RENCANA ANGGARAN PELAKSANAAN (RAP) PEMBUATAN POND
SUTT 150 KV SIANTAN-TAYAN
NO NO TWR KLAS PONDASI KONTRAK KONTRAK ONO PPH
1 T 01 DD 15m-18 btg 508,912,432.00 493,645,059.04
2 T 02 BB 15 -16 BT! 1"0,39","26.00 165,285,"94.22
-
3 T 05 AA 15 -16 BT! 165,302,861.00 160,343,""5.1"
-
4 T06 AA 15 -16 BT! 165,302,861.00 160,343,""5.1"
-
5 T0" AA 15 -16 BT! 165,302,861.00 160,343,""5.1"
-6 T08 AA 15 -16 BT! 165,302,861.00 160,343,""5.1"
-
" T12 DD 15 -36 BT! 4"2,994,253.00 458,804,425.41
-
8 T133 AA 15 -16 BT! 165,302,861.00 160,343,""5.1"
-
9 T134 AA 15 -16 BT! 165,302,861.00 160,343,""5.1"
Juml! 2,144,121,5"".00 2,0"9,"9",929.69
TAPAK TOWER YANG SUDA" BEBAS BARU # TAPAK TOWER
-
7/25/2019 Rap Pondasi Tower Siantan-tayan
2/2
SI DENGAN SWAKELOLA
RAP AR!IN K#T#RAN!AN
488,923,4"5.00 4,"21,584.04
142,5"3,656."4 22,"12,13".48
-
138,349,333.30 21,994,441.8"
-
138,349,333.30 21,994,441.8"
-
138,349,333.30 21,994,441.8"
-138,349,333.30 21,994,441.8"
-
319,323,490.92 139,480,934.49
-
138,349,333.30 21,994,441.8"
-
138,349,333.30 21,994,441.8"
1,"80,916,622.46 $#%&%%1&'0$' 1'#*