Rajesh Uppal Maruti Suzuki: IT Weds OT

24
Rajesh Uppal Exec Director & CIO Feb 2015 IT Weds OT

Transcript of Rajesh Uppal Maruti Suzuki: IT Weds OT

Page 1: Rajesh Uppal Maruti Suzuki: IT Weds OT

Rajesh Uppal Exec Director & CIO

Feb 2015

IT Weds OT

Page 2: Rajesh Uppal Maruti Suzuki: IT Weds OT

Equity Structure 56.20% Suzuki, 43.80% Public

Manpower Around 16000 employees

Models 15 models with over 150 variants

Group Companies 28

Net Sales (13-14) Rs. 426,448 million

Net Profit (13-14) Rs. 27,830 million

Total Sales (2013-14) 1,155,041 units

Market Share (2013-14) 42.1 % (Passenger vehicles)

Our Business Card

Page 3: Rajesh Uppal Maruti Suzuki: IT Weds OT

Our Manufacturing Dimensions • 200 variants of 16 models• 3000 components make a car• Lean inventories < day

• Infrastructure– Two Geographic locations– 5 Plants – 128 production shops

• Approx 4 cars produced per minute

Page 4: Rajesh Uppal Maruti Suzuki: IT Weds OT

High Automation

• Manesar Weld example

Page 5: Rajesh Uppal Maruti Suzuki: IT Weds OT

Operational Technology

“ Operational Technology (OT) covers the spectrum of systems that deal with the physical transformation of products and services. They are task-specific systems, are highly customized for industries and considered mission-critical. “

Source: Chainlink Research

Page 6: Rajesh Uppal Maruti Suzuki: IT Weds OT

IT Orchestrates Shop Floor

Page 7: Rajesh Uppal Maruti Suzuki: IT Weds OT

IT Orchestrates Shop Floor

• Machine Interfacing

Page 8: Rajesh Uppal Maruti Suzuki: IT Weds OT

Machine Interfacing

Page 9: Rajesh Uppal Maruti Suzuki: IT Weds OT

IT Orchestrates Shop Floor

• Machine Interfacing• Guided Manufacturing (Pika-Pika)

Page 10: Rajesh Uppal Maruti Suzuki: IT Weds OT

Guided Manufacturing (Pika-Pika)

Page 11: Rajesh Uppal Maruti Suzuki: IT Weds OT

IT Orchestrates Shop Floor

• Machine Interfacing• Guided Manufacturing (Pika-Pika)

• Fool Proofing (Poke-Yoke)

Page 12: Rajesh Uppal Maruti Suzuki: IT Weds OT

Fool Proofing (Poke Yoke)

Page 13: Rajesh Uppal Maruti Suzuki: IT Weds OT

IT Orchestrates Shop Floor

• Machine Interfacing• Guided Manufacturing (Pika-Pika)

• Fool Proofing (Poke-Yoke)

• Shop Floor Control

Page 14: Rajesh Uppal Maruti Suzuki: IT Weds OT

Shop Floor Control

Page 15: Rajesh Uppal Maruti Suzuki: IT Weds OT

IT Orchestrates Shop Floor

• Machine Interfacing• Guided Manufacturing (Pika-Pika)

• Fool Proofing (Poke-Yoke)

• Shop Floor Control• Synchronized Production

Page 16: Rajesh Uppal Maruti Suzuki: IT Weds OT

Synchronized Production

Page 17: Rajesh Uppal Maruti Suzuki: IT Weds OT

DATA Emitters

Page 18: Rajesh Uppal Maruti Suzuki: IT Weds OT

Big Data on OT

Page 19: Rajesh Uppal Maruti Suzuki: IT Weds OT

Raw material receiving

Inspect in Labs

Holding area

Heat treatment for melting metal

Cast metal into desire shapes

Machine Control Panel

Finished component

Manual Input

OKReject

Dispatch to M/C shop

Inspection at M/C shop handover

Parameters• Metal Temperature• Metal Pressure• Pouring time• Vacuum reading• Etc… (12

parameters)

Casting manufacturing process

Page 20: Rajesh Uppal Maruti Suzuki: IT Weds OT

What we did

Parameters set based on experience/ Hit and TrialNo historical data available for decision makingEnd to end process traceability of casting components.Trend availability of appropriate values .

Page 21: Rajesh Uppal Maruti Suzuki: IT Weds OT

Parameter based Quality Prediction in Casting shop

Control Quality in Casting shop through Proactive Defect Prediction based on Casting Process Parameters .

Plant Data

Process parameter

Machine DataFailure Data

Page 22: Rajesh Uppal Maruti Suzuki: IT Weds OT

Quality Control

Page 23: Rajesh Uppal Maruti Suzuki: IT Weds OT

A new Horizon of OT with IT

OT

IT

Efficiency

Quality Cost Flexibility

MES

Prediction Systems

Page 24: Rajesh Uppal Maruti Suzuki: IT Weds OT

Thank You Drive safely with “Maruti”