Rancho Cordova, Mather, Gold River New Measure A and All ... · 1_Rancho Cordova 8/25/04 7:56 PM...

3
PRSRT STD US POSTAGE PAID CCOM Rancho Cordova, Mather, Gold River and All of Sacramento County … See map inside for local Measure A transportation plans 7

Transcript of Rancho Cordova, Mather, Gold River New Measure A and All ... · 1_Rancho Cordova 8/25/04 7:56 PM...

Page 1: Rancho Cordova, Mather, Gold River New Measure A and All ... · 1_Rancho Cordova 8/25/04 7:56 PM Page 1 New Measure A Taxpayer Safeguards The proposedNew Measure A includes legal

1_Rancho Cordova 8/25/04 7:56 PM Page 1

New Measure A Taxpayer Safeguards

The proposed New Measure A includes legal restrictions to ensure that allfunds generated will be spent on transportation projects and programs.

New Measure A does not raise taxes beyond current levels.

An independent citizens’ oversight committee will closely monitor how allof the New Measure A funds are spent and will review external financialaudits of the fund every year.

The funds will be legally dedicated to transportation purposes only.

The sales tax will end in 30 years and can be extended only by anothervote of the people.

Over 99% of the New Measure A funds must be spent for transportationprojects, maintenance and services. Less than 1% of the funds generatedwill be spent for administration.

Requires reviews every 10 years to ensure future transportation needs are met.

All Measure A funds stay in Sacramento County. State and federal politiciansare not able to divert New Measure A transportation dollars.

PRSRT STDUS POSTAGEPAIDCCOM

Rancho Cordova, Mather, Gold Riverand All of Sacramento County …

See map inside forlocal Measure Atransportation plans

Phone: (916) 323-0080Fax: (916) 323-0850Mail: 901 F Street, Suite 210, Sacramento, California 95814-0730E-Mail: [email protected]: www.sta.sacramento.ca.us

This material is offered as a public education service by the Sacramento Transportation Authority(STA). The STA was formed in 1988 to administer the original Measure A transportation salestax program. The STA Board is made up of all five County Supervisors, four members from theSacramento City Council, one member each from the cities of Citrus Heights, Elk Grove, Folsomand Rancho Cordova, and one member representing the cities of Galt and Isleton. For moreinformation please contact us at:

The New Measure A will provide $4.7 billion innew transportation projects and ongoing local transportationservices—protected by new taxpayer safeguards.

7

Page 2: Rancho Cordova, Mather, Gold River New Measure A and All ... · 1_Rancho Cordova 8/25/04 7:56 PM Page 1 New Measure A Taxpayer Safeguards The proposedNew Measure A includes legal

1_Rancho Cordova 8/25/04 7:56 PM Page 2

Ongoing Funding for Transit —Continued funding for bus and lightrail service.

Senior and Disabled Transit —Fare discounts on fixed route bus andrail transit services and expansion ofspecial transit services for seniorsand riders with disabilities.

Neighborhood Shuttle Services —Funding for the creation of newneighborhood shuttle service.

Local Arterial, Traffic Control andSafety Projects — Improvements tolocal arterials and new safety programson roads across the County. Projectsinclude high priority safety and opera-tional improvements, emergency vehiclepreemption systems for quicker police,fire and ambulance response, bicycleand pedestrian improvements andimproved accessibility for persons withdisabilities. Planned projects includeFolsom Boulevard, Sunrise Boulevardand Bradshaw Road.

City Street and County RoadMaintenance — Funding for fillingpotholes, replacing aging pavement,fixing bridges and other local safetyprojects, under formulas that assureeach city and the County of Sacramentoreceives its fair share.

Air Quality, Smart Growth andEnvironmental Mitigation —Funding for programs to assistSacramento County to improve airquality, encourage smart growth andmitigate the environmental impactsof transportation projects. Builderswill be required to pay an additionalshare toward providing neededtraffic improvements.

for Rancho Cordova, Mather, Gold River and all of Sacramento CountyA comprehensive transportation funding planMeasure A Renewal

HA

ZE

L A

VE

.

FOLSOM BLVD.

ELK

GR

OV

E-F

LOR

IN R

D. JACKSON HWY.

U. P. R

. R.

WHITE ROCK RD.

U. P. R

. R.

DEL PASOBLV

D.

WA

TT

AV

E.

WA

TT

AV

E.

STO

CK

TON

BLV

D.

FREE

POR

TB

LVD

.

BR

AD

SH

AW

RD

.

SU

NR

ISE

BLV

D.

TWINCIT

IES

RD.

5

99

5

16

99

99

5160

80

5080

50

SacramentoRancho Cordova

Citrus Heights

Folsom

Elk Grove

Galt

Isleton

ARDEN WY.

ELK GROVEBLVD.

ExecutiveAirport FLORIN RD.

ANTELOPE RD.

MADISON AVE.McClellan

COSUMNES RIVER BLVD.

SHELDON RD.

GREENBACK LANE

SU

NR

ISE

BLV

D.

104

American RiverParkway/Bikeway

I-80 CorridorImprovements80

Downtown/NatomasAirport LRT Extension

Engineering and Design

DowntownIntermodal Station

I-5 CorridorImprovements5

LRT Extensionfrom

Meadowview Roadto

Cosumnes River College

LRTImprovementsin NE Corridor

New FolsomBridge Crossing

US 50 CorridorImprovements50

I-5/Route 99/US 50 ConnectorCorridor Study Area

Proposed Transportation Projects

Arterial Improvements

New Bus /Carpool Lanes

Interchange Upgrade

Commuter Rail

Sacramento County

50

It will include the following planned projects forRancho Cordova, Mather and Gold River:

Projects

Adding bus and carpool lanes from SunriseBoulevard to downtown SacramentoBus/carpool ramp connection fromeastbound Highway 50 to southboundHighway 99

I-5/Highway 99/Highway 50 ConnectorRoad and Open Space Preservation

A new road connecting I-5, Highway 99 and Highway 50between Elk Grove, Rancho Cordova and Folsom, withfunding for a full range of environmental mitigations,including open space and habitat preservation

American River Parkway/Bikeway NetworkImprovement Program

$1 million per year for maintaining and upgrading theAmerican River Bikeway and associated facilities

FOLSOM BLVD.

ELK

GR

OV

E-F

LOR

IN R

D. JACKSON HWY.

R. R

.

WHITE ROCK RD.DEL PASO

BLVD.

WA

TT

AV

E.

STO

CK

TON

BLV

D.

FREE

POR

TB

LVD

.

BR

AD

SH

AW

RD

.

SU

NR

ISE

BLV

D.

99

5

16

5080

50

SacramentoRancho Cordova

ARDEN WY.

ExecutiveAirport FLORIN RD.

SU

NR

In 1988, Sacramento

County voters approved

Measure A, Sacramento’s

half-cent sales tax for

transportation improvements.

To continue funding for local

transportation projects and

services, an extension of

Measure A will be placed

on your November ballot.

The new Measure A will not increase taxes.

Page 3: Rancho Cordova, Mather, Gold River New Measure A and All ... · 1_Rancho Cordova 8/25/04 7:56 PM Page 1 New Measure A Taxpayer Safeguards The proposedNew Measure A includes legal

1_Rancho Cordova 8/25/04 7:56 PM Page 1

New Measure A Taxpayer Safeguards

The proposed New Measure A includes legal restrictions to ensure that allfunds generated will be spent on transportation projects and programs.

New Measure A does not raise taxes beyond current levels.

An independent citizens’ oversight committee will closely monitor how allof the New Measure A funds are spent and will review external financialaudits of the fund every year.

The funds will be legally dedicated to transportation purposes only.

The sales tax will end in 30 years and can be extended only by anothervote of the people.

Over 99% of the New Measure A funds must be spent for transportationprojects, maintenance and services. Less than 1% of the funds generatedwill be spent for administration.

Requires reviews every 10 years to ensure future transportation needs are met.

All Measure A funds stay in Sacramento County. State and federal politiciansare not able to divert New Measure A transportation dollars.

PRSRT STDUS POSTAGEPAIDCCOM

Rancho Cordova, Mather, Gold Riverand All of Sacramento County …

See map inside forlocal Measure Atransportation plans

Phone: (916) 323-0080Fax: (916) 323-0850Mail: 901 F Street, Suite 210, Sacramento, California 95814-0730E-Mail: [email protected]: www.sta.sacramento.ca.us

This material is offered as a public education service by the Sacramento Transportation Authority(STA). The STA was formed in 1988 to administer the original Measure A transportation salestax program. The STA Board is made up of all five County Supervisors, four members from theSacramento City Council, one member each from the cities of Citrus Heights, Elk Grove, Folsomand Rancho Cordova, and one member representing the cities of Galt and Isleton. For moreinformation please contact us at:

The New Measure A will provide $4.7 billion innew transportation projects and ongoing local transportationservices—protected by new taxpayer safeguards.

7