Transcript of rates.req
Belleza - Fabrication Rate required
Sr. No. Description Qty Unit Rate Amt Rem
A-Bldg 4 Making & fixing refuse area name board 12.00 Sft 50.00 600 7 Solar water tank stands 12.50 Sft 80.00 1,000
B-Bldg Fabrication work8 Drilling 23mm od drill for MS flat 50X8 268.00 Nos 90.00 24,120 9 Providing & fixing 20mm end cap 453.00 Nos 10.00 4,530 Previously 12.5 given
10 Providing & fixing 50mm end cap 130.00 Nos 15.00 1,950
C-Bldg Fabrication work
13 Providing & fixing 60mm od MS flange 40.00 Nos 15.00 600 4 Providing & fixing 80mm MS flange 420.00 Nos 15.00 6,300 5 Providing & fixing 45mmX 6"length MS bend for railing 40.00 Nos 60.00 2,400 6 Providing & fixing PVC spacer for grills 2,498 Nos 2.00 4,996 7 Providing & fixing 50X12mm MS screws for grills 2,498 Nos 2.00 4,996
D-Bldg Fabrication work
6 repairing of grills 3.00 Nos 400.00 1,200 7 chiseling of plaster for fixing of grill 9.00 Nos 400.00 3,600 9 Gas bank chajja & top roofing 92.81 Sft 35.00 3,248
10 Gas bank window with percolated sheet 13.68 Sft 40.00 547 12 Main gate 1.00 job 12,587 12,587 25 UGWT covers with safty grating & 6"ms sheet fixing for sides 4.00 Nos 750.00 3,000
Development - Fabrication work
11 Chain link Fixing 1,433.72 Sft 12.00 17,205 Rs 8 given in 201217 Pole making & fixing with material 10.00 nos 2,540.00 25,400 18 Shade for parking 347.34 Sft 35.00 12,157
Description Qty Unit Rate Amt
A Main entrance – sliding /rolling gate wicket gate 25.38 Sft 125.00 3,173.09 sliding gate 63.83 Sft 125.00 7,978.75 20' track - track roller bearing 2.00 nos 200.00 400.00 roller bearing 4.00 nos 75.00 300.00 Heavy hinges 2.00 nos 225.00 450.00 lock patti 2.00 nos 25.00 50.00 stopper 2' 1.00 nos 325.00 325.00 16" aldrop 1.00 nos 180.00 180.00
Total = 12,856.84
B Pole making Profile cuttingDoor 10.00 nos 180.00 1,800.00 50mm X 8mm Ms plate 40.00 nos 50.00 2,000.00 Bend 15.00 nos 280.00 4,200.00 L & key lock 10.00 nos 60.00 600.00 Rod hinges for door 20.00 nos 30.00 600.00 Ms ball 3" 10.00 nos 50.00 500.00 Bracket 60.00 nos 25.00 1,500.00 Nut bolt for earthing 10.00 nos 15.00 150.00 Nut bolt for Bracket 90.00 nos 5.00 450.00 Making of pole 10.00 nos 1,000.00 10,000.00 Fixing of pole 10.00 nos 360.00 3,600.00
Total 25,400.00 Rate per pole 254.00