Page 1: RCP STANDARD

CHECKING SULFATE RESISTANCE RCP FOR USE

I. In RCP manufacturer:

a. Concrete mix design of RCP must be provided

b. Material:

(*) Check sand, stone and cement to make sure that the type, size are in conformity with the approved mix design. The material must be clean without impurities. Mechanical, physical criteria must be suitable with technical requirement (take a sample on site for testing)

(*) Reinforced steel must be in accordance with designed type (steel samples are taken on site for testing).

(*) Cement: cement must be sulfate- resistant as designed (samples are taken on site for testing)

(*) Water for mixing concrete: meet technical requirement of TCXDVN 324:2004

c. During Fabrication - Pipe Casting Time:

(i) Contractor provide Invoice showing number of sacks of cement delivered to manufacturer.

(ii) Inspector to view these sacks, count them and confirm the number of sacks.

(iii) Factory/ Contractor keeps a tabular record, updated daily, showing: Date, Pipe Diameter, Number of Pipes Cast, Sacks of Cement used, Totals To Date (Pipes, Sacks). Inspectors will review this table frequently, confirm that it is accurate, and sign the Table accepted.

(iv) Factory to save empty Cement Sacks and stock them in one location for Inspector’s use.

(v) One sample group for concrete compressive strength (include 03 cubes per group) to test 28-day compressive strength will be taken for every RCP lot, frequency according to Vietnamese Regulation.

(vi) Completed Pipe are to be placed side by side in an area designated for PIIP Pipes.

(vii) All Pipe for use on PIIP Project will be marked to clearly identify them as such .

(viii) Inspector will inspect the physical quality of each Pipe before it is approved for delivery to the Contract Site.

(ix) Inspector will assure that the correct weight (number of sacks) of cement is used to fabricate each Pipe of each diameter and will-

Page 2: RCP STANDARD

document this by the above-noted tabular record and by counting number of sacks delivered and used.

(x) When Pipe approved for delivery are delivered to the Contract Site, Inspector will again inspect the physical quality of the Pipes to assure no damage occurred during Storage and delivery to the Site.

II. Checking pipe on the site:

1. Visual check

Check the inside, outside of the pipe with eyes, the pipe surface must be smooth and not rough. The two ends of the pipe must be steadily round, not de-formed or cracked. The pipe must not have the steel or the rusty color outside.

2. Check by equipment:

(*) Checking equipment:

- Steel ruler having the accuracy to 1mm.

- Caliper having the accuracy to 1mm

- Feeler gage to check the crack and the feeler thickness is from 0.05 to 1.0mm.

- Magnifier, magnifying degree is from 5 to 10 times

(*) Checking: In one product lot, take 5 random products for checking

a. Checking the smoothness of the surface :

o The surface inside and outside of the pipe must be smooth. There must not

be any rough point or hollow point which is more than 5mm. Measure the depth of the hollow point.

o Put the ruler along the element of the pipe, then stake the scroll bar of the

caliper to the bottom of the hollow area, measure the distance from the bottom of the hollow area to the edge of the ruler.

o The surface of the pipe must not have any hollow which is bigger than or

equal to 12mm.

o If the pipe has some error due to transporting process or mould

dissembling, the cracked area must be <=(6xDdd)mm2, in which the area of each cracked piece is <=(3xDdd)mm2. Ddd is the inner diameter of the pipe. Measure the creaked area similar to the equivalent round or draw a square grid to measure.

b. Surface crack : Crack on surface due to deformation is allowed, but the crack’s width must not exceed 0.1mm. These cracks will be filled by trowel with cement mortar.

Measure the concrete crack: if there is a crack, apply the end of the feeler gage on the crack to determine the width and the depth of the crack.

Page 3: RCP STANDARD

Change of RCP concrete’s color: acceptable. However, if the color change is caused by the the rusted steel, then the pipe doesn’t meet the quality requirement.

c. Checking the diameter and thickness of the actual pipe and compare it with the design. The tolerance is mentioned in Table 1- TCXDVN 372:2006- Drain pipe.

d. Thickness of steel protection concrete layer : the thickness is regulated to be >=12mm. Determine the thickness:

o Drill two holes on the pipe surface up to the steel position and measure

with the caliper (thrust the scroll bar of the clipper into the holes). Use cement mortar to fill the drilled holes, or

o Chisel a trench of 30cm length, 2.5cm width to reveal the steel or cut the

pipe’s section to measure the thickness pf steel protection layer.

e. The straightness of the RCP : The pipe must meet the straightness standard of the two site (inner and outside). The straightness tolerance (flexure) according to the length is 1mm/metre.

f. Perpendicularity of the pipe’s end : The pipe end ‘s cross section must be perpendicular to the outside element. Depending on the nominal diameter, the deviation of the Perpendicularity of the pipe’s end & cannot exceed the value in Table 2 (TCXDVN 372:2006)

g. Testing the loading capacity of the pipe :

(*) Requirement on the compressive strength of the concrete: ensure that the compressive strength is in accordance with the design (The tested concretes which are 28 days old attain the designed compressive strength)

(*) Requirement on the load capacity of the pipe: using destructive test method (3 sides test) depending on the load capacity, the pipe must attain three following types of force:

- Crack resistance (crack resistance load): is the compressive force stipulated for each kind of pipe with the specified load capacity kept at least in 1 minute without any crack.

- Working force (working load): is the compressive force which is used in the design calculation. The stipulated compressive force is kept in 1 minute if no crack or small crack (depth <=2mm or width <=0.25mm) appears.

- Maximum force (maximum load or destruction load) is the maximum compressive force which the pipe can bear.

Three above mentioned compressive forces are for each load level relevant to each kind of nominal diameter defined in Table 3 (TCXDVN 372:2006)

Page 4: RCP STANDARD

For each test: cut a pipe section which is 1.0m long to test with destructive test method (3 sides) (can compress at the end of pipe section which is 1000mm long for longer pipe without cutting for specific testing).

Testing the load capacity of the pipe

(*) Testing principle: the testing is done by destructive test method (3 sides). When compressing, the tested pipe is put in a location that it can border 3 hard bars along the 3 element of the pipe as shown in picture 8.

(*) Testing device & equipment:

- Hydraulic press or mechanical compressor which use hydraulic jack system. The compressor must be installed with the force measuring machine having the suitable scale of force so that testing load must be from 20 to 80% of maximum value of force scale. The accuracy of this press is in (*)-2% of the stipulated testing load.

- Two buffer bars are made from solid steel (or solid wood) they must be straight and flat. The buffer bar is 1000mm long. Other dimension are shown in picture 8.

- Two buffer bars are put parallels, the distance between two inside edges is >=23mm. The rubber buffers’ hardness is 45-60

- The above force transmission bar is made by hard steel with 1000mm length and was rested on the pipe through a rubble gasket that have the above-mentioned specifications. The transmission bar must be straight, the deviation does not exceed 2.5mm/m compared with the straight line. The compressive force of the machine contact the middle point of transmission bar’s length and regularly distribute to the element of the pole that contact the transmission bar.

- The tacked caliper ruler that have diameter of 2.5mm have the standard thickness of 2.5mm and is used for measuring the width of the crack (picture 09)

- Steel ruler or retractable steel ruler can be used to measure the length of 100mm with 1mm accuracy.

(*) Testing:

- Prepare the sample for testing: with each product lot, it is necessary to take at least 02 pipes as testing sample and the length of trial pipe is 1000mm or from the longer pipe.

- Putting the tested pipe on the two gasket bar firmly.

- Mark the middle point of the inner edge of the two buffer bar at the front of the trial pipe. Connect the two point (the lower element), draw the second element that is symmetric with the below element through

Page 5: RCP STANDARD

the axis of trial pipe (which is the higher element). Put the gasket and transmission bar on the above element (picture No 08)

- Start the machine so that the force can contact the middle point of the transmission bar and load gradually to 10% of the regulated compressive force. Retain the load to check the entire system: how stable the scaffold system is, whether the support-bar and transmission bar contact regularly to the pipe. Then increase the load to 200kn/minute speed. When attaining the crack resistance that is regulated at Table 03 and in conformity with regulated size of tested sample, keep the loading within 01 minute and observe in order to discover any crack.

- If there is no crack, continue increasing the load until attaining the working force, keep the load within 01 minute and observe the crack. If there is still no crack or small crack, (deepness<=2mm, width <=0.25mm, defined by caliper ruler) then continue to increase the load but slowly with speed of 44Kn/minute until it is destructive. Record the highest volume of the compressive force that can archive. This is the maximum compressive force or destructive force.

(*) Evaluate the results:

- When testing compressive strength to the crack resistance force and do not observe any crack, the pipe meet crack resistance force requirement.

On the contrary, the pipes do not meet the requirement of force resistance standard.

- When the testing load is equal to working load, if there is no crack or the crack is small (width <=0.25mm and depth <=2mm), the pipe meets the requirement for working load. On the contrary, the pipe does not meet the requirement for working load.

- When testing to destroy the pipe, if the force attains the stipulated maximum value, the pipe meets the stipulated requirement for the maximum load.

- In case the maximum compressive force is higher than the stipulated maximum force, but does not attain the maximum value of the priory-tested pipe that has higher compressive value (Table 3), the pipe is only considered to meet the requirement for stipulated maximum load. If it attains the maximum value of the close pipe, that pipe is considered to have bigger load than stipulated.

Page 6: RCP STANDARD

- The pipe lot is accepted when all (2) tested pipes meet the requirement. If one of them does not meet the requirement, we will test 2 more pipes for each unacceptable pipe. After the second test, if the pipes meet the requirement, that pipe lot is accepted. If those pipes do not meet the requirement, each pipe will be checked for acceptance.

h. Check the water absorbency of the pipe :

The water proof capacity of the pipe is shown by the hydrostatic pressure capacity when the pipe is full of water without water absorbency through the pipe wall. The specification defines the water proof capacity of pipe working at high pressure system to pressure 2m water column.

- For each pipe lot, we take 3 pipes which are 28 days old to test the water absorbency.

Testing:

(*) For the pipes which can not sustain the high pressure: put the pipe bottom on the rough, smooth, waterproof ground. Fill the intersection of pipe end and ground so that the water can not leak out. Fill the pipe with water 10mm from the pipe’s edge and keep the water in a time period depending on the pipe thickness.

Drain thickness Water keeping period8cm 36 hours

16cm48 hours

20cm 60 hours24cm 72 hours

Page 7: RCP STANDARD

After the testing period, we should observe the outside of pipe whether it is absorbent or not.

o If it is not absorbent, the pipe attains the water-proof quality.

o If one of three tested pipes is absorbent, we will take three other

pipes to test.

o If one of these is absorbent again, that pipe lot does not meet the

waterproof requirement. Each pipe of this pipe lot will be checked for acceptance.

(*) For the pipes which can sustain the high pressure:

- Bind 2 pipes together, put it on the ground and cover 2 ends. The pipes are tightened to avoid moving. Fill the pipe with water in order to create pressure equivalent to 2m water column. The pressure is increased gradually to 2m water column and kept in 3 minutes.

- If the pipe surface does not show absorbency, that pipe lot meets the requirement.

- If the pipe surface shows absorbency, the test will be done with other two pipes.

- If there is still any absorbency with these two pipes, this pipe lot does not meet the requirement on the waterproof at high pressure. Each pipe of this pipe lot will be checked for acceptance.

i. Check the accessories of the pipe :

The accompanied accessories may be:

- Soft connection round made by rubber or plastic in accordance with the design.

- Pipe belt in accordance with the design.

- Other accessories for installation of the pipe: pipe foundation in accordance with the design.

j. Label, maintenance and delivery :

(*) Label: the pipe must have:

- Manufacturer name

- Nominal diameter, useful length, load.

- Product lot number

- Date of manufacturing

(*) When the pipe is finished, quality certificate must be provided, with the following content:

- Manufacturer name

- Pipe type and loading level

- Number of finished pipes and lot number

- Manufacturing date

(*) Delivery:

The pipes are only loaded and delivered when the compressive strength of concrete attains at least 70% of the designed compressive strength.

Page 8: RCP STANDARD

NGHIÊM THU ÔNG CÔNG BTCT BÊN SUN PHAT

I) Tai nha may san xuât ông công:

a. Phai co thiêt kê câp phôi bê tông ông công :

b. Vê vât liêu :

- Kiêm tra cac loai vât liêu cat, soi va xi măng đung chung loai, kich thươc hat như thiêt kê câp phôi đươc châp thuân. Vât liêu phai sach, không lân tap chât. Cac chi tiêu cơ ly phu hơp vơi yêu câu ky thuât (lây mâu tai hiên trương đê thi nghiêm).

- Côt thep đung chung loai thiêt kê (lây mâu thep tai hiên trương đê thi nghiêm)

- Xi măng: kiêm tra đung chung loai xi măng bên sun phat theo thiêt kê (lây mâu tai hiên trương đê thi nghiêm)

- Nươc trôn bê tông thoa man yêu câu ky thuât TCXDVN 324:2004.

c. Trong suôt qua trinh đuc ông :(i) Nha thâu cung câp hoa đơn thê hiên sô bao xi măng đươc giao đên nha may san

xuât (ii) Giam sat phai kiêm tra nhưng bao xi măng nay, đêm va xac nhân sô lương.

(iii) Nha may/Nha thâu giư môt Ban lưu dang bang; câp nhât hang ngay, trong đo thê hiên: Ngay thang, đương kinh ông, đêm sô ông đươc đuc, sô bao xi măng đươc sư dung, Tông sô ông đươc san xuât, Sô bao đươc sư dung (cho đên ngay kiêm tra). Giam sat sẽ xem xet Bang nay thương xuyên, xac nhân rằng bang nay chinh xac va ky vao Bang nay nêu châp thuân.

(iv) Nha may lưu giư cac vo bao xi măng va lưu giư ơ môt vi tri đê giam sat kiêm tra(v) Môt tô hơp mâu đê thi nghiêm cương đô bê tông (môi nhom gôm 3 mâu) đê lây

kêt qua cương đô 28 ngay cho môi lô ông, Sự thương xuyên dựa vao Luât Viêt Nam.

(vi) Nhưng ông hoan thanh phai đươc đăt canh nhau trong khu vực danh riêng cho cac ông cua Dự an ĐTCSHTWT

(vii) Tât ca cac ông đươc dung cho Dự an ĐTCSHTWT sẽ đươc đanh dâu ro rang đê xac đinh.

(viii) Giam sat sẽ kiêm tra chât lương cơ ly cua môi ông trươc khi no đươc châp thuân ban giao đên công trương.

(ix) Giam sat sẽ đam bao vê khôi lương chinh xac (sô lương bao) xi măng đươc dung đê san xuât môi ông cung đương kinh va sẽ lưu hô sơ theo dang bang đa nêu ơ trên va bằng cach đêm sô lương bao đươc giao va sư dung.

(x) Khi cac ông đươc châp thuân ban giao đươc ban giao đên công trương cua Hơp đông, giam sat sẽ kiêm tra chât lương cơ ly cua ông môt lân nưa đê đam bao không xay ra hư hong trong qua trinh vân chuyên, lưu trư va ban giao đên công trương.

Page 9: RCP STANDARD

II) Kiêm tra ông công tai hiên trương thi công;

1. Kiêm tra băng ngoai quan :

Măt thương kiêm tra măt trong, măt ngoai công phai nhăn, phăng, không cong vênh. Hai đâu công tron đêu, không bi meo hoăc vơ. Công không đươc hơ côt thep hoăc co mau ri săt lô ra ngoai.

2. Kiêm tra băng thiêt bi:

- Dung cu kiêm tra:

+ Thươc thep co đô chinh xac đên 1mm.

+ Thươc kep, đô chinh xac đên 0.1mm

+ Bô căn la đê kiêm tra vêt nưt, đô day căn la tư 0.05 đên 1.0mm.

+ Kinh lup, đô phong đai tư 5-10 lân.

- Tiên hanh kiêm tra: trong 01 lô san phâm lây ra 05 ông bât ky đê kiêm tra:

a. Kiêm tra đô phăng cua bê măt :

- Bê măt trong va ngoai công phai phăng đêu. Không đươc co cac điêm gô lên hoăc lom xuông lơn hơn 5mm. Đo chiêu sâu vêt lom.

- Đăt thươc dai doc theo đương sinh cua ông rôi căm thanh trươt cua thươc kep đên đay vêt lom đên mep dươi cua thươc.

- Trên bê măt công không đươc co lô hông co chiêu sâu lơn hơn hoăc bằng 12mm.

- Khi vân chuyên ông công hoăc do thao khuôn ma công bi khuyêt tât thi diên tich bê măt vơ <=(6*Ddd)mm2 trong đo diên tich môt miêng vơ <=(3*Ddd)mm2. Ddd la đương kinh trong cua ông công. Đo diên tich vơ bê măt quy vê đương tron tương đương hoăc ke săn lươi ô vuông đê đo.

b. Nưt bê măt : cho phep cac vêt nưt bê măt bê tông do biên dang mêm, nhưng bê rông vêt nưt không đươc qua 0.1mm. Cac vêt nưt nay đươc lâp bằng xoa vưa xi măng.

Đo vêt nưt bê tông: Nêu co vêt nưt thi căm đâu thươc la căn vao vêt nưt đê xac đinh bê rông va chiêu sâu cua vêt nưt.

Sự biên mau cua bê tông ông công: co thê châp nhân sự biên mau cua bê tông công. Nhưng nêu biên mau do côt thep ri thi công không đat yêu câu chât lương.

c. Kiêm tra đương kinh va đô day công đuc thưc tê so vơi thiêt kê :

Đô sai lêch cho phep đươc nêu trong Bang 01: TCXDVN372-2006: ông BTCT thoat nươc.

d. Chiêu day lơp bê tông bao vê côt thep : quy đinh chiêu day lơp bao vê >=12mm. Xac đinh chiêu day lơp bê tông bao vê:

- Khoan 02 lô trên măt ông công cho tơi côt thep rôi đo bằng thươc kep (choc thanh trươt cua thươc kep vao lô). Dung vưa xi măng trat kin lô khoan.

Page 10: RCP STANDARD

- Hoăc đuc môt ranh dai 30 cm rông 2.5 cm đê lô thep hoăc căt ngang tiêt diên công đê đo chiêu day lơp bao vê thep.

e. Đô thăng cua ông công : công phai thoa man tiêu chuân đô thăng trên ca 02 măt (trong va ngoai). Sai lêch đô thăng (tưc đô cong) theo chiêu dai la 1mm/m.

f. Đô vuông goc cua đâu ông công : Tiêt diên cua đâu ông phai vuông goc vơi đương sinh ơ ngoai. Tuy theo đương kinh danh đinh sai lêch vê đô vuông goc cua đâu công & không đươc vươt qua gia tri ơ Bang 2 (TCXDVN 372:2006)

g. Kiêm tra kha năng chiu tai cua ông công :

- Yêu câu vê cương đô bê tông: đam bao cương đô theo thiêt kê (cac mâu bê tông thi nghiêm nen 28 ngay đat cương đô thiêt kê)

- Yêu câu vê kha năng chiu tai cua ông công: dung phương phap ep 3 canh, phu thuôc vao câp chiu tai, ông công phai đat 03 loai lực sau:

+ Lực không nưt (tai trong không nưt) la lực ep quy đinh cho môi loai ông công vơi câp chiu tai xac đinh đươc duy tri it nhât trong 1 phut ma không xuât hiên vêt nưt.

+ Lực lam viêc (tai trong lam viêc) la lực ep đươc sư dung trong tinh toan thiêt kê. Lực ep quy đinh đươc duy tri trong môt phut ma không xuât hiên vêt nưt hoăc vêt nưt nho co chiêu sâu <=2mm hoăc bê rông vêt nưt <=0.25mm.

+ Lực cực đai (tai trong cực đai hay tai trong pha hoai) la lực ep tôi đa ma công đat đươc.

Ba lực ep nêu trên cho tưng câp tai trong ưng vơi môi loai đương kinh danh đinh đươc cho ơ Bang 03 (TCV+XDVN 372:2006)

Môi lân kiêm tra: co thê căt môt đoan ông công dai 1.0m đê thư bằng phương phap ep ba canh (cung co thê ep trên đâu đoan công dai 1000mm đôi vơi công dai hơn, ma không phai căt ra đê thi nghiêm riêng)

Thư kha năng chiu tai cua ông công:

- Nguyên tăc thư: phep thư đươc thực hiên theo phương phap ep ba canh. Khi ep ông công thư đươc lăp đăt đê tiêp xuc chăt chẽ vơi ba thanh cưng theo 3 đương sinh cua ông như sơ đô hinh 08.

- Dung cu va thiêt bi thư:

+ May ep thuy lực hoăc may ep cơ hoc dung hê thông kich thuy lực. May phai đươc lăp đông hô lực co thang lực phu hơp sao cho tai trong thư phai nằm trong pham vi 20-80% gia tri lơn nhât cua thang lực. Đô chinh xac cua may trong khoang ±2% tai trong thư quy đinh.

+ Hai thanh gôi tựa dươi đươc lam bằng thep cưng (hoăc bằng gô cưng)

đam bao thăng va bê măt phăng. Thanh gôi tựa co chiêu dai 1000mm. Cac kich

thươc khac như hinh 08

+ Hai thanh gôi tựa đăt song song vơi nhau khoang cach giưa hai mep trong

Page 11: RCP STANDARD

>=25mm. Cac tâm đêm cao su co đô cưng 45-60 đô cưng shore.

+ Thanh truyên lực ơ trên lam bằng thep cưng dai 1000mm đươc ti lên ông

qua môt đêm cao su co đăc tinh như trên. Thanh truyên lực phai thăng, đô sai lêch

không qua 2.5mm/m so vơi đương thăng. Lực ep cua may tac dung lên điêm giưa cua chiêu dai thanh truyên lực va phân bô đêu lên đương sinh cua ông công tiêp xuc vơi thanh truyên lực.

+ Thươc căn la đâu vat khum tron đương kinh 1.5mm thươc co chiêu day

chuân 0.25mm dung đê đo chiêu rông vêt nưt (hinh 9)

+ Thươc thep hoăc thươc thep cuôn co thê đo đươc chiêu dai 1000mm vơi đô

chinh xac lên đên 1mm.

- Tiên hanh thư:

+ Chuân bi mâu thư: vơi môi lô san phâm cân it nhât la hai ông công lam mâu

thư. Ông công thư dai 1000mm hoăc tư ông dai hơn.

+ Đăt ông công thư ti lên hai thanh gôi tựa môt cach vưng vang.

+ Đanh dâu điêm giưa hai mep trong cua 2 thanh gôi tựa ơ hai đâu công thư.

Nôi hai điêm (la đương sinh dươi), ke đương sinh thư hai đôi xưng vơi đương

sinh dươi qua truc cua ông công thư (đo la đương sinh trên). Đăt tâm nêm va thanh truyên lực lên đương sinh trên (hinh 08)

+ Vân hanh may cho lực tac đông lên điêm giưa cua thanh truyên lực, tăng tai

tư tư đên gia tri 10% lực ep quy đinh. Giư tai đê kiêm tra toan bô hê thông gia lăp vưng chăc, ôn đinh chưa, cac thanh gôi tựa va thanh truyên lực co tiêp xuc vơi ông công không. Sau đo, tiêp tuc tăng tai vơi tôc đô 200KN/phut. Khi đat đên gia tri lực không nưt đươc quy đinh ơ Bang 3 ưng vơi kich thươc danh đinh cua mâu thư, thi giư tai trong đo trong 1 phut va quan sat phat hiên vêt nưt.

Nêu không co vêt nưt thi tiêp tuc tăng tai tơi khi đat lực lam viêc, giư tai trong đo trong 1 phut va quan sat vêt nưt. Nêu không xuât hiên vêt nưt hoăc vêt nưt nho (chiêu sâu <=2mm, chiêu rông <=0.25mm, xac đinh bằng thươc căn la) thi lai tiêp tuc tăng tai nhưng châm lai vơi tôc đô 44KN/phut cho đên khi pha hoai. Ghi lai lực ep lơn nhât đat đươc. Đo chinh la lực ep cực đai hoăc lực pha hoai.

- Đanh gia kêt qua:

+ Khi thư ep đên lực không nưt ma không xuât hiên vêt nưt thi công đat yêu

câu quy đinh đôi vơi lực không nưt. Trong trương hơp lai, ông không đat yêu câu

vê tiêu chuân chiu lực.

+ Khi thư ep đên lực lam viêc ma không thây vêt nưt hoăc vêt nưt nho (vêt nưt co bê rông <=0.25mm va chiêu sâu <=2mm) thi ông đat yêu câu quy đinh đôi vơi tai trong lam viêc. Trong trương hơp ngươc lai, ông không đat quy đinh vơi tai trong lam viêc)

+ Khi ep thư đên pha hoai công, nêu lực cực đai đat đươc gia tri quy đinh thi

ông đat yêu cau quy đinh đôi vơi tai trong lam viêc.

Page 12: RCP STANDARD

+ Trương hơp lực ep cực đai lơn hơn lực cực đai quy đinh nhưng chưa đat đên

gia tri cực đai cua ông công cao hơn liên kê (Bang 3) thi vân chi coi ông công đat yêu câu đôi vơi tai trong cực đai quy đinh. Con nêu no đat đươc thi ông công đo đươc xêp vao công chiu tai cao hơn quy đinh.

+ Lô công đươc châp nhân khi tât ca 02 ông công đươc thư đat yêu câu. Nêu không đat thi cư 1 ông công không đat phai thư thêm 02 ông nưa. Nêu kêt qua lân hai đat yêu câu thi lô công đươc châp nhân. Nêu kêt qua không đat thi phai nghiêm thu tưng san phâm.

h. Kiêm tra đô thâm nươc cua ông công :

Kha năng chông thâm nươc cua ông công đươc biêu thi bằng kha năng chiu đươc ap lực thuy tinh khi ông chưa đây nươc ma không bi thâm nươc qua thanh ông. Tiêu chuân con quy đinh kha năng chông thâm nươc cua ông công lam viêc ơ chê đô ap lực cao đê ap lực 2m côt nươc.

- Tư môi lô san phâm lây ra 3 ông bât ky đa đu 28 ngay tuôi đê thư đô thâm nươc.

- Tiên hanh thư:

+ Vơi ông công không chiu ap lực cao: dựng đay công trên nên cưng, phăng

không thâm nươc. Trat kin phân tiêp xuc đâu công va nên, không cho nươc ro ri.

Đô nươc đây công, cach mep công 10mm va giư nươc trong thơi gian tuy thuôc

chiêu day ông công:

Chiêu day công Thơi gian giư nươc

8cm 36h

16cm 48h

20cm 60h

24cm 72h

Hêt thơi gian thư, quan sat măt ngoai công xem co thâm nươc không

+ Nêu không co nươc thâm thi ông đat chât lương chông thâm.

+ Nêu 1 trong 3 ông thư bi thâm thi phai lây 03 ông khac đê thư tiêp.

+ Nêu lai co 01 ông bi thâm thi lô công đo không đat yêu câu vê chông thâm.

Va lô công đo phai nghiêm thu tưng san phâm.

- Vơi ông công chiu ap lực cao:

+ Lây hai ông công đươc nôi liên vơi nhau, đăt nằm ngang trên măt phăng va bit kin hai đâu. Cac ông đươc nêm chăt đê không bi di chuyên. Công đươc bơm đây nươc đê tao ap lực tương đương côt nươc 2m. Ap lực đươc tăng dân đên 2m côt nươc va giư ap lực trong 3 phut.

+ Nêu trên măt công không co hiên tương thâm thi lô công đat yêu câu.

+ Nêu co hiên tương thâm thi lam thi nghiêm vơi hai ông công khac.

+ Nêu vân co hiên tương thâm thi lô công đo không đat yêu câu vê đô chông thâm ơ ap lực cao. Va lô san phâm nay phai nghiêm thu tưng san phâm.

Page 13: RCP STANDARD

i. Kiêm tra phu kiên cua ông công :

Cac phu kiên co thê la:

- Vong liên kêt mêm bằng ông cao su hoăc chât deo theo quy đinh cua thiêt kê

- Vanh đai ông theo quy đinh cua thiêt kê.

- Cac phu kiên phuc vu lăp đăt công: mong công theo thiêt kê.

j. Ghi nhan, bao quan va vân chuyên :

- Ghi nhan: trên ông công phai ghi ro:

+ Tên cơ sơ san xuât.

+ Đương kinh danh đinh, chiêu dai hiêu dung va câp tai trong.

+ Sô hiêu lô san xuât.

+ Ngay thang năm san xuât.

- Ông công khi xuât xương phai co phiêu kiêm tra chât lương kem theo vơi nôi dung:

+ Tên cơ sơ san xuât.

+ Loai ông công va câp tai trong.

+ Sô lương ông công xuât xương va sô hiêu lô.

+ Ngay thang năm san xuât.

- Vân chuyên: san phâm chi đươc phep bôc xêp, vân chuyên khi cương đô bê tông đat tôi thiêu 70% cương đô thiêt kê.