Rapidly deployable construction€¦ · Rapidly deployable construction ... modular buildings,...

6
DIRTT for Healthcare Rapidly deployable construction DIRTT provides prefabricated interior solutions for alternate care sites to meet open configuration and acute care needs. FOR RENOVATIONS OR ALTERNATE CARE SITES Expand capacity quickly Renovations: Transition existing lower-acuity units to high-acuity units Repurpose administration spaces Convert shell spaces Alternate care sites: Convert retail space, convention centers, schools, gyms, modular buildings, trailers or tents to alternate care sites – including patient pods, nurse stations and support areas DIRTT SCOPE Wall frames and finishes Installed above floor Can be freestanding, connect to the underside of a ceiling, or support a ceiling Minimum height 4’0”, maximum height 10’0” Infection-control gaskets 48” swing doors and hardware – 45 1/4” clear opening Factory installed utilities and/or rough-in for electric, network, low voltage, plumbing, medical gasses and other trades – if required SCOPE BY OTHERS Building or temporary structure, ceiling and floor MEP/utility engineering and infrastructure Connection of factory installed components to building utilities DIRTT solutions can be tailored to meet your specific needs and site conditions. Our technology-backed manufacturing approach allows healthcare spaces to be executed with unprecedented speed and cleanliness. FREESTANDING LOW WALLS FREESTANDING WITH CEILING SOLUTIONS FOR TEMPORARY STRUCTURES INCLUDE: Triage rooms Treatment rooms Patient rooms Isolation rooms Exam rooms Headwalls

Transcript of Rapidly deployable construction€¦ · Rapidly deployable construction ... modular buildings,...

Page 1: Rapidly deployable construction€¦ · Rapidly deployable construction ... modular buildings, trailers or tents to alternate care sites – including patient pods, nurse stations

DIRTT for HealthcareRapidly deployable construction

DIRTT provides prefabricated interior solutions for alternate care sites to meet open configuration and acute care needs.

FOR RENOVATIONS OR ALTERNATE CARE SITES

• Expand capacity quickly • Renovations:

• Transition existing lower-acuity units to high-acuity units• Repurpose administration spaces• Convert shell spaces

• Alternate care sites: • Convert retail space, convention centers, schools, gyms,

modular buildings, trailers or tents to alternate care sites – including patient pods, nurse stations and support areas

DIRTT SCOPE

• Wall frames and finishes• Installed above floor• Can be freestanding, connect to the underside of a ceiling,

or support a ceiling• Minimum height 4’0”, maximum height 10’0”

• Infection-control gaskets• 48” swing doors and hardware – 45 1/4” clear opening• Factory installed utilities and/or rough-in for electric, network, low

voltage, plumbing, medical gasses and other trades – if required

SCOPE BY OTHERS

• Building or temporary structure, ceiling and floor• MEP/utility engineering and infrastructure• Connection of factory installed components to building utilities

DIRTT solutions can be tailored to meet your specific needs and site conditions. Our technology-backed manufacturing approach allows healthcare spaces to be executed with unprecedented speed and cleanliness.

FREESTANDING

LOW WALLS

FREESTANDING WITH CEILING

SOLUTIONS FOR TEMPORARY STRUCTURES INCLUDE:

• Triage rooms• Treatment rooms• Patient rooms

• Isolation rooms• Exam rooms

• Headwalls

Page 2: Rapidly deployable construction€¦ · Rapidly deployable construction ... modular buildings, trailers or tents to alternate care sites – including patient pods, nurse stations

ROOM TEMPLATE ONE:10’ X 12’ ROOMS – WITHOUT POWER DETAILS

• 8’0” high• 4” wide aluminum frames with factory installed ½” low-pressure

laminate inserts• Aluminum frame hinge door with 6mm glass, 45 1/4” clear opening• Structural cornice cap for stability and attachment for temporary ceiling• Anti-skid pad or carpet gripper for base• Additional options and wall heights available

BASE DETAIL

CORNICE DETAIL

HEIGHT ADJUSTABLE

Quantity Cost*

Single $14,315.00

4 Pack $45,350.00

8 Pack $86,510.00

Please contact your local DIRTT representative for pricing.

Page 3: Rapidly deployable construction€¦ · Rapidly deployable construction ... modular buildings, trailers or tents to alternate care sites – including patient pods, nurse stations

1 24Mar20 First Issue MLC

10'[3048]cl-cl

12'

[365

8]cl

-cl

10'[3048]cl-cl

10'[3048]cl-cl

10'[3048]cl-cl

40'[12192]cl-cl

B C C C B

AB C C B

HD5BHF4

HD5BHF4

HD5BHF4

HD5BHF4

I

J

E

F

A B C D G H K L M N

L1M L1M L1M L1M

DRAWING INDEX

DW-101 PLAN AND ELEVATIONS

PROJECT DETAILS/NOTES:

FRAME AND TRIM DETAILS

EXTRUSION PROFILE: FRAME FINISH:

□ CURVILINEAR □ ANODIZED ALUMINUM

□ RECTILINEAR □ POWERDER-COATED

□ BLADE □ VENEER

□ EVIL TWIN

BASE TRIM COLOR: PVC/GLASS WIPE COLOR:

□ SILVER □ SILVER

□ CHARCOAL □ CHARCOAL

□ BLACK □ BLACK

REVEAL: COPLANAR:

□ CLASSIC □ NO

□ ENZO □ YES

FLOOR, CEILING, AND SEISMIC DETAILS

FLOOR TYPE: WALL HEIGHT: X' X"

□ CARPET

□ HARD SURFACE

CEILING TYPE: GRID TYPE:

□ DRYWALL BULKHEAD □ 9/16" □ 15/16"

□ CORNICE RAIL TILE TYPE:

□ LOW WALL □ FLUSH

□ GRID □ CONCEALED

□ TEGULAR

SEISMIC REQUIRED: HARDWARE REQUIREMENTS:

□ NO

□ YES

DOORS: REFERENCE DOOR SCHEDULE FOR FURTHER DETAILS

ELECTRICAL PROVISION REQUIRED - SEE ELECTRICAL SHOP DRAWINGS

DATA PROVISION REQUIRED - SEE PON SHOP DRAWINGS

MILLWORK PROVISIONS REQUIRED - SEE MILLWORK SHOP DRAWINGS

ADDITIONAL NOTES:________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Elevation I

Elevation J

Elevation E

Elevation F

Elevation A Elevation B Elevation C Elevation D

Elevation G Elevation H

Elevation K Elevation L Elevation M Elevation N

1'-758"4'

9'-758"9'-75

8"

4'4'1'-758"

9'-758"

1'-758" 1'-75

8"

9'-758"

4' 4'4' 4'4'

4' 1'-3 516" 1'-3 5

16"4'

9'-758"

4' 438"43

8" 4' 438"

9'-758"9'-75

8"

1'-3 516" 4'

9'-758"

4' 438"4'4' 1'-3 5

16"4' 3'-758"

11'-758"

4' 4'

11'-758"

4' 3'-758"

4' 3'-758"

11'-758"

4'

3'-758"4'

11'-758"

4' 4'

11'-758"

4' 3'-758"

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2 M1

M1

M4

M6M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2 M1

M1

M4

M6M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2 M1

M1

M4

M6M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2 M1

M1

M4

M6M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2M1

M1

M4

M6M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2M1

M1

M4

M6M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2M1

M1

M4

M6M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2M1

M1

M4

M6M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

HD5BHF4

HD5BHF4

HD5BHF4

HD5BHF4

HD5BHF4

HD5BHF4

HD5BHF4

HD5BHF4

1"

8'

1"

8'

1"

3'-2

"

8'

1"

3'-2

"

3'-6

"

8'

1"

8'

1"

8'

1"

8'

1"

8'

1"

8'

1"

8'

1"

8'

1"

8'

1"

8'

1"

8'

This

draw

ing

is th

e co

nfid

entia

l and

pro

prie

tary

info

rmat

ion

of D

IRTT

Env

ironm

enta

l Sol

utio

ns L

td. (

DIRT

T). A

ny re

prod

uctio

n, a

ltera

tion,

disc

losu

re o

r use

of t

his d

raw

ing

othe

r tha

n as

agr

eed

to b

y DI

RTT

is ex

pres

sly p

rohi

bite

d. D

o no

t use

dra

win

gs fo

r sca

le p

urpo

ses.

All

site

dim

ensio

ns, d

raw

ings

, det

ails,

and

spec

ifica

tions

con

tain

ed h

erei

n m

ust b

e ve

rifie

d by

sub-

cont

ract

ors a

nd a

ny d

iscre

panc

ies m

ust b

e re

port

ed to

DIR

TT in

writ

ing

befo

re p

roce

edin

g w

ith w

ork.

See

cov

er p

age

of d

raw

ing

pack

age

for f

ull d

iscla

imer

.

C:\Users\MCHEVA~1\AppData\Local\Temp\ICEcad-354064b2-b8ae-41e6-bbe3-b97288800a7e\ICEcad.dwg 2020-3-24 3:34:09 PM

Project:Drawn by:Scale:Plot Date: 2020/03/24

DW-101

MLC----

--------

Project Address:

Project Name:

----

RAPID RESPONSEACUITY LOW4 PACK 10X12

Contact:Contact Number:

--------

Date Revision Initial

PRELIMSHOPS

Rev

AS NOTED

PLAN AND ELEVATIONSSHEET

DW-101FLOOR PLAN - 4 PACK 10x121

1/2" = 1'-0" / 1:24.000002

DW-101ELEVATIONS2

1/4" = 1'-0" / 1:48

SHOP DRAWINGS:

1 24Mar20 First Issue MLC

10'[3048]cl-cl

12'

[365

8]cl

-cl

BA

C C

HD5BHF4

C

D

A B G H

E

F

L1M

DRAWING INDEX

DW-101 PLAN AND ELEVATIONS

PROJECT DETAILS/NOTES:

FRAME AND TRIM DETAILS

EXTRUSION PROFILE: FRAME FINISH:

□ CURVILINEAR □ ANODIZED ALUMINUM

□ RECTILINEAR □ POWERDER-COATED

□ BLADE □ VENEER

□ EVIL TWIN

BASE TRIM COLOR: PVC/GLASS WIPE COLOR:

□ SILVER □ SILVER

□ CHARCOAL □ CHARCOAL

□ BLACK □ BLACK

REVEAL: COPLANAR:

□ CLASSIC □ NO

□ ENZO □ YES

FLOOR, CEILING, AND SEISMIC DETAILS

FLOOR TYPE: WALL HEIGHT: X' X"

□ CARPET

□ HARD SURFACE

CEILING TYPE: GRID TYPE:

□ DRYWALL BULKHEAD □ 9/16" □ 15/16"

□ CORNICE RAIL TILE TYPE:

□ LOW WALL □ FLUSH

□ GRID □ CONCEALED

□ TEGULAR

SEISMIC REQUIRED: HARDWARE REQUIREMENTS:

□ NO

□ YES

DOORS: REFERENCE DOOR SCHEDULE FOR FURTHER DETAILS

ELECTRICAL PROVISION REQUIRED - SEE ELECTRICAL SHOP DRAWINGS

DATA PROVISION REQUIRED - SEE PON SHOP DRAWINGS

MILLWORK PROVISIONS REQUIRED - SEE MILLWORK SHOP DRAWINGS

ADDITIONAL NOTES:________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Elevation C Elevation DElevation A Elevation B Elevation G Elevation HElevation E Elevation F

438" 1'-3 5

16"4'

9'-758"

4'

11'-758"

4'4' 3'-758"

11'-758"

4' 3'-758"4'4'

9'-758"

1'-758"4'

M1

M1

M1

M1

M2 M1

M1

M4

M6M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2M1

M1

M4

M6M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

HD5BHF4

HD5BHF4

1"

3'-2

"

8'

1"

3'-2

"

3'-6

"

8'

1"

8'

1"

8'

1"

8'

1"

8'

1"

8'

1"

8'

This

draw

ing

is th

e co

nfid

entia

l and

pro

prie

tary

info

rmat

ion

of D

IRTT

Env

ironm

enta

l Sol

utio

ns L

td. (

DIRT

T). A

ny re

prod

uctio

n, a

ltera

tion,

disc

losu

re o

r use

of t

his d

raw

ing

othe

r tha

n as

agr

eed

to b

y DI

RTT

is ex

pres

sly p

rohi

bite

d. D

o no

t use

dra

win

gs fo

r sca

le p

urpo

ses.

All

site

dim

ensio

ns, d

raw

ings

, det

ails,

and

spec

ifica

tions

con

tain

ed h

erei

n m

ust b

e ve

rifie

d by

sub-

cont

ract

ors a

nd a

ny d

iscre

panc

ies m

ust b

e re

port

ed to

DIR

TT in

writ

ing

befo

re p

roce

edin

g w

ith w

ork.

See

cov

er p

age

of d

raw

ing

pack

age

for f

ull d

iscla

imer

.

C:\Users\MCHEVA~1\AppData\Local\Temp\ICEcad-354064b2-b8ae-41e6-bbe3-b97288800a7e\ICEcad.dwg 2020-3-24 3:31:25 PM

Project:Drawn by:Scale:Plot Date: 2020/03/24

DW-101

MLC----

--------

Project Address:

Project Name:

----

RAPID RESPONSEACUITY LOWSINGLE 10X12

Contact:Contact Number:

--------

Date Revision Initial

PRELIMSHOPS

Rev

AS NOTED

PLAN AND ELEVATIONSSHEET

DW-101FLOOR PLAN - SINGLE 10x121

1/2" = 1'-0" / 1:24.000002

DW-101ELEVATIONS2

1/4" = 1'-0" / 1:48

Page 4: Rapidly deployable construction€¦ · Rapidly deployable construction ... modular buildings, trailers or tents to alternate care sites – including patient pods, nurse stations

ROOM TEMPLATE TWO:10’ X 12’ ROOMS – WITH POWER DETAILS

• 8’0” high• 4” wide aluminum frames with removable thermofoil finish tiles• Aluminum frame hinge door with 6mm glass, 45 1/4” clear opening• Factory-installed modular power with quick-connect cables • Structural cornice cap for stability and attachment to temporary ceiling• Anti-skid pad or carpet gripper for base• Additional options and wall heights available

BASE DETAIL

CORNICE DETAIL

MODULAR POWER

Please contact your local DIRTT representative for pricing.

Page 5: Rapidly deployable construction€¦ · Rapidly deployable construction ... modular buildings, trailers or tents to alternate care sites – including patient pods, nurse stations

1 24Mar20 First Issue MLC

10'[3048]cl-cl

12'

[365

8]cl

-cl

10'[3048]cl-cl

10'[3048]cl-cl

10'[3048]cl-cl

40'[12192]cl-cl

EHC10-38WEHC10-38WEHC05-38W

EHC10-38W EHC10-38WEHC10-38WEHC15-38W

MFT45 MFT25

C B B B E

AD F F D

WB18 WB20WB19 WB18WB20 WB20 WB37 WB20SHC3 SHC3 SHC3SHC3

HD5BHF4

HD5BHF4

HD5BHF4

HD5BHF4L1M L1M L1M L1M

I

J

E

F

A B C D G H K L M N

DRAWING INDEX

DW-101 PLAN AND ELEVATIONS

PROJECT DETAILS/NOTES:

FRAME AND TRIM DETAILS

EXTRUSION PROFILE: FRAME FINISH:

□ CURVILINEAR □ ANODIZED ALUMINUM

□ RECTILINEAR □ POWERDER-COATED

□ BLADE □ VENEER

□ EVIL TWIN

BASE TRIM COLOR: PVC/GLASS WIPE COLOR:

□ SILVER □ SILVER

□ CHARCOAL □ CHARCOAL

□ BLACK □ BLACK

REVEAL: COPLANAR:

□ CLASSIC □ NO

□ ENZO □ YES

FLOOR, CEILING, AND SEISMIC DETAILS

FLOOR TYPE: WALL HEIGHT: X' X"

□ CARPET

□ HARD SURFACE

CEILING TYPE: GRID TYPE:

□ DRYWALL BULKHEAD □ 9/16" □ 15/16"

□ CORNICE RAIL TILE TYPE:

□ LOW WALL □ FLUSH

□ GRID □ CONCEALED

□ TEGULAR

SEISMIC REQUIRED: HARDWARE REQUIREMENTS:

□ NO

□ YES

DOORS: REFERENCE DOOR SCHEDULE FOR FURTHER DETAILS

ELECTRICAL PROVISION REQUIRED - SEE ELECTRICAL SHOP DRAWINGS

DATA PROVISION REQUIRED - SEE PON SHOP DRAWINGS

MILLWORK PROVISIONS REQUIRED - SEE MILLWORK SHOP DRAWINGS

ADDITIONAL NOTES:________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

9'-758" 9'-75

8"

4' 1'-758" 1'-75

8"4' 4'

9'-758"

4'4' 1'-758"4'

9'-758"

4' 1'-758"4'

1'-3 516" 43

8" 4'4'

9'-758"

1'-3 516"43

8" 4'4' 4'

9'-758"

1'-3 516"4' 4'

9'-758"

438" 43

8"1'-3 516"

9'-758"

4'4' 3'-758"4'

11'-758"

4' 4' 3'-758"

11'-758"

4' 4' 3'-758"

11'-758"

3'-758"

11'-758"

4'4' 3'-758"4'

11'-758"

4'

HD5BHF4

HD5BHF4

HD5BHF4

HD5BHF4

HD5BHF4

HD5BHF4

HD5BHF4

HD5BHF4

1"

1'-6

"

8'

1"

8'

1"

3'-2

"

8'

1"

3'-2

"

3'-6

"

8'

1"

8'

1"

8'

1"

8'

1"

8'

1"

8'

1"

8'

1"

8'

1"

8'

1"

8'

1"

8'

Elevation I

Elevation J

Elevation E

Elevation F

Elevation A Elevation B Elevation C Elevation D

Elevation G Elevation H

Elevation K Elevation L Elevation M Elevation N

M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2

M2M2M2M2M2M2M2M2M2M2M2M2

M1

M1

M1

M1

M2 M1

M1

M4

M6M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2 M1

M1

M4

M6M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2 M1

M1

M4

M6M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2 M1

M1

M4

M6M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2M1

M1

M4

M6M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2M1

M1

M4

M6M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2M1

M1

M4

M6M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2M1

M1

M4

M6M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

This

draw

ing

is th

e co

nfid

entia

l and

pro

prie

tary

info

rmat

ion

of D

IRTT

Env

ironm

enta

l Sol

utio

ns L

td. (

DIRT

T). A

ny re

prod

uctio

n, a

ltera

tion,

disc

losu

re o

r use

of t

his d

raw

ing

othe

r tha

n as

agr

eed

to b

y DI

RTT

is ex

pres

sly p

rohi

bite

d. D

o no

t use

dra

win

gs fo

r sca

le p

urpo

ses.

All

site

dim

ensio

ns, d

raw

ings

, det

ails,

and

spec

ifica

tions

con

tain

ed h

erei

n m

ust b

e ve

rifie

d by

sub-

cont

ract

ors a

nd a

ny d

iscre

panc

ies m

ust b

e re

port

ed to

DIR

TT in

writ

ing

befo

re p

roce

edin

g w

ith w

ork.

See

cov

er p

age

of d

raw

ing

pack

age

for f

ull d

iscla

imer

.

C:\Users\MCHEVA~1\AppData\Local\Temp\ICEcad-354064b2-b8ae-41e6-bbe3-b97288800a7e\ICEcad.dwg 2020-3-24 3:58:37 PM

Project:Drawn by:Scale:Plot Date: 2020/03/24

DW-101

MLC----

--------

Project Address:

Project Name:

----

RAPID RESPONSEACUITY MEDIUM4 PACK 10X12

Contact:Contact Number:

--------

Date Revision Initial

PRELIMSHOPS

Rev

AS NOTED

PLAN AND ELEVATIONSSHEET

DW-101FLOOR PLAN - 4 PACK 10x121

1/2" = 1'-0" / 1:24.000002

DW-101ELEVATIONS2

1/4" = 1'-0" / 1:48

SHOP DRAWINGS:

1 24Mar20 First Issue MLC

10'[3048]cl-cl

12'

[365

8]cl

-cl

EHC10-38W

MFT21

AA

B C

WB11 WB9SHC3

HD5BHF4L1M

C

D

A B G H

E

F

DRAWING INDEX

DW-101 PLAN AND ELEVATIONS

PROJECT DETAILS/NOTES:

FRAME AND TRIM DETAILS

EXTRUSION PROFILE: FRAME FINISH:

□ CURVILINEAR □ ANODIZED ALUMINUM

□ RECTILINEAR □ POWERDER-COATED

□ BLADE □ VENEER

□ EVIL TWIN

BASE TRIM COLOR: PVC/GLASS WIPE COLOR:

□ SILVER □ SILVER

□ CHARCOAL □ CHARCOAL

□ BLACK □ BLACK

REVEAL: COPLANAR:

□ CLASSIC □ NO

□ ENZO □ YES

FLOOR, CEILING, AND SEISMIC DETAILS

FLOOR TYPE: WALL HEIGHT: X' X"

□ CARPET

□ HARD SURFACE

CEILING TYPE: GRID TYPE:

□ DRYWALL BULKHEAD □ 9/16" □ 15/16"

□ CORNICE RAIL TILE TYPE:

□ LOW WALL □ FLUSH

□ GRID □ CONCEALED

□ TEGULAR

SEISMIC REQUIRED: HARDWARE REQUIREMENTS:

□ NO

□ YES

DOORS: REFERENCE DOOR SCHEDULE FOR FURTHER DETAILS

ELECTRICAL PROVISION REQUIRED - SEE ELECTRICAL SHOP DRAWINGS

DATA PROVISION REQUIRED - SEE PON SHOP DRAWINGS

MILLWORK PROVISIONS REQUIRED - SEE MILLWORK SHOP DRAWINGS

ADDITIONAL NOTES:________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

4'438"

9'-758"

1'-3 516"4'4' 3'-75

8"4'

11'-758"

4' 4' 3'-758"

11'-758"

4'

9'-758"

1'-758"4'

HD5BHF4

HD5BHF4

1"

3'-2

"

8'

1"

3'-2

"

3'-6

"

8'

1"

8'

1"

8'

1"

8'

1"

8'

1"

1'-6

"

8'

1"

8'

Elevation C Elevation DElevation A Elevation B Elevation G Elevation HElevation E Elevation F

M1

M1

M1

M1

M2 M1

M1

M4

M5M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2M1

M1

M4

M5M1

M1

M1

M1

M3

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2

M1

M1

M1

M1

M2M2 M2 M2 M2M2M2

This

draw

ing

is th

e co

nfid

entia

l and

pro

prie

tary

info

rmat

ion

of D

IRTT

Env

ironm

enta

l Sol

utio

ns L

td. (

DIRT

T). A

ny re

prod

uctio

n, a

ltera

tion,

disc

losu

re o

r use

of t

his d

raw

ing

othe

r tha

n as

agr

eed

to b

y DI

RTT

is ex

pres

sly p

rohi

bite

d. D

o no

t use

dra

win

gs fo

r sca

le p

urpo

ses.

All

site

dim

ensio

ns, d

raw

ings

, det

ails,

and

spec

ifica

tions

con

tain

ed h

erei

n m

ust b

e ve

rifie

d by

sub-

cont

ract

ors a

nd a

ny d

iscre

panc

ies m

ust b

e re

port

ed to

DIR

TT in

writ

ing

befo

re p

roce

edin

g w

ith w

ork.

See

cov

er p

age

of d

raw

ing

pack

age

for f

ull d

iscla

imer

.

C:\Users\MCHEVA~1\AppData\Local\Temp\ICEcad-354064b2-b8ae-41e6-bbe3-b97288800a7e\ICEcad.dwg 2020-3-24 3:53:10 PM

Project:Drawn by:Scale:Plot Date: 2020/03/24

DW-101

MLC----

--------

Project Address:

Project Name:

----

RAPID RESPONSEACUITY MEDIUMSINGLE 10X12

Contact:Contact Number:

--------

Date Revision Initial

PRELIMSHOPS

Rev

AS NOTED

PLAN AND ELEVATIONSSHEET

DW-101FLOOR PLAN - SINGLE 10x121

1/2" = 1'-0" / 1:24.000002

DW-101ELEVATIONS2

1/4" = 1'-0" / 1:48

Page 6: Rapidly deployable construction€¦ · Rapidly deployable construction ... modular buildings, trailers or tents to alternate care sites – including patient pods, nurse stations

CONCEPTS:

To learn more about how DIRTT can assist your organization, please reach out to your local DIRTT representative or our healthcare team at [email protected]