tower, E-Square Properties Corp, Global City, Taguig City Design By : Ascendas Properties Management Corp. Contact Person : Mr. Orlando Yu Area : 3,320 Sqm.

CHEVRON 42

PROPOSED OFFICE FIT-OUT PROJECT (September - December 2010)

Project Cost : P 33,203,059 ($ 772,164.16 ) Location : 42F Yuchengco Tower, RCBC Plaza, Makati City Design By : Syndicated Architects Contact Person : Cesar Rizaldy V. de los Reyes Area : 2,300 Sqm.

Page 63: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

CHEVRON EXPANSION

PROPOSED OFFICE FIT-OUT PROJECT (September 2010 – June 2011)

Project Cost : P 12,768,000.00 ($ 296,930.23 ) Location : 5F, 23F, 32F & 39 Yuchengco Tower, RCBC Plaza, Makati City Design By : Syndicated Architects Contact Person : Cesar Rizaldy V. de los Reyes Area : 20,700 Sqm.

GREENCROSS INCORPORATED

PROPOSED OFFICE FIT-OUT PROJECT (August - December 2010)

Project Cost : P 10,000,000.00 ($ 232,558.14 ) Location : 16F & 17F Common Goal Tower, Ayala Alabang, Muntinlupa City Design By : Goudie Associates Contact Person : Arch. Joey Jiminez Area : 750 Sqm.

SEAOIL PHILIPPINES, INC.

PROPOSED OFFICE FIT-OUT PROJECT (October - December 2010)

Project Cost : P 10,816,000.00 ($ 251,534.88) Location : 7F Raffles Bldg. Emerald Ave., Pasig City Design By : Team Asterisk Contact Person : Arch. AeroinDayo Area : 1,200 Sqm.

SMARTMATIC

PROPOSED OFFICE FIT-OUT PROJECT (October – December 2010)

Project Cost : P 3,750,000.00 ($ 87,209.30 ) Location : 16F Ascendas Tower, 2nd Ave. cor. 30th St., Bonifacio Global City, Taguig City Design By : ADD + Consortium Contact Person : Mr. Art Corbito Area : 450 Sqm.

TOTAL INFORMATION MANAGEMENT

PROPOSED OFFICE FIT-OUT PROJECT (September 2009 – March 2010 )

Project Cost : P 14,000,000.00 ($ 325,581.40 ) Location : 3F & 5F TIM Bldg. 5600 S. Osmena S. Superhighway Design By : Steven J. Leach, Jr. + Associates Contact Person : Arch. Mina De Leon

Area : 1,210 Sqm.

MACQUARIE OFFSHORE SERVICE PTY LTD – MANILA BRANCH 30F

PROPOSED OFFICE FIT-OUT PROJECT (January - March 2010 )

Project Cost : P 5,500,000.00 ($127,906.00 ) Location : 29F, 30f & 31F, The Enterprise Ctr. Tower, Ayala Ave., LegaspiVill. Makati

City Design By : DB & B Philippines, Inc. Contact Person : Ms. Rosario Gomez Area : 1,400 Sqm.

Page 64: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

ING ASIA PRIVATE BANK LTD. PROPOSED OFFICE FIT-OUT PROJECT (February – March 2010 )

Project Cost : P 4,245,000.00 ($98,720.93 ) Location : 22F Tower 1, Ayala Triangle, Makati City Design By : Goudie Associates Contact Person : Arch. Carlos De Castro Area : 800 Sqm.

ANZ GLOBAL SERVICES & OPERATIONS (MANILA) INC.

PROPOSED OFFICE FIT-OUT PROJECT (May – September 2010)

Project Cost : P 31,144,438.00 ($724,289.26 ) Location : 12F Solaris One, 130 Dela Rosa St. Makati City Design By : Adrianse Group Philippines, Inc. Contact Person : Ms. Karen Palma Area : 2,800Sqm.

MERIDIAN INTERNATIONAL OFFICE

PROPOSED OFFICE FIT-OUT PROJECT (May – July 2010)

Project Cost : P 11,511,479.00 ($267,708.81 ) Location : 2F Commerce & Industry Plaza, Mckinley Hill, Taguig City Design By : Team Asterisk Contact Person : Arch. AeroinDayo Area : 1,200Sqm.

SUNGARD SYSTEMS PHILIPPINES INC.

PROPOSED OFFICE FIT-OUT PROJECT ( July – September 2010 )

Project Cost : P 18,918,163.00 ($ 439,957.28 ) Location : 10F Solaris One Bldg. Dela Rosa St. LegaspiVill. Makati City Design By : PDM International HK Limited Contact Person : Mr. Roan Hamman Area : 1,029 Sqm.

WPP ASIA PACIFIC - GroupM

PROPOSED OFFICE FIT-OUT PROJECT ( August – September 2010 )

Project Cost : P 27,500,000.00 ($639,534.88 ) Location : 21F, 22F & 23F Picadilly Star Bldg. Fort Bonifacio Global City, Taguig City Design By : DB & B Philippines Contact Person : Arch. Ma. Rosario R. Gomez Area : 2,674.90Sqm.

WPP SIA PACIFIC – OGILVY & MATHER PHILIPPINES

PROPOSED OFFICE FIT-OUT PROJECT (August – September 2010)

Project Cost : P 26,000,000,00 ($ 604,651.16) Location : 24F & 25F Picadilly Star Bldg. Fort Bonifacio Global City, Taguig City Design By : DB & B Philippines Contact Person : Arch. Ma. Rosario R. Gomez Area : 1,499.74Sqm.

Page 65: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

WPP ASIA PACIFIC – BATES 141

PROPOSED OFFICE FIT-OUT PROJECT (August – September 2010 )

Project Cost : P 8,500,000.00 ($197,674.42 ) Location : 21F Picadilly Star Bldg. Fort Bonifacio Global City, Taguig City Design By : DB & B Philippines Contact Person : Arch. Ma. Rosario R. Gomez Area : 510.66 Sqm.

NCO

PROPOSED OFFICE FIT-OUT PROJECT (March - May 2010)

Project Cost : P 8,102,180.00 ($176,134.35) Location : 2F Bldg. 2, Berthaphil 3, Clark Economic Zone, Pampanga Design By : Goudie Associates / JCL International Contact Person : Mr. James Leido Area : 1,260 Sqm.

ABACUS SECURITIES CORPORATION

PROPOSED OFFICE FIT-OUT PROJECT (January – March 2010 )

Project Cost : P 5,000,000.00 ($ 111,111.11 ) Location : 29F Tektite Tower, Pasig City Design By : Team Asterisk Contact Person : Ms. Sheila Aguilar Area : 219 Sqm.

ALABANG RESIDENCE

PROPOSED OFFICE FIT-OUT PROJECT (August 2009 – July 2010 )

Project Cost : P 27,000,000.00 ($600,000.00 ) Location : San Bartolome St, Ayala Alabang, Muntinlupa City Design By : Isla + Isaac Contact Person : Arch. Dezzie Isla Area : 1,600 Sqm.

ACCRA LAW OFFICE

PROPOSED OFFICE FIT-OUT PROJECT (January - April 2010)

Project Cost : P 74,000,000.00 ($1,608,695.70 ) Location : 22F – 26F Accra Law Tower, 2nd Ave., cor. 30th St., Bonifacio Global City, Taguig Design By : Add+ Consortium Contact Person : Atty. Regina Geralde Area : 4,250Sqm.

TELUS INTERNATIONAL PHILS. INC

PROPOSED OFFICE FIT-OUT PROJECT (February 15, - April 2010)

Project Cost : P 55,000,000.00 ($1,145,833.30) Location : 4F Telus House, Araneta Center, Quezon City Design By : Goudie Associates Contact Person : Mr. Fernan Amor Area : 4,000 Sqm.

Page 66: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

ANZ BANKING GROUP LIMITED

PROPOSED OFFICE FIT-OUT PROJECT (January - March 2010)

Project Cost : P 11,700,000.00 ($254,347.83 ) Location : 8F Metrobank Card Center, 6788 Ayala, Makati City Design By : Adrianse Group Contact Person : Arch. Karen Palma, Ms. Paula McKeon Area : 580 Sqm.

LIST OF COMPLETED PROJECTS 2009

JP MORGAN CHASE BANK NATIONAL ASSOCIATION

PROPOSED OFFICE FIT-OUT PROJECT (February – October 2009)

Project Cost : P 468,000,000.00 ($10,173,913.00) Location : G/F – 23rd Net Plaza, Building, Global City, Taguig Design By : Adrianse Group Inc. Contact Person : Arch. Rafael Santos Area : 50,000 Sqm.

TELUS INTERNATIONAL PHILS., INC. (CUBAO)

PROPOSED OFFICE FIT-OUT PROJECT (April – June 2009)

Project Cost : P 62,000,000.00 ($1,377,777.80) Location : L2 Cyber Park, Gen. McArthur Ave., cor. Gen. Araneta Center, Quezon City Design By : Goudie Associates Contact Person : Arch. Allan Lim Area : 2,000 Sqm.

LEGISPRO CORPORATION

PROPOSED OFFICE FIT-OUT PROJECT (March - June 2009)

Project Cost : P 10,342,378.00 ($224,843.30) Location : 4th Floor One E-Com Center Harbor Drive cor. Sunset Ave., Pasay City Design By : Team Asterisk Contact Person : Arch. AeroinDayo Area : 555 Sqm.

JAPAN TOBACCO INTERNATIONAL (PHILIPPINES), INC.

PROPOSED OFFICE FIT-OUT PROJECT (February - April 2009)

Project Cost : P 8,200,000.00 ($178,260.87) Location : 29F Discovery Centre 25 ADB Ave., Ortigas Center, Pasig City Design By : Team Asterisk Contact Person : Arch. AeroinDayo Area : 700 Sqm.

Page 67: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

RISKMETRICS GROUPS

PROPOSED OFFICE FIT-OUT PROJECT (January - April2009)

Project Cost : P 25,695,000.00 ($ 494,134.00) Location : 15F Solaris One Bldg., Dela Rosa St., Makati City Design By : .Goudie Associates Contact Person : Atty. Tom Tuazon Area : 2,100 Sqm.

ANZ BANKING GROUP LIMITED

PROPOSED OFFICE FIT-OUT PROJECT (January - March 2009)

Project Cost : P 9,760,000.00 ($ 187,692.00) Location : Ground, 5th& 9thFlrs. Metrobank Card Corp. Center, Ayala Ave., Makati City Design By : Dewey & Felix Architects Contact Person : Mr. BonieMacaranas Area : 1,000 Sqm.

ENDERUN COLLEGES

PROPOSED OFFICE FIT-OUT PROJECT

(January – March 2009 ) Project Cost : P 6,700,000.00 ($ 128,846.00) Location : Mckinley Hills, Fort Bonifacio, Taguig City Design By : LC Studio Design Contact Person : Mr. Fernan Amor Area : 2,000 Sqm

MORE – TBA 6/F

PROPOSED OFFICE FIT-OUT PROJECT (January - February 2009)

Project Cost : P 1,350,000.00 ($25,961.00) Location : 6F TBA Building 1411 Benavidez St. LegaspiVill. Makati City Design By : Adrianse Group Contact Person : Mr. Paul Hamoy Area : 150 Sqm.

PFIZER PHILIPPINES

PROPOSED OFFICE FIT-OUT PROJECT (January – March 2009)

Project Cost : P 1,500,000.00 ($28,846.00) Location : 24F Ayala GFU Center, Ayala Ave., Makati City Design By : Ms. Belle Barredo Contact Person : Ms. Con Barcala Area : 120 Sqm.

Page 68: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :
Page 69: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

LIST OF COMPLETED PROJECTS 2008

SPANISH EMBASSY - MANILA

PROPOSED OFFICE FIT-OUT PROJECT (July – September 2008)

Project Cost : P 18,080,000.00 ($ 347,692.00) Location : Level 27, PCI Tower, Paseo de Roxas, Makati City Design By : Add + Consortium Contact Person : Engr. Art Corbito Area : 1,200 Sqm.

CAMDEN INDUSTRIES INC.

PROPOSED OFFICE FIT-OUT PROJECT (April – May 2008)

Project Cost : P 2,360,000.00 ($ 55,379.56) Location : Unit 801-802 Atlanta Centre, Annapolis St., Greenhills San Juan Design By : Magi Nation Inc. Contact Person : Ms. Suzette F. Cocuaco Area : 375 Sqm.

ADMEREX SOLUTIONS, INC.

PROPOSED OFFICE FIT-OUT PROJECT (May – July 2008)

Project Cost : P 5,637,00.00 ($ 132,277.36) Location : 15F The Peak Tower, 107 LP Leviste St., Salcedo Village, Makati City Design By : Adrianse Group Philippines, Inc. Contact Person : Ms. MalouMolano Area : 525 Sqm.

JP MORGAN CHASE BANK N.A. (PHILIPPINES COSTUMER CARE CENTER)

PROPOSED OFFICE FIT-OUT PROJECT (April – August 2008 )

Project Cost : P 56,700,000.00 ($ 1,330,517.42 ) Location : L7 to L10 Net One Bldg. Fort Bonifacio, Taguig City Design By : Adrianse Group Philippines Inc. Contact Person : Ms. Alice Irene Caedo Area : 8,000 Sqm

SN ABOITIZ POWER HYDRO INC. – BAGUIO CITY

PROPOSED OFFICE FIT-OUT PROJECT (March - April 2008)

Project Cost : P 1,390,046.00 ($ 32,618.70) Location : Palermo St. South Drive Baguio City Design By : Adrianse Group Philippines, Inc. Contact Person : Mr. Paul Hanoy Area : 150 Sqm.

MANILA OSLO REMOVABLE ENTERPRISE – EXTENSION OFFICE

PROPOSED OFFICE FIT-OUT PROJECT (April – June 2008)

Project Cost : P 9,577,000.00 ($ 184,173.00 ) Location : 6th Flr. TBA Center Benavidez St., Makati City Design By : Adrianse Group Philippines, Inc. Contact Person : Mr. Paul Hanoy Area : 250 Sqm.

Page 70: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

SAFEWAY PHIILTECH INC. OFFICE EXPANSION

PROPOSED OFFICE FIT-OUT PROJECT (April – June 2008)

Project Cost : P 4,250,000.00 ($ 99,730.00) Location : 21stFlr. Tower 1, RCBC Plaza, Ayala Ave., cor. Sen. Gil Puyat Ave. Makati Design By : Work Group Inc. Contact Person : Mr. Nigel Gayares Area : 800 Sqm.

SAFEWAY PHIILTECH INC. - OFFICE EXPANSION

PROPOSED OFFICE FIT-OUT PROJECT (April - July 2008 )

Project Cost : P 39,750,000.00 ($ 932,770.15) Location : 2 World Sq. & 3 World Sq., Upper Mckinley Road Fort Bonifacio, Taguig City Design By : Work Group Inc. Contact Person : Mr. Nigel Gayares Area : 2,000 Sqm.

SEAOIL PHILIPPINES, INC.

PROPOSED OFFICE FIT-OUT PROJECT (March - April 2008)

Project Cost : P 10,500,000.00 ($252,707.58) Location : 22F Taipan Place Building, Emerald Ave., Pasig City Design By : Team Asterisk Contact Person : Mr. AeroinDayo Area : 600 Sqm

FAIRWAYS TOWER

PROPOSED OFFICE FIT-OUT PROJECT (February - April 2008 – On-going)

Project Cost : P 19,442,834.84 ($ 468,389.17) Location : G/F & 29th Floors Fairways Tower, Mckinley Road, cor. Fort Bonifacio Global City, Taguig City Design By : Periquet Galicia, Inc. Contact Person : Arch. Paul Ricafort, Arch. Mendell Martinez Area : 1,000 Sqm.

ENDERUN COLLEGES

PROPOSED OFFICE FIT-OUT PROJECT

(February - April 2008) Project Cost : P 60,000,000.00 ($ 1,153,846.00) Location : Mckinley Hills, Fort Bonifacio, Taguig City Design By : DB & B Contact Person : Mr. Fernan Amor Area : 2,000 Sqm.

ENDERUN COLLEGES – MUSEUM BUILDING

PROPOSED OFFICE FIT-OUT PROJECT (February - April 2008)

Project Cost : P 10,000,000.00 ($ 240,905.80) Location : Mckinley Hills, Fort Bonifacio, Taguig City Design By : DB & B Contact Person : Mr. Fernan Amor Area : 600 Sqm.

Page 71: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

FIESTA MARKET PAY LOUNGE

PROPOSED OFFICE FIT-OUT PROJECT (March – April 2008)

Project Cost : P 1,400,000.00 ($ 33,726.81) Location : G/F Market Market Fort Bonifacio, Taguig City Design By : A+D Design Contact P0erson : Mr. Eric De Jesus Area : 50 Sqm.

TRANSNATIONAL E-BUSINESS SOLUTIONS, INC.

PROPOSED OFFICE FIT-OUT PROJECT ( July – August 2008)

Project Cost : P 23,292,000.00 ($ 447,923.00) Location : Penthouse Floor, NET Quad Bldg., Fort Bonifacio Global City, Taguig Design By : Adrianse Group Contact Person : Antonio R. Tiu Area : 1,678 Sqm.

Page 72: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :
Page 73: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

LIST OF COMPLETED PROJECTS 2007

CBR ASIA INSURANCE BROKERS, INC.

PROPOSED OFFICE FIT-OUT PROJECT (December 2007 – January 2008)

Project Cost : P 1,892,857.14 ($46,167.24) Location : 3F Cacho Gonzales Building, 101 Aguirre St. Legaspi Village, Makati City Contact Person : Ms. Shirley Tan Area : 300 Sqm.

LUNDBECK PHILIPPINES

PROPOSED OFFICE FIT-OUT PROJECT (May – July 2007)

Project Cost : P 3,300,000.00 ($ 80,487.80) Location : 6th Floor Electra House Blg., Esteban St., Makati City Design By : Team Asterisk Contact Person : Mr. AeroinDayo Area : 195 Sqm.

ING BANK

PROPOSED OFFICE FIT-OUT PROJECT (May – November 2007)

Project Cost : P 36,800,000.00 ($ 45,600.00) Location : 20th, 21st& 22nd Floors, Ayala Triangle Tower 1, Makati City Design By : Goudie Associates Contact Person : Ms. Mary Ann Chee Area : 3,600 Sqm.

CITISEC-ONLINE.COM

PROPOSED OFFICE FIT-OUT PROJECT (October – December 2007)

Project Cost : P 5,500,000.00 ($127,906.97) Location : 24F Tektite East Tower, Ortigas Center, Pasig City Design By : Ms. ValenAng Contact Person : Ms. Kathy Ong Area : 600 Sqm

GWI BUSINESS SOLUTIONS, INC.

PROPOSED OFFICE FIT-OUT PROJECT (November - December 2007)

Project Cost : P 1,505,882.00 ($35,020.55) Location : 17F Yuchengco Tower, RCBC Plaza, 6819 Ayala Avenue, Makati City Design By : Adrianse Group Philippines, Inc. Contact Person : Mr. Abdullah Daud Area : 120.16 Sqm

SANOFI-AVENTIS PHILIPPINES, INC.

PROPOSED OFFICE FIT-OUT PROJECT (October – December 2007)

Project Cost : P 8,281,000.00 ($192,581.39) Location : 22F Feliza Bldg., 108 V.A. Rufino St. LegaspiVill., Makati City Design By : Syndicated Architect Contact Person : Mr. Tom Reblora Area : 800 Sqm

Page 74: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

ORACLE PHILIPPINES, CORP.

PROPOSED OFFICE FIT-OUT PROJECT (November – December 2007)

Project Cost : P8,300,000.00 ($193,023.25) Location : 15F Net 2 Building, Fort BonifacioTaguig City Design By : Work Architecture Contact Person : Ms. Indira Fugen Area : 1,100 Sqm

SUPPLY CHAIN CONSULTING, INC.

PROPOSED OFFICE FIT-OUT PROJECT (October - November 2007)

Project Cost : P 8,200,000.00 ($190,697.24) Location : Paseo de Magallanes Commercial Ctr. Lot 8 Blk 4 Phase 1, EDSA cor. Osmena Highway, Makati City Design By : Steven J. Leach, Jr. + Associates Contact Person : Ms. Elsie Dela Rosa Area : 938 Sqm

ETIHAD AIRWAYS

PROPOSED OFFICE FIT-OUT PROJECT (October – November 2007)

Project Cost : P 5,640,000.00 ($131,162.79) Location : 22F The Enterprise Center Tower 1, 6766 Ayala Avenue, Makati City Design By : Binswanger, Phils. Contact Person : Mr. Keith Elliot Area : 367.80 Sqm

APL CO. PTE. LIMITED

PROPOSED OFFICE FIT-OUT PROJECT (May – July 2007)

Project Cost : P 9,5000,000.00 ($ 219,399.53) Location : Velco Centre, cor. R. Oca& A. Delgado Streets, Port Area, Manila 1018 Design By : Steven J. Leach, Jr. + Associated Contact Person : Mr. Mark Matthew Parco Area : 650 Sqm

STEEL ASIA MANUFACTURING CORP.

PROPOSED OFFICE FIT-OUT PROJECT (July – August 2007)

Project Cost : P 6,400,000.00 ($ 147,806.00) Location : 6th Floor, 8101 Pearl Plaza Building, #Pearl Drive, Ortigas Center, Pasig City Design By : HBO + EMTB Philippines, Inc. Contact Person : Mr. Neil Cardona Area : 400 Sqm

ADVANCE CONTACT SOLUTIONS, INC.

PROPOSED OFFICE FIT-OUT PROJECT (April 11 – June 10, 2007)

Project Cost : P 4,000,000.00 ($ 83,857.45) Location : 10th Floor Citibank Center, Paseo de Roxas, cor. Villar St., Makati City Design By : DionedaVirata Design Contact Person : Mr. Ramon De la Isla Area : 600 Sqm.

Page 75: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

KUMON PHILIPPINES, INC.

PROPOSED OFFICE FIT-OUT PROJECT (March 01 – May 30, 2007)

Project Cost : P 3,350,000.00 ($70,157.07) Location : 17F & 19F, Philamlife Tower, Paseo de Roxas, Makati City, Philippines Design By : Adrianse Group Contact Person : Ms. Tess Austria Area : 800 Sqm.

JP MORGAN CHASE BANK

PROPOSED OFFICE FIT-OUT PROJECT ( March 06 – May 07, 2007)

Project Cost : P 9,500,000.00 ($ 198,952.88 ) Location : L32 Philamlife Tower, Paseo de Roxas St., Makati City, Philippines Design By : Goudie Associates Contact Person : Arch. Joey Jimenez Area : 470 Sqm.

MANILA OSLO RENEWABLE ENTERPRISE OFFICE

PROPOSED OFFICE FIT-OUT PROJECT (February - April 2007 )

Project Cost : P 5,900,000.00 ($ 123,560.21) Location : 2F Herco Building, Buenavides St., Makati City, Philippines Design By : Adrianse Group Contact Person : Mr. FudjiEscuadra Area : 345 Sqm.

LA FARGE CEMENT SERVICES (PHILS.), INC.

PROPOSED OFFICE FIT-OUT PROJECT (April 02 – May 10, 2007)

Project Cost : P 4,099,000.00 ($ 85,842.94) Location : 25F & 26F Salcedo Tower, H.V. Dela Costa St., Makati City, Philippines Design By : DB&B Contact Person : Arch. Gina R. Gomez Area : 1,037 Sqm.

ASTRA ZENECA PHARMACEUTICALS (PHILS.)INC.

PROPOSED OFFICE FIT-OUT PROJECT (June – August 2007)

Project Cost : P 15,900,000.00 ($ 387,804.87) Location : 25th & 26thSalcedo Tower 169 H.V. De La Costa St., Makati City Design By : ADB+ Contact Person : Mr. Juan Miraflor Area : 1,300 Sqm.

EMERSON ELECTRIC (ASIA) LTD.

PROPOSED OFFICE FIT-OUT PROJECT (November - December 2007)

Project Cost : P 19,500,000.00 ($ 475,609.00) Location : Part of 23rd Floor San Miguel Properties Centre, Ortigas Centre, Pasig City Design By : Goudie Associates Contact Person : Mr. Nigel Gayares Area : 2,000 Sqm.

Page 76: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

EMERSON NETWORK POWER

PROPOSED OFFICE FIT-OUT PROJECT (April 13 – May 21, 2007)

Project Cost : P 8,450,000.00 ($ 176,963.35) Location : 18F Orient Square Bldg., Emerald Ave., Ortigas Avenue, Pasig City Design By : Goudie Associates Contact Person : Ms. Romina Santiago Area : 520 Sqm.

EMERSON NETWORK POWER (PHASE 2)

PROPOSED OFFICE FIT-OUT PROJECT (September – October 2007)

Project Cost : P 29,000,000.00 ($ 707,317.00) Location : 23rd Floor San Miguel Properties Centre, Ortigas Centre, Pasig City Design By : Goudie Associates Contact Person : Ms. Imelda Lim Area : 3,013 Sqm.

CEO SUITES

PROPOSED OFFICE FIT-OUT PROJECT (April – May, 2007)

Project Cost : P 7,800,000.00 ($ 151,664.93) Location : 37F Penthouse Level LKG Bldg., Ayala Ave., Makati City, Philippines Design By : DB&BContact Person: Ms. Gina R. Gomez Area : 1,500 Sqm.

CASPO ON LINE GAMING

PROPOSED OFFICE FIT-OUT PROJECT (April 04-30, 2007)

Project Cost : P 2,838,080.00 ($ 59,436.23) Location : 20F Tower I, RCBC Plaza, Ayala Ave., cor. Gil Puyat Ave., Makati City Design By : DB&B Contact Person : Mr. Roldan Tamayo Area : 120 Sqm.

ASTEC POWER

PROPOSED OFFICE FIT-OUT PROJECT (January 29 – March 16, 2007)

Project Cost : P 24,000,000.00 ($ 502,617.81) Location : 10th,11th, & 12th Floors 1800 Eastwood Ave. Bldg., Eastwood City, Libis Q.C. Design By : Goudie Associates Contact Person : Mr. Gary Guiang Area : 1,800 Sqm.

PACIFIC HEALTHCARE (PHILS.), INC.

PROPOSED OFFICE FIT-OUT PROJECT (March 20 – April 15, 2007)

Project Cost : P 3,800,000.00 ($ 81,675.40) Location : Penthouse B, Prince Building, 117 Roda St., Legaspi Village, Makati City Design By : Steven J. Leach + Associates Contact Person : Mr. AvelinoLugtu Area : 200 Sqm.

Page 77: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

GAMING WEB, INC.

PROPOSED OFFICE FIT-OUT PROJECT (February 12, 2007 – April 04, 2007)

Project Cost : P 3,212,000.00 ($ 67,267.02) Location : 17F Yuchengco tower, RCBC Plaza, Makati City, Philippines Design By : Binswanger Philippines Contact Person : Mr. Bobby Fernan Area : 1,200 Sqm.

PACIFIC HARBOR INVESTMENTS HOLDINGS PHILS., INC.

PROPOSED OFFICE FIT-OUT PROJECT (February 27- March 13, 2007)

Project Cost : P 2,100,000.00 ($43,979.06) Location : 23F Enterprise Center, Ayala Avenue, Makati City, Philippines Design By : Steven J. Leach + AssociatesContact Person: Mr. AvelinoLugtu Area : 100 Sqm.

Page 78: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :
Page 79: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

LIST OF COMPLETED PROJECTS 2006

RUFINO TOWER CONDOMINIUM

PROPOSED OFFICE FIT-OUT PROJECT (February 25, 2006 – On-going)

Project Cost : P 9,750,000.00 ($ 191,176.47) Location : Rufino Street, Rufino Tower, Ayala Avenue, Makati City Design By : Atelier Almario Contact Person : Ms. Blanca Castro Area : 900 Sqm.

JWT PHILIPPINES 7TH FLOOR

PROPOSED OFFICE FIT-OUT PROJECT (February 2006 – On-going)

Project Cost : P 12,250,000.00 ($ 240,196.07) Location : 7F Equitable Bank Tower, Paseo de Roxas, Makati City Design By : Innovation Contact Person : Ms. Julie de Guzman Area : 750 Sqm.

MILLWARD BROWN

PROPOSED OFFICE FIT-OUT PROJECT (February 2006 – On-going)

Project Cost : P 2,967,000.00 ($ 58,176.47) Location : 8F Equitable Bank Tower, Paseo de Roxas, Makati City Design By : Innovation Contact Person : Mr. Allan Red Area : 290 Sqm.

UNILEVER PHILIPPINES (FOOD FOR LIFE)

PROPOSED OFFICE FIT-OUT PROJECT (March 2006 – On-going )

Project Cost : P 650,000.00 ($ 12,745.00) Location : U.N. Avenue, Manila Design By : Unilever Engineering Group Contact Person : Nips Poblete Area : 100 Sqm.

Page 80: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

LIST OF PROJECTS

CALL CENTER PROJECTS

LIST OF COMPLETED CALL CENTER PROJECTS

CONVERGYS PHILIPPINES SERVICES

PROPOSED OFFICE FIT-OUT PROJECT (October – December 2008)

Project Cost : P 15,000,000.00 ($348,837.20) Location : 9F Robinson Equitable Tower, Ortigas Center, Pasig City Design By : Goudie Associates Contact Person : Mr. Frank Millare Area : 2,000 Sqm

CONVERGYS PHILIPPINES SERVICES - COMMONWEALTH

PROPOSED OFFICE FIT-OUT PROJECT (September – December 2008)

Project Cost : P 16,000,000.00 ($ 307,692 ) Location : Diliman Commercial Center, Commonwealth Ave., Diliman Quezon City Design By : Goudie Associates Contact Person : Mr. Frank Millare Area : 1,000 Sqm

SITEL CUSTOMER CARE (PHILS.), INC.

PROPOSED FIT-OUT WORKS (July2007– September 2007)

Project Cost : P 22,507,262.50 ($ 548,957.62) Location : 24th Floor Cyber One Builing, Eastwood Libis Quezon City Design By : DTSI Contact Person : Mt. JpsephIric Mina Area : 1,320 Sqm.

SC RESERVATION (PHILIPPINES), INC.

PROPOSED OFFICE FIT-OUT PROJECT (March 01 – June 30, 2007)

Project Cost : P 21,000,000.00 ($ 439,790.58) Location : JHMC Building, Club Camp John Hay 1Loakan Rd., Baguio City Design By : Del Rosario Design Group Contact Person : Arch. Fernando Del Rosario Area : 2,100 Sqm.

Page 81: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

TELUS INTERNATIONAL PHILS. INC

PROPOSED OFFICE FIT-OUT PROJECT (April - June 2009)

Project Cost : P 60,000,000.00 ($ 1,304,347.80) Location : L2 Cyber Park, Gen, McArthur Ave., Araneta Center, Quezon City Design By : Goudie Associates Contact Person : Mr. Fernan Amor Area : 2,000 Sqm.

TELUS INTERNATIONAL PHILS. INC

PROPOSED OFFICE FIT-OUT PROJECT (March - June 2008)

Project Cost : P 15,180,825.00 ($ 365,714.88) Location : 23F Discovery Centre, ADB Avenue, Pasig City Design By : Goudie Associates Contact Person : Mr. Fernan Amor Area : 800 Sqm.

TELUS INTERNATIONAL PHILS. INC

PROPOSED OFFICE FIT-OUT PROJECT (July – September 2008)

Project Cost : P 21,428,571.42 ($ 412,087.00) Location : 31F Discovery Centre, ADB Avenue, Pasig City Design By : Goudie Associates Contact Person : Mr. Fernan Amor Area : 1,000 Sqm.

SITEL (PHILIPPINES) INC. PROPOSED SITEL CALL CENTER AND OFFICE FIT-OUT PROJECT (April – May 2004)

Phase 1 – 20th Floor Project Cost : P 20,500,000.00 ($ 372,727.27) Phase 2 – 26th Floor Project Cost : P 19,500,000.00 ($ 353,545.45) Location : Cyber One Bldg., Eastwood Cyberpark, Quezon City Design By : Adrianse Group Phils.,Inc/ Contact Person : Mr. Joseph Iric Mina Area : 1,200 Sqm.

AMBERGRIS SOLUTIONS

PROPOSED FIT-OUT WORKS (30TH FLOOR) (April – May 2004)

Project Cost : 9,100,000.00 ($ 165,545.55) Location : 30th Floor, Raffles Corporate Center Design By : Asterisk, Inc. Contact Person : Mr. Fernando Amor Area : 1,200 Sqm.

AMBERGRIS SOLUTIONS PROPOSED FIT-OUT WORKS (7TH& 18TH FLOORS) 7th Floor (January – February 2004)

Project Cost : P 12,060,677.41

Page 82: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

($ 219,285.04) Area : 1,200 Sqm.

18th Floor (October – December 2003)

Project Cost : 10,615,992.80 ($ 193,018.05) Area : 1,200 Sqm. Location : 7th& 18th Floor, Raffles Corporate Center Design By : Asterisk, Inc. Contact Person : Mr. Fernando Amor

HARTE HANKS INTERNATIONAL STRATEGIES (PHASE 1)

PROPOSED OFFICE FIT-OUT PROJECT (November 2005 – February 2006)

Project Cost : P 31,485,000.00 ($ 583,055.55) Location : 4th Floor, Market Market, Fort Bonifacio Global City, Taguig City Design By : Goudie Associates Contact Person : Mr. Fernan Amor Area : 2,400 Sqm.

HARTE HANKS INTERNATIONAL STRATEGIES (PHASE 2)

PROPOSED OFFICE FIT-OUT PROJECT (November 2005 – 2007)

Project Cost : P 32,125,000.00 ($ 741,916.85) Location : 4th Floor, Market Market, Fort Bonifacio Global City, Taguig City Design By : Goudie Associates Contact Person : Mr. Fernan Amor Area : 2,200 Sqm.

HARTE HANKS INTERNATIONAL STRATEGIES (PHASE 3)

PROPOSED OFFICE FIT-OUT PROJECT ( February 2006 - 2007)

Project Cost : P 11,000,000.00 ($ 254,041.57) Location : 4th Floor, Market Market, Fort Bonifacio Global City, Taguig City Design By : Goudie Associates Contact Person : Mr. Fernan Amor Area : 400 Sqm.

SIX CONTINENTS (SC RESERVATION PHILIPPINES, INC.)

PROPOSED FIT-OUT WORKS (June 30 – October 2003)

Project Cost : P 18,805,094.68 ($ 341,910.81) Location : 28th& 29th Floors Tower 2 RCBC Plaza, Ayala Avenue, Makati City Design By : Del Rosario Design Group Contact Person : Arch. Fernando del Rosario Area : 2,000 Sqm.

INFONXX PHILIPPINES, INC.

PROPOSED OFFICE FIT-OUT PROJECT (February 01 – March 16, 2007)

Project Cost : P 1,940,000.00 ($ 40,628.28) Location : 11F RCBC Plaza Tower II, Ayala Avenue, Makati City, Philippines Design By : Del Rosario Design Group Contact Person : Arch. Fernando Del Rosario Area : Sqm.

Page 83: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

INFONXX CALL CENTER

PROPOSED OFFICE FIT-OUT WORKS (July – September 2004)

Project Cost : P 10,878,892.60 ($ 197,798.05) Location : 14th Floor, RCBC Plaza, Tower 2, Ayala Avenue, Makati City Design By : Del Rosario Design Group Contact Person : Arch. Ronald Angeles Area : 2,480 Sqm.

Page 84: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

LIST OF COMPLETED PROJECTS 2005

NOKIA PHILIPPINES – GATEWAYPROPOSED OFFICE FIT-OUT PROJECT(September - October 2005)

Project Cost : P 1,540,000.00 ($ 30,800.00)

Location : 4th Floor Gateway Mall, Cubao, Quezon CityDesign By : KingsmenContact Person : Mr. Francis TeoArea : 80 Sqm.

NOKIA PHILIPPINES – ROBINSONS MANILAPROPOSED OFFICE FIT-OUT PROJECT(July - August 2005)

Project Cost : P 1,040,000.00 ($ 20,800.00)

Location : 2nd Floor Robinsons Mall, ManilaDesign By : KingsmenContact Person : Mr. Francis TeoArea : 54 Sqm.

SAFEWAY PHILTECH, INC.PROPOSED OFFICE EXPANSION(May 30 – June 31, 2005)

Project Cost : P 10,452,000.00 ($ 190,036.36)

Location : 22/F Yuchengco Tower, RCBC Plaza, Ayala Ave., Makati CityDesign By : Team Asterisk Inc.Contact Person : Ms. Cherrie RacelisArea : 800 Sqm.

ING OFFICE RESTACKINGPROPOSED FIT-OUT WORKS(May 27 – Aug. 21, 2005)

Project Cost : P 8,900,000.00 ($ 161,818.18)

Location : 20/F & 21/F Tower One, Ayala Triangle, Makati CityDesign By : Goudie Associates Manila Ltd Co.Contact Person : Ms. Marie Ann CheeArea : 3,000 Sqm.

ENDERUM COLLEGES / HOTEL SCHOOLPROPOSED FIT-OUT WORKS(May 18 – Sept.. 30, 2005)

Project Cost : P 9,000,000.00 ($ 163,636.36)

Location : 2nd Floor, Wynsum Tower, Emerald Ave., Ortigas Center, Pasig CityDesign By : Goudie Associates Manila Ltd Co.Contact Person : Mr. Fernan AmorArea : 8,000 Sqm.

Page 85: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

INVENT ASIAPROPOSED FIT-OUT WORKS(May 30 – June. 03, 2005)

Project Cost : P 1,375,000.00 ($ 25,000.00)

Location : 1208 Orient Square Bldg., Emerald Ave., Ortigas Center, Pasig CityContact Person : Mr. Allan StevensArea : 168 Sqm.

KUMON PHILIPPINES, INC.PROPOSED FIT-OUT WORKS(May 30 - June 30, 2005)

Project Cost : P 1,700,000.00 ($ 30,909.09)

Location : 19F PhilamLife Tower, Ayala Ave., Makati CityDesign By : Goudie Associates Manila Ltd Co.Contact Person : Ms. Marie Anne CheeArea : 384 Sqm.

UNILEVER PHILIPPINES, INC. – LEARNING CENTERPROPOSED FIT-OUT WORKS(June 14 – July 2005)

Project Cost : P 3,200,000.00 ($ 58,181.81)

Location : U.N. Avenue, ManilaDesign By : HBO + EMTBContact Person : Engr. Nelson Delos ReyesArea : 300 Sqm.

WIRELESS SERVICE ASIAPROPOSED RENOVATION WORKS(March – April 2005)

Project Cost : P 7,362,329.25 ($ 133,860.53)

Location : 53/F PBCOM Tower, Ayala Ave. cor Hererra St., Makati CityDesign By : Team Asterisk Inc.Contact Person : Arch. Mia MangahasArea : 800 Sqm.

MINDSHARE AND MAXXUSPROPOSED OFFICE EXPANSION PROJECT(April – May 2005)

Project Cost : P 3,979,862.00 ($ 72,361.13)

Location : 17/F & 25/F Philamlife Tower, Paseo de Roxas, Makati CityDesign By : Goudie Associates Manila Ltd Co.Contact Person : Mr. Carlos de Castro

Page 86: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

MCI WORLDCOM PHILIPPINES, INC.PROPOSED OFFICE RENOVATION WORKS(April - May 2005)

Project Cost : P 2,632,681.68 ($ 47,866.94)

Location : 17th Floor, The Enterprise Center, Ayala Ave., Makati CityDesign By : Team Asterisk Inc.Contact Person : Arch. Mia MangahasArea : 300 Sqm.

TIM MAKATIPROPOSED TIM MAKATI OFFICE(March - April 2005)

Project Cost : P 6,400,000.00 ($ 116,363.64)

Location : 5th Floor King’s Court II Bldg., Pasong Tamo, Makati CityContact Person : Arch. Leonardo G. Sioco Jr.Area : 693 Sqm.

Page 87: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

LIST OF COMPLETED PROJECTS 2004

APACPROPOSED FIT-OUT WORKS(December 2003 – January 2004)

Project Cost : P 7,775,000.00 ($ 141,363.63)

Location : 3F Bldg. C Northgate Cyberzone, Filinvest Corporate City, AlabangDesign By : Del Rosario Design GroupContact Person : Arch. Allan Joseph LimArea : 1,000 Sqm.

ON –DEMAND SOLUTIONSPROPOSED FIT-OUT WORKS(July – October 2004)

Project Cost : P 4,500,000.00 ($ 81,818.18)Location : 17/F B.A. Lepanto Bldg. 8747 Paseo de Roxas, Makati CityDesign By : Binswanger Phils., Inc.Contact Person : Mr. Jin PischerArea : 1,200 Sqm.

GENERAL MOTORS AUTOMOBILES PHILS. INC.PROPOSED FIT-OUT WORKS(March – April 2004)

Project Cost : P 3,117,000.00 ($ 56,672.72)Location : 30th Floor, Philamlife Tower, Paseo de Roxas, Makati CityDesign By : Asterisk, Inc.Contact Person : Mr. Fernan AmorArea : 450 Sqm.

UNILEVER PHILIPPINES, INC.PROPOSED FIT-OUT WORKS(March – April 2004)

Project Cost : P 3,051,887.27 ($ 55,488.85)

Location : 1351 United Nations Avenue, ManilaDesign By : HBO+EMTBContact Person : Engr. Nelson Delos ReyesArea : 280 Sqm.

Page 88: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

CARRIER INC. TENANCYPROPOSED OFFICE FIT-OUT(April – May 2004)

Project Cost : P 1,450,000.00 ($ 26,363.00)

Location : 3F Concepcion Building, Sen. Gil Puyat., Makati CityDesign By : Team Asterisk, Inc.Contact Person : Arch. Mia MangahasArea : 340 Sqm.

ISS INC.PROPOSED OFFICE FIT-OUT(may – june 2004)

Project Cost : P 2,050,000.00 ($ 37,272.72)

Location : 15th Floor Philamlife Tower, Paseo de Roxas, Makati CityDesign By : Goudie AssociatesContact Person : Mr. Tom TuazonArea : 100 Sqm.

MONDE NISSIN - SHERIDANPROPOSED OFFICE FIT-OUT(June 2004 – January 2005) )

Project Cost : P 7,456,000.00 ($ 135,563.63)

Location : Sheridan St., Pioneer Ave., Mandaluyong CityDesign By : ADD + ConsortiumContact Person : Arch. Zaldy delos ReyesArea : 1,500 Sqm.

Page 89: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

LIST OF COMPLETED PROJECTS 2003

JAPANESE RESTAURANTPROPOSED JAPANESE RESTAURANT(June – October 2003)

Project Cost : P 1,300,000.00Location : Unit 103 Gateway Center, Magallanes Village, Makati CityDesign By : New Success DesignContact Person : Mrs. Sylvia H. LopezArea : 160 Sqm.

THOMSON FINANCIAL 17TH, 18TH & 20TH FLOORSPROPOSED FIT-OUT WORKS(Sept. 05, 2003 – Oct. 28, 2003)

Project Cost : P 1,400,000.00Location : 17th, 18th & 20th Floors Ayala Life – FGU Bldg., Ayala Ave, Makati CityDesign By : Goudie AssociatesContact Person : Mr. Freddie GalvesArea : 200 Sqm.

SUPERIUS (CORPORATION) TENANCYPROPOSED FIT-OUT WORKS(July 21 - October 2003)

Project Cost : P 3,785,040.00Location : Unit 805 Asian Star Building, Asean Drive, Filinvest Corporate City

Alabang, Muntinlupa CityDesign By : Asterisk, Inc.Contact Person : Arch. Mia MangahasArea : 250 Sqm.

PFIZERPROPOSED PFIZER FIT-OUT WORKS(June 30 – August 2003)

Project Cost : P 25,839,262.61Location : 32nd Floor Ayala Life-FGU Center, Ayala Avenue, Makati CityDesign By : HBO+EMTBContact Person : Ms. Belle CustodioArea : 956 Sqm.

MTV PHILIPPINES TENANCYPROPOSED FIT-OUT WORKS(May – August 2003)

Project Cost : P 8,300,000.00Location : Unit C The Fort, Bonifacio Global City, Taguig, Metro ManilaDesign By : DNA Design Group PhilippinesContact Person : Ms. Mia MangahasArea : 800 Sqm.

ANZ BANKPROPOSED FIT-OUT WORKS(June – August 2003)

Project Cost : P 7,383,000.00Location : 23rd Floor, GT Tower, Ayala Avenue, Makati CityDesign By : HBO + EMTBContact Person : Mr. Kim ChanArea : 1,200 Sqm.

Page 90: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

WORLD BANKPROPOSED WORLD BANK OFFICE EXPANSION(May - July 2003)

Project Cost : P 6,500,000.00Location : 20th Floor Taipan Building, Ortigas Center, Pasig CityDesign By : Steven J. Leach, Jr. + AssociatesContact Person : Arch. Leonardo G. SiocoArea : 400 Sq.m

KUMON PHILIPPINES, INC.PROPOSED KUMON PHILS. OFFICE EXPANSION(June – August 2003)

Project Cost : P 1,007,464.00Location : 19/F Philamlife Tower, Paseo de Roxas, Makati CityDesign By : Goudie AssociatesContact Person : Ms. Marie Ann CheeArea : 180 Sq.m

ASIA GLOBAL CROSSINGPROPOSED FIT-OUT WORKS(June - August 2003)

Project Cost : P 890,000.00Location : 18/F Tower I The Enterprise Center 6766 Ayala Ave., Makati CityDesign By : ADD + ConsortiumContact Person : Arch. Zaldy delos ReyesArea : 200 Sq.m

SAFEWAY PHILTECH, INC.PROPOSED FIT-OUT WORKS(May – August 2003)

Project Cost : P 15,445,694.05Location : 21/F & 22/F Yuchengco Tower, RCBC Plaza, Ayala Avenue, Makati CityDesign By : DNA Design Group Phils., Inc.Contact Person : Ms. Mia MangahasArea : 1,954 Sq.m

DHL WORLDWIDE EXPRESS (PHILS.) CORPORATION (DHL GATEWAY)PROPOSED DHL GATEWAY(March - August 2003)

Project Cost : P 22,300,000.00Location : R5 MaintenanceDesign By : Steven J. Leach, Jr. + AssociatesContact Person : Arch. Leonardo G. Sioco

SPL OFFICEPROPOSED FIT-OUT WORKS(February – March 2003)

Project Cost : P 3,676,235.00Location : 23/F Yuchengco Tower, RCBC Plaza, Ayala Avenue, Makati CityProject Manager : Mr. Brian Parsons

Ms. Mandy BenosaArea : 465 Sq.m

Page 91: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

LUNDBECK MANILAPROPOSED FIT-OUT WORKS(March – April 2003)

Project Cost : P 900,900.00Location : 3/F Ace Building Rada St., cor. Dela Rosa St., Makati CityDesign By : Innovation HKContact Person : Mr. John ScadeArea : 98 Sq.m

Page 92: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

LIST OF COMPLETED PROJECTS 2002

MARSMAN DRYSDALEPROPOSED FIT-OUT WORKS(September – November 2002)

Project Cost : P 8,000,000.00Location : 45 Level Philamlife Tower, Paseo de Roxas, Makati CityDesign By : ADD + Consortium, Inc.Contact Person : Arch. Bong Libo

MICROSOFT PHILS., INC.PROPOSED FIT-OUT WORKS(November – December 2002)

Project Cost : P 1,163,000.00Location : 22/F Tower II The Enterprise Center 6766 Ayala Ave., Makati CityDesign By : HBO + EMTB Philippines, Inc.Contact Person : Ms. Belle Costudio

MONDE NISSIN CORP., INC.PROPOSED FIT-OUT WORKS(June 27 – October 2002)

Project Cost : P 7,000,000.00Location : 22nd & 23rd Floor 6750 Office Tower, Ayala Ave., Makati CityDesign By : ADD + ConsortiumContact Person : Arch. Bong Libo

SARA LEE PHILIPPINESPROPOSED FIT-OUT WORKS(October – December 2002)

Project Cost : P 11,589,435.00Location : 24th & 25th Floor Insular Building, Alabang, Metro ManilaDesign By : DNA Design Group Phils., Inc.Contact Person : Ms. Mia Mangahas

BANGKO SENTRAL NG PILIPINAS - CAFETERIAPROPOSED FIT-OUT WORKS(November 2002 – February 2003)

Project Cost : P 25,607,804.66Location : 2/F Cafetorium Bldg. BSP Complex, P. Ocampo cor. A. Mabini, Malate, ManilaDesign By : Steven J. Leach, Jr. + AssociatesContact Person : Arch. Leonardo G. Sioco

DHL WORLDWIDE EXPRESS (PHILS.) CORPORATION (DHL TIMOG)PROPOSED DHL WAREHOUSE(June – August 2002)

Project Cost : P 12,000,000.00Location : 99 Timog Avenue, Diliman, Quezon CityDesign By : Steven J. Leach, Jr. + AssociatesContact Person : Arch. Leonardo G. Sioco

Page 93: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

CORMANT TECHNOLOGYPROPOSED FIT-OUT WORKS(March – April 2002)

Project Cost : P 1,575,000.00Location : 10F Net One Bldg. Fort Bonifacio Global City, Taguig, Metro ManilaDesign By : Steven J. Leach, Jr. + AssociatesContact Person : Mr. Paul GoodisonArea : 150 Sqm.

FIRMENICHPROPOSED FIT-OUT WORKS(March – April 2002)

Project Cost : P 2,640,000.00Location : 2/F UPRC III Pasong Tamo Extension, Makati CityDesign By : Davenport Campbell, Inc.Contact Person : Ms. Belle CostudioArea : 500 Sqm.

LINK2SUPPORT, INC.PROPOSED FIT-OUT WORKS(March – May 2002)

Project Cost : P 10,000,000.00Location : 5/F Techno Plaza One, Eastwood City, Libis, Quezon CityDesign By : Goudie AssociatesContact Person : Arch. Reynan CumpasArea : 1,300 Sqm.

FRASER PLACEPROPOSED FIT-OUT WORKS(March – April 2002)

Project Cost : P 3,924,050.85Location : The Forbes Tower, Valero Street, Makati CityDesign By : Tema InternationalContact Person : Arch. Ruby Socorro O. Bucoy-SohArea : 750 Sqm.

HERBALIFEPROPOSED FIT-OUT WORKS(March – May 2002)

Project Cost : P 5,950,000.00Location : G/F Royal Match Building, 6780 Ayala Avenue, Makati CityDesign By : Steven J. Leach, Jr. + AssociatesContact Person : Arch. Leonardo G. SiocoArea : 500 Sqm.

Page 94: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

LIST OF COMPLETED PROJECT 2001

THOMSON FINANCIALPROPOSED FIT-OUT WORKS(October – November 2001)

Project Cost : P 6,821,600.00Location : 17th Floor Ayala Life FGU Bldg., Ayala Avenue, Makati CityDesign By : Steven J. Leach, Jr. + AssociatesContact Person : Mr.Freddie Galves (Thomson), Ms. Mina de Leon (SLA)Area : 500 Sqm.

DHL WORLDWIDE EXPRESS (PHILS) CORP.PROPOSED DHL PHILIPPINES WAREHOUSE(October - December 2001)

Project Cost : P 10,200,000.00Location : M & N Square Building, C. Raymundo Ave., Pasig CityProject Management : Bovis Lend Lease Projects Pte. Ltd.Design By : Steven J. Leach, Jr. + Associates (Consultants) Inc.Contact Person : Mr. Mike Fitspatrick / Chris WilliamsArea : 1,330 Sqm.

ATR PROFESSIONAL ASSURANCE CORPORATIONPROPOSED INTERIOR RENOVATION WORKS(October - December 2001)

Project Cost : P 4,324,060.00Location : The Professional Tower, Boni Cor. EDSA, Mandaluyong CityDesign By : New Success Designs, Inc.Contact Person : Ms. Sylvia Heras Lopes (NSDI), Mr. Eulogio A. Mendoza (ATR)Area : 300 Sqm.

ALDEX REALTY CORP.PROPOSED FIT-OUT WORKS(October - December 2001)

Project Cost : P 2,850,000.00Location : 41/F Discovery Centre 25 ADB Avenue, Ortigas Centre, Pasig CityDesign By : Goudie Associates Manila Ltd. Co.Contact Person : Mr. Herman Son / Ms. Mary Ann Chee (Goudie)Area : 180 Sqm.

Page 95: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

SPL WORLDGROUPPROPOSED FIT – OUT WORKS(August – October 2001)

Project Cost : P 7,100,000.00Location : Level 23 Yuchengco Tower, Ayala Ave. cor. Gil Puyat Ave., Makati CityProject Management By : Hailey Construction (Consultants) Corporation / DNA Consulting (HK) Ltd.Design By : SPACE (US)Contact Person : Mr. Brian ParsonsArea : 650 Sqm.

REGUS BUSINESS CENTREPROPOSED FIT – OUT WORKS(August – September 2001)

Project Cost : P 14,321,272.48Location : 18F Philamlife Tower 8767 Paseo de Roxas, Makati CityDesign By : Goudie AssociatesContact Person : Mr. Reynan CumpasArea : 2,000 Sqm.

PRA SOLUTION / NAVITAIRE, INC.PROPOSED NAVITAIRE OFFICE EXPANSION(July – August 2001)

Project Cost : P 2,954,000Location : 16/F Philamlife Paseo de Roxas, Makati CityDesign By : Davenport Campbell, Inc.Contact Person : Mr.Tony Villarino, Jr.Area : 550 Sqm.

GREEN CROSS INC.PROPOSED OFFICE RELOCATION(May - August 2001 )

Project Cost : P 8,800,000.00Location : 14 & 15/F Common Goal Tower, Industry St., Alabang-Zapote Rd., MuntinlupaDesign By : Goudie Associates, Ltd.Contact Person : Ms. Joanna CoArea : 740 Sqm.

PLANTERS DEVELOPMENT BANKPROPOSED EXTERIOR RENOVATION WORKS OF FRONT & BACK AREAS(June – August 2001)

Project Cost : P 1,305,212.50Location : No. 314 Sen.Gil Puyat Avenue, Makati CityDesign By : New Success DesignContact Person : Ms.Sylvia Heras Lopez (NSDI), Mr.Leo Katigbak (Planters Bank)Area : 200 Sqm.

ABS-CBN BANTAY BATAPROPOSED ABS-CBN BANTAY BATA OFFICE(July – August 2001)

Project Cost : P 640,000.00Location : 2nd Floor ABS-CBN Building Mother Ignacia, Quezon CityDesign By : New Success DesignContact Person : Ms. Sylvia Heras LopezArea : 53 Sqm

Page 96: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

XIC GLOBAL OFFICEPROPOSED FIT-OUT WORKS(March 01-30, 2001)

Project Cost : P 4,467,643.00Location : 22nd Floor IBM Plaza,Eastwood City, Libis, Quezon CityDesign By : DNA Consulting (HK) Ltd.Contact Person : Ms. Grace Frias (XIC), Mr. Nick Torres (DGD)Area : 1,200 Sqm.

PHILIPPINE FOUNDATION FOR GLOBAL CONCERNPROPOSED FIT-OUT WORKS(June 01-30, 2001)

Project Cost : P 2,000,000.00Location : 43/F Philamlife Tower 8767 Paseo de Roxas, Makati CityDesign By : Imagination, Inc.Contact Person : Ms. Suzette CocuacoArea : 380 Sqm

MARUBENI ENERGY SERVICES CORP.PROPOSED FIT-OUT WORKS(February – May, 2001)

Project Cost : P 4,500,000.00Location : 36/F The Enterprise Center, Paseo de Roxas, Makati CityDesign By : Steven J.Leach, Jr. + AssociatesContact Person : Engr. Romy Canlobo (Marubeni), Ms.Mina de Leon (SLA)Area : 330 Sqm.

SAN MIGUEL PACKAGINGPROPOSED FIT-OUT WORKS(May 15 – June 15, 2001)

Project Cost : P 3,2000,000.00Location : 9th & 10th Floor San Miguel Bldg., Saint Francis Ave., Mandaluyong CityContact Person : Mr. Oliver GorospeArea : 1,200 Sqm.

KAWASAKI GROUP OF COMPANIESPROPOSED FIT-OUT WORKS(February 25 - May 2001)

Project Cost : P 5,710,000.00Location : Makati Sky Plaza, Ayala Avenue, Makati CityDesign By : Goudie AssociatesContact Person : Mr.Yasuhiza Nagata / Ms. Dezzie IslaArea : 948.39 Sqm.

JARDINE LLOYD THOMSONPROPOSED OFFICE RELOCATION(March - April 2001)

Project Cost : P 5,070,503.34Location : 25/F Philamlife Tower, 8767 Paseo de Roxas, Makati CityDesign By : Davenport Campbell, Inc.Contact Person : Mr. Kevin NormanArea : 650 Sqm.

Page 97: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

PLANTERS BANKPROPOSED FIT-OUT WORKS1. G/F BANKING HALL INTERIOR & FRONT EXTERIOR AREA RENOVATION(November – December 2000)2. SIDE & BACK AREAS EXTERIOR, ELEVATOR LOBBY & 3/F INTERIOR RENOVATION(January – March, 2001)

Project Cost : P 2,567,900.00 4,630,585.00

Location : Planters Bank Building, Gil Puyat Avenue, Makati CityDesign By : New Success DesignContact Person : Ms. Sylvia Lopez (NSDI), Mr. Leo Katigbak (Planters)Area : 230 Sqm. / 820 Sqm.

PBCOM CORPORATE BUSINESS CENTER (2ND FLOOR)PROPOSED FIT-OUT WORKS(April – June 2001)

Project Cost : P 3,186,880.00Location : 2nd Floor PBCOM Tower, Ayala Avenue, Makati CityDesign By : Steven J. Leach, Jr. & AssociatesContact Person : Arch. Lamberto G. MercadoArea : 200 Sqm.

PBCOM CORPORATE BUSINESS CENTER (3RD FLOOR)PROPOSED FIT-OUT WORKS(April – June 2001)

Project Cost : P 6,250,000.00Location : 3rd Floor PBCOM Tower, Ayala Avenue, Makati CityDesign By : Steven J. Leach, Jr. & AssociatesContact Person : Arch. Lamberto G. MercadoArea : 600 Sqm.

PBCOM CORPORATE BUSINESS CENTER (4TH FLOOR)PROPOSED FIT-OUT WORKS(April – June 2001)

Project Cost : P 4,920,000.00Location : 3rd Floor PBCOM Tower, Ayala Avenue, Makati CityDesign By : Steven J. Leach, Jr. & AssociatesContact Person : Arch. Lamberto G. MercadoArea : 600 Sqm.

PBCOM CORPORATE BUSINESS CENTER (5TH FLOOR)PROPOSED FIT-OUT WORKS(April – June 2001)

Project Cost : P 9,999,000.00Location : 5th Floor PBCOM Tower, Ayala Avenue, Makati CityDesign By : Steven J. Leach, Jr. & AssociatesContact Person : Arch. Lamberto G. MercadoArea : 800 Sqm.

MR. EDWARD GOPROPOSED INTERIOR RENOVATION WORK(June 15 - July 15, 2001)

Project Cost : P 1,616,488.00Location : Unit 16-A Pacific Plaza Tower South, Fort Bonifacio, Makati CityDesign By : New Success DesignContact Person : Ms. Sylvia Heras LopezArea : 250 Sqm

Page 98: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

MR.& MRS. BUTCH ALBERTPROPOSED INTERIOR RENOVATION WORK(May 25 – July 31, 2001)

Project Cost : P 3,260,185.00Location : Unit 21-B Pacific Plaza Tower South, Fort Bonifacio, Makati CityDesign By : New Success DesignContact Person : Ms. Sylvia Heras LopezArea : 250 Sqm

LIST OF COMPLETED PROJECT 2000

THOMSON ASIA PTE. LTD.PROPOSED FIT-OUT WORKS(September - December 2000)

Project Cost : P 8,722,530.00Location : 18th Floor Ayala Life FGU Bldg., Ayala Avenue, Makati CityDesign By : Steven J. Leach, Jr. + AssociatesContact Person : Mr.Freddie Galves (Thomson), Ms. Mina de Leon (SLA)Area : 1,100 Sqm.

PBCOM CORPORATE BUSINESS CENTERPROPOSED FIT-OUT WORKS(November 2000 – January 2001)

Project Cost : P 9,729,700.00Location : Ground Floor PBCOM Tower, Ayala Avenue, Makati CityDesign By : Steven J. Leach, Jr. & AssociatesContact Person : Arch. Lamberto G. MercadoArea : 750 Sqm.

ATLAS RESOURCESPROPOSED FIT-OUT WORKS(Nov. 2000 – January 2001)

Project Cost : P 6,780,000.00Location : 19th Floor PCI Equitable Tower, ADB Avenue, Pasig CityContact Person : Mrs. Janice SuaArea : 660 Sqm.

GLOBAL LINK HOLDINGS CORP.PROPOSED FIT-OUT WORKS(November 2000 – January 2001)

Project Cost : P5,500,000.00Location : 14th Floor Ayala Life FGU Center, Alabang Zapote Road, Muntinlupa CityContact Person : Mr. Alfredo MattaArea : 1,128 Sqm.

UCPB GENERAL INSURANCEPROPOSED FIT-OUT WORKS(Oct. – December 2000)

Project Cost : P 3,884,000.00Location : 24th & 25th Floor LKG Tower, Ayala Avenue, Makati CityDesign By : Group 3 Design StudioContact Person : Arch. Edwin M. Gumila (Group 3)Area : 1,600 Sqm.

Page 99: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

J. WALTER THOMPSON (JWT)PROPOSED FIT-OUT WORKS(Oct. – December 2000)

Project Cost : P 21,790,528.00Location : Level 29 & 30 Tower 1, The Enterprise Center, 6766 Ayala Ave., Makati CityDesign By : BDG Mccoll (Hongkong)Contact Person : Mr. Randi Lorica (JWT), Mr. John Scade (BDG Mccoll)Area : 1,679 Sqm.

KUMON PHILIPPINES, INC.PROPOSED FIT-OUT WORKS(July – October 2000)

Project Cost : P 2,000,000.00Location : 19th Floor Philamlife Tower, Paseo de Roxas, Makati CityDesign By : Goudie AssociatesContact Person : Mr. Joseph InfanteArea : 290 Sqm.

PRA SOLUTIONPROPOSED PRA SOLUTION FIT-OUT WORKS(August – October 2000)

Project Cost : P 7,395,000.00Location : 16th Floor Philamlife Tower, Paseo de Roxas, Makati CityDesign By : Davenport CampbellContact Person : Ms. Joy Alejandro (DC)

QUEZON CITY HALL 14TH & 15TH FLOORPROPOSED INTERIOR FIT-OUT WORKS(April - October 2000)

Project Cost : P 2,712,386.91Location : Quezon City Hall, Quezon CityDesign By : New Success DesignContact Person : Ms. Sylvia Lopez (NSD)Area : 2,040 Sqm.

FPD-SAVILLSPROPOSED FITTING-OUT WORKS(July – October 2000)

Project Cost : P 2,700,000.00Location : 37/F Philamlife Tower, Paseo de Roxas, Makati CityDesign By : Davenport CampbellContact Person : Arch. Joy Alejandro (DC), Mr. David Leechiu (FPD)Area : 310 Sqm.

Page 100: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

PBCOM T. ALONZO BRANCHPROPOSED OFFICE RENOVATION WORKS(July – September 2000)

Project Cost : P 1,550,000.00Location : T. Alonzo St., cor. Soler St., Sta. Cruz, ManilaDesign By : Steven J. Leach, Jr. + AssociatesContact Person : Arch. Lamberto G. MercadoArea : 300 Sqm.

DISCOVERY CENTER 22ND FLOORPROPOSED OFFICE RENOVATION(March – June 2000)

Project Cost : P 13,500,000.00Location : ADB Avenue, Ortigas Center, Pasig CityDesign By : Steven J. Leach, Jr. + AssociatesContact Person : Eng. Edwin Bolanos (Jose Aliling, Inc.), Arch. Ricci Uy (SLA)Area : 1,100 Sqm.

PRIMARK PHILIPPINES, INC.PROPOSED OFFICE RELOCATION(June – July 2000)

Project Cost : P 15,116,000.00Location : 20/F Ayala FGU Center, Ayala Avenue, Makati CityDesign By : Goudie AssociatesContact Person : Ms. Dinah Snowden, Ms. Dezzie Isla (GA)Area : 1,154 Sqm.

TEXACO PHILIPPINES, INC.PROPOSED FIT-OUT WORKS(June – July 2000)

Project Cost : P 7,915,000.00Location : 8th Floor Asian Star Building, Asean Drive, Filinvest Corporate City, AlabangDesign By : Goudie AssociatesContact Person : Mr. James Le JeuneArea : 503 Sqm.

SSA – US VETERANS (US EMBASSY)PROPOSED FIT-OUT WORKS(June – November 2000)

Project Cost : P 2,350,000.00Location : G/F US Embassy Roxas Boulevard, ManilaDesign By : Steven J. Leach, Jr. + AssociatesContact Person : Arch. Agripino AgorArea : 326 Sqm..

Page 101: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

ABN-AMRO SAVINGS BANK BRANCHESPROPOSED FIT-OUT WORKS1. ABN-AMRO SAVINGS BANK – TEKTITE BRANCH Strata 100 Emerald Ave., Ortigas Center, Pasig City

(March – May 2000)2. ABN-AMRO SAVINGS BANK – LIBIS BRANCH IBM Plaza Eastwood Center, Libis, Quezon City

(March – May 2000)3. ABN-AMRO SAVINGS BANK – SHELL HOUSE BRANCH Shellhouse Bldg. Valero cor. Villar St., Makati City (March – May 2000)

Project Cost : P 3,949,000.00 – Tektite Branch 4,075,000.00 – Libis Branch 5,310,000.00 – Shell House Branch

Design By : Davenport CampbellContact Person : Arch. Letlet Reyes (DC), Mr.Area : 175 Sqm. – Tektite Branch

191Sqm. – Libis Branch 235 Sqm. – Shell House Branch

UNITED OVERSEAS BANK PHILIPPINESINTERIOR DESIGN FITTING-OUT WORKS(August – September 2000)

Project Cost : P 5,599,193.80Location : Ground Floor IBP Bldg., Dona Juliana Vargas Ave., Ortigas Center, Pasig CityDesign By : Tema International PhilippinesContact Person : Mr. Vince Au Yoong

OGILVY & MATHER PHILIPPINES, INC.PROPOSED FITTING-OUT WORKS(April – June 2000)

Project Cost : P 12,935,452.00Location : 15/F Philamlife Tower, Paseo de Roxas, Makati CityDesign By : Davenport CampbellContact Person : Ms. Mariel Catacutan (DC), Ms. Nympha Salazar (Ogilvy)Area : 710 Sqm.

ABN AMRO SAVINGS BANKPROPOSED BANKING HALL, GROUND FLOOR AND BASEMENT(February – April 2000)

Project Cost : P 15,250,000.00Location : LKG Tower 68013 Ayala Avenue, Makati CityDesign By : Davenport CampbellProject Management by : Jones Lang LaSalle (HK)Contact Person : Ms. Caroline Cruz (Davenport) Mr. Kenneth Chan (JLL – HK)Area : 754 Sqm.

MINDSHARE MANILAPROPOSED FITTING-OUT WORKS(February – March 2000)

Project Cost : P 7,500,000.00Location : 17th Floor Philamlife Tower, Paseo de Roxas, Makati CityDesign By : BDG McCollProject Management By : Jones Lang LaSalle (HK)Contact Person : Mr. Kenneth Chan (JLL – HK), Mr. Gene Torcal (Mindshare),

Mr. John Scade (BDG McColl) Area : 440 Sqm.

Page 102: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

ABN AMRO SAVINGS BANK 16TH, 17TH, 18TH & 19TH FLOORPROPOSED ABN AMRO SAVINGS BANK FIT OUT WORKS (January 2000 – March 2000 )

Project Cost : P 62,186,000.00Location : LKG Tower 68013 Ayala Avenue, Makati CityDesign By : Davenport CampbellProject Management by : Jones Lang LaSalle (HK)Contact Person : Ms. Caroline Cruz (Davenport) Mr. Kenneth Chan (JLL – HK)Area : 5,200 Sqm.

AVENTIS PHARMACEUTICALSPROPOSED OFFICE INTERIOR FITTING OUT WORKS(February 2000 - March 2000)

Project Cost : P 3,795,000.00Location : 12/F Orient Square, Emerald Avenue, Ortigas Center, Pasig CityDesign By : Group 3 DesignContact Person : Mr. Manolito Co (Aventis), Arch Jesselyn Gumila (Group 3)Area : 700 Sqm.

BAXTER HEALTH CARE PHILIPPINES, INC.PROPOSED OFFICE INTERIOR FITTING OUT WORKS(February 2000 - March 2000)

Project Cost : P 2,800,000.00Location : 19/F Wynsum Corporate Plaza, Emerald Avenue, Ortigas Center, Pasig cityDesign By : Steven J. Leach, Jr. + AssociatesContact Person : Ms. Amie V. Enriquez (Baxter) Arch. Boy Sioco (SLA)Area : 600 Sqm.

JOSE MARI CHAN’S RESIDENCEPROPOSED INTERIOR RENOVATION (MASTER’S BEDROOM, DRESSER & T & B)(April - May 2000)

Project Cost : P 885,000.00Location : #09 Dapdap, North Forbes Park, Makati CityDesign By : New Success DesignContact Person : Ms. Sylvia LopezArea : 55 Sqm.

Page 103: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

LIST OF COMPLETED PROJECT 1999

CHASE MANHATTAN BANKPROPOSED CHASE MANHATTAN BANK INTERIOR FITTING OUT WORKS(December 1999 – March 2000)

Project Cost : P 20,300,000.00Location : 31/F Philamlife Tower, Paseo de Roxas, Makati CityDesign By : Group 3 DesignContact Person : Mr. Gerry Shirley, Mr. Mert Natividad (Chase), Arch. Edwin Gumila (Group 3)Area : 1,500 Sqm.

PBCOM BINONDO 2ND FLOORPROPOSED OFFICE RENOVATION WORKS(November 1999 – March 2000)

Project Cost : P 2,575,000.00Location : #214 PBCOM Building, Juan Luna St., Binondo, ManilaDesign By : Steven J. Leach, Jr. + AssociatesContact Person : Arch. Lamberto G. MercadoArea : 459 Sqm.

PHILIP MORRIS PHILIPPINES, INC.PROPOSED OFFICE RENOVATION(October 1999 – December 1999)

Project Cost : P 12,572,000.00Location : 27/F Tower 1 Enterprises Center, Ayala Ave., cor. Paseo de Roxas, Makati CityDesign By : Goudie Associates ManilaContact Person : Mr. Logan Vijayaratnam, (Philip Morris) Ms. Dinah L. Snowden, (Goudie)Area : 1,175 Sqm.

DISCOVERY CENTRE 4TH FLOORPROPOSED SUPPLY AND INSTALLATION OF HEALTH CLUB FINISHES AT 4TH FLOOR(June 1999 – March 2000)

Project Cost : P 4,500,000.00Location : ADB Avenue, Ortigas Center, Pasig CityDesign By : Steven J. Leach Jr. + AssociatesContact Person : Engr. Edwin Bolaños (Jose Aliling, Inc.) Arch. Ricci Uy (SLA) Area : 1,340 Sqm.

DISCOVERY CENTRE GROUND FLOORPROPOSED SUPPLY AND INSTALLATION OF G/F LOBBIES/HALLWAYS AND ELEVATORLOBBIES(May 1999 – March 2000)

Project Cost : P 3,900,000.00Location : ADB Avenue, Ortigas Center, Pasig CityDesign By : Steven J. Leach Jr. + AssociatesContact Person : Engr. Edwin Bolaños (Jose Aliling, Inc.) Arch. Ricci Uy (SLA) Area : 1,128 Sqm.

LA TONDEÑA DISTILLERS, INC.PROPOSED OFFICE RENOVATION(June - October 1999)

Project Cost : P 3,360,000.00Location : 3rd and 6th Floor San Miguel Building, Pasig CityDesign By : New Success DesignContact Person : Ms. Sylvia Herras - LopezArea : 1,100 Sqm.

Page 104: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

PROCTER & GAMBLE PHILS.PROPOSED RECEPTION LOBBY(June – September 1999)

Project Cost : P 1,033,878.00Location : 14/F 6750 Ayala Avenue, Makati CityDesign By : Steven J. Leach, Jr. + AssociatesContact Person : Arch. Leonardo Sioco (SLA) Area : 95 Sqm

INTERNATIONAL FINANCE CORPORATIONPROPOSED MAIN FITTING OUT WORKS(June – August 1999)

Project Cost : P 2,978,447.00Location : 11/F Tower 1, Ayala Triangle, Ayala Ave., Makati CityDesign By : Goudie Associates Manila Ltd. Co.Contact Person : Arch. Carlos de Castro, (GA) Erwein John M. Catoto, (IFC) Area : 275 Sqm.

MICROSOFT PHILIPPINESPROPOSED OFFICE RENOVATION(July – October 1999)

Project Cost : P 3,900,000.00Location : 22/F Tower 2, The Enterprise Centre, Ayala Ave., Makati CityDesign By : Steven J. Leach, Jr. + AssociatesContact Person : Arch. Ricci Uy, (SLA) Miss Borge Gaerlan, (Microsoft) Area : 1,070 Sqm.

DBS BANK PHILIPPINES, INC. – LEVELS 1, 2, B-1, 6TH & 7THPROPOSED DBS BANK PHILS., INC. OFFICE RENOVATION(February – June 1999)

Project Cost : P 5,146,773.00 ( Levels 1, 2, & B-1) P 5,649,264.00 (Level 6th & 7th)

Location : Levels B-1, 1, 2, 6 & 7, The Enterprise Center, Ayala Ave., Makati CityDesign By : Design Programmers, Inc.Contact Person : Mr. Leslie Seow Area : 5,126 Sqm

DBS BANK PHILIPPINES, INC. - WILSON BRANCHPROPOSED FAÇADE & PARKING RENOVATION(May – June 1999)

Project Cost : P 282,000.00Location : #214 Wilson Street, Greenills, San Juan, M.M.Design By : Design Programmers, Inc.Contact Person : Mr. Leslie Seow

CALATAGAN GOLF CLUBHOUSEPROPOSED CALATAGAN GOLF CLUBHOUSE INTERIOR FINISHING WORKS(Oct. 1998 – July 1999)

Project Cost : P 11,300,000.00Location : Barrio Balintoc, Calatagan, BatangasContact Person : Arch. Bob Sanches, (SLA) / Mr. Alfred C. Moraleja, (GHT)Design By : Steven Leach, Jr. + AssociatesArea : 2,608 Sqm.

Page 105: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

PHILIPPINE BANK OF COMMUNICATIONS - GILMORE BRANCHPROPOSED CIVIL WORKS CONSTRUCTION(January – July 1999)

Project Cost : P 1,575,000.00Location : Gilmore Street cor. Aurora Blvd., Quezon CityDesign By : Steven J. Leach, Jr. + AssociatesContact Person : Mr. Rommel O. Echon, (PBCOM) Area : 203 Sqm

PHILIPPINE BANK OF COMMUNICATIONS - PACO BRANCHPROPOSED CIVIL WORKS CONSTRUCTION(January – July 1999)

Project Cost : P 1,595,000.00Location : Pedro Gil Street, Paco, ManilaDesign By : Steven J. Leach, Jr. + AssociatesContact Person : Mr. Rommel O. Echon, (PBCOM) Area : 110 Sqm

AETNA LIFE INSURANCE – SAN FERNANDOPROPOSED OFFICE INTERIOR RENOVATION(May - June 1999)

Project Cost : P 515,000.000Location : LK Building San Fernando, PampangaContact Person : Arch. Ramon Torres, (SLA) / Mr. Nolan Yambao, (Aetna)Design By : Steven J. Leach Jr. + Associates

PARIBAS ASIA EQUITY (PHILS.)PROPOSED OFFICE INTERIOR RENOVATION WORKS(January – March 1999)

Project Cost : P 860,000.00Location : 25th Flr., Pacific Star Bldg., Buendia cor. Makati Ave., Makati CityContact Person : Ms. Anne Bautista, Ms. Mariel Catacutan (Davenport)

Design By : Davenport CampbellArea : 317.35 Sqm.

THE WORLD BANKPROPOSED OFFICE INTERIOR FIT-OUT WORKS(January - March 1999)

Project Cost : P 5,700,000.00Location : 20th Floor Taipan Place, Garnet St., Ortigas Center, Pasig CityContact Person : Ms. Zeny Uson, (World Bank)Design By : Steven J. Leach, Jr. + Associates

Area : 650 Sqm.

Page 106: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

SAN PASCUAL COGENERATION COMPANY (PHILS.) LIMITEDPROPOSED SAN PASCUAL COGENERATION COMPANY NEW OFFICE(Jan. – Feb. 1999)

Project Cost : P 1,312,000.00Location : 1610/11 Tower One, Ayala Triangle, Ayala Avenue, Makati CityContact Person : Ms. Cristy C. Villanueva, Mr. Jong Guangco (Goudie)

Design By : Goudie AssociatesArea : 525 Sqm.

JONES LANG WOOTTONPROPOSED OFFICE INTERIOR RENOVATION WORKS(Jan. – Feb. 1999)

Project Cost : P 1,387,000.00Location : 8th Floor The Enterprise Center, Ayala Avenue, Makati CityContact Person : Mr. Peter M. Small, Managing Director

Design By : Goudie AssociatesArea : 220 Sqm.

Page 107: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

LIST OF PROJECTS 1998

PHILIPPINE BANK OF COMMUNICATIONS - NOVALICHES BRANCHPROPOSED CIVIL WORKS CONSTRUCTION(June 1998 – January 1999)

Project Cost : P 1,800,000.00Location : Quirino Highway, Novaliches, Quezon CityDesign By : Steven J. Leach, Jr. + AssociatesContact Person : Engr. Antonio Victor R. Antonio, (PBCOM) Area : 311 Sqm

UNITED STATES INFORMATION SERVICESPROPOSED OFFICE INTERIOR FINISHING WORKS(June – Dec. 1998)

Project Cost : P 1,069,561.00Location : US Embassy 1020 Roxas Blvd., Annex Office Bldg. (1st Floor West)Contact Person : Ron Walton - Senior Project Manager - NATI Const. Division

Design By : Karn Charuhas Chapman & TwoheyArea : 1,132 Sqm.

XAVIER SPORTS & COUNTRY CLUBPROPOSED XAVIER SPORTS & COUNTRY CLUBINTERIOR FINISHING WORKS PACKAGE #006(July – Dec. 1998)

Project Cost : P 1,903,733.02Location : Km. 5 Upper Balulang, Carmen, Cagayan De Oro CityDesign By : Alfredo B. Alfonso, Architects & AssociatesContact Person : Arch. Wilfredo Avilla

MANDARIN ORIENTAL HOTELPROPOSED SHOPFITTING AND BUILDING WORKS AT 3RD FLOOR BALLROOM,FUNCTION ROOMS & CORRIDOR(June – Sept. 1998)

Project Cost : P 9,200,000.00Location : 3rd Floor Mandarin Oriental Hotel, Makati Avenue, Makati CityDesign By : Hirsch Bedner AssociatesContact Person : Mr. Lloyd Adrukow - Project Manager , (Mandarin Oriental)

Ms. Gillian Lane / Mr. Andrew Healey, (Quantity Surveyor : WT Partnership)Area : 1,200 Sqm.

AYALA AON RISK SERVICES, INC.PROPOSED OFFICE INTERIOR FIT-OUT WORKS(July – Sept. 1998)

Project Cost : P 7,074,054.00Location : 4/F Ayala Triangle, Ayala Tower 1, Ayala Ave., Makati CityContact Person : Mr. Peter Gebbie / Ms. Teresita “TQ” Quianson, (Ayala Aon)

Mr. Andrew Gay / Arch. Reynan Cumpas (Davenport)Design By : Davenport CampbellArea : 1,093 Sqm.

Page 108: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

ABN – AMRO (HG ASIA SECURITIES) – FINANCE MANAGERPROPOSED FINANCE MANAGER ROOM OFFICE INTERIOR RENOVATION(September 1998 – On going)

Project Cost : P 636,000.00Location : 3/F Pacific Star Building, Gil Puyat Ave. cor. Makati Ave., Makati CityContact Person : Ms. Mina de Leon, (SLA)Design By : Steven J. Leach Jr. + AssociatesArea : 70 Sqm.

RAYTHEON INTERNATIONALPROPOSED OFFICE INTERIOR FIT-OUT WORKS(September - October 1998)

Project Cost : P 895,500.00Location : 1404 TOEP Ayala Triangle, Ayala Avenue, Makati CityContact Person : Ms. Mina de Leon, (SLA)Design By : Steven J. Leach Jr. + AssociatesArea : 74 Sqm.

AETNA LIFE - HERRERAPROPOSED OFFICE INTERIOR FIT-OUT WORKS(July – Sept. 1998)

Project Cost : P 2,300,000.00Location : 8th Floor Herrera St., Legaspi Village, Makati CityContact Person : Arch. Ramon Torres, (SLA) / Mr. Nolan Yambao, (Aetna)Design By : Steven J. Leach Jr. + AssociatesArea : 420 Sqm.

AETNA LIFE - ALABANGPROPOSED OFFICE INTERIOR FIT-OUT WORKS(July – August 1998)

Project Cost : P 920,000.00Location : 459 DMR Building, Almanza, Zapote -Alabang Road, Las Pinas CityContact Person : Arch. Ramon Torres, (SLA) / Mr. Nolan Yambao, (Aetna)Design By : Steven J. Leach Jr. + AssociatesArea : 220 Sqm.

APMC HEAD OFFICEPROPOSED FINISHING OF INTERIOR WORKS PROJECT(April - June 1998)

Project Cost : P 1,550,000.00Location : 5th Floor Glorietta 4, Ayala Center, Ayala Avenue, Makati CityContact Person : Engr. Bong Robles, (APMC)Area : 500 Sqm.

PHILIPPINE BANK OF COMMUNICATIONS - ARANETA BRANCHPROPOSED ONE STOREY WITH MEZZANINE PBCOM BUILDING1. STRUCTURAL WORKS(February - June 1998 )2. INTERIOR FINISHING WORKS(June 1998 - On-going)

Project Cost : P 4,475,000.00 - Structural Works 1,839,800.00 - Interior Finishing Works

Location : Araneta Avenue cor. Bayani Street, Quezon City

Contact Person : Engr. Antonio Victor R. Antonio – AVP, (PBCom)Design By : Arch. Francisco Y. Lim - Erwin S. LimInterior Design By : Steven J. Leach, Jr. + Associates Area : 350 Sqm.

Page 109: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

PHILIPPINE BANK OF COMMUNICATIONS PROPOSED HEAD OFFICE BLDG. RENOVATION PROJECT(GROUND & MEZZANINE FLOOR)Project Schedule :Phase 1 March 1997 - September 1997Phase 2 October 1997 - December 1997Phase 3 February 1998 - April 1998Phase 4 May - July 1998

Project Cost : P 14,350,000.00Location : #214 PBCOM Bldg., Juan Luna St., Binondo, ManilaDesign By : Steven J. Leach Jr. + AssociatesContact Person : Mr. Boyet Echon / Engr. Antonio Victor R. Antonio, (PBCom)Area : 2,150 Sq.m.

XAVIER SPORTS & COUNTRY CLUBPROPOSED XAVIER SPORTS & COUNTRY CLUB(October 1996 - On-Going) Project Cost : P 3,390,000.00 - Ceiling Main Hall - Main & Lower Level - Oct. 1996 / Completed

2,750,000.00 - Exterior CHB Walls for Masonry Works -Dec. 1996 / Completed 425,960.00 - Built-Up Trellis Columns at Sports Hall - Oct. 1996 / Completed 2,896,137.00 - Interior Finishing Work Package # 001 - Feb. 10, 1997 / Completed 450,000.00 - Plenum Barrier for FCU - March 1997 / Completed 8,000,000.00 - Interior Finishing Works Package # 002 - March 1997 / Completed 5,000,000.00 - Interior Finishing Works Package # 003 - May 16, 1997 / Jan. 1998 2,250,000.00 - Interior Finishing Works Package # 004 - July 25, 1997 / Feb. 1998

9,350,000.00 - Interior Finishing Works Package #005 - Nov. 1997 / July 1998Location : Km. 5 Upper Balulang, Carmen, Cagayan De Oro CityDesign By : Arch. Alfredo B. AlfonsoContact Person : Arch. Alfredo B. Alfonso

AETNA LIFE - CAGAYAN DE ORO CITYPROPOSED OFFICE INTERIOR FIT-OUT WORKS(February - April 1998)

Project Cost : P 1,400,000.00Location : 3rd Floor Jofelmar Building, Montola St., Cagayan de Oro CityContact Person : Arch. Leonardo Sioco - (SLA) / Mr. Nolan Yambao, (Aetna)Design By : Steven J. Leach Jr. + Associates

NOL TRAINING CENTERPROPOSED INTERIOR FIT-OUT WORKS(January - February 1998)

Project Cost : P 1,319,510.00Location : 2nd Floor NOL Tower, Madrigal Business Park, AlabangContact Person : Mr. Sydney Salvo, Mr. Philip Low, (NOL)Area : 273 Sqm.

GLAXO WELLCOME PHILIPPINES INC.PROPOSED OFFICE EXPANSION - GLAXO WELLCOME BUILDING(September 1997 - May 1998)

Project Cost : P 9,500,000.00Location : Don Chino Roces Avenue, Makati CityContact Person : Ms. Pamela Gomez , (Glaxo) / Mary Ann Chee (Goudie)Design By : Goudie AssociatesArea : 4,109 Sqm.

Page 110: RCW CONSTRUCTION & DEVELOPMENT  · PDF filercw construction & development corporation ... pcab constructor’s license: ... equipment listing 1. pumps :

BOULEVARD MANSIONPROPOSED HOTEL LOBBY (February - May 1998)

Project Cost : P 3,000,000.00Location : 1440 Roxas Boulevard, ManilaDesign By : Chai Hilgendorf Sy, Inc.Contact Person : Mr. Marcelo Co, (Mansion Group)Area : 250 Sqm.

MABINI MANSIONPROPOSED HOTEL LOBBY & COFFEE SHOP RENOVATION PROJECT(October 1997 - May 1998)

Project Cost : P 5,500,000.00Location : No. 1611 A. Mabini Street, Malate, ManilaDesign By : Wilma R. DeeContact Person : Mr. Marcelo CoArea : 200 Sq.m. (SLA)

RESIDENTIAL PROJECTS

PETER LIMPROPOSED FINISHING OF INTERIOR WORKS PROJECT(August 1996 - July 1998)

Project Cost : P 4,700,000.00Location : Blk 2 Lot 2 Bautista St., cor. Gajo St., Corinthian Gardens,

Quezon CityDesign By : Steven J. Leach Jr. + AssociatesContact Person : Arch. Leopoldo Cruz / Arch. Leonardo Sioco