RAW reprocessing and MC over the Christmas break

8
RAW reprocessing and RAW reprocessing and MC over the Christmas MC over the Christmas break break ALICE TF ALICE TF December 17, 2009 December 17, 2009

description

RAW reprocessing and MC over the Christmas break. ALICE TF December 17, 2009. Re-processing (and processing) status. 1 Dec. 7 Aug. Collisions, 10TB. Cosmics, 85% reprocessed No further processing requested. ~130TB. Collision data. - PowerPoint PPT Presentation

Transcript of RAW reprocessing and MC over the Christmas break

Page 1: RAW reprocessing and MC over the Christmas break

RAW reprocessing and MC RAW reprocessing and MC over the Christmas break over the Christmas break

ALICE TFALICE TFDecember 17, 2009December 17, 2009

Page 2: RAW reprocessing and MC over the Christmas break

22

Re-processing (and processing) statusRe-processing (and processing) status

7 Aug1 Dec

~130TB

Cosmics, 85% reprocessedNo further processing requested

Collisions,10TB

Page 3: RAW reprocessing and MC over the Christmas break

33

Collision dataCollision data• Runs 104321 onward – (single) AliRoot v4-17-Rev-20 revision• Pass 1 with ‘floating OCDB – more on that later• ‘Good runs’ – this is rather immaterial – all runs are marked as ‘good’• No backlog, but two detectors (HMPID, EMCAL) and one system (HLT) excluded

Page 4: RAW reprocessing and MC over the Christmas break

44

Collision data (2)Collision data (2)• Look only at ‘many detectors’ runs

• 365GB RAW, 215 GB output from reconstruction (x4 replica = 860 GB)

• All RecPoint written out• Very good reconstruction efficiency• The ESDs are ready few hours after data taking (all automatic process)

Page 5: RAW reprocessing and MC over the Christmas break

55

Reprocessing of RAWReprocessing of RAW• ~40 physics runs to be replicated to T1s

• Exclusively 2 replicas (2x 365GB)• Pass 2 processing will be done exclusively at T1s (as per computing model)• Same level of replicas for ESDs and other objects• Approximately 1 day to reprocess everything

Page 6: RAW reprocessing and MC over the Christmas break

66

OCDBOCDB• Very flexible update policy – all requested retrofits are done on the spot• Quick turnaround, but unstable situation

• Essentially every detector has requested a manual update of 1 or more objects

• This is a ‘shuttle by hand’, which cannot continue for very long

• Clearly some of the detector online calibration strategies need substantial updates

Page 7: RAW reprocessing and MC over the Christmas break

77

MC productionMC production• Mostly ‘First physics’

• 11 cycles, 100-200K events each• Fast turnaround – requested in the

evening, ready by morning• Reflecting the running conditions

• Few larger cycles are in preparation• Muon Coctail (LHC09a18) 100 Mio events still to be completed

• Will run over Christmas, if nothing else is requested by Physics Coordination

Page 8: RAW reprocessing and MC over the Christmas break

88

Grid updatesGrid updates

• SL5 migration • Essentially ready (after a long and painful push)

• Many thanks to Patricia and the sites• From January, SL4 will no longer be suppported

• CREAM CE• Not yet there, the uptake is difficult at best• Not a showstopper, however it will increase stability and must be installed