Raw material weighbridge
-
Upload
itplant -
Category
Data & Analytics
-
view
79 -
download
7
description
Transcript of Raw material weighbridge
![Page 1: Raw material weighbridge](https://reader034.fdocuments.in/reader034/viewer/2022042509/54b9dfc24a7959d8668b459d/html5/thumbnails/1.jpg)
Material Handling (WB)
Live on 01.02.2012
![Page 2: Raw material weighbridge](https://reader034.fdocuments.in/reader034/viewer/2022042509/54b9dfc24a7959d8668b459d/html5/thumbnails/2.jpg)
Problems & Benefits (WB)
Problems : * High Maintenance cost* High Transaction time (server Hang, Very Slow response )* Stand alone system* Duplicity of work ( SAP & Prime)* Not Real Time base approach* Dependent System with more manual check and validations
* Limited reporting
Benefits :* Data Entry time reduce up to 40% by simplification and atomization of data entry process* Live Status of weighbridge available to all concerns * No Duplicity work* Maintenance cost reduce as new report development
and enhancement done in house * There was cost required to interface WB with SAP which was avoided by using VB with same hardware setup.* Real Time Solution* Independent system with Transparency, less manual check and auto validation* Scope for update in future, Reports available as per demand
![Page 3: Raw material weighbridge](https://reader034.fdocuments.in/reader034/viewer/2022042509/54b9dfc24a7959d8668b459d/html5/thumbnails/3.jpg)
VRAVRA
EP1EP1 EP2EP2
WB 4-5WB 4-5 WB 2-3WB 2-3 WB 1 (100MT)WB 1 (100MT)
PlantPlant
Raw Material Storage AreaRaw Material Storage Area
Direct feeding
Vehicle IN
Vehicle Out
Vehicle IN
Vehicle Out
![Page 4: Raw material weighbridge](https://reader034.fdocuments.in/reader034/viewer/2022042509/54b9dfc24a7959d8668b459d/html5/thumbnails/4.jpg)
User Login Screen
![Page 5: Raw material weighbridge](https://reader034.fdocuments.in/reader034/viewer/2022042509/54b9dfc24a7959d8668b459d/html5/thumbnails/5.jpg)
VRA Data Entry Screen
![Page 6: Raw material weighbridge](https://reader034.fdocuments.in/reader034/viewer/2022042509/54b9dfc24a7959d8668b459d/html5/thumbnails/6.jpg)
EP1 Data Entry Screen
![Page 7: Raw material weighbridge](https://reader034.fdocuments.in/reader034/viewer/2022042509/54b9dfc24a7959d8668b459d/html5/thumbnails/7.jpg)
Weight Capture Screen
![Page 8: Raw material weighbridge](https://reader034.fdocuments.in/reader034/viewer/2022042509/54b9dfc24a7959d8668b459d/html5/thumbnails/8.jpg)
EP2 Data Entry Screen
![Page 9: Raw material weighbridge](https://reader034.fdocuments.in/reader034/viewer/2022042509/54b9dfc24a7959d8668b459d/html5/thumbnails/9.jpg)
Report Inward Material Summery (YWBRI)
![Page 10: Raw material weighbridge](https://reader034.fdocuments.in/reader034/viewer/2022042509/54b9dfc24a7959d8668b459d/html5/thumbnails/10.jpg)
Report Vehicle Live Status (YWBS)
![Page 11: Raw material weighbridge](https://reader034.fdocuments.in/reader034/viewer/2022042509/54b9dfc24a7959d8668b459d/html5/thumbnails/11.jpg)
Report Truck Retention Report (YWBTR)
![Page 12: Raw material weighbridge](https://reader034.fdocuments.in/reader034/viewer/2022042509/54b9dfc24a7959d8668b459d/html5/thumbnails/12.jpg)
Report Raw Material Receipt Summary for pending (YWBPR)
![Page 13: Raw material weighbridge](https://reader034.fdocuments.in/reader034/viewer/2022042509/54b9dfc24a7959d8668b459d/html5/thumbnails/13.jpg)
Report Weighbridge weight Excess Report (YWEX)
![Page 14: Raw material weighbridge](https://reader034.fdocuments.in/reader034/viewer/2022042509/54b9dfc24a7959d8668b459d/html5/thumbnails/14.jpg)
Report Weighbridge Tree report
![Page 15: Raw material weighbridge](https://reader034.fdocuments.in/reader034/viewer/2022042509/54b9dfc24a7959d8668b459d/html5/thumbnails/15.jpg)
Thank You