  • Sub- Structure Works Acappella Ph3

    Conc. Lean Conc Fwk Bar

    No Type Location Length Breadth Depth Base Slab Wall Depth

  • Sub- Structure Works Acappella Ph3

    2 4 DST 0.50 0.50 0.35 0.35 0.35 0.35 0.50 0.40 1.44 0.70 T1 5 16 1.50 - 11.83 - - -

    T2 5 16 1.45 - 11.44 - - -

    B1 5 16 2.95 - 23.27 - - -

    B2 5 16 2.90 - 22.87 - - -

    T3 6 16 1.92 - 18.13 - - -

    T3 5 10 0.74 2.28 - - - -

    6 2 SWT 0.90 0.90 0.9 0.35 0.35 0.90 2.30 1.68 2.56 3.24 T1 14 12 2.60 - - 32.30 - -

    0.90 0.90 0.9 0.35 0.35 0.90 2.30 1.68 2.56 3.24 T2 19 12 1.89 - - 31.86 - -

    B1 14 16 5.20 - 114.84 - - -

    B2 21 16 4.80 - 159.01 - - -

    T3 17 10 2.25 23.57 - - - -

    T4 15 10 9.10 84.11 - - - -

    7 3 SWT 2.00 1.00 1.10 0.35 0.35 1.10 5.05 3.57 4.59 6.60 T1 11 12 2.97 - - 28.99 - -

    T2 17 12 1.87 - - 28.21 - -

    B1 11 12 5.90 - - 57.59 - -

    B2 17 12 4.80 - - 72.41 - -

    T3 17 10 2.25 23.57 - - - -

    T3 9 10 2.25 12.48 - - - -

    T4 5 10 9.10 28.04 - - - -

    8 5 WRT 1.35 1.00 1.1 0.35 0.35 1.10 3.83 2.68 3.49 5.17 T1 11 10 2.30 15.56 - - - -

    T2 10 10 2.34 14.42 - - - -

    B1 6 16 4.02 - 38.05 - - -

    B2 5 16 3.39 - 26.74 - - -

    T3 15 10 2.60 24.03 - - - -

    T4 6 10 3.20 11.83 - - - -

    - - - - -

    9 6 WRT 0.90 0.90 0.8 0.35 0.35 0.80 2.05 1.55 2.56 2.88 T1 9 10 2.05 11.37 - - - -

    T2 9 10 1.89 10.48 - - - -

    B1 11 16 2.97 - 51.54 - - -

    B2 11 16 3.47 - 60.21 - - -

    T3 15 10 2.79 25.79 - - - -

    T4 6 10 2.40 8.87 - - - -

    - - - - -

    332.06 656.56 271.91 0.00 0.00

    18.09 13.11 19.76 24.71

    23.43 17.33 28.42 32.11

    Project Title:Cadangan pembangunan (fasa 3) Hotel dan Pangsapuri Servis 21 tingkat Di Atas

    Dwg No: ST/Base/Slab/101A (CD) rev. 20 Oct 2011

    Length Wide Depth Fwk Conc Bar Length Dia No T10

    (m) (m) (m) (m) (m3) Mark

    1 90.95 0.20 0.10 68.55 - T1 1.10 10 457 309.66

    ** 22.4 B1 2.52 10 457 709.41

    0.00

    Total (KG)

    1354.74 90.95

    1021.082 68.55

    Omission on scupper rebar due wrongly constructed at GL E-G1

    kg/m

    Sebahagian Lot 1714 Jalan Lompat Tinggi 13/33, Seksyen 13, 40100, Selangor Darul Ehsan.

    kg/m

    1,549.00OVERALL QTY

    Reinforcement Bars (KG)

    1,019.07

    96.17

    Ratio Kg/m3 89.36

    1260.53

    1,261.00

    No Gridline

    Basement RC Scupper Drain

    11/B-P

    **omission

    (KG)

    Total (KG)

    Total Weight (KG)

    TOTAL QTY Total Weight (KG)

    Ratio Kg/m3

    Page 2 of 2