Raleigh Bike Share: Feasibility Study & Implementation Plan
Jennifer Baldwin Bicycle & Pedestrian Coordinator Office of Transportation Planning
City of Raleigh
How the Conversation Started
• 2011 Triangle region forum held to discuss possibility of regional bike share system
• 2012 Urban Design Center hosted an educational lunch forum about bike share – Toole Design Group: “Bike Sharing in United States:
State of the Practice & Guide to Implementation” – Charlotte B-Cycle Review
• FY2013 CIP allocation to conduct a Bike Share Feasibility Study & Implementation Plan – Currently negotiating contract with Toole Design Group
Study Scope
• Objective feasibility analysis as to whether bike share is right for Raleigh – Phase One: Determine the
feasibility for implementing a bike share system in Raleigh
– Phase Two: Provide an implementation plan for a bike share system in Raleigh
Phase One: Feasibility
• Task 1: Bike Share System Review – Data summary for peer US bike share systems – Complete profiles for at least three existing bike
share programs in comparable US Cities
Nice Ride (Minneapolis, MN) Deco Bike (Miami Beach, FL) Boulder N-Cycle (Boulder, CO)
Phase One: Feasibility
• Task 2: Existing Conditions & Demand Analysis – Demographics – Economics – Housing – Transportation Infrastructure – Physical Conditions – Recreation/Entertainment – Retail – Transit
• Task 3: Policy Review – Examine existing and proposed policies, plans, and
regulations that influence land use and bicycle use – Review impact on bike share implementation
Phase One: Feasibility
• Task 4: Business Model Assessment – Summary and evaluation
of different business models nationally
– Analysis and recommendation of appropriate business model for Raleigh
Phase One: Feasibility
• Task 5: Final Bike Share Feasibility Study – Outline of major goals and objectives for the bike
share study – Draft and Final Bike Share Feasibility Report
• Million dollar questions: – Will bike share in Raleigh work? What should it
look like? Can it be sustained? How much $$?
Phase One: Feasibility
Phase Two: Implementation Plan
• Task 6: Financial Plan Development – Revenue forecasting
• Potential ridership (demand analysis)
– Expense modeling • Capital costs • Installation costs • Operating costs
• Task 7: Phasing & Expansion Plan – Scale and phasing parameters – Estimated number of stations/bikes – Projected ridership – Demographic information – Station density
Phase Two: Implementation Plan
Ecobici (Mexico City, Mexico)
• Task 8: Station Planning, Sizing & Placement – Demand-based network – Adjust for specific locations – Create siting guidelines
• Solar requirements • On-street/sidewalk restrictions • Operations requirements • Permitting process
– Identify field locations – Site design & photo renderings
Phase Two: Implementation Plan
• Task 9: Public Involvement – Project website – Crowd-sourcing online map – Online survey – Public Open House
• Stakeholder Engagement – Possible partners & sponsors – Underwriting specific stations?
Phase Two: Implementation Plan
• Task 10: Implementation Plan – Final report with specific action items and
recommendations
• Project expected to take six months • Project kickoff schedule for Dec 2013
Phase Two: Implementation Plan