    THE ORNERSTONE OF OUR

    SU ESS

    EICHHOLZ is a German railway construction company owned by STRABAG Group.

    STRABAG is one of the leading construction groups in Austria and Germany, andacross Central and Eastern Europe. The company has operations worldwide, employingmore than 60,000 employees (2008). Thanks to its innovative and extensive rangeof products, the STRABAG Group has become a leader in complex building con-struction and civil engineering projects. From the initial groundbreaking to the hand-over of the keys - STRABAG is YOUR partner of choice for projects of all shapes andsizes, especially those involving infrastructure, industry and the environment. Ourmain areas of operation are building construction and construction engineering, trans-portation infrastructures, and special divisions & concessions. The high concentrationof specialist expertise within each segment and the close cooperation between theareas allow for the successful implementation of even the most complex ideas.

    HAS A SOLID FOUNDATION

    For the EICHHOLZ Group, railway construction means developing turnkey railwaytraffic systems from A to B. Within the system of “railway construction”, theEICHHOLZ Group draws upon more than 85 years of experience to provide valuableinput during the planning stages and in setting high-quality standards during the con-struction phase, while adhering to deadlines and budgetary constraints. This is whythe EICHHOLZ Group is a reliable system partner for “the 5 metres around the rail”!

    RAILWAY ONSTRU TION

  • 8/9/2019 Railway Construction Manual

    3/7

    ind permission of Schlatter AG

    OVERHEAD LINE WELDING

    TECHNOLOGY

    THE HI HEST EFFI IEN Y IN RAILWAYONSTRU TION

    Track welding works on tracks in

    operation according to DB AG Ril826.1020: CLASS 1• mobile Flash butt welding (RA mobile)

    including grooved rail profiles• aluminothermic welding (AS welding)• mobile insulated rail joint manufac-

    turing (MT and MT-reinforced)• electrical joint welding with welding

    rods and filler wire (OEV/MF)• electrical resurface welding with stick electrodes and filler wire (OEA/MF)

    Welding works in factories accordingto DB AG Ril 826.1021: CLASS 2• stationary Flash butt welding (RA

    stationary)• sta tionary insulated rail joint manufacturing (MT and

    MT-reinforced)• Manual metal arc welding

    (Process 111)• Metal arc welding with filer wire

    electrodes (Process 114)

    Supervision with stress equalisation

    according to DB AG Ril826.1030:• Supervision with carrying out stress

    equalisation for CFR tracks and turnouts

    Welding of structural steel elementsaccording to DIN 18.800-7, DB AGRil 804 and DB AG Ril 804.9050:CLASS E• Manual shielded metal arc welding

    (Process 111)• Metal active gas (MAG) welding

    (Process 135)

    TRACK

    CONSTRUCTION

    MACHINES

    • Universal track and turnout tamping machine Unimat 4S• Track tamping machine 09/32 and

    09/3X• Ballast pro ling machines SSP 100 and 110 SW• Rail track construction cranes GS 40 and GS 80• Flash butt welding machines

    MACHINE

    TECHNOLOGY

    • Rail track unloading facility CR-FP/E“Eichholz”

    • CWR unloading device EMD• Portal frame “Donelli” PTH 350• Hydraulic 4-spindle screw driver machine• Rail-road excavator 900 Litronic• Rail-road Unimog LOCTRAC ZW 100 S

    5 METRES

    AROUND THE

    RAIL

    Consultation on areas rangingfrom maintenance services toproject management for generalcontractors.

    Construction of rail track systemswith ballasted tracks and slab tracks• for high-speed traffic• for the urban railway / LRT• for regional trains• for all infrastructure providers• for industrial railways and feeder lines

    Tramway systems

    Track welding• Flashbutt welding• All manual welding work

    Track-bound undergroundengineering• Installation of substructures (PSS)• Installation of frost protection

    layers (FSS)• Installation of drainage systems• Laying of railway cables

    All types of level crossings

    Cable duct systems• Track-bound cable duct systems

    including shafts• All sizes of cable ducts, buried or

    elevated• Junction boxes, dispatchers, special kits• fully equipped above-ground

    switchgear houses and subterranean stations

    Platforms• Securing the railway embankment

    and foundation• Laying of pre-fabricated platform

    edges• Backing and surface reinforcements• Complementing this with ramps, lift

    shafts and stairways.

    Recording and measurement ofthe tracking system

    Installation of fuelling and washingsystems as well as wagonretarding systems

    Overhead lines for short and long-distance traffic

  • 8/9/2019 Railway Construction Manual

    4/7

    5 METRES AROUND THE RAIL

    FAHRLEITUNGSBAU GMBH is aspecialist in the construction andmaintenance of overhead catenary linesystems in Germany and neighbouringcountries.

    Complete range of servicesOur customers know and appreciate thefact that we offer all technical servicesfor overhead lines from one source. Con-tractors therefore only need to addressone contact person. This ensures thesmooth handling of projects.

    A detailed list of our services:• Planning and statistics• Foundations• Mast erection• Pre-assembly of the cantilever• Pulling the carrier cable• Pulling the contact wire• Rail adjustment work• Commissioning

    Our switch factory produces turnoutsand major turnout components fromall customary types of rail (vignol andgrooved rails) for all gauges, alsomixed gauges, up to a radius of R =500 m.

    Here is a detailed list of our services:• Construction of special turnouts• Production of turnouts, major turn-

    outs components and crossings• Delivery of sleeper sets for turnouts• Induction hardening and tempering

    of rail tracks and major turnout components• Manufacturing of stationary insulation

    joints• Fastening devices for railway crossings, including the “Lindau”

    system in particular• Guard rail constructions• rail expansion joints for bridges• Transformer crossings• Production of accessories and spare

    parts

    We can also deliver turnouts andmajor tunrout components as wellas sets of sleepers made of new,second-hand or reworked material.

    Furthermore, we also perform:• Switch and track inspections in

    accordance with DS 820/821 of theDeutsche Bahn AG

    • Welding work on tracks based on the certificates granted by the

    Deutsche Bahn AG• Using multi-lined bending machines

    to bend rails of all types into all shapes• Reconditioning of old switches and

    crossings

    OVERHEAD LINE CONSTRUCTION TURNOUTS CONSTRUCTION

    Products for short-distance traffic Apart from developing and producinga complete service portfolio for moun-ting and maintaining overhead linesystems, we also produce productsfor short-distance railway traffic. Ourproduct innovations have continuouslyset the standards. This was also thecase with the most recent developmentin the road and metropolitan railwaysector, the introduction of shackleinsulators with silicon coating, whichwas the result of ideas that came fromour company.

    Expertise in overhead lineconstructionThrough many years of experience incooperating closely with our customers,we have the capacity to meet ourcustomers’ technical requirementsquickly and professionally at any time.FAHRLEITUNGSBAU GMBH is aqualified partner, an innovative com-pany with many years of experienceand comprehensive know-how in all

    matters relating to overhead lines forelectrical railways.

  • 8/9/2019 Railway Construction Manual

    5/7

    SERVI ES THAT MEET EVERY REQUIREMENT

    Underground engineering work ontracks• Installation and renewal of protective

    surfaces• Ground enhancement and stabilisation• Longitudinal installation of tracks and preservation of ballast• Drainage systems and route- accom panying underground cable

    engineering work

    Pipeline underground engineering• Renovation of waste water systems• Drinking water, gas supply, waste

    water (rain and dirty water)

    Special constructions• Preparing subways and water crossings up to DN 400• Underground engineering for light

    signal systems, including relatedroad construction work

    • Drainage and outer sealing

    Developments• Waste water systems

    • Water supply pipes• Cable system (media)• Electricity supply cables• Gas supply pipes• Telecommunication lines• Lighting cables

    Telecommunications lines• Underground engineering and cable

    laying for telecommunications companies telecommunication companies

    • Building cable systems as well asshaft constructions

    • Installation and laying of telecom-munications und signal cables(DBAG, EVU, VB)

    • Laying of bre-glass cables• Feeding in cables

    Electrical power lines• Underground engineering and laying

    of cables for power utilities in the low, medium and high-voltage ranges• Laying of traction current lines• Cable duct trough systems including

    special constructions• Construction of converter substations and special constructi ons

    Road construction and landscaping• Restoration of all types of surfaces• Building of access roads in bitumen

    and plaster• Plastering and natural stone work,laying of all kinds of slabs• Yard fixtures and design of space

    Bridges in cast-in-situ concrete• Abutments and pillars in reinforced

    concrete• superstructures in reinforced concrete and/or pre-stressed concrete• concrete slab with pre-bent rolled

    steel joists (RSJ)

    Various types of construction• Mixed construction• Compound construction• Modular construction• Frame mode

    Provisional bridges• Mounting of flat or deep foundations• Erecting, maintenance and expansion of single or multi-section temporary

    bridges

    Subways incast-in-situ concrete• Full-framed subways, in in-situ concrete• Complementing this with ramps, lift

    shafts and stairways

    Bridges using displacementconstruction methods• Full or half-framed, and one or mu ltiple-sectio n bridges• Girder-style bridges• Mounting outside the platform• Displacement of bridges via displacement tracks

    Steel bridges

    Bridge renovations(whilst in operation)

    Retaining walls• Mounting of retaining walls in in-situ

    concrete or prefabricated parts• Gabions

    UNDERGROUND ENGINEERINGCONSTRUCTION ENGINEERING

  • 8/9/2019 Railway Construction Manual

    6/7

    SERVI ES THAT MEET EVERY REQUIREMENT

    Benefits of the platform21 system• Platform facilities are fixed with

    screws and dowels retrospectively• Platform roof connection is integrated into the foundations• Allows for construction on top of

    existing platforms• Minimal remaining mass• No building in the track’s pressure

    range• High level of pre-manufacturing• Can be used for arcs up to a radius

    of 300 m• No longitudinal installation of tracks

    is necessary• Type solution for connection to sub

    way system “Stuttgart” (tunnel21)

    System benefits tunnel21• High level of prefabrication• Modular connection to platform

    system platform21• Fast mounting is possible during

    periods of track possession

    System construction offers a turn-key“station 21“ product portfolio from one-

    stop concrete finished parts at a f ixedprice, incl. certification and frameworkagreement with the German FederalRailway Authority (EBA).

    Accurate and particularly fast installationon-site includes planning, prefabrication,transportation and assembly of prefa-bricated platforms and subways.

    station21• All from one source• EBA type certification• Simple planning• Fixed price• Life-long flexibility• Persistently high level of quality• Construction based on module 813• Cost transparency through framework agreement with the

    Deutsche Bahn (German Rail)• Quality according to DIN EN ISO 9001• Variable contact spacing• Very short construction periods• System benefits, such as a type solution

    Track building is more than mere execution – quality, profitability and reliability mustbe part of the construction process. This is why we have purposefully chosen toinclude key areas such as new constructions, reconstructions, and the repair of tracksystems with all types of gauges, rail and sleeper profiles in our service portfolio. Itis also why we use the most advanced technology and have employed a competentand experienced team of specialists.

    Our range of services includes: • Track construction: slab track and• Earthworks and underground ballasted tracks engineerin g • Creation of complete platforms• Manufactur ing of base courses and stations• Retrieval of building material • Concrete, plaster and asphalt surface and recycling treatments• Cable duct systems, piping, • Level crossings round off our service

    drainage portfolio

    SYSTEM CONSTRUCTION STATION 21TRAMWAY CONSTRUCTION -LRT-TRACKS