Rajesh Srivastava CV (2)

download Rajesh Srivastava CV (2)

of 3

Transcript of Rajesh Srivastava CV (2)

  • 7/28/2019 Rajesh Srivastava CV (2)

    1/3

    CURRICULUM VITAE

    Rajesh Kumar SrivastavaMob. No.09639001935

    [email protected]

    M/s. Bajaj EcoTec Products,

    Palia Kalan Lakhempur Kheri -262902 U.P

    PERSONAL DETAILS:

    Father's Name Shi.Prem Kishore SrivastivaDate Of Birth 15th June 1963Nationality Indian

    Technical Education Diploma in Mechanical Engineering

    Permanent address Near Kanta baba ki kutiGandhi Nagar,Distt Basti(U.P)

    Salary Drawn 4 Lack P.A(CTC)

    Salary Expected Negotiable

    Experience:-

    Presently I am working in M/s Bajaj eco-tech products , a division of BAJAHINDUSTHAN LTD ,Palia kalan ( Uttar pradesh) as a Manager (Utility).This unit is

    known to be the world's largest & only manufacturing industry to produceMDF( substitute to natural wood) from raw agro waste Bagasse (sugarcane). This is a

    continuous process plant heaving 200 MT. production capacity per day & heaving

    touch screen technology with multiple inter lockings. (Date Oct. 2011 to Till date ) Previously worked in M/s Bajaj eco-tech products ltd, Gonda (U.P) as a Assistant

    Manager (Utility) (on dated Nov 2007 to Sept 2011)

    Previously worked in M/s Shridi Industries Ltd, Sidcul Ruderpur (U.S Nagar) as a

    Assistant Manager (Utility) (on dated Jan 2007 to Nov 2007 ) Previously worked in M/s Radha Vanaspati Ltd, Kichha, Ruderpur (U.S Nagar) as a

    Mechanical Engineer (on dated July 1999 to April 2006 )

    Previously worked in M/s Oswal Foods Ltd, Khalilabad Sant Kabeer Nagar (U.P) asa Mechanical Engineer (on dated March 1991 to June1999 )

    Previously worked in M/s Vidarvha Iron & steel Corporation Ltd, Nagpur. as a

    Shift Engineer (on dated March 1985 to Feb1988)

    Responsibility

    Responsible for all types of mechanical activities like Installation testing,commissioning operation maintenance brake down trouble shooting & Repairing.

    Governing of steam Generation,Electrolysis Effluent treatment plant.

    Job work of machines & Project work of plant. Analysis of daily fuel and water consumption, Mech. Faults & brake down

    Maintain Engineering Drawing & Circuit Diagram, Technical Manual Detail &

    history R&D Work on energy Conservation.

    Territories Covered:-

  • 7/28/2019 Rajesh Srivastava CV (2)

    2/3

    Operation and Maint. Of water tube fluidized bed Steam boiler Cap. 14 Ton /Hr

    (Make Industrial Boiler) working pressure 17.5kg/Cm2. With APH,DUSTCOLLECTOR and 2 nos Grundfos pump cap. 20 M3/hr

    Operation and maint of thermic fluided heater 2 nos cap. 20 lakh kilo callory/kg make

    Thermotech with mech seal pump capacity160M3/hr Operation and maint of Hot Air Generation plant cap 50 lakh kilo callory /kg

    (Cheema Boiler)

    Operation and maintenance of R.O plant 2 nos Cap 15M3/hr. 5M3/hr (Make Hyper

    Filtration). Operation and maintenance of Cooling tower Cap.50M3/hr (Make-Paharpur)

    Operation & maintenance of Effluent treatment plant cap. 132M3/hr with Everest

    make twin load compressor cap. 1120 M3/hr Vacuum system 2 nos vacuum pump ltr 330 make Mazzada cap. 330 M3/hr for resin

    plant .

    Automation Differential pressure switch hydraulic & pneumatic controlled solenoidvalve , limits switch float switch.

    Industrial Gear box,Redican gear boxes ratio(10:1,15:1,20:1,25:1,30:1,40:1) for speed

    controlled Air Compressor room 3 nos Atlas Make air compressor working pressure 7 kg/Cm2

    capacity of 142.7ltr/sec each.

    Achievement

    Erection and commissing of water tube fluidized bed steam boiler capacity- 12

    ton/hrs, working pressure 17.5kg/cm2 make-thermax-2 nos,\

    Erection and commissing of thermic fluid heater- capacity- 20 Lakh Kilocalorie/kg

    make-thermax-2 nos.

    Erection and commissing of thermic fluid heater- capacity- 15 Lakh Kilocalorie/kg

    make-thermax-2 nos.

    Erection and commissing of thermic hot air generation plant capacity 50 LakhKilocalorie/kg make-cheema-1 nos.

    Erection and commissing of 200 ton/day MDF board plant have following section.

    Depither Capacity 10 ton/hrs-2 nos.

    Washing Capacity 28 ton/hrs- make quality-1 nos.

    Refiner- Make-ANDRIZ

    Plug feed screw- size 24 Capacity- 10ton/hrs.

    Refiner- size 54 capacity- 9.5 ton / hrs.

    Digestor (Horizontal tube ) Tube dia- 1450 mm. length-10 mtr. Capacity -27041

    liters

    Ribben feeder-size -20 capacity -400 liters. Discharge screw- capacity 2640 liters.

    Project Work

    Fabrication of tanks, Pipe Lines,Column,Trusses,foundation work of tanks pumps,

    Chimney,Boiler Etc.