RCRA Corrective Action Process

RCRA Facility Assessment (RFA) -1988

RCRA Facility Investigation (RFI) – 1990-2006

Corrective Measures Study (CMS) – 2009 - 2010?

Corrective Measures Implementation (CMI)

Interim Corrective Measures (ICM)

Focused CMS – ATP Group

Page 3: RCRA Corrective Action Process - New York State Department of

Regulatory Site History • 1980 - BSC Receives Interim Status• 1988 - EPA Performs a RCRA Facility

Assessment; 104 SWMUS/6 water courses• 1990 - BSC & EPA sign Administrative Order

to conduct RCRA Facility Investigation (RFI)• 2005 – RFI is submitted (approved 06)• 2005 – Phase I BPA accepted• 2007 – Phase II & III accepted• 2009 – CMS Order is signed

Page 4: RCRA Corrective Action Process - New York State Department of
Page 5: RCRA Corrective Action Process - New York State Department of

Corrective Measures Site (CMS)

• Consent Order signed on June 30, 2009

• Order requires ArcelorMittlal Tecumseh Redevelopment Inc. to perform a Corrective Measures Study (CMS) for the CMS site (43 SWMUs & 4 water courses)

• Recommend final action for SWMUs; will be subject to public review and comment

Page 6: RCRA Corrective Action Process - New York State Department of

CMS SWMUs Requiring Further Action

Page 7: RCRA Corrective Action Process - New York State Department of

Consent Order continued

• Requires Tecumseh Redevelopment Inc. to provide $25,000,000 in financial assurance

• Implement a Long-Term Groundwater Monitoring Plan

• Implement a Soil-Fill Management Plan

Page 8: RCRA Corrective Action Process - New York State Department of

Interim Corrective Measures

• To expedite cleanup, Interim Corrective Measures (ICMs) have been performed at:

• Benzol Yard in coke oven area

• Dredging of lower stretch of Smokes Creek

• Tank removal in tank farm area

Page 9: RCRA Corrective Action Process - New York State Department of

FIGURE 7-1

CUMULATIVE VOC MASS REMOVED TO DATE

Former Benzol Plant Tank Storage Area (SWMU P-11)Tecumseh Redevelopment, Inc.

Interim Corrective Measures

146 214 258 2851,309 1,637

2,1862,916

3,5064,072 4,327 4,473 4,852

5,537 5,686 5,765

4,042

4,962

5,3685,863

6,3126,668

7,6477,912

8,428

0

3,049

1,849

958713513252189

1,405

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

Apr-05

May-05

Jun-0

5

Aug-05

Aug-05

Sep-05

Oct-05

Dec-05

Apr-06

Jul-0

6

Oct-06

Jan-0

7

Apr-07

Oct-07

Apr-08

Nov-08

Apr-09

Sampling Event

VOC

Mas

s Re

mov

ed (p

ound

s)

APL Mass (pounds)

LNAPL Mass (pounds)

189 398727 971 1,243

2,714

3,486

5,235

9,440

6,958

8,468

10,19010,785

11,520

13,18413,598

14,193

Benzol ICM

Page 10: RCRA Corrective Action Process - New York State Department of

Focused CMS for Acid Tar Pit Group

• Focused CMS for the Acid Tar Pits and Agitator Sludge Pit was performed to:

• Expedite cleanup in these areas to prevent recontamination of Smokes Creek sediments, and

• Develop a cleanup plan earlier than the site-wide CMS which will take several years to implement

Page 11: RCRA Corrective Action Process - New York State Department of

Acid Tar Pits

Agitator Sludge Pit

Page 12: RCRA Corrective Action Process - New York State Department of

Acid Tar Pit Group• SWMU S-11 ~ 1.4 acres & 50,000 cubic

yards of waste material

• SWMU S-22 ~ 1.4 acres consisting of three (3) surface impoundments & has ~50,000 cubic yards of waste material, including

• SWMU S-24 ~ 1 acre & about 23,000 cubic yards of waste material

Page 13: RCRA Corrective Action Process - New York State Department of

ATP SWMU Group Waste

• Spent pickle liquor (acids)• Coal tar• Coke oven condensate• Waste lime• Iron precipitator dust• Tar like agitator sludge

Page 14: RCRA Corrective Action Process - New York State Department of

ATP Group

• Waste material was dumped from about 1938 through the early 1970s

• The depth of waste in ranges from 20 to 40 ft below ground surface (BGS)

• At a depth of 38-52 BGS, a dense and non-permeable layer of clay is present

Page 15: RCRA Corrective Action Process - New York State Department of

Focused Corrective Measures Studyfor ATP Group

• Evaluate remedial alternatives

• Define corrective measure objectives

• Recommend a remedy for the Acid Tar Pit group that meets all corrective measures objectives

Page 16: RCRA Corrective Action Process - New York State Department of

Corrective Measures Objectives

• Protect human health & the environment;• Attain environmental cleanup standards;• Control the source(s) of contamination to

reduce or eliminate further releases of hazardous constituents to the environment

• Comply with applicable waste management standards

• Be consistent with current & anticipated future land use in that portion of the site

Page 17: RCRA Corrective Action Process - New York State Department of

Alternative Corrective Measures1. No Action ($0)2. Individual In-Place Containment Cells ($6.7 M)3. Excavate & Dispose Agitator Sludge Pit (S-24) Off-Site &

Contain In-Place ATP (S-11 & S-22) ($17 M)4. Excavate Agitator Sludge Pit (S-24); Consolidate &

Construct Combined In-Place ATP Containment Cell ($5.5 M)

5. Excavate S-11,S-22 & S-24; Consolidate in proposed On-Site Hazardous Waste CAMU ($14.5 M)

6. Excavate S-11, S-22, & S-24, Stabilize, & Dispose Off-Site ($52.7 M)

Page 18: RCRA Corrective Action Process - New York State Department of

What Plan is proposed for the ATP & Agitator Sludge Pit?

• Alternative 4 was selected and includes:• Excavate all waste in the agitator sludge

pit and consolidate with the ATP• After consolidation in the ATP, construct

an impermeable slurry wall around the entire ATP area to the lake sediment layer

• Install a groundwater collection system w/in the containment area

• Install a final cover system

Page 19: RCRA Corrective Action Process - New York State Department of

ATP SWMU Group (current)

SWMU S-24

SWMU S-22

SWMU S-11