Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50%...

34
1

Transcript of Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50%...

Page 1: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

1

Page 2: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

2

Ramco ERP for Facility Management Services

Page 3: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

3

The Industry is adopting mobility and biometry for ease, accuracy and real-time data availability.To avoid disputes in billing/Payroll

Biometry Mobility

Mega Trends in Facilities Management

Total FM

Integrated Systems

The Industry is moving to single company providing end-to-end Services spanning different facility management domains

Service on the GO

The Industry leaders are consolidating multiple systems to be replaced by integrated systems for better information accuracy and availability

Unified Information Complete Service

Page 4: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

4

Global Business Transformation Trends

• Business Change Acceleration

• Enterprise Agility + Flexibility

• Global Networks 24X7 Connectivity

• Hyper-Collaboration + Social Business

• Digital Talent Strategies

• Millennial Talent 50% Workforce @ 2020

• Hyper-efficient Cost Management

• Innovation = Survival of the Fittest

• Urbanization + Smart Cities

• Work Life Innovation

* Source JLL – Study of Millennial Workforce in FM

Page 5: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

5

A view from FM and services industry experts

Dr Keith FutcherFormer ISS Greater China Regional Director,

Advisor to ISS

Dr Dean KashiwagiDirector of the Performance-Based Studies

Research Group, Arizona State University

Stan MitchellCEO Key Facilities Management

International UK

Founding chairman, Global Facility

Management Association

Page 6: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

6

Ramco Product Design Philosophy – Answer to the Mega Trends

A Product driven by New Technology, Persistent Innovation, Perceptual Simplification

Page 7: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

7

Facilities Management Overview

Building Services• Energy• Water• HVAC….

• Services• Metering• Lease/Rent

Leasing/Rental Agreements

Services Contract• Fixed• Periodic

People DeploymentTraining, Skills, Availability

Attendance Overtimes

• Parameters • SLA • Customer

Equipment

Field Services• Resource Planning• Spares Availability

& Planning

Labor, Spares, Adhoc

Page 8: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

8

Facility Management Services Industry – Issues & challenges

How do I connect?

Site Profitability – Visibility

PayrollCRM

Skill based recruitment and

mapping

How do I manage my Tools, equipment and Uniform distribution ?

High TAT for Invoice to Collection

Page 9: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

9

Contract ManagementSite Assessment led

quotation / RFQ

Training / Inventory / Site Deployment of

Manpower

Rostering / Attendance Reporting

Invoicing led from Attendance /

Timesheet

Service Quality, Customer satisfaction

Dashboard view – Site / Contract

Performance

Arrear Billing / Arrear Payroll

Facilities Management - Needs

Page 10: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

10

Ramco Solution

10

Contract

Site Deployment/Tracking

Roster Plan & Schedule

Attendance

Work Reporting

Invoice

Page 11: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

11

Ramco’s Differentiators

Page 12: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

12

Location based time sheet – record time In & Out based on location

Improve your maintenance performance with superior mobile apps

Page 13: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

13

Achieve Plant Performance With Right Maintenance Strategy

Preventive Maintenance

Predictive Maintenance

Inspections

Real Time Condition Monitoring

Lubrication

Calibration

Reduced Unplanned Downtime

Higher Equipment Availability

Higher Productivity

Reduced Maintenance Cost per Unit of Production

Shutdown/ Overhaul

Connect Control Room to Board room

• Ramco EAM/ERP/BILevel 4

• Ramco OPTIMALevel 3

• RTI middleware Level 2

• PLC / DCS / Plant controlLevel 1

Page 14: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

14

Contracting Hub

Page 15: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

15

Operations Hub

Page 16: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

16

Property Management Hub

Page 17: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

17

Maintenance Cost AnalysisContracted Vs BilledOvertime Analysis

Health Safety Environment

Analytics Dashboards

Page 18: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

18

Ramco Facility Management Services Solution –Key differentiators

Complete automation reduces data entry significantly

Profitability at different levels viz., Region, Customer, Site, Employee

End to end integrated solution operations, billing and payroll

Increase in the operational efficiency

Rostering, Online attendance capturing & Information flow from multiple sites

Contract Management with Expiry tracking reduces the leakage of revenue and increases customer retention

Invoicing process made easy with one click to generate invoice

Page 19: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

19

Agent Planning Use Case

Page 20: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

20

Field Agent planning board

Typical Scenario

a day in the life of Mark, a Field Service Planner

He has to plan across

check for

• Problem Type

• Parts Availability

• Permits

based on• Customer Location

• Customer Category

• Contract Terms

based on

• Skill Type

• Duty Hours Policy

• Employee v/s Contract

• Agent Performance

Constantly factoring all below variables while planning can result in

complications

Part Availability Delays

Permits not in place

Multiple+customers

Multiple +Work orders Multiple+Agents

Agent on Leave

Stuck in TrafficWorng Skill

Assigned

Page 21: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

21

Faster Servicing of

IssuesEfficient

Work Planning

OHS Compliant

Agent Rostering+ +

=

+ Lower Servicing Cost

Ramco Field Agent planning &

optimization

solution

Better

Customer Delight

Page 22: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

22

Ramco Value Proposition

Page 23: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

23

Highlevel Overall Flow of the Facilities Management Process

23

Contracting with Customer

Setting up the services

1. Setting up the facility to be managed

Rendering the services

1. In-house Resource

2. Outsourced Resource

Deployment of People/Resources

Tracking the CostReporting Work

completionPeriodic invoicing or

event based invoicing

Page 24: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

24

Contracting Process - Details

24

Customer Contracting

Contracting based on Property

Contracting based on People

Contracting based on group of equipment

Page 25: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

25

Customer Invoicing

Service Setting up Processes

Setup Service Location

Induct Equipment to be Maintained

Document the SLAs

Render Service

Contracting based on Group of Equipment

Setup Site Details

Deploy People/Resour

ces

Track People attendance

Contracting based on People

Setup the facility and services

Setup Billing Process and billing cycles

Deploy resources

Contracting based on Property

Page 26: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

26

Business Analytics, Events Dashboard & Alerts, Performance Management

Sales and Operations

Material Inbound

Sub-contracting

Purchasing

Purchase Admin Item Admin

Physical Inventory & Cycle

Count

Distribution Management

Warehousing

Procurement Inventory Management Human ResourcesFinance Management

Employee Development

Customer Portal

Supplier Portal

Employee Self Service

Assessment &

Estimation

Lead Management

Quotation

Work force planning

CRM

Contract

Management

Core Accounting Setup

General Accounting

Bank Operations

Payables Management

Project Costing

Fixed Assets

Receivables Management

Consolidation

Performance Management

Staffing

Attendance Management

Planning

Compensation & Benefits

Time & Attendance

Rostering

Complaints

Tracking

Site Admin

Site Deployment

Resource Allocation

Site Start Activity

Service Level

Review

Service Level

Assessment

Site Visit

Information

Work reporting

Site Instruction

Contract termination

Customer

Complaints

Investigation Details

Solution Offering – Integrated Facilities Management

Powered by Ramco VirtualWorks®

Page 27: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

27

Solution Offering – Property Development

Workforce

Management

General

AccountingDaily LogsReservation / LOIRequisition

Estimation &

BudgetingLand ManagementLead Tracking

Opportunity

Management

Compliance

Management

Work Breakdown

Structure

RFQ & Quotation

processing

Rental / Services

AgreementComplaint Register Receivables Planning

After Sales Service

Scheme

Management

Contracts

Management

Blanket/Direct

ProcurementFit-out & Handover

Preventive

MaintenancePayables

Employee

Development

Customer Portal

Broker

ManagementBill Tracking

Inbound

Logistics

Work Order

Management

Banking

Operations

Attendance

Management

M-Book / RA Bill &

Labor BillingWarehousing

Cost Planning &

ControlStaffing

Project Tracking Supplier Rating Fixed assetsCompensation

& Benefits

Advance /

RetentionSupplier Portal

Project Review /

Profitability

Tenant Billing

FinanceLeasing / Services HR & PayrollMaintenanceProcurementMarketing/

CRMConstruction

Metered Billing

Property Management

Property Sales

Booking

Management

Payment Schedule

Sales/Construction

Agreement

Commission

Management

Demand Notices

Substitution &

Transfers

Relationship

Management

Alerts

Non-Metered Billing

Consolidation

Taxation

Business Analytics, Event Dashboard & Alerts, Performance Management

Analysis & Reports

Page 28: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

28

RAMCO ENTERPRISE FACILITY ASSET MANAGEMENT

Project

Management

Procurement &

InventoryFixed Assets HCMMaintenance Management

Finance &

Accounting

Inventory Administration

Inventory Analysis &

Planning

Warehouse Management

Material Requests,

Issues & Returns

Physical Inventory &

Cycle Counting

General Accounting

Receivables

Management

Payables Management

Global Tax Solution

Equipment Induction &

Setup

Preventive Maintenance

Predictive Maintenance

Shutdown / Outage

Management

Lubrication Financial Services

Employee Records

Training and Certification

Skills and Competency

Time Management

Project Administration

Bid Management

Project Definition

Project Planning

Project Execution

Project Closure

Asset Planning

Capitalization

Insurance

Asset

Inventory

Depreciation

Transfer

Revaluation

Disposal

Management Accounting

Std. Procedures & Tasks

Maintenance Budgets

Inspection & Calibration

Warranty & AMC

Tracking

Planning Folders

Fault Reporting

Safety & Permit

Management

Procurement

Administration

Supplier Management

Inbound Logistics

Real Time Integration

(RTI)

Reliability Downtime Analysis

Work ManagementMaintenance History

Review

Work Logs Workforce Planning

Goods Receipts/Return

Subcontracting

Data Uploads Embedded Work Flow

Analytics eSignature DeviceIntegration

SOA Integration / Collaboration

AdvancedReporting

Mobility Extension ToolkitWizard Interface

Advanced Planning & Optimization

Enterprise Add-ons

Page 29: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

29

Case Studies

Page 30: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

30

Facility Management Services customers

Page 31: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

31

Some of the achievements at a glance …

The Client World’s No.1 Security service provider

The Challenge Unique business process, huge volume of data and integration of multiple processes

The Solution Ramco co-created a new offering for facility management industry with tight integration with operations, finance, HR & Payroll and SCM

The Outcome Around 225,000 employee’s payroll runs smoothly every month. Strong hold on operations and on-time and correct invoices goes to customer every month.

The Client Part of World’s No.2 security services company

The Challenge Running de-centralized payroll, handling pan India operations, data integrity and information on time

The Solution Ramco’s Facility management solution was implemented

The Outcome Successful payroll run for around 20,000 employees, MIS reports gives much grip on operations to the management.

The Client India’s foremost facility management service provider

The Challenge The Challenge was to handle the merger of multiple companies and also handle the integration of Business Development, Operations, HR& Payroll departments for a smooth run of the business

The Solution Ramco’s Facility management solution was implemented

The Outcome 2 legal entities, 18 locations across India with 22,000 employees payroll is run through HCM and 2500 site invoices are processed successfully.

Page 32: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

32

Endorsements

Voice of Our Customers

“We did evaluate a number of solutions in the ERP field which would meet our needs and objectives. Ramco provided a very good fit, bothfrom the point of view of their functional suitability, as well as for our commercial requirements. It was a very good decision. We have beenable to successfully integrate this with most of our business needs. I would believe that this has been a rich and valuable experience for us.”

Mr. Jogesh Ramaswamy,

CTO – G4S IT

“Ramco’ Enterprise Suite has eliminated the operational / data redundancies, enhanced the flow of information, and have thus,significantly improved productivity and profitability.”

Mr. Mahesh Mathur,

Vice President – Systems, DLF – India

Page 33: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

33

Endorsements

Voice of Our Customers

“We went through almost all available options. RAMCO was the final choice because it gave a comfort level having done implementation in similar industries like ours. We had similar pain points of a large geographical spread, multiple bases, large spread, an annuity model of business etc.”

“With RAMCO, the customization is way easier. Also, the implementation is done by the company itself and not by a partner. That brings a lot of difference in long-term experience.”

“If I have to do this whole process again, I would choose RAMCO again. In our industry, we are on the pioneer side when it comes to automation. I have seen and heard other peers who have tried the usual big ERP suites and have given up midway. That is a reflection of both the vendor and the company side. Standardization of processes is important. Automation only sits upon a set of processes.”

Brendon Pereira

VP, Corporate Planning and IT - Dusters Total Solutions

Page 34: Ramco ERP for Facility Management Services · •Digital Talent Strategies •Millennial Talent 50% Workforce @ 2020 ... Marketing/ CRM Construction Metered Billing Property Management

34

Thank you