Ralph J. Stephenson PE PC Consulting Engineer Hiawatha ... · Flint, Michigan Ralph J. Stephenson...
Transcript of Ralph J. Stephenson PE PC Consulting Engineer Hiawatha ... · Flint, Michigan Ralph J. Stephenson...
,
Subject:
From:
Project:
Data disk:
Date of Monitoring:
Monitored from:
Monitoring Report #1
Ralph J. Stephenson PE PC
Consulting Engineer 323 Hiawatha Drive Mt. Pleasant, MI 48858 ph 517 772 2537 July 7,1991
Mott Durham Pool Renovation Mott Community College Flint, Michigan
Ralph J. Stephenson PE
91:28
d269 rjs
July 2, 1991 (wd 129)
• Sheet #1, Issue #1 network model dated July 2, 1991 (wd 129)
Key dates:
• June 25, 1991 (wd 124) - Letter of intent issued • July 15, 1991 (wd 137) - Mobilize & move on site • September 3, 1991 (wd 172) - Start of school for fall • November 8, 1991 pm (wd 221) - Contract completion date Total time available for contract work = 221 - 124 = 97 working days
Actions taken:
• Reviewed project in detail with Mr. Dan West • Prepared preliminary network model with Mr. West • Identified long lead items • Provided Mr. West with copy of data disk from meeting
General Summary:
This meeting was primarily devoted to reviewing the project, developing the master laundry list and preparing a network model of the job. A set of meeting notes was prepared during the session and a copy of these is attached to this report.
R. N. West Construction is currently obtaining submittals for key items including:
1
Face brick Glazed tile Concrete mix design Metal fascia panels Aluminum windows Structural steel, joists and metal deck Aluminum door frames Fiberglas doors Stainless steel frames, doors & hardware
Ralph J. Stephenson PE PC
Consulting Engineer 323 Hiawatha Drive Mt. Pleasant, MI 48858 ph 517 772 2537 July 7, 1991
It is the intent of West Construction to move on the job site by July 15, 1991 (wd 137) and to start work at the east wall and canopy. Work will next move to the west wall and from there to the south and north walls.
The contract completion date for all work is the pm of November 8, 1991 (wd 221).
We discussed the various delivery projections for important long lead items and these are shown on the network as well as being described in the meeting notes.
To be stressed is the need to keep the Durham Pool open and operating during the entire construction period. Mr. West is checking on exit requirements to accomplish this during the renovation.
The network model prepared at this session was printed out and given to Mr. West at the end of our meeting. Subsequently I reviewed the work plan and made minor revisions as needed. A revised copy of the issue #1 network model is enclosed with this monitoring report. I have left it unassembled for ease of duplicating. Also enclosed is a bar chart translation of the network model.
This report is being sent to Mr. Dan West, Mr. Jerry Harburn and Mr. Junior Paul. Further distribution as needed will be made by those receiving the copies.
I shall plan on monitoring the project regularly as w k proceeds and will be in touch with Mr. Harburn shortly to set the next pIa ng and monitoring date.
2
To:
From:
Re:
Dan West Junior Paul Jerry Harburn
Ralph J. Stephenson
Ralph J. Stephenson P.E. P.C. Consulting Engineer
July 30, 1991
Durham Pool Monitoring - Tuesday, August 6, 1991
We have set the date of the first monitoring of the Durham Pool exterior renovation project for 8:30 AM, Tuesday August 6, 1991. I will be at the job site at 8:30 AM and plan to inspect the project with Dan West, and whomever else desires to accompany us
The monitoring will be made from the issue #1 network models, dated July 2,1991 which have been distributed to Mr. West, Mr. Paul and Mr. Harburn.
Procurement of materials is of considerable importance so I would appreciate having available as much information as possible about submittals, approvals and deliveries.
After the monitoring we should discuss the need for updating the network model to reflect any changed conditions that might influence the plan and schedule. I shall review this at the job site with those involved.
Thank you for you assistance in this initial monitoring.
Ralph J. Stephenson PE
1
Subject: Monitoring Report #2
Ralph J. Stephenson PE PC
Consulting Engineer 323 Hiawatha Drive Mt. Pleasant, MI 48858 ph 517 772 2537 August 8, 1991
Mott Durham Pool Renovation Mott Community College Flint, Michigan
From: Ralph J. Stephenson PE
Project: 91:28
Data disk: d269 rjs
Date of Monitoring: August 6, 1991 (wd 153)
Monitored from: • Sheet #1, Issue #1 network model dated July 2, 1991 (wd 129)
Key dates: • June 25, 1991 (wd 124) - Letter of intent issued • July IS, 1991 (wd 137) - Mobilize & move on site • September 3, 1991 (wd 172) - Start of school for fall • November 8, 1991 pm (wd 221) - Contract completion date
c,.y
Total contract time remaining = 221 -153 ~uorking days from August 6,1991 (wd 153) ~YV
Actions taken: • Inspected project with Mr. Dan West • Reviewed current job status with Mr. West, Mr. Paul and Mr. Harburn • Reviewed procurement status • Prepared monitoring status network • Evaluated current project status
General Summary: West moved on site July IS, 1991 (wd 137) and began east wall lay out and demolition work. As of August 6, 1991 (wd 153) erection of the east wall dust partition is complete and demolition of required wall areas is substantially complete.
The canopy footings at the east wall are poured and construction of the new canopy columns is in work. Masonry for the east wall was delivered on July 18.1 1991 (wd 140) and erection of the east wall face brick and glazed tile started on August 5.1 1991 (wd 152).
1
Ralph J. Stephenson PE PC
Consulting Engineer 323 Hiawatha Drive Mt. Pleasant, MI 48858 ph 517 772 2537 August 8, 1 991
At the west wall lay out is complete and demolition of the existing wall is in progress. Mr. West is investigating methods of most effectively removing the glass block and is setting up the scaffold for this work Wall demolition will probably start about August 15,1991. This work had an early start of August 23, 1991 (wd 166) in the issue #1 network model.
Since on this project procurement is of critical importance to maintaining the proper flow of field work Mr. West and I carefully reviewed current information regarding the status of procurement. A brief summary is given below as discussed with Mr. West.
• Face brick - On job • Glazed tile - On job • Concrete mix design - Approved • Metal fascia - Submittals approved - delivery in early August, 1991 • Aluminum windows - Submittals approved - no current word on delivery. Mr. West anticipates no problems. • Miscellaneous iron, structural steel, joists and metal deck for canopy -Submittals approved - Steel is to be delivered to the erector about August 15, 1991. Should be available as needed. • Aluminum door frame and fiberglas door - Submittals approved - No current word on delivery dates. • Stainless steel frames, doors and hardware - Submittals approved - Stainless steel frames will be on job about August 30, 1991.
A monitored network model for sheet #1, issue #1 is enclosed with this report. In the monitored network all activities completed as of August 6, 1991 (wd 153) are shown shaded.
This report is being sent to Mr. Dan West, Mr. Jerry Harburn and Mr. Junior Paul. Further distribution as needed will be made by those receiving the copies.
I shall be in touch with Mr. Harburn shortly to set the next monitoring date.
2
' ...
Subject:
From:
Project:
Data disk:
Date of Monitoring:
Monitored from:
Monitoring Report #3
Ralph J. Stephenson PE PC
Consulting Engineer 323 Hiawatha Drive Mt. Pleasant, MI 48858 ph 517 7722537 September 15, 1991
Mott Durham Pool Renovation Mott Community College Flint, Michigan
Ralph J. Stephenson PE
91:28
d269 rjs
September 11, 1991 (wd 178)
• Sheet #1, Issue #1 network model dated July 2,1991 (wd 129)
Key dates:
• June 25, 1991 (wd 124) - Letter of intentissued • July 15, 1991 (wd 137) - Mobilize & move on site • September 3, 1991 (wd 172) - Start of school for fall • November 8, 1991 pm (wd 221) - Contract completion date
Total contract time remaining = 221 - 178 = 43 working days from September 11, 1991 (wd 178)
Actions taken:
• Inspected project with Mr. Dan West • Reviewed current job status with Mr. West, and Mr. Harburn • Reviewed procurement status • Evaluated current project status
General Summary:
As of September 11, 1991 (wd 178) most project work is meeting target dates between early and late starts and finishes. Masonry at the east elevation and canopy is almost complete, canopy structural steel is erected, plumbed, and trimmed, much of the sash and glass is installed and soffit metal lath at the canopy is in place. Canopy insulation and roofing will probably be installed in the very near future which will allow canopy plastering to begin.
1
Ralph J. Stephenson PE PC
Consulting Engineer 323 Hiawatha Drive Mt Pleasant, MI 48858 ph 517 7722537 September 15,1991
A brief review of procurement with Mr. West showed this portion of the project to be in fair to good condition. However on a job of this short duration, submittals, approvals, fabrication and deliveries must be constantly expedited.
Aluminum windows were shipped September 9,1991 (wd 176) according to Mr. West. Glass for the east wall is on the job. Aluminum door frames are apparently available from the contractor when needed. Stainless steel frames and doors are in transit from New Jersey.
At the west elevation, masonry is in work and expected to be completed in about the pm of September 18, 1991. Metal fascia panels at the west elevation are complete.
Overall, the project is trending toward late finish dates. However it does not appear at present that there is a need to update the current issue #1 network model. The project status of the project will again be reviewed at our next session to determine if the work plan should be revised.
This report is being sent to Mr. Dan West, Mr. Jerry Harbum and Mr. Junior Paul. Further distribution as required will be made by those receiving copies.
I shall be in touch with Mr. Harbum shortly to set the next planning and monitoring date.
2
Sun, Jul 7, 1991 Mott Durham Pool Renovation • disk 269
1. Molt Dutham Pool Renovation notes· disk 269 1.1. General notes (to be updated as proJect procsecIs) 1.2. 8:49:17 AM· Tuesday, July 2, 1991 (129)
12.1. R.N. West Construction Company offices 1.2.2. Those attending
Junior Paul· MCC - in meeting part time Dan West - RNW Bob West - RNW • in meeting part time Jerry Harburn • THA • in meeting part time Ralph J. Stephenson· consultant
12.3. Those InvolvBcl THA
Jerry Harburn - principal in charge Bob Hall - project manager Ron Korzecke - field inspector
R. N. West Construction Company Robert West - Consultant to West Dan West - President Ron Hoard - Superintendent
Alvin Ashbaker -masonry Alvin Ashbaker - President
Koertz Glass -sash & glazing Roy Bevel - Project manager
Rohman Iron - structural steel & mise iron Jack Quinn - Project manager
Newkirk Electric - electrical Rick Clemens -Project manager
Central Interiors - lath & plaster Roger Simmons· Project manager
Shorts Roofing - roofing Ray Shorts - President
FBH - hardware & stainless steel doors & frames Jeff Knoblock - President
1.2.4. Key dates Building dates
06/25/91 am (124 ) - Letter of intent issued 07/15/91 (137) - Mobilize & move on site In work - Contract execution 11/08/91 pm (221) - Project complete Total time available = 221 - 124 = 97 wd
School calendar dates 09/03/91 (172) • Start of school
Parking and traffic critical Trades contracts expiration dates - to be completed by rjs & dwe
Carpenters· automatic extension of contract Laborers • have settled Electricians • have settled Plumbers· ? Glass & glaziers· Roofers - ?
1.2.5. Laundry lists Abatement
Sun, Jul7, 1991
Only as required· none at this point Front end work
Mott Durham Pool Renovation - disk 269
Page 1
Page 1
Sun,Jul7,1991
Sun, Jul7, 1991
Mott Durham Pool Renovation -disk 269
Obtain general building permit Obtain electrical pennit Obtain mechanical permit
Procurement Turn around on submittals
01 wd - rnw log in submittal and check 01 wd - hand deliver submittal to tha 02 to 04 wd - tha check & approve submittal 01 wd - tha mail submittal to rnw 01 wd - rnw log in submittal & review 01 wd - rnw return submittal to sub 7 to 9 wkg days - Normal submittal total turnaround time
Items to follow Face brick
Being selected Delivery after selection = 25 working days
Aluminum windows Shop dwgs to be submitted July 15, 1991 (137) Shop dwg turnaround - 11 wd Delivery after approval of sd = 30 wd
Stainless steel frames Shop dwgs to be submitted July 3, 1991 (130) Shop dwg turnaround - 11 wd Delivery after approval of sd = 40 wd
Stainless steel doors Shop dwgs to be submitted July 3, 1991 (130) Shop dwg turnaround - 11 wd Delivery after approval of sd = 40 wd
Hardware Hardware schedule to be submitted July 3, 1991 (130)
Aluminum door frames Shop dwgs to be submitted July 15, 1991 (137) Shop dwg turnaround - 11 wd Delivery after approval of sd = 30 wd
Fiberglas doors - frp (fiberglas reinforced panel) Shop dwgs to be submitted July 15, 1991 (137) Shop dwg turnaround - 11 wd Delivery after approval of sd = 30 wd
Miscellaneous iron Shop dwgs to be submitted July 15, 1991 (137) Shop dwg turnaround - 11 wd Delivery after approval of sd = 15 wd
Structural steel, joists & metal deck Shop dwgs to be submitted July 15, 1991 (137) Shop dwg turnaround - 11 wd Delivery after approval of sd = 15 wd
Glazed tile Color selected and approved Available as needed
Metal fascia panels Dies for panel manufacture already available
Must check to see if panel spec conform to dies available Shop dwgs to be submitted July 15, 1991 (137) Shop dwg tumaround - 11 wd
Obtain general building pennit
Page 2
Page 2
Sun,Jul7,1991
Sun, Ju17, 1991
Molt Durham Pool Renovation· disk 269
Delivery after approval of sd = 20 wd Actions needed to keep Durham Pool operational
Assume pool must be operational at all times Erect interior temporary partitions at west elevation Must keep at least one west elevation exit available at a time Erect interior temporary partition at east elevation Provide temporary access at canopy construction area
Construction actions West wall renovation
Erect working scaffolds Erect dust partition Demolish wall elements as required Erect new glazed tile & face brick ext wall Clean brick Install fascia panel framing Install new fascia panels Repair roof edge as required Install new aluminum sash Glaze aluminum sash Install new aluminum door frames Install new frp doors & hardware Maintain exit signs as required
Check for conduit requirments if any East wall renovation & entrance canopy
Excav, form, reinf & pour canopy footings Construct masonry & concrete canopy piers Erect canopy structural steel, joists & metal deck
What kind of connection is to be made at main building? Lay canopy insulation & roofing Install mechanical & electrical rough in above canopy ceiling Install canopy cement plaster soffit Erect dust partition at inside of wall Erect working scaffolds Demolish wall elements as required Erect new glazed tile & face brick ext wall Clean brick Install fascia panel framing Install new fascia panels Repair roof edge as required Install new aluminum sash Glaze aluminum sash Install new aluminum door frames Install new frp doors & hardware Maintain exit signs as required
Check for conduit requirments if any South wan renovation
Tuck point wall jOints Repair existing brick as required Clean existing masonry Install new electrical conduit & light fixture
North wall renovation Tuck pOint wall joints Repair existing brick as required Clean existing masonry
Delivery after approval of sd = 20 wd
Page 3
Page 3
Sun, Jul7, 1991
Sun,Ju17,1991
Mott Durham Pool Renovation - disk 269
Install new electrical conduit & light fixture Miscellaneous work
Apply waterproofing to existing concrete deck over locker rooms Waterproof existing elevator pit Caulk & seal as required Remove dirt from planter Cast new concrete slab in planter
Install new electrical conduit & light fixture
Page 4
Page 4
()
112/91 1/2191
c:::J 112/91 112/91
113191, r--::
113/91
91
3 713/91 7/B/91
i COML£TE SELECT ANO i
APPROVE FACE BRICK &. RANGE -:3
/0 '7/3/91
113191
7/8/91
2 7/5/91
SUEIMIT CONCRETE NUl DESIGNS - 2
..... ,_. ...14 • .,JOI..
25 7;9/91 8/12/91
MfR & DELIVER FACE BRICI( -25
811:2/91 o
B/12/91
6/13/91
i /81
1
3/9
1
7./9/91 i 6112/91
7/3/91 5 'MFR& DELI .... ER 1110/91
.OTE: ElIl PROTECTION ERECTION INCUDED WITH DUST PARTITION
1116/91 5
7/:22/91
ERECT DUST PARTN &
TILE - 5 (AVA GLAZED AS NEE ILADLE
816/91
1/B/91
OED)
8112/91 2
7/9/91
REVIEW &. APPROVE CONCRETE I1IX DESIGN
-2
,.,~.""In ~ t'i I' .... ./ft<t
() I DEMO EAST WAU AS 7/\5/91 7115/91 REQUIRED FOR CANOPY II ' & PREP EXISTS WAll 1-1 ---
8IS/w--e1SI91 FOR CANOPY STROCT-
/ .",.. . .'."'~ /1 3 4
7115/91 7115/91 7116/91 7/111/91 7/ 19/91 1124/91
LAV OUT EAST WALL &. E)(cAVATE, FORM, CONSTRUCT MASOHRV CANOPY WORK - I ~11'f' &. POUR CANOPV &. CONCRETE CANOPV
FOOTINGS AT EAST COLUMNS - 4 'WALL AREA -:l I--
..,lfC/ftt '71tc/ni 1'\:/ t.c ''''. i"'1IJ IDJnt .... J,,.. ...... '" AI,.. .. ~,..t
______ 7_/="'" ,;,/ 7/IS/c:::J
7112/91
I10fJILlZE 8. MOVE ON' SITE - 7
~".'.' ...: 1/16/91
REMOVE DIRT FROM [KISTING PLANTER 8.
CONSTRUCT NEW CONCRETE SLAB IN
711B/91 7/16/91
E T IR TO SET LATE FINISH DATE AT PM
7/16/91
o /3/91
713/91
\
1712/91
91 1/15191
7 71"3/91 7112/91
i PREP &. SUBMIT NET AL i
FASCIA SHOP DRAWINGS - 7
6115/91 8/23/91
7 713/91 7112/91
PREP & SUBMIT ALUM WINOOW SHOP DRAWINGS -1
6/1/91 8/9/91
1115191 1
7/23/91
REVIEW a. APPROIIE NET AL FASt 1.11. SHCf'
DRAWIM3S - 7
6126/91 9/4/91
1 7/15/91 7/23/91
REVIEW &. APPROVE ALUM WINDOW SHOP
DRAWIM3S - 1
8/12/91 6/20.191
PLANTER - 3
7/16191
1/24191
7/16/91
20 6/20/91
FAlla. DELI ..... ER !'£rAL FASCIA PANELS - 20
111B/91
o 9/4191 9/4191
1013191 10/3/91
9/S/91 1(\/~19I /
/
30/ 9.14191 7/24/91
,.--f A6 &. DELIVER
ALUMINUM WINOOWS -:'!O
fI!2"'~1 IO/2i91
1116/91
I
/
o 6112/91 8112/91
I I "1319> w~
____ 7:..-/..::.;23/91 8/13/91 6/2'2/91
EREtT WORKING PART ERECT NEW EAST
8 7123/91
SCAFFOLD AT EAST WALL EXT FACE !IRICK WAll AREA - 1 &. GlAZED TilE - 8
8/1:2/91 6112191
"-a/14l91 8/1~/91 I ERECT R.UMB &. TRIM I
CANOPV STRUCT
8/1l/91 ,,:91
8119/91 6/:20191 ~
LAVCANOPV INSULATION &. ROOFING
-2
8/23191 r--
9/10/91
81:21/91
r--INST ALL CA~PY ABOVE CEILING
2 914191 9/S/91
i CIWLK. SEAL & APPLY i
WATERPROCFING TO EICISTING cotIC 01(
OVER LOCKER ROOMS -I-I -----------------------------2
,/1 I 10/23/91 10/24191
5 9/5/91 9/11/91
INSTAll EAST WALL EXT WINDOWS. GLASS.
FASCIA FRAMING & FASCIA PANElS - 5
10/9/91
5 9/5191 9/11/91
INSTALL &. GLAZE
9/12/91 2
9/13/91 ---. CLEAN EAST WALL
MASONRV -2
10110/91 10/11191
9112/91 8
9123/91 ---,
INSTALL CA~PV CEMENT PLASTER
SOFFIT - 8
9124191 2
9125/91
STEEL. JDISTS. METAL ~ID( - 3
MECHANICAL &. l / " I ELECTRICAL ROUGH IN 10\1-\;-;,,,.<'-------;
ENTRY AWM SASH, CURTAIN WALL
ASSEMBL" & EXT DOORS AT EAST ELEVATION - 5
INSTALL STAINLESS STEEL [)()(RS &
FRAMES AT EAST WALL AREA -:2
9/25/91 97:27/91 9/30/91 10/1191
/
/ 0/
9/4/91 9/4191
--------;~ 10/3/91 1013/91
./
WORK -:2
5 8/29/91
LAY OUT WEST WAL~ ERECT DUST PARTN&. OEMO WEST WALL AS
REQUIRED - 5
8123/91 8729/91
10/10/91
3 9/4191 --.
ERECT WORKING SCAFFOlD AT WEST
WALL AREA-3
8/30/91 914191
\ o
9/3T \ :J~~~~ 9/1 !iil9! .", ''011'''''
/1
10111/91 10/22/91
915/91
'PART ERECT NEW W' WALL EXT fACE !!RICK
&. GLAZED TILE - 10
1017 10/24191
10 9/19/91 10/2/91
/ icOI'F ERECT NEW WEST! WALL EXT FACE 6RICK
8. GLAZED TilE - 10
9/5/91 7"
o 9/5/91 915/91
-----------------------------------------------------------------------------------I-W-25~/~/25191
o 9/i3/91 9/13/91
~/14I91
1011/91
\
7 1011 tl91
IIIST AlL WEST WALL Err WINDOWS. GLASS.
FASCIA FRAMING &. FASCIA PANELS - 7
10114191 2
10/15/91
CLEAN WEST WAlL ! MASO'4RV' :2 i
I
I
10/3/91 10111/91 10/14191 10/15/91
~0!16/91 "'-,10/3/91 10/~91/ '''J INSTAlL WEST WALL I"'"
ALUM FRAMES, NEW F18ERGLAS
REINFORCED PANEL DOORS &. HARDWARE -
2
3 10118191
CLEAN EXISTING soun WALl. MASONRV - 3
Q/?5/91
10/21/91 3
10123/91
CLEAN EXISTIIIG NORTH WALL MASONRV - 3
,\'W" 10/11/91
3 /'"
1011619 ,/
10116/91 /10/21/9 I (t/23/9
\ 10/7191" 10/6/91 It\lI~/91/ 1013/91
TUCK POINT 6. REPAIR TUCK POINT &. REPAIR \ 0 EXISTING SOUTH ""ALI. EXISTING NORTH WALl.
1012/ 91\ 10/2191 -3 -3 I
10111/ 91 10/11/91
10/11/91 10/15/91 10/16191 IOlla/91
IW:2419 I 1
10/24191
INSTALL NEW EXT LIGHTS AT SDUTIi.
NDRTIi &. EAST WALLS OF POOL-I
10/25191 '2
10/2B/91
CLEAN UP &. MOVE OUT OF I'RflJ£CT - :2
J 012419 1 ()12419 I 10/25/91 10/2B/91
/1 /
\,
7/3/91
[ 6/2191
713/91 7
7112/91 7115191 7
7/23/91 7124/91 15
13/13/91 ---,
/ Mist IRON, $TRUCT !'IISC IROH, STlaICT IR(JI, STRUCT STEEL. 0
STEEL. JOIST & METAL STEEL. JOIST" I'ETAL JOISTS & I'ETAL DECK 13113/91 13113/91
PREFARE&5U1:1I'1IT I I FiEVIEW&APPRDVE W fAII&OELtYERI'IISC ~
DECK SHOP OWGS - 7 DECK SHOP DRAWINGS - 15
1311419 .--~ 8/22/91
/
13/91 7/1~/91 PREP" SUBMIT ALUM
o DOOR FRANE" 7/3/91 FIBERGLAS DOOR SHOP
DRAWINGS - 7
tuz/91
~ 1312191 13/1~/91 ~
113/91 1
7/3/91
PREPARE & SUBMIT STAINLESS STEEL FRAMES, DOORS "
HARWARE SHOP DWGS - 1
13/15/91 B/15/91
- 1 9/25/91 9/25/91
13/23191
7115/91
913/91
7 7123/91
REVIEW" APPROVE ALUM DOOR FRAME"
FIBERGLAS DOOR SHOP O!'i:AW1NGS -7
6113/91 8/21/91
115191 7
1115191
RE .... IEW & Af'PI<.1)\IE ST AIMLESS STEEL FRAMES, DOORS & HARDWARE SHOP
ORAWlr«OS - 7
6/16/91 a126/91
9/4191
7/24/91
9124/91
30 9/4/91 .......,
FAil" DELIVER ALUM DOOR FRAMES"
FIBERGlAS DOORS - 30
a/2M!!
7/16/91
fAIl" DELI .... ER
10/3/91
40 9/10/91
STAINLESS STEEL FRAI1ES, DOORS &. HARDWARE - 40
13/27/91 10/22/91
,~ """"0
.\eL., ~
~ III ~
-0>
~ N (l)
" !iN 2 \iiI xC "'Q. ... ~ °0 01-
~~ ....... ;; ~;;l
~ j;; '" .... 2
;; o .....
lilt; G)j!
;:, <I[
>-a! " ... 0 I-- ~
(JI I-....
7/2/91, 5
719/91 ~
'" - STARTS ON JUl¥ 2, 1991 (129)- 5
7110/91
7/2/91 7 7I9/91~7 I 0/91
0/91
l 7/15/91
B - 10
[)-8
10 7123/91 --,
712~ I
e 7I1~
7/24191
Reference sam,'e ... twen I10del
7/24191
C-7
1241 91
91
l E-ji
7/25/91
7 8/1/91 ......,
8111
6/1/91
] F-8
191
8/2/91 8/13/91
IE_III stert Dunltlon Eerlll
o 1/2/91 1/2/91
I 55-INSTL DOORS. I
HARDWARE. MILLWORK & TRIM-10 - semple activity
112/91 112/91
lAte stert Lete
Activity
.s .. ."ell lIeU,,!ty "mile ...
041 046 042 047 043 048 044 049 045 050
lIn 001 hIIn
1_ .. , - .July 2. 1991
NETWORK MODEL FOR MOTT COMMUN I TV COLLEGE DURHAM POOL RENOVATION Fl int, Michigan
Tomblinson HIIrbum & A.ssociates Architects of Record
R. N 'West Construction Company Genenll Contractors
Relph J. Stephenson PE PE Consulllng Engineer 323 Hlowetlle Or1¥e Nt. Pleesent. Nlcillgen 48656 ph 517 7122537
Shee t