Transcript of Railway budget 2011-12
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 1/25
Railway budget budget 2011-12
Presented by:
Anuradha saini
Athumani
Rahul Goyal
Presented To:
Ms. Ashima Thapar Faculty, PCTE
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 2/25
Introduction
Railway budget was being presented on25th February, 2011.
Railway¶s services are comparable to
emergency services, required all the time.rail transportation is vitally interlinked withthe economic development of the country.
We need a large heart and a large mind toundertake big works.
railways have developed several business-oriented policies for the first time.
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 3/25
Railways
Infrastruc
ture for
Industry
Initiative
Special Freight
Train operators
Automob
ile and
Ancillary
Hubs
New Catering
Policy
some of policy
initiatives
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 4/25
Projects
Announced setting up of a large number
of rail-based factories/manufacturing
or on t ese projects are at different
stages of progress
Increasing demand
Components are not readily available.It as been decided to set up rail-based
industries.
Policies
85 proposals ave already beenreceived.
Ot er are also elcome
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 5/25
New Manufacturing units
work on thenew coachfactory at Rae
Bareli isprogressing
rapidly now
Work on the
wagon factoryin rissa willalso be takenup once the
site isfinalized.
Perambur¶ssecond unit
and Palakkadcoach factory
will start soon
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 6/25
New initiatives
� Jammu-Kashmir Rail Link projectinvolves a large number of bridges.
� Railways will set up a Bridge factory inJ&K
� propose to set up a state-of-the-artInstitute for Tunnel and Bridgeengineering at Jammu.
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 7/25
I propose to set up a metro coach factory on the land purchasedfrom willing sellers at singur/adjacent polba.
Imphal, Manipur will soon be connected to the railway network.
Proposal of opening up a centre of excellence in software at
Darjeeling under the aegis of centre for railway information systemsSetting up of a railway industrial park through a joint venture
between Burn
Standard Co. Ltd. and SAIL has already been initiated in this Park.
A captive thermal power plant of 1,000 MW at Nabi nagar is at anadvance stage of construction.
A second thermal power plant of 1,320 MW capacity at Adra is inthe process of being set up.
New Manufacturing Initiatives
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 8/25
Expansion of rail infrastructure
� railways will be achieving its target of 800 km,
� for gauge conversion 700 km for doubling and 1,000 km of electrification.
� Railways¶ efforts to provide dignity to the poor through the Izzat scheme
� we have decided to give them small shelter throughS
ukhi GrihaS
cheme.
� This scheme is being taken up on pilot basis to provide 10,000 dwellingunits at Mumbai, Sealdah, Siliguri, Tiruchirapalli and other places.
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 9/25
Annual plan 2011-12
Rs. 57630cr
The highestever plan
investment bythe railways.
Which will beraised throughGBS, diesel
cess, internal
resources,market
borrowingsthrough IFRC.
10000 cr will beraised throughtax free bonds.
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 10/25
Projected lines
� greater thrustis given to theexpansion of the railnetwork withallocation of `9,583 cr for new lines.
In the lastbudget I hadannouncedupdation of
surveys for 114socially
desirable newlines.
ut of this 94will be
completed byMarch, 2011
and theremaining by
December,2011.
there is ascheme for 12five year plan
for sociallydesirable lines.The scheme isbeing named,
PradhanMantri RailVikas Yojana.
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 11/25
To connect unserved and
underserved regions to the rail network.
Wadsa-Gadchirholi in Maharashtra
Bhadutola-Jhargram via Lalgarh in WestBengal
Gudur-Durgrajpuram in Andhra Pradesh
Hansdiha-Godda in Jharkhand
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 12/25
A non-lapsable Fund for railwayprojects in the northeast region hasbeen created that will boost theprogress of projects.
All the state capitals of this regionexcept Sikkim will get connected by railnetwork in the next seven years.
India¶s longest tunnel between Banihaland Qazigund would be completed thisyear.
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 13/25
Safety
� We are trying sincerely to ensure any incidents do not occur.
� Railway is passenger friendly, safe and a cheap mode of transport. Rail faresare close to one-fourth that of the road.\
� our recent trials with an improved version of ACD have met with success and itwill be commissioned on three zonal railways,
� The number of incidents at unmanned level crossings, has come down by 36%with the elimination of 1,500 unmanned crossings, construction of 172 R Bsand 240 RUBs/subways.
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 14/25
safety
� Frequent calls for µrail rokos¶ are not only crippling operations on IndianRailways but also causing immense hardship to passengers,
� A GPS based µFog Safe¶ device edhas been deploy
� We cannot ensure efficient and punctual operations of trains without the help of state governments.
� I am now making an offer that whichever state ensures trouble-free train runningfor the whole year, shall be given two new trains and two projects as a special
package.
� An All India Security Help Line on a single number has been set up
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 15/25
Modernization of railways
A project with IIT, Chennai on prototype manufacture of ultrasonic systems;
Partnership with Jadavpur University for development of new designs for rail steel bridges;
A collaborative study with IIT, Mumbai on the problem of corrosion of rails;
E-procurement and e-auction to ensure transparency andeconomy.
Issuing paperless railway receipts;
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 16/25
InitiativesGreen initiatives
� Fr ee supply of 14 lakhCFLs to r ailwayhouseholds
� Regener ative br aking inMumbai EMUs
� Windmill at ICF, Chennai
� Pr oduction of locos withµhotel load conver ter¶
� Use of bio-diesel, CNG andL NG in locos, wor kshopsetc.
Adarsh stations
� upgr adation of 584 stationsas Adar sh Stations, out of which 442 stations will be
completed by Mar ch 2011.� The r emaining will be
completed in 2011-12.
� safe dr inking water, pay &use toilets, high-level
platfor ms, better accessibility for the
physically challengedamong many other facilitiesat these stations.
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 17/25
Measures to improve passenger
amenitiesIntroduction of a pan-India, multi-purpose ³Go-India´ smart cardon a pilot basis.
Better accessibility at stations for physically challengedcustomers;
A new portal for e-ticketing by Centre for Railway Information
Systems (CRIS) is ready and will be launched shortly.
Provision of internet access on Howrah-Rajdhani Express as apilot project;
Introduction of advance booking of retiring rooms.
Extension of Rail Yatri Sevaks with modern trolleys to six more
stations:
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 18/25
Different facilities proposed
physically handicapped persons are not entitledfor concessions on Rajdhani and Shatabdi
trains. It is proposed to extend the concessionfacility to them in these trains also.
Press correspondents are now entitled to avail50% concession with family for two years.
At present the concession for senior citizens isextended to both men and women at 60 years of age. I propose to reduce this in case of women
to 58 years.
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 19/25
Staff welfare measures
Expand the scope of Liberalized ActiveRetirement Scheme for Guaranteed
Employment for safety category.
extending medical facilities to both dependentfather and mother of railway employees.
Increasing the scholarship for the girl child
Setting up of a Railway Vidyalaya PrabandhanBoard (RVPB) to improve quality of education to
children studying in 269 railway schools.
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 20/25
Staff welfare
Recruitment
recruitment is inprocess of1.75 lakhs
jobs
13,000 posts in RailwayProtection Force.
for the first time,railways are inducting16,000 ex-servicemenby end of March 2011.
Training
A training centre isproposed to be
started at Kharagpur.
Setting up of Polytechnics
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 21/25
Metropolitan Projects
� Every day over 5 lakhpassengers utilize the metro
services.� It is also proposed to take up the
following new surveys for newconnectivity of Kolkata metro.
� It is also proposed to introduce34 new services in Kolkata Metroin the coming year.
KolkataMetro is
expandingits
network.
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 22/25
Financial performance
Indian Railwaysare passing
through a very
difficult phase.
we have not
only paid thefull dividend for 2009-10, butalso achievedan operating
ratio of 95.3%.
The total grossearnings havenow been fixedat `94,742 cr
which is `177 cr higher than the
budget.
we will save
`3,700 cr by our economy driveand other austerity
measures.
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 23/25
Budget estimates
railways¶ earnings are set toexceed the rupees one lakh
crore mark.
rdinary Working Expenses havebeen assessed at `73,650 cr.
The expected perating Ratio is91.1%.
PSUs earning a net profit of `1,782 cr. These PSUs paid a
dividend ̀ 311.88 cr to the railways.
Hamara Mushkil Daur Gujar Chuka Hai
Aur Hum Din-o-din Majboot Hote Jayenge
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 24/25
Few benefits proposed
In 2011-12, the covering around 1,000 kmare proposed to be electrified.
There is no increase in passenger faresproposed for this year.
Mobile vans for issuing e-tickets will beextended to government medical college
hospitals, High Courts, District Court,University campus, IT hubs, IITs and IIMs.
8/7/2019 Railway budget 2011-12
http://slidepdf.com/reader/full/railway-budget-2011-12 25/25