    S.NO DESCRIPTION OF ITEM Qty. UNIT

    Rate Amount

    SH-1 Earth work

    1 1.1

    Earth work in excavation over areas(Exceeding 30cm in depth ,1.5 mtrs in

    width as well as 10 sqmt on plan ) incl.

    disposal of excavated earth ,and lift upto

    1.5 mtrs , disposed earth to be leveled

    and neatly dressed with in a lead of 50

    mtrs in

    993.32 M3 55.00 54632.60

    2 1.2a

    Pumping out water accumulated due to

    broken water main drain or the like and

    due to spring tidal or rivers seepage.

    382.04 KL 22.00 8404.88

    1.50 Anti Termite Treatement

    Below PCC 120.00 m2 30.00 3600.00

    Around plinth walls and below floor 242.53 m2 30.00 7275.90

    3 1.3

    Filling availale excavated earth in

    trenches all around foundations etc. and

    under floors, lead up to 50 mtrs and lift

    upto 1.5 mtrs, in layers not exceeding 20

    cm in depth, consolidating eachdeposited layer by ramming and

    watering.

    761.00 m3 47.00 35767.00

    4 1.4

    supply and filling of excavated earth for

    filling including ramming watering and

    conolodating in layers (incl. carriage from

    available source).

    456.37 m3 150.00 68455.50

    5 1.6

    Supply, filling of sand under floors incl.

    ramming and watering including

    consolidation.

    21.31 m3 210.00 4475.10

    SH-2 CONCRETE WORK

    6 2.1

    Providing and laying in position cement

    concrete of 1:4:8 nominal mix. (1 Cement

    : 4 Coarse Sand : 8 graded crushed

    stone agg. Of 40mm nominal size)

    excluding cost of centering and

    shuttering all work upto plinth level.

    2.88 m3 1450.00 4176.00

    7 2.2

    Providing and laying in position cement

    concrete of 1:5:10 nominal mix. (1

    Cement : 5 Coarse Sand : 10 gradedcrushed stone agg. Of 40mm nominal

    size) excluding cost of centering and

    shuttering all work for PCC bed concrete.

    49.50 m3 1300.00 64350.00

    Providing and laying in position cement

    concrete of 1:5:10 nominal mix (1

    Sub-contract

    JAGTI (JAMMU) PROJECT- BILL OF QUANTITIES

  • 8/13/2019 Rate Analysis and BOQ

    2/37

    S.NO DESCRIPTION OF ITEM Qty. UNIT

    Rate Amount

    Sub-contract

    9 2.4

    Providing and laying Damp Proof course

    40mm thk with cement concrete 1: 2 :4

    grade (1 Cement : 2 Coarse Sand : 4

    graded crushed stone agg.) of nominal

    size 12.5mm

    56.55 m2 120.00 6786.00

    10 2.5

    Providing and laying bitumen of

    penetration 80/100 of approved quality

    (@1.70Kg/Sqm) on DPC and binding

    with sand incl. cleaning the surface with

    brushes and kerosene soaked cloth.

    56.55 m2 61.00 3449.55

    11 2.6

    Filling with sunken floor of Toilets etc.

    with cinder incl. necessary compaction as

    directed with all lead and lift for all f loors.

    19.51 m3 450.00 8779.50

    12 2.7

    Providing and laying water proofing

    treatment to vertical and horizontal

    surface of depressed portion W/C and

    the like consisting of :

    94.28 m2 235.00 22155.80

    13 2.8

    Cast in situ plum concrete work of

    nominal mix concrete 1:4:8 grade (1

    Cement : 4 Coarse sand : 8 graded

    crushed stone agg. Of 20mm nominal

    size aggregates), volumetric batching

    using plums (Size over 160mm split

    nallah stone or quarry stones) @ 20% of

    gr

    32.94 m3 1350.00 44469.00

    14 2.9

    Providing and laying of Cement Concrete

    1:3:6 (1 Cement : 3 coarse sand : 6

    crushed stone agg. Of 20mm nominal

    size) excluding the cost of form work

    using plums (Size over 160mm split

    nallah stones or quarry stone @20%ofgross volume) including cost of st

    32.94 m3 1600.00 52704.00

    15 2.10

    Cast in situ concrete work of nominal mix

    1:2:4 (1 Cement : 2 Coarse Sand : 4

    graded crushed stone agg. Of 20mm

    nominal size) including curing but

    excluding cost of form work plinth

    protection alround building.

    14.07 m3 2180.00 30672.60

    SH-3 R.C.C WORK

    16 3.1

    Providing and laying in position machinebatched, machine mixed and machine

    vibrated Design mix Cement concrete of

    specified grade for reinforced Cement

    concrete structural elements, excluding

    the cost of centering Shuttering

  • 8/13/2019 Rate Analysis and BOQ

    3/37

    S.NO DESCRIPTION OF ITEM Qty. UNIT

    Rate Amount

    Sub-contract

    20 3.3 Roof beam lv1,2,3&mummty 82.58 m3 2750.00 227095.00

    22 3.4 Above plinth beam RCC work in columns 66.42 m3 2750.00 182655.00

    26 3.5 Stair case lv1,2&3 8.31 m3 2800.00 23268.00

    29 3.6 In Chajjas 3.02 m3 2750.00 8305.00

    FORM WORK:

    30 3.7 PCC 9.23 m2 88.00 812.24

    31 Coloumns and footing 199.56 m2 88.00 17561.28

    32 3.8 Pedastals&columns upto L3 856.99 m2 89.00 76272.11

    37 3.9 beams up to L3 1071.22 m2 89.00 95338.58

    41 3.10 slabs including Stair case up to L3 1027.16 m2 89.00 91417.24

    45 3.11

    Form work to sides and soffits of arches

    (span up to 6 mtrs) for in-situ concrete

    work (upto level -V)

    59.00 m2 89.00 5251.00

    46 3.12 Edges of slab L1 to L3 633.81 rm 13.00 8239.53

    REINFORCEMENT:

    3.13

    Providing, assembling and placing high

    strength (TMT) deformed bars, Fe - 415

    grade (confirming to IS: 1786 - 1985) forRCC work, including cost of binding

    wires for all floors.

    61386.12 kgs 36.00 2209900.32

    50 4.1.a BRICK WORK (1:6)

    51pb top to dpc level in CM(1:6) 80.31 m3 2033.00 163270.23

    52 4.1.b supper structure CM (1:6) 276.17 m3 2033.00 561453.61

    53 4.2 Half Br. Masonry in CM(1:4) 614.20 m2 277.00 170133.40

    SH-7 FLOORING:

    5440mm thick marble chips(Makrana)

  • 8/13/2019 Rate Analysis and BOQ

    4/37

    S.NO DESCRIPTION OF ITEM Qty. UNIT

    Rate Amount

    Sub-contract

    56

    7.3

    Providing and fixing glass strips in joints

    of Terrazo/cement concrete floors of

    nominal size of 40 mm wide and 4 mm

    thick in flooring.

    1449.60 rm 15.00 21744.00

    57

    7.4

    Providing 40mm thk flooring in 1:2:4 Max

    size of crushed stone aggregate 20mm

    nominal finished with a flaoting coat of

    neat cement

    710.98 m2 170.00 120866.60

    58 7.5

    Providing 21mm thk cement plaster

    skirting upto 30cm height with cment

    mortar 1:3 (1 Cemwnt :3 Coarse Sand )

    Finish With a floating Coat of neat

    cement

    55.44 m2 100.00 5544.00

    59 7.6 Providing KOTA Stone in Kitchen counterover 20mm average thkl base (1:5:10)

    59.04 m2 467.00 27571.68

    60 7.7

    P & F 1st Quality Ceramic Glased tile th

    5mm of approve(Khajaria/Orient/Bell/

    Johnson) with 12mm thk bed concrete

    314.64 m2 448.00 140958.72

    SH-8ROOFING WATER PROOFING &

    INSULATION

    61 8.1

    Providing and laying 4 layers coarse

    water proofing treatment with bitumin felt

    over roofs bitumin 85/25 or 90/15

    299.59 m2 207.00 62015.13

    62 8.2

    P & Laying 100mm thk mud puska or

    damped brick earth on roof laid considate

    and plastered with 25mm thk mud mortar

    mixed with busha@35kg/cum including

    Brick Tiles in gruted in ceval material

    299.59 m2 235.00 70403.65

    63 8.3

    Provisind Gola 75X75mm cement

    concrete M-15 grade of 20mm nominal

    size with a dose of 100ml CICO super in

    the ration 1 cement:4 sand:100mm CICO

    268.48 rm 56.00 15034.88

    64 8.4

    Making Khurras 450 X 450mm with an

    average minimum thk of 50mm cement

    concrete M-15over PVC Sheet

    8.00 nos 112.00 896.00

    SH-9 FINISHING:

    65 9.1

    18mm thk cement plaster in two coats

    12mm thk(1:5) and 6mm thk for parapet

    wall

    179.75 m2 85.00 15278.75

    66 9.2

    15mm thick cement palster 1 cement:6

    coarse sand on rough side of single/ half 1965.89 m2 64.00 125816.96

  • 8/13/2019 Rate Analysis and BOQ

    5/37

    S.NO DESCRIPTION OF ITEM Qty. UNIT

    Rate Amount

    Sub-contract

    71 9.7

    Finishing new works with two (or more)

    coats of cement based paints of specified

    shade of (Supper plus,Super ex,

    Snowsum) for exterior to an even shade.

    1942.00 m2 24.50 47579.00

    72 9.8

    Painting to new metalic surfaces with 2

    coats synthetic enamel of nerolac or ICI

    paints primimh and preparation of

    surfaces but including cost of sand

    574.56 m2 29.00 16662.24

    73 9.9

    Applying prime coat on new wooden /

    wood based surfaces with new white

    primer of nerolac enamel or ICI Paints

    1081.31 m2 22.50 24329.48

    74 9.10 Painting to new Wood and new woodbased surfaces with 2 coats of synthetic

    enmel of nerolac ICI paints

    1135.75 m2 29.00 32936.75

    SH-10 MISCELLANEOUS:

    75 10.1

    p & f Palin grills of specified design ,ade

    of MS square bars in windows

    /ventilators/ stair railingsincl incl .welding

    with flat iron frame and finished smooth

    with a primer coat of red oxide metallic

    primer

    1500.00 kgs 64.00 96000.00

    76 10.2

    Making Plith protection 50mm thk of CC

    1:3:6 (1 Cement :3 Coarse Sand :6

    Graded crushed stone agg of 20mm

    nomial size )over 75 mm bed of dry brick

    ballest 40mm nomial size well rammed

    and consolidated and grouted with fine

    sand incl finishing

    637.00 m2 244.00 155428.00

    77 10.3Supplying & Fixing of MS Pipe 50mm

    dia in staircases and Balconies(Railing)

    637.00 m2 73.00 46501.00

    78 10.4

    Brick tile coping 80mm th ick 1 cement ,3

    coarse sand mortar with first class 100 A

    brick tiles (Laid in specfied design) with

    plastering 1:3 mix (1 cement :6 sand )as

    per perspective view

    842.70 m2 260.00 219102.00

    79 10.5

    Providing and fixing duly welded and built

    up section of structural steel for O.T.S

    portion and nosing of steps.

    7.50 kgs 73.00 547.50

    80 10.60

    P & F Poly Corbonate Corrugated sheet

    having depth 17mm and overall width

    1070mm manufactured by VMI plastics

    (for roofing)

    22.59 m2 1038.00 23448.42

  • 8/13/2019 Rate Analysis and BOQ

    6/37

    S.NO DESCRIPTION OF ITEM Qty. UNIT

    Rate Amount

    Sub-contract

    82 5.2

    Providing and fixing 3.00 mm thick glass

    panes (Modi / Ashai Float/ Saint Gobain)

    for fixing in the ventilators/ windows to be

    fixed with putty (of Eagle make) & glazing

    pins for fixed glazing.

    1.26 m2 336.00 423.36

    83 5.3

    Providing and fixing glazed shutters for

    windows/ventilators of 1st class deodar

    wood using 10kg / sqm. (4mm thick)

    glass panes Modi / Asahi Float / Saint

    Gobain with necessary screws 35mm

    thick (excluding cost of aluminium fittings

    and hinges).

    130.46 m2 1447.00 188775.62

    84 5.4

    Providing and fixing 35mm thick wire

    gauze shutters of 1st class deodar wood

    termite treated and kiln seasoned wood

    85G (wire dia 0.56 mm) wire gauge (12

    mesh to an inch) complete but excluding

    cost of hinges and Aluminium fittings.

    164.32 m2 1012.00 166291.84

    85 5.11

    Providing and fixing 35 mm FRP flush

    door shutter (manufactured by RR prefab

    industry)Rajshree and should be water

    proof, fire proof,termite resistant andwashable fixed frame of angle i ron

    50X50x5mm with all necessary

    accessories/fittings, all as specifi

    31.92 m2 2188.00 69840.96

    SH-6 METAL WORK 0.00

    86 6.1

    Providing and fixing pressed steel door

    frames incl. horizontal member (made of

    1.25mm thick sheet) 80*90 mm nominal

    section single rebate (of specified width)to door frames, incl. cost of f ixed M.S.

    Butt hinges and provision for tower bolts,

    aldrops, mo

    373.92 rm 174.00 65062.08

    87 6.2

    Providing and fixing pressed Door /

    Window / Ventilator frames including

    boxed member (made of 1.25mm thick

    sheet) 80*125 mm size double rebate (of

    specified width) to frames incl. cost of

    fixed M.S. Butt hinges and provision of

    stay hooks, T-bolts and fl

    1052.80 rm 196.00 206348.80

    Fittings to doors and windows:

    88 5 5Providing and fixing of tower bolts with

  • 8/13/2019 Rate Analysis and BOQ

    7/37

    S.NO DESCRIPTION OF ITEM Qty. UNIT

    Rate Amount

    Sub-contract

    96 5.10Providing and fixing of door and windows

    handles

    97 a 100 mm 490.00 nos 32.00 15680.00

    98 b 125 mm 102.00 nos 39.00 3978.00

    99 5.12 Providing and fixing of Mild steel hooks 280.00 nos 28.00 7840.00

    100 5.13Providing and fixing of Helical door

    spring48.00 nos 258.00 12384.00

    Civil works Sub-total 7,810,676.96

    ELECTRIFICATION ITEMS

    1

    Points wiring for one light

    point/fan/point/call bell point with

    1.5sqmm,PVC Insulated copper

    conductor wire (of

    Finolex/Shalimar/Grandlay make) laid in

    high density PVCconductor of 25mm dia

    (2mm thick for ceiling,1.5mm in

    walls),(High Power make), conce

    101 a)One light/fan/bell push point controlledby one 5/6 amp one way switch 213 nos 325.00 69225.00

    105b) Twin control light pointwith 2 No. two

    way 5/6 Amps switch5 nos 336.00 1680.00

    106 2

    Providing circuit wiring from switch

    fuse/DB to switch board using

    2x2.5sqmm along with 1x1.5sqmm PVC

    insulated copper conductor wire (of

    Finolex/Shalimar/Grandlay make) in high

    density PVC conduit (High Power make),

    (2mm thick for celing 1.5 mm in wals)

    950 rm 84.00 79800.00

    107 3

    Wiring for power socket outlet with

    2x4.0sqmm PVC insulated copper

    conductor wire (of

    Finolex/Shalimar/Grandlay make) in high

    density PVC conduit, (25mm dia 2mm

    thick) (High Power make) concealed in

    walls/ceiling with all accessories as

    required, with 1

    750.00 rm 95.00 71250.00

    108 4

    Wiring with 2x6.0sqmm along with 1x4.0

    sqmm PVC insulated copper conductor

    wire (of Finolex/Shalimar/Grandlay make)

    in high density PVC Conduit, (40mm dia

    2 thi k) (Hi h P k )

    100 rm 179.00 17900.00

  • 8/13/2019 Rate Analysis and BOQ

    8/37

    S.NO DESCRIPTION OF ITEM Qty. UNIT

    Rate Amount

    Sub-contract

    110 6

    Flush button type socket outlet,6 pin

    Multipurpose type with one switch 1516

    amps on and includeing MS/GI Boxes of

    suitable size with 3.0mm laminated

    sheet, sunken flush along withwall, ofAnchor/S.S.K/Bajaj make and labour

    complete all as specified.

    96 nos 157.00 15072.00

    111 7

    Wall bracket, made out of CRCAsheet

    steel 18 SWG and 15mm squire tubing

    canopy 65mm dia, 18mm deep, 20SWG

    sheet, stove painted with heat resistant

    glass fixed with accessories of Anchore

    make EG. Lamp holder, incandescent

    lam wiring , connector etc.

    48 nos 112.00 5376.00

    112 8

    Fluorescent Tube fitting Rail ( Patti) type

    complete with polyester

    (Philips/Crompton Greves/ Bajaj make)

    ballast, capactor, rotary lamp holder,

    started holder, starter connector blocks,

    fluorescent tubes rod, all accessories of

    above make pre wired, 1x4

    48 nos 252.00 12096.00

    113 9

    Celing Rose bakelite 65x50mm of

    (Anchor/S.S.S.K/ Bajaj make) 3 terminalsupplied and fixing in complete all as

    specified Economical range.

    48 nos 17.00 816.00

    114 10

    Lamp holder bakelite body of

    Anchor/S.S.S.K/ Bajaj suitable for batten

    fitting straight or angle faced as required

    Material and Labour complete all as

    specified.

    87 nos 22.00 1914.00

    115 11

    CI/MS box (not less than 16 SWG sheet)fixed in lintel , slab , recessed, 75mm dia,

    including mild steel hook made to sharp

    the accommodate ceiling fan ( Gupta

    make ) with material and labour complete

    all as s ecified excludin cost of fan .

    48 nos 44.50 2136.00

    116 12

    Supply installation Testing Distributed

    Board SPN 220/230 Volt, comprising

    MCB SPN 20 Amps, one No. as

    incomming MCB 6 Amps 2 Nos. 10

    Amps 2 Nos. as outgoing with bus bar

    enclosed in shet metal box, (of Standard,

    Indo Asian / L&T make) matrial and

    Labour

    24 nos 1290.00 30960.00

    supply and fixing of Distribution board,

  • 8/13/2019 Rate Analysis and BOQ

    9/37

    S.NO DESCRIPTION OF ITEM Qty. UNIT

    Rate Amount

    Sub-contract

    119 15

    Earthing complete with Copper Earthing

    Plate Electrode 600x6.3mm buried

    directly in ground to a depth not less than

    2.25mm below ground level, connected

    to 25x5mm GI stip, including charcoal,common salt, necessary earthwork,

    providing funnel, with wire m

    2 nos 5610.00 11220.00

    120 16

    Supply and fixing Aluminum Strip

    25x3mm, completely connected from

    Earth link to equipment.

    20 nos 56.00 1120.00

    121 17Supply and fixing Bell/ Buzzer of

    Anchor/S.S.K/Bajaj make.24.00 nos 56.00 1344.00

    Labour charges for electrical works. 1.00 42802.04 42802.04

    Electrical works Sub-total 520,876.04

    PLUMBING WORKS

    122 1.1

    Providing, laying and jointing PVC pippe

    of 3/6mtr. Length Type-B (ISI:3592-1992)

    (Supreme or Finolex make) of the

    following internal diameters includingtesting of pipes and joints complete

    (including earth cutting Wherever

    required).

    a) 150mm dia 20.00 rm 341.00 6820.00

    123 1.2

    Providing and laying cement concrete

    1:5:10 (1 cement, 5 coarse sand, 10

    graded stone aggregates 40mm nominal

    size) bedding and all round for PVC

    pipes of the following internal diameternecessary from work and curing

    complete.

    a) 150mm 20.00 rm 146.00 2920.00

    124 1.3

    Providing laying and jointing with a stiff

    mixture of cement mortar in proportion

    1:1 (1 cement: 1 fine sand) salt glazed

    stone ware pipes grade 'A' of the

    following internal diameter including

    testing of pipes and joints complete.

    a) 150mm dia 40.00 rm 146.00 5840.00

    Providing and laying cement concrete

    1:5:10 (1 cement, 5 coarse sand, 10

    EXTERNAL DRAINAGE/SEWERAGE

  • 8/13/2019 Rate Analysis and BOQ

    10/37

    S.NO DESCRIPTION OF ITEM Qty. UNIT

    Rate Amount

    Sub-contract

    a) 100x100mm size with FPS bricks. 12.00 no 527.00 6324.00

    127 1.6

    constructing P- type manhole with RCC

    top slab in 1:2:4 mix (1 cement: 2 coarse

    sand :4 graded stone crushed

    aggregates 20mm nominal size)foundation concrete 1:4:8 mix (

    1cement:4 coarse sand 8 crushed stone

    aggregates 40mm nominal size) inside

    plasterin

    128

    a) With 230mm tick walls of brick

    masonry using bricks of class

    designation 75 in cement mortar 1:3 (1

    cement, 3 coarse sand ) of size 450mm x

    450mm.

    16.00 3130.00 50080.00

    129

    b) With 115mm thick walls of brick

    masonry using bricks of class

    designation 75 in cement mortar 1:3 (1

    cement,3 Coarse sand) of size 450mm x

    450mm.

    4.00 2244.00 8976.00

    2SOIL,WASTE AND VENT PIPE

    PLUMBING WORKS

    2.1

    Providing and fixing sand cast iron

    spigot and socket soil waste ,Rain water

    and ventilating pipes (Bengal Iron

    Foundry make/equivalent) of the

    following nominal size (Lead caulked

    joints to be measured and paid for

    separately)

    130 a) 75mm dia 75.00 562.00 42150.00

    131 b) 100mm dia 300.00 658.00 197400.00

    2.2

    Providing and fixing M.S holder clamps

    including steel bolts to sand cast /cast

    (spun) iron pipes of the following nominal

    diameters size embedded in and

    including cement concrete block 100mm

    x100mm x 100mm of 1:2:4 mix (1

    cement, 2 coarse sand agg., 4

    132 a) 100mm dia 190.00 51.00 9690.00

    2.3

    Exter over item 2.1 for providing and

    fixing sand cast iron fitting andaccessories (Bengal Iron Foundry

    make/equivalent).

    133 a) Plain bends:

  • 8/13/2019 Rate Analysis and BOQ

    11/37

    S.NO DESCRIPTION OF ITEM Qty. UNIT

    Rate Amount

    Sub-contract

    138 i) 100mm x 75mm nominal size 48.00 421.00 20208.00

    139 d) Door bends

    140 i) 100mm nominal size 16.00 298.00 4768.00

    2.4 Providing and fixing:

    141a) Cast iron cowl (Bengal Iron Foundry/

    equivalent) of the following diameter

    142 i) 100mm nominal size 24.00 220.00 5280.00

    2.5

    Providing lead caulked joints to sand

    iron /cast (spun) iron soil waste and

    ventilating pipes and fitings of following

    nominal size / diameter including testing

    of joints:

    143 i) 100mm nominal size 350.00 68.00 23800.00

    144 ii)75mm nominal size 120.00 60.00 7200.00

    2.6

    Proivding and fixing cast iron trap of self

    cleaning design with C.P. screwed

    dowmn or hinged with or withoutvent,arm complete, including cost of

    cutting and making good and Walls and

    floors (floor Trap).

    145 i) 75mm dia 72.00 382.00 27504.00

    146 ii)100mm dia

    147 2.7Providing and fixing Waste Coupling of

    35mm dia (CP).24.00 169.00 4056.00

    148 2.8Providing and fixing Waste Water pipe

    of 32mm dia (PVC).24.00 51.00 1224.00

    2.9

    Painting heavy cast iron soil, Waste vent

    pipe , rain water pipe and fittings With

    paint of color such as chocolate, grey or

    buff etc. Over a coat of primer for new

    Work.

    149 a) 100mm dia pipe 279.00 28.00 7812.00

    150 b) 75mm dia pipe

    Providing and laying cement concrete

    1:2:4 mix (1 cement 2 coarse sand 4

  • 8/13/2019 Rate Analysis and BOQ

    12/37

    S.NO DESCRIPTION OF ITEM Qty. UNIT

    Rate Amount

    Sub-contract

    3.1

    Providing and fxing Wall,ceiling and floor

    galvanized mild steel tubes (medium

    grade of Prakash Surya/Jindal/Tata

    make) of the following nominal bore ,

    tube fitting and clamps (of ship/ unique/sun /heavy pipe fittings) including making

    good the wall , c

    153 a) 15mm dia ( Concealed) 500.00 89.00 44500.00

    154 b) 25mm dia (Exposed) 311.00 166.00 51626.00

    C) 40mm dia (Exposed) 100.00 252.00 25200.00

    155 3.2

    Making connections of G.I distributionbranch with galvanized mild steel main

    25mm to 40mm nominal bore by

    providing and fixing the Tee including

    cutting and threading the pipes complete.

    48.00 no 36.00 1728.00

    3.3

    Painting GI pipes and Fitting with white

    paint over a ready mix primer coat, both

    of approved quality for new work.

    156 a) 15mm dia 500.00 rm 16.00 8000.00

    157 b) 25mm dia 311.00 rm 17.00 5287.00

    158 c) 40mm dia 100.00 rm 17.00 1700.00

    3.4

    Providing and fixing brass full way valve

    of Type Class-I (Fly Wheel) of Neva

    make or Zoloto make the following

    nominal bore wheel:

    159 a) 15mm dia

    160 b) 25mm dia 4.00 no 365.00 1460.00

    161 c) 40mm dia 16.00 no 561.00 8976.00

    3.5

    Providing and fiximg PVC water tanks

    with lockable covers of (Sintex make)

    including connections of inlet/ outlet,

    overflow and clearing pipes , capacity of

    tanks tobe measured (1500 liter capacity)

    of ISI make; Double layer.

    16.00 no 8415.00 134640.00162 3.6 100 mm dia., steel jalli 48.00 no 23.00 1104.00

    163 3.7 C.I Manhole cover 16.00 no 1908.00 30528.00

    4 SANITARY FIXTURES

  • 8/13/2019 Rate Analysis and BOQ

    13/37

    S.NO DESCRIPTION OF ITEM Qty. UNIT

    Rate Amount

    Sub-contract

    165 4.2

    Providing and fixing white glazed vitreous

    China wash basins

    (parryware/Hindware/Cera make ) with

    C.P. waste coupling , 32mm and sealing

    of joints between wash basins and wallaround the wash basin with white cement

    of matching color all complete includ

    24.00 no 1040.00 24960.00

    4.3

    Providing and fixing C.P. brass bib taps

    of double 'O' ring system with Copper

    Platting Before nickle and crome platting

    of make Jaquare Queen/Plumber

    Nectar/Nova with P Cup.

    166 i) Long Nose Bib Cock 24.00 no 637.00 15288.00

    167 ii) Short Body Bib Cock. 24.00 no 388.00 9312.00

    168 iii) Long Body Bib Cock 72.00 no 432.00 31104.00

    4.4

    Providing and fixing 15mm Cp brass

    angle valve of double 'O' ring system with

    Copper Platting Before nickle and crome

    platting with CP Cup of make Jaquare

    Queen/Plumber Nectar/Nova with CP.

    brass connection pipe nuts,washers and

    CP brass flange complete

    169 i) 15mm dia 96.00 no 397.00 38112.00

    170 4.5

    Providing and fixing concealed stop cock

    of double 'o' ring system with Copper

    plating before nickle and crome plating

    (of make Jaquare Queen/ Plumber

    Nectar/nova with CP cup of 15mm

    nominal bore.

    48.00 no 490.00 23520.00

    171 4.6

    Providing and fixing C.P. brass shower

    with arm with CP Cup of make jaquar

    Queen/Plumber Nectar/Nova 230mm

    long.

    24.00 no 393.00 9432.00

    172 4.7Providing and fixing CP connection pipe

    with unions of 450mm length.48.00 no 90.00 4320.00

    173

    Labour charges for Plumbing , sanitary

    and water supply excluding extern al

    drianage system.

    1.00 45000.00 45000.00

    Plumbing Works-Sub total 1,028,447.00

    Grand total Contract amountSub-

    contract 9,360,000.00

  • 8/13/2019 Rate Analysis and BOQ

    14/37

    Rate Amount Metal Sand Cement/limestone/Marble/Bric

    kEarth

    Miscellane

    ousFormwork Steel

    1 2 3 4 5 6 7 8 9 10 11 12

    SH-1 Earth work

    1 1.1 Earthwork excavation for footings 868.78 M3 110.00 95565.25 868.78

    2 1.2 Earth work in surface excavation .100 Sqm 15.00 0.00

    0.00

    1.2aBailing out of water during PCC,

    footings.0.00 KL 50.00 0.00 0.00

    1.50 Anti Termite Treatement 348.30 m2 76.00 26470.80 152.38

    3 1.3 Back filling upto G.L 636.47 m3 43.00 27368.38 636.47

    4 1.4 Back filling upto DPC level. 92.76 m3 320.00 29682.22 92.76

    1.4 Back filling with excavated earth 218.15 m3 43.00 9380.36 218.15

    5 1.6 Sand filling under floors 0.00 m3 280.00 0.00 0.00

    SH-2 CONCRETE WORK

    6 2.1

    PCC(1:4:8) using 40mm upto

    Plinth beam. m3 2776.00 0.00 0.00 0.00 0.00

    7 2.2PCC(1:5:10) using 40 mm under

    footings and floors.77.17 m3 2435.00 187916.37 69.46 38.20 204.51

    8 2.3PCC(1:4:8) using brick bats under

    floors.45.83 m3 2555.00 117104.61 41.25 22.69 151.71

    9 2.4DPC Course PCC(1:2:4) using 20

    mm42.46 m2 296.00 12568.16 1.53 0.84 11.24

    10 2.5B.T coat using 80/100 B.T over

    DPC Course.42.46 m2 115.00 4882.90 96.00

    11 2.6Filling with sunken floor of Toilets

    etc. with cinder material.24.70 m3 833.00 20575.10 24.70

    12 2.7

    Water proofing treatment to

    vertical and horizontal surface of

    depressed portion W/C .

    131.24 m2 385.00 50527.57 131.24

    13 2.8Plum concrete PCC (1:4:8) for

    balcony10.00 m3 2683.00 26830.00 7.20 3.17 33.20 2.00

    Plum concrete PCC (1:3:6) for

    S.NO

    Material

    DESCRIPTION OF ITEM Qty. UNIT

    Contract

  • 8/13/2019 Rate Analysis and BOQ

    15/37

    Rate Amount Metal Sand Cement/limestone/Marble/Bric

    kEarth

    Miscellane

    ousFormwork Steel

    S.NO

    Material

    DESCRIPTION OF ITEM Qty. UNIT

    Contract

    ornamental brick work 41/2" 168.80 m2 422.00 71234.44 5.24 36.88 9706.12

    SH-7 FLOORING:54

    7.140 mm thick Marble chips

    (Makrana) flooring.208.50 m2 420.00 87570.00 5.37 2.69 86.74 3919.00

    55

    7.2Marble chips skirting riser or dedo

    (up to 30cm height) .102.44 m2 441.00 45176.04 1.23 22.02 921.96

    56

    7.3Glass strips in joints of

    Terrazo/cement concrete floors.1449.60 rm 24.00 34790.40 1449.60

    57

    7.440mm th. flooring in CC( 1:2:4)

    with a flaoting coat of neat cement.710.98 m2 300.00 213294.00 26.16 13.08 244.90

    58 7.521mm th. plaster skirting upto

    30cm height with CM(1:3) .55.44 m2 191.00 10589.04 1.16 13.64

    59 7.6Providing KOTA Stone in Kitchen

    counter.59.04 m2 904.00 53372.16 1.09 0.54 3.13 70.85

    60 7.7Ceramic Glased tile 5mm

    thickness.314.64 m2 724.00 227799.36 3.47 1.74 31.46 314.64

    SH-8ROOFING WATER PROOFING &

    INSULATION

    61 8.1

    Water proofing treatment with

    bitumin felt over roofs ( bitumin

    85/25 or 90/15 )

    299.59 m2 282.00 84484.38 1797.54

    62 8.2100mm thick mud puska over roof

    slab .299.59 m2 350.00 104856.50

    63 8.3Gola 75X75mm with M-15 (1:2:4)

    concrete .268.48 rm 87.00 23357.76

    64 8.4

    Khurras 450 X 450mm with th. of

    50mm cement concrete M-15over

    PVC Sheet.

    8.00 nos 241.00 1928.00

    SH-9 FINISHING:

    65 9.118mm thk cement plaster in two

    coats .454.83 m2 205.00 93240.15 8.19 56.22 0.09

  • 8/13/2019 Rate Analysis and BOQ

    16/37

    Rate Amount Metal Sand Cement/limestone/Marble/Bric

    kEarth

    Miscellane

    ousFormwork Steel

    S.NO

    Material

    DESCRIPTION OF ITEM Qty. UNIT

    Contract

    81 5.1Flush door shutters of 35 mm

    thick.using 3 mm ply on both sides.

    175.31 m2 1800.00 315549.00 175.305

    82 5.23.00 mm thick glass panes for

    fixing in the ventilators/ windows .90.00 m2 571.00 51390.00 90.000

    83 5.3

    glazed shutters for

    windows/ventilators of 1st class

    deodar wood using 10kg / sqm.

    (4mm thick) glass panes .

    130.46 m2 2250.00 293535.00 130.460

    84 5.4

    35mm thick wire gauze shutters of1st class deodar wood termite

    treated and kiln seasoned wood

    85G (wire dia 0.56 mm) wire gauge

    (12 mesh to an inch)

    165.06 m2 1389.00 229264.17 165.057

    85 5.11

    35 mm FRP flush door shutter with

    fixed frame of angle iron

    50X50x5mm .

    31.92 m2 2787.00 88961.04 31.92

    SH-6 METAL WORK

    86 6.1 Pressed steel door frames. 359.04 rm 400.00 143616.00 359.040

    87 6.2Pressed Door / Window /

    Ventilator frames.1046.50 rm 400.00 418600.00 1046.500

    Fittings to doors and

    windows:

    88 5.5Tower bolts with necessary screws

    aluminium fittings

    89 a 150 mm x 10 mm 980.00 nos 51.00 49980.00 980.000

    90 b 225 mm x 10 mm 352.00 nos 73.00 25696.00 352.00

    91 5.6Sliding door bolts with necessary

    screws

    92 300 x 16 mm 24.00 nos 102.00 2448.00 24.000

    93 5.7 Lock-in-bolts for doors 50.00 nos 60.00 3000.00 50.00

    94 5.8 Door rubber buffer 124.00 nos 25.00 3100.00 124.00

    95 5.9 Door stoppers 124.00 nos 29.00 3596.00 124.00

    96 5.10 Door and windows handles

    97 a 100 mm 490.00 nos 49.00 24010.00 490.00

  • 8/13/2019 Rate Analysis and BOQ

    17/37

    Rate Amount Metal Sand Cement/limestone/Marble/Bric

    kEarth

    Miscellane

    ousFormwork Steel

    S.NO

    Material

    DESCRIPTION OF ITEM Qty. UNIT

    Contract

    119 15Earthing complete with Copper

    Earthing Plate .2.00 nos 11156.00 22312.00 2.000

    120 16

    Aluminum Strip 25x3mm,

    completely connected from Earth

    link to equipment.

    20.00 nos 297.00 5940.00 20.000

    121 17 Bell/ Buzzer 24.00 nos 89.00 2136.00 24.000

    Labour charges for electrical

    works.

    Sub-total

    PLUMBING WORKS

    122 1.1 PVC pipes

    a) 150mm dia 19.80 rm 510.00 10098.00 19.8

    123 1.2PCC (1:5:10) bed alround the pipe

    .

    a) 150mm 19.80 rm 271.00 5365.80 19.8

    124 1.3salt glazed stone ware pipes grade

    'A'

    a) 150mm dia 40.00 rm 177.00 7080.00 40

    125 1.4PCC (1:5:10) bed alround the pipe

    .

    a) 150mm 40.00 rm 271.00 10840.00 40

    126 1.5

    Square mouth S.W gully trap

    grade 'A' with brick masonry

    chamber and C.I cover.

    a) 100x100mm size with FPS

    bricks.12.00 no 945.00 11340.00 12

    127 1.6P- type manhole with RCC(1:2:4)

    top slab

    128 a) With 230mm tick walls of brickmasonry of size 450mm x 450mm. 16.00 4429.00 70864.00 16

    129b) With 115mm thick walls of brick

    masonry) of size 450mm x 450mm.4.00 4116.00 16464.00 4

    EXTERNAL DRAINAGE/SEWERAGE

  • 8/13/2019 Rate Analysis and BOQ

    18/37

    Rate Amount Metal Sand Cement/limestone/Marble/Bric

    kEarth

    Miscellane

    ousFormwork Stee

    S.NO

    Material

    DESCRIPTION OF ITEM Qty. UNIT

    Contract

    149 a) 100mm dia pipe 279.00 35.00 9765.00 279

    150 b) 75mm dia pipe

    2.10Bed concrete 1:2:4 mix 75mm thick

    all round pipe

    151 a) 75mm and 75.00 276.00 20700.00 75

    152 b) 150mm 30.00 394.00 11820.00 30

    3 WATER SUPPLY

    3.1 Galvanized mild steel tubes

    153 a) 15mm dia ( Concealed) 556.08 246.00 136795.68 556.08

    154 b) 25mm dia (Exposed) 311.00 314.00 97654.00 311

    C) 40mm dia (Exposed) 100.00 396.00 39600.00 100

    155 3.2 G.I distribution branch 48.00 no 248.00 11904.00 48

    3.3Painting GI pipes and Fitting with

    white paint

    156 a) 15mm dia 500.00 rm 8.00 4000.00 500

    157 b) 25mm dia 311.00 rm 10.00 3110.00 311

    158 c) 40mm dia 100.00 rm 14.00 1400.00 100

    3.4 brass full way valve of Type

    159 a) 15mm dia

    160 b) 25mm dia 16.00 no 518.00 8288.00 16

    161 c) 40mm dia 4.00 no 598.00 2392.00 4

    3.5

    PVC water tanks with lockable

    covers of (Sintex make) 1500 lits

    capacity

    16.00 no 11475.00 183600.00 16

    4 SANITARY FIXTURES

    4.1 W.C pan

    164 a) H.S.I.Orissa Pan W.C.580mm. 24.00 no 3112.00 74688.00 24

  • 8/13/2019 Rate Analysis and BOQ

    19/37

    Rate Amount Metal Sand Cement/limestone/Marble/Bric

    kEarth

    Miscellane

    ousFo

    S.NO

    Material

    DESCRIPTION OF ITEM Qty. UNIT

    Contract

  • 8/13/2019 Rate Analysis and BOQ

    20/37

  • 8/13/2019 Rate Analysis and BOQ

    21/37

  • 8/13/2019 Rate Analysis and BOQ

    22/37

  • 8/13/2019 Rate Analysis and BOQ

    23/37

  • 8/13/2019 Rate Analysis and BOQ

    24/37

  • 8/13/2019 Rate Analysis and BOQ

    25/37

  • 8/13/2019 Rate Analysis and BOQ

    26/37

    Rate Amount Metal SandCement/lim

    e

    stone/Marble/Bri

    ckEarth

    Miscellane

    ousFormwork

    1 2 3 4.00 5 6 7 8 9 10 11

    SH-1 Earth work

    1 1.1 Earthwork excavation for footings 868.78 M3 110.00 95565.25 868.78

    2 1.2 Earth work in surface excavation . nonoper

    atio

    nal

    100

    Sqm15.00 0.00

    0.00

    1.2a Bailing out of water during PCC,footings.

    0.00 KL 50.00 0.00 0.00

    1.50 Anti Termite Treatement 348.30 m2 76.00 26470.80 152.38

    3 1.3 Back filling upto G.L 636.47 m3 43.00 27368.38 636.47

    4 1.4 Back filling upto DPC level. 92.76 m3 320.00 29682.22 92.76

    1.4 Back filling with excavated earth 218.15 m3 43.00 9380.36 218.15

    5 1.6 Sand filling under floors 0.00 m3 280.00 0.00 0.00

    SH-2 CONCRETE WORK

    6 2.1PCC(1:4:8) using 40mm upto Plinth

    beam.

    oper

    atiom3 2776.00 0.00 0.00 0.00 0.00

    7 2.2PCC(1:5:10) using 40 mm under

    footings and floors.77.17 m3 2435.00 187916.37 61.74 37.04 204.51

    8 2.3PCC(1:4:8) using brick bats under

    floors.45.83 m3 2555.00 117104.61 36.67 22.00 151.71

    9 2.4DPC Course PCC(1:2:4) using 20

    mm42.46 m2 296.00 12568.16 1.36 0.03 11.24

    10 2.5B.T coat using 80/100 B.T over DPC

    Course.42.46 m2 115.00 4882.90 96.00

    11 2.6Filling with sunken floor of Toilets etc.

    with cinder material.24.70 m3 833.00 20575.10 24.70

    12 2.7

    Water proofing treatment to vertical

    and horizontal surface of depressed

    portion W/C .

    131.24 m2 385.00 50527.57 131.24

    Plum concrete PCC (1:4:8) for

    Qty.

    Material

    UNITDESCRIPTION OF ITEM

    Contract

    S.N

    O

  • 8/13/2019 Rate Analysis and BOQ

    27/37

    Rate Amount Metal SandCement/lim

    e

    stone/Marble/Bri

    ckEarth

    Miscellane

    ousFormwork

    Qty.

    Material

    UNITDESCRIPTION OF ITEM

    Contract

    S.N

    O

    577.4

    40mm th. flooring in CC( 1:2:4) with a

    flaoting coat of neat cement.

    710.98 m2 300.00 213294.00 26.16 13.08 244.90

    58 7.521mm th. plaster skirting upto 30cm

    height with CM(1:3) .55.44 m2 191.00 10589.04 1.16 13.64

    59 7.6Providing KOTA Stone in Kitchen

    counter.59.04 m2 904.00 53372.16 1.09 0.54 3.13 70.85

    60 7.7 Ceramic Glased tile 5mm thickness. 314.64 m2 724.00 227799.36 3.47 1.74 31.46 314.64

    SH-8ROOFING WATER PROOFING &

    INSULATION

    61 8.1Water proofing treatment with bituminfelt over roofs ( bitumin 85/25 or

    90/15

    299.59 m2 282.00 84484.38 1797.54

    62 8.2100mm thick mud puska over roof

    slab .299.59 m2 350.00 104856.50

    63 8.3Gola 75X75mm with M-15 (1:2:4)

    concrete .268.48 rm 87.00 23357.76

    64 8.4

    Khurras 450 X 450mm with th. of

    50mm cement concrete M-15over

    PVC Sheet.

    8.00 nos 241.00 1928.00

    SH-9 FINISHING:

    65 9.118mm thk cement plaster in two

    coats .454.83 m2 205.00 93240.15 8.19 56.22 0.09

    66 9.2

    mm c cemen p as er n

    (1:6) on rough side of single/ half 1448.87 m2 145.00 210086.31 21.73 125.18

    67 9.312mm thick plaster in CM( 1:6) on

    wall1490.84 m2 135.00 201263.62 17.89 103.05

    68 9.4 6mm thick ceiling plaster in CM (1:3) 1042.35 m2 127.00 132379.07 6.25 72.05

    69 9.5Making grooves in walls/ corners of

    slab2700.00 rm 10.00 27000.00

    70 9.6

    e was ng new oc s w

    three(or more) coats of lime to an

    even shade.

    6137.44 m2 22.00 135023.68 9.00 1963.98

    71 9.7

    Two (or more) coats of cement based

    paints of specified shade or exterior

    to an even shade.

    1942.00 m2 45.00 87390.00 621.44

    72 9.8Painting to new metalic surfaces with

    2 coats of synthetic enamel paint.574.56 m2 51.00 29302.56 63.20

    73 9.9Applying prime coat on new wooden

    / wood based surfaces .1081.31 m2 61.00 65959.91 64.88

    74 9.10Painting to new Wood surfaces with 2

    coats of synthetic enamel paints.1135.75 m2 51.00 57923.25 136.29

  • 8/13/2019 Rate Analysis and BOQ

    28/37

    Rate Amount Metal SandCement/lim

    e

    stone/Marble/Bri

    ckEarth

    Miscellane

    ousFormwork

    Qty.

    Material

    UNITDESCRIPTION OF ITEM

    Contract

    S.N

    O

    99 5.12 Mild steel hooks 280.00 nos 42.00 11760.00 280.00

    100 5.13 Helical door spring 48.00 nos 382.00 18336.00 48.00

    577.76 501.32 5031.44 201534.24 1816.15 4022.84

    ELECTRIFICATION ITEMS Meatal Sand Cement Bricks E/w Formwork

    1

    Wiring for light point/fan point/calling

    bell with 1.5 sq mm pvc insulatedcopper conducted wire.

    101

    a)One light/fan/bell push point

    controlled by one 5/6 amp one way

    switch

    213.00 nos 520 110760.00 213.000

    105b) Twin control light pointwith 2 No.

    two way 5/6 Amps switch5.00 nos 743 3715.00 5.000

    106 2

    Circuit wiring from switch fuse /DB to

    switch board using 2x 2.5 sq mmalong with 1x 1.5 sqmm wire. 950.00 rm 119 113050.00 950.000

    107 3Wiring for power socket 2x 4 sq mm

    wire.750.00 rm 208.00 156000.00 750.000

    108 4

    Wiring with 2x6.0sqmm along with

    1x4.0 sqmm PVC wire in walls,

    ceiling .

    100.00 rm 282.00 28200.00 100.000

    109 5 Sub main cable with PVC wire of 2x10 sqmts concealed in wall/ceiling.

    75.00 rm 386.00 28950.00 75.000

    110 6

    Flush button type socket outlet,6 pin

    Multipurpose type with one switch

    1516 amps

    96.00 nos 223.00 21408.00 96.000

    111 7 Wall bracket. 48.00 nos 297.00 14256.00 48.000

    112 8Fluorescent Tube fitting Rail ( Patti)

    type48.00 nos 431.00 20688.00 48.000

    113 9 Celing Rose bakelite 65x50mm. 48.00 nos 44.00 2112.00 48.000

    114 10 Lamp holder bakelite body. 87.00 nos 52.00 4524.00 87.000

    M t i lC t t

  • 8/13/2019 Rate Analysis and BOQ

    29/37

    Rate Amount Metal SandCement/lim

    e

    stone/Marble/Bri

    ckEarth

    Miscellane

    ousFormwork

    Qty.

    Material

    UNITDESCRIPTION OF ITEM

    Contract

    S.N

    O

    2.2

    M.S holder clamps including cement

    concrete block 100mm x100mm x

    100mm of 1:2:4 mix

    132 a) 100mm dia 190.00 60.00 11400.00 190

    2.3 sand cast iron fitting and accessories

    133 a) Plain bends:

    134 i) 100mm nominal size 36.00 377.00 13572.00 36

    135 b) T-C.I bends

    136 i) 100mm nominal size 24.00 603.00 14472.00 24

    137 C) C.I Reduced T bends

    138 i) 100mm x 75mm nominal size 48.00 547.00 26256.00 48

    139 d) Door bends

    140 i) 100mm nominal size 16.00 452.00 7232.00 16

    2.4 Providing and fixing:

    141 a) Cast iron cowl

    142 i) 100mm nominal size 24.00 309.00 7416.00 24

    2.5

    Lead caulked joints to sand iron /cast

    (spun) iron soil waste and ventilating

    pipes .

    143 i) 100mm nominal size 350.00 202.00 70700.00 350

    144 ii)75mm nominal size 120.00 146.00 17520.00 120

    2.6 Cast iron trap (floor Trap).

    145 i) 75mm dia 72.00 542.00 39024.00 72

    146 ii)100mm dia

    MaterialContract

  • 8/13/2019 Rate Analysis and BOQ

    30/37

    Rate Amount Metal SandCement/lim

    e

    stone/Marble/Bri

    ckEarth

    Miscellane

    ousFormwork

    Qty.

    Material

    UNITDESCRIPTION OF ITEM

    Contract

    S.N

    O

    165 4.2White glazed vitreous China wash

    basins24.00 no 1528.00 36672.00 24

    4.3C.P. brass bib taps of double 'O' ring

    system.

    166 i) Long Nose Bib Cock 24.00 no 331.00 7944.00 24

    167 ii) Short Body Bib Cock. 24.00 no 374.00 8976.00 24

    168 iii) Long Body Bib Cock 72.00 no 467.00 33624.00 72

    4.4 Providing and fixing 15mm Cp brassangle valve of double 'O' ring system

    169 i) 15mm dia 96.00 no 238.00 22848.00 96

    170 4.5Concealed stop cock of double 'o'

    ring system with Copper plating48.00 no 542.00 26016.00 48

    171 4.6C.P. brass shower with arm with CP

    Cup24.00 no 569.00 13656.00 24

    172 4.7CP connection pipe with unions of

    450mm length.48.00 no 60.00 2880.00 48

    173

    Labour charges for Plumbing ,

    sanitary and water supply excluding

    extern al drianage system.

    13712244

    Initial Rebate = 4.5% 617051

    13095193

    925626

    12169567

    Rebate after negotiation = 7.06844

    NET TOTAL COST FOR ONE BLOCK

  • 8/13/2019 Rate Analysis and BOQ

    31/37

    SLNO ITEM OF WORK QTY RATE UNIT AMOUNT

    Framed strucutre:

    1 Cement 5108.33 252.00 BAGS 1287298

    2 Sand 495.35 176.00 CUM 87181

    3 Metal 592.98 423.00 CUM 250831

    4 Bricks 199710.19 2.65 EACH 529232

    5 steel 60.10 46600 MT 2800886

    6 B.T Coat 96.00 27.00 kg 2592

    7 Cynder 24.70 355.00 cum 8769

    8 Water proofing treatment 131.24 190.00 sqm 24936

    9 Boulder stone for plum concrete 3.36 200.00 cum 672

    10 Marble chips 4840.96 8.00 cft 3872811 Glass strips 1449.60 10.00 rmt 14496

    12 Kota stone 70.85 300.00 sqm 21255

    13 Ceramic glazed tiles 314.64 280.00 sqm 88099

    14 Roofing treatment 1797.54 30.00 sqm 53926

    15 100 mm thick mud pushka 299.59 160.00 sqm 47934

    16 Gola 75x75 268.48 45.00 rmts 12082

    17 Khurrass 450x450 mm 8 50.00 nos 400

    18 White washing 1963.98 15.00 kgs 29460

    19 Cement based paints 621.44 40.00 kgs 24858

    20 Synthetic enamel paint 63.20 80.00 lts 5056

    21 Wood primer 64.88 40.00 lts 2595

    22 Synthetic enamel paint 136.29 80.00 lts 10903

    23 M.S square grills 1500.00 55.00 kgs 82500

    TOTAL AMOUNT REQUIRED FOR ONE UNIT ( MATERIALS )

  • 8/13/2019 Rate Analysis and BOQ

    32/37

    SLNO ITEM OF WORK QTY RATE UNIT AMOUNT

    TOTAL AMOUNT REQUIRED FOR ONE UNIT ( MATERIALS )

    28 Doors , Windows and Ventilators

    29 Flush dooor shutters 35 mm 175.305 900.00 sqm 157775

    30 3 mm thick glass panels 90 280.00 sqm 25200

    31

    Glazed shutters for windows and

    ventilators 130.46 1290.00 sqm 168293

    32 35 mm thick wire gauge shutters 165.057 900.00 sqm 148551

    33 35 mm FRP Flush door shutters 31.92 2000.00 sqm 63840

    34 Pressed steel door frames 359.04 275.00 rmt 98736

    35

    Pressed steel windows and ventilator

    frames 1046.5 275.00 rmt 287788

    36

    Accessories for doors and windows

    fittings 100295

    50 Plumbing

    51 150 mm dia. PVC Pipe ( Type-B) 19.8 198.00 rmt 3920

    52 PCC ( 1:5:10) alround the pipe 19.8 135.00 rmt 2673

    53

    150 mm Salt glazed stone ware pipe

    grade-A 40 161.67 rmt 6467

    54 PCC ( 1:5:10) alround the pipe 40 135.00 rmt 5400

    55 100x100 Square mouth SW Gully trapgrade-A 12 612.00 each 7344

    56

    P- type manholes with 9" br. Walls

    (450x450) 16 3000.00 each 48000

    57

    P- type manholes with 41/2" br. Walls

    (450x450) 4 2800.00 each 11200

    58 75 mm C.I S/S joint pipes 75 423.00 each 31725

    59 100 mm C.I S/S joint pipes 300 500.50 each 150150

    60 100 mm M.S holder clamps 190 28.69 each 5451

    61 100 mm C.I Plain bends 36 266.00 each 9576

  • 8/13/2019 Rate Analysis and BOQ

    33/37

    SLNO ITEM OF WORK QTY RATE UNIT AMOUNT

    TOTAL AMOUNT REQUIRED FOR ONE UNIT ( MATERIALS )

    68 75 mm C.I Trap 72 400.00 each 28800

    69 35 mm dia., waste coupling 24 183.00 each 4392

    70 32 mm dia., waste pvc pipe 24 30.00 each 720

    71 Painting to 100 mm dia., C.I pipe 279 18.00 each 5022

    72

    75 mm thick bed concrete for C.I

    Pipes 105 130.00 each 13650

    73 Water supply:

    74 15 mm dia., G.I pipe 556.08 92.47 rmt 51421

    75 25 mm dia., G.I pipe 311 172.36 rmt 53604

    76 40 mm dia., G.I pipe 100 224.00 rmt 22400

    77 G.I distribution branch 48 32.00 rmt 1536

    78 Painting to 15 mm dia., pipe 500 3.90 rmt 1950

    79 Painting to 25 mm dia., pipe 311 4.84 rmt 1505

    80 Painting to 40 mm dia., pipe 100 6.75 rmt 675

    81 25 mm dia., brass full way valve 16 566.00 each 9056

    82 40 mm dia., brass full way valve 4 1198.00 each 4792

    83 1500 lit capacity Sintex tank 16 6225 each 99600

    84 Sanitary fittings:

    85 580 mm Orrisa W.C pan 24 2080.00 each 49920

    86 White glazed china wash basin 24 755.00 each 18120

    87 C.P brass bib tap

    88 Long nose bib tap 24 375.00 each 9000

    89 Short body bib tap 24 317.00 each 7608

    90 Long body bib tap 72 375.00 each 27000

    91 15 mm dia., c.p brass angle valve 96 305.00 each 29280

  • 8/13/2019 Rate Analysis and BOQ

    34/37

    SLNO ITEM OF WORK QTY RATE UNIT AMOUNT

    TOTAL AMOUNT REQUIRED FOR ONE UNIT ( MATERIALS )

    105

    PCC ,Footins, Balcony, Dpc

    Course,Kitchen partition wall.333.30 45.00

    sqm 14999

    106 Pedastals&columns upto Mumty 720.14 50.00 sqm 36007

    107 beams up to Mumty 1091.65 75.00 sqm 81874

    108

    slabs including Stair case up to

    Mumty1068.84 75.00

    sqm 80163

    109

    Form work for arches (span up to 6mtrs) for in-situ concrete work (upto

    level -V)

    59.00 75.00

    sqm 4425

    110 Edges of slab upto Mumty 665.05 6.00 rmt 3990

    8122903

    1 Framed strucutre: 5537537

    2 Doors , Windows and Ventilators 1050478

    3 Electrical fittings: 460907

    4

    External sewage, plumbing, sanitary

    and water supply 852523

    5 Formwork: 221458

    Total 8122903

    Abstract of Materials

    6%10% 3%

    MaterialFramed strucutre:

    Doors , Windows and Ventilators

    Electrical fittings:

    External sewage, plumbing, sanitary and water supplyFormwork:

  • 8/13/2019 Rate Analysis and BOQ

    35/37

    SLNO ITEM OF WORK QTY RATE UNIT AMOUNT

    TOTAL AMOUNT REQUIRED FOR ONE UNIT ( MATERIALS )

  • 8/13/2019 Rate Analysis and BOQ

    36/37

    CONSTRUCTION OF MINITOWNSHIP FOR KASHMIRI MIGRANTS AT JAGTI, NAGROTA, JAMMU

    Sl,No Items Material Labour T&P Total

    1 Framed strucutre: 5537537 1110192 124084 6771814

    2 Doors , Windows and Ventilators 1050478 1050478

    3 Electrical fittings: 460907 45000.00 505907

    4 External sewage, plumbing, sanitary and water supply 852523 86360.00 938883

    5 Formwork: 221458 221458

    Total 8122902.6 1241552 124084 9488539

    cost per squre foot as per recorded quantities 677 103 10 791

    Total bill amount per building 12169567

    Bill amount per suare foot 1014.131

    Total bill amount per building 8104932

    Bill amount per suare foot+addl steel cost 755 excluding service tax

    Total bill amount per building 12900000

    Bill amount per suare foot 1075

    Total bill amount per building 8591400

    Bill amount per suare foot 716 excluding service tax

    due to hike in steel cost Rs 80 per sft addl expenditure for JV

    Sub contractor billing

    Present billing

    Amounts considered at the time of award ing sub contract

    TOTAL AMOUNT REQUIRED FOR ONE UNIT

    As per billing quantities

    Sub contractor billing

    As per Technical Sanctioned estimate quantities

  • 8/13/2019 Rate Analysis and BOQ

    37/37

    Material Labour Total

    8122902.6 1241552 9364455

    87%

    13%

    Material

    Labour