. GOVERNMENT OF INDIA MINISTRY OF RAIL WAYS RAILWAY BOARD No. 20 12/RSF/649/2/RP-II/RWF New Delhi, dt. 03'.08.12 The Chief Mechanical Engineer, Rail Wheel Factory, Bangalore - 560 064. The Controller of Stores, All India Railways & P/Units. Sub:- Minutes of the Quarterly WTA Meeting for the planning of items for the period II/2012-13 (July - September, 2012). Minutes of quarterly WTA meeting for the period II/2012-13 (July - September, 2012) held with the representatives of RWF and Zonal Railways/PUs in Rail Bhawan, New Delhi on 10.07.12 has been uploaded on Indian Railway's website www.indianrailways.gov.in. To access the Minutes kindly click on "Ministry of Railways. Then click on "Railway Board". Then click on "About Indian Railways" Tab. Then click on " Railway Board Directorates". Then click on "Stores". Then click on "Conferences I Meetings" to open the page containing the minutes of the meeting. Please ensure that the statement of requirements of WTA items for the Quarter III/20 12-13 (October - December, 12) should reach this office latest by 15.09.12 positively. The exact date and venue of the meeting would be advised later on. Encl.:- As above. WTA fctcH I ~ itoCf; Cffi" ~ -ti ()f d crt ~. . ev Misra) Director, Railway Stores (F) Railway Board. Copy of the Minutes of the meeting together with allocation statement is forwarded for infonnation and necessary action please. 1. The Chief Mechanical Engineers, All India Railways and Production Units. 2. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi. 3. Mis Jessop & Co~Ltd., 21 & 22, Jessore Road, Kolkata - 700 028. 4. Mis Bharat Earth Movers Ltd., "BEML SOUDHA", 23/1, 4th Main, S.R. Nagar, Bangalore-560 027. 5. Mis Titagarh Wagons Ltd.,l13, Park Street, Kolkata -700016. 6. Mis Bharat Heavy Electrical Ltd., (Transportation Business Deptt.), Integrated Office Complex, Lodhi Road, New Delhi-110 003. 7. Mis BESCO Ltd., Wagon Division, Baruipur Works, Railway Station, Baruipur, Eastern Railway, West Bengal. 8. AM(RS), AM(ME), Adv(L)/RS, EDRS(C), EDRS(P), EDME(Chg.), EDME(W), EDME (Tr.), EDEE(RS), DME(PU), DME(P)-l, DEE/G, DRS(W), DRS(M), DF(S)-l and RS(WT A) Branches of Railway Board. 9. CWM, Eastern Railway, Kancharapara. -

Transcript of Rail Wheel Factory, Bangalore- 560 064. . ev Misra - Indian Railway

.GOVERNMENT OF INDIAMINISTRY OF RAIL WAYS

RAILWAY BOARD

No. 20 12/RSF/649/2/RP-II/RWF New Delhi, dt. 03'.08.12

The Chief Mechanical Engineer,Rail Wheel Factory, Bangalore - 560 064.

The Controller of Stores,All India Railways & P/Units.

Sub:- Minutes of the Quarterly WTA Meeting for the planning of items forthe period II/2012-13 (July - September, 2012).

Minutes of quarterly WTA meeting for the period II/2012-13 (July - September, 2012) held withthe representatives of RWF and Zonal Railways/PUs in Rail Bhawan, New Delhi on 10.07.12 has beenuploaded on Indian Railway's website www.indianrailways.gov.in. To access the Minutes kindly click on"Ministry of Railways. Then click on "Railway Board". Then click on "About Indian Railways"Tab. Then click on " Railway Board Directorates". Then click on "Stores". Then click on"Conferences I Meetings" to open the page containing the minutes of the meeting.

Please ensure that the statement of requirements of WTA items for the Quarter III/20 12-13(October - December, 12) should reach this office latest by 15.09.12 positively. The exact date and venueof the meeting would be advised later on.

Encl.:- As above.WTA fctcH I~ itoCf; Cffi"~ -ti ()f dcrt ~.

. ev Misra)Director, Railway Stores (F)

Railway Board.

Copy of the Minutes of the meeting together with allocation statement is forwarded for infonnation andnecessary action please.

1. The Chief Mechanical Engineers, All India Railways and Production Units.2. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi.3. Mis Jessop & Co~Ltd., 21 & 22, Jessore Road, Kolkata - 700 028.4. Mis Bharat Earth Movers Ltd., "BEML SOUDHA", 23/1, 4thMain, S.R. Nagar, Bangalore-560

027.5. Mis Titagarh Wagons Ltd.,l13, Park Street, Kolkata -700016.6. Mis Bharat Heavy Electrical Ltd., (Transportation Business Deptt.), Integrated Office Complex,

Lodhi Road, New Delhi-110 003.7. Mis BESCO Ltd., Wagon Division, Baruipur Works, Railway Station, Baruipur, Eastern Railway,

West Bengal.8. AM(RS), AM(ME), Adv(L)/RS, EDRS(C), EDRS(P), EDME(Chg.), EDME(W), EDME (Tr.),

EDEE(RS), DME(PU), DME(P)-l, DEE/G, DRS(W), DRS(M), DF(S)-l and RS(WT A) Branchesof Railway Board.

9. CWM, Eastern Railway, Kancharapara.

-

RWF MINUTES

Present : AM/PU, ADV.(RS), ADV.RS(P), CAO/wPO/Patna, CME &COS/RWF, Bangalore, EDs & Directors of Stores Directorate & MechanicalDirectorate, COS/CMM/JAG Officers of Zonal Railways & Production units,SAG Officers of Mechanical Department of Zonal Railways & ProductionUnits, GM/WAP, SAIL/DSP.

RWFIBangalore

. Supply performance of RWF/Bangalore was commendable for 1st Quarter of2012-13. RWF supplied 53000 wheels & 26000axles in 1st Quarter.

. It was decided that RWF will produce 1000 loco wheels in 2ndQuarter andconcentrate on supply of loose wheels & axles in this quarter, RWF will beallotted 15000 BG chg. Wheels, 7000 BOXN wheels & 3000 EMU wheels inthis quarter.

. With the availability of forgings & forged axles from MSF and VISL, it hasbeen possible for RWF to increase production of axles. CME/RWF requestedfor additional allocation of BOX 'N' axles.

. Maintenance shutdown of Axle & Wheelshops are to be taken in 3rdquarter.

. EDME/Frt. Requested for the allotment of wheels needed or BLC Wagons(840 mm dia) to Northern Railway.

. Availability of HMS in RWF is to be monitored and ensured.

RWPIBELA

. 1000 BOX "N" wheels allotted in 1st quarter could not be supplied byRWP/BELA..

. During 2ndquarter CAO/WPO indicated that 4000 BOX "N" Wheels will besupplied.

. The Wheelset pressing capacity for BOXN wheel sets is available atRWF/Bangalore. Thus it would be difficult to maintain supply of only BOXNwheels from RWP/Bela when production ofBOXN wheels reaches more than35000/per annum in 2013-14. Thus RWP/Bela must explore possibility ofproducing BG Coaching Wheels.

. CAO/WPO requested zonal Railways to maintain supply of HMS toRWP/BELA.

DSP/SAIL

. DSP supplied only 10776 nos. wheels & 1143 nos. axles during 1st quarteragainst their annual commitment of 68000 wheels & 12000 axles.

. GM/DSP/SAIL assured that in 2nd quarter their supply performance willimprove and atleast 12000 wheels will be supplied in this quarter.

S.No. Item Supply Position1. WDG-4 loco wheels . 717 nos. received (DLW-400, SWR-

317). 561 nos. dispatched on 10.07.12. 685 nos. are yet to come

2. WDP-410co wheels . 2456 nos. received (DLW-1821,NWR-65 SWR-470 WR-200 NFR-, , ,200)

. 572 nos. dispatched on 10.07.12

. 868 nos. are yet to come3. WAG-9 loco wheels . 839 nos. received (CLW-363,

NR-156, SCR-120, CR-200). 351 nos. dispatch on 10.07.12. 357 nos. are yet to come

-2-BG Coaching Wheels. Critical review of the requirement of BG coaching wheels is required to be

under taken by Railways as requirement projected by Railways is 70 to 80%higher in comparison to consumption during previous years.

. CWM/Matunga requested for additional allotment of BG Coaching wheels. Itwas advised to them that requirement should be supported with indents andsupply will be made as per quantity indented.

Imported WT A Items

. Supply of loco wheels against contract on Mis Bonatrans is as follows:

. Supply of WAP-5 loco wheels against contract on Mis KL W is as follow:

S.No.1.

Item Su I PositionWAP-5 loco wheels 221 nos. already reached at Kolkatta Port

CLW-161, NR-60Tender for 12054 nos. LHB coaching wheels has been decided, LOA hasbeen issued.Contract for 2997 nos. WDG-4 & 2523 nos. WAG-9 loco wheels has beenissued.For 172 nos. WAP-5 loco wheels LOA has been issued, contract is underIssue.Tender for 10000 nos. EMU wheels has opened on 07.06.12.Tender for 10000 nos. 's' profile Loco Wheels (conventional type) hasopened on 20.07.12. '

Tender for 10000 nos. BG Coaching Wheels is due to open on 7thSeptember,2012.

.

.

.

.

.

.

No. Item Quantity Actual Supplies Variation TotalPlanned (April- June, (+) excess Supplies(April - June, 2012) (-) shortfall from April

2012) -June, 2012A LOOSE WHEELS(i) BOX 'N' Wheels 5875 4406 -1469 4406

WIWL-4764/R(ii) MG Chg. Wheels 0 122 122 122

MG/T -0-1-004(WIWL-770/R)

(WAP-W-031)(iii) BG Chg. Wheels 15370 10168 -5202 10168

WIWL-1660/R(iv) BG Loco Wheels 1050 218 -832 218

WIWL-4984/R(v) MG Loco Wheels 0 0 0 0

WIWL-4955/R(vi) 840 mm dia wheels for 700 5790 -121 5790

CONCOR(vii) EMU/DMU Wheels to 4000 2264 -1736 2264

Drg. No. K-4004(vii) Wheels for BVZC 0 0 0 0

Wagons to Drg. No.W/WL-4747TOTAL WHEELS 26995 17757 -9238 17757

-3-. Tender for 4000 nos. MG Coaching wheels is due to open on 30th August,

2012.. Tender for 909 nos. Kolkatta Metro wheels has opened on 22.06.12.. DME/PU requested for early finalization of tenders for EMU and "8" shaped

wheels and early issue of BG Coaching & MG Coaching Wheels tenders.

Submission of Indents

. All the Railways and Production Units were advised to ensure to submit theirindents for the WTA items for contract Period 2014-15 by 31.07.12. In caserequirement is nil, same may also be confirmed in writing. Instructions forsubmission of indents, position of Buffer stock etc. were detailed in Board'sminutes of the WTA meeting held on 13.04.12 circulated vide Board's letterof even no. dated 03.05.12.

Other issues

. ICF & RCF were requested to use Cast EMU wheels for trail or coaches.

The position regarding supplies made by RWF during the previous quarter Le.April- June, 2012 was discussed. The same is tabulated as under:-

SUPPLIES DURING APRIL - JUNE. 2012

B LOOSE AXLES(i) Nos. 9957 9257 -700 9257(ii) Equated Box 'N' Units 12575 11216 -1359 11216C WHEEL SETS(i) 16T BG Chg. 300 288 -12 288

Wheelsets(ii) Wheelsets for BCN 0 0 0 0(iii) BOX 'N' W/sets 15375 17297 -1922 17297

including WagonBuilders & BLCWagons

(iv) EMU W/sets for 0 0 0 0Trailer CoachesTOTAL WHEELSET 15675 17585 1910 17585S

-4-

The detailed supply position (Railway wise/Consignee wise) is given in theenclosed Annexure-I.

The item-wise planning for July - September, 2012 is shown in Annexure -II.

I I ANNEXURE -I IPosition regarding quantities planned vis a -vis actual supplies made by RWF/Bangalore during the 1stQuarter (April- June, 2012).

S.NOS. DRAWING & RLY./CONSIGNEE QTY.PLANNED QTY. SUPPLIED VARIATIONDESCRIPTION (JAN. - MAR.,12) (JAN. - MAR.,12) (+) EXCESS

- TFALLWHEELS

1 Wheel disc. BOX 'N' CRIPR 175 176 1Type to Drg. No. ERlJMP 800 775 -25WlWl-4764/R NR/JUDW 700 770 70(WAP/SKlM-155) NCRlJHS 1400 499 -901

NFRlNBQ 300 257 -43NWRIAIl 200 220 20SRICW/PER 500 263 -237SCRIRYPS 1100 1035 -65SECRlRWSS 350 35 -315SWR/UBl 100 104 4WRlDHD 250 272 22Total 5875 4406 -1469

2 BG Chg. Wheels to CRlMTN/PR 1200 776 -424Drg. NoWlWl- ERlllH/HlR 900 856 -441660/R Eco.RlMCS 400 187 -213

NR/AMVJUDWI 1100 1108 8ASRNER/GKP 400 319 -81NFRlNBQ/DBRT 400 360 -40NWRlAIl/JU 800 577 -223SRICW/PERI 900 386 -514lW/PER/GOCSCRITPTY/lGD 1100 573 -527SERlKGP 1100 549 -551SECR/RWSS 120 37 -83SWR/UBUAP 600 332 -268SWRlUBl(For BVZI 300 56 -244WRlBVP/Pl 400 354 -46WR/Pl (BEMl AlC) 750 444 -306WCRlBPl 400 368 -32ICF 2400 1696 -704RCF 2100 1190 -910Total 15370 10168 -5202

3 MG Coaching NWR/BKN 0 122 122Wheels to RDSO's Total 0 122 122Drg. No.CG-K 6099(WAP-W-031)

4 840 dia wheel for NRIJUDW 300 346 46CONCOR for BlC NCRlJHS 200 233 33wagon SRICW/PER 50 0 -50

SCRIRYPS 50 0 -50WRlDHD 100 0 -100

Total 700 579 -121

5 BG Loco Wheel to CR/BSL 300 38 -262Drg.NoWIWL-

SR/LW/PER 300 44 -2564948/R

SWRIAP 50 0 -50

CLW 200 58 -142

DMW 200 78 -122

Total 1050 218 -832

6 EMUIDEMUWheel CR/MTN 1000 406 -594to Drg. No. K-4004

ER/HLR 1000 756 -244

NRlGZB 500 231 -269

SRiCW/PER 500 234 -266

SERlKGP 500 250 -250

WRlDHD/PL 500 387 -113

Total 4000 2264 -1736

TOTAL WHEELS 26995 17757 -9238AXLES

1 BG DSL Loco aaxle ERlKPA 4 4 0to Drg. NoWIWL- SRiLW/PER 10 10 04973/R Total 14 14 0

2 Axle for WDG-2 A CRiPR 60 48 -12(Axle RT (with light NRiCB 80 11 -69wt. 5002 FZ) to Drg. NERlGKP 16 0 -16No. TPL-5868 Alt 'b' SCRlTPTY 10 0 -10part NO.11231622 DLW 105 51 -54

DMW 250 190 -60Total 521 300 -221

3 Axle rough turned CLW 72 64 -8for WAP-4 loco to Total 72 64 -8Drg.NO.03/2I11/55Alt. 1

4 Axle rough for WDS- DLW 120 78 -426 to Drg. No. TPL- Total 120 78 -422585

5 Axle driving rough DMW 150 135 -15turned for WDM-2C NERlGKP 10 10 0& WDM-3A Locos to Total 160 145 -15Drg.NO.DIWL-5058/R Alt. NIL

6 Axles for WAG-9 & CLW 240 255 15WAP-7 (Rough CRiBSL 24 23 -1machined) to CLW'sDrg. NO.1209-01- ERlKPA 40 34 -6011-002 SCR/LGD 6 12 6

Total 310 324 14

7 Axle (3 phase) for CR/BSL 8 0 -8WAP-5 Loco to Total 8 0 -8CLW's Drg. No.1210-01-311-025

8 Axle rough GM loco CRIBSL 6 0 -6to EMD Pt.No.40077315 SCRITPTY 6 6 0(Geared) & DLW SWRlUBUAP 25 10 -15Part No. 17230019

Total 37 16 -21

9 Axle rough ERlKPA 11 0 -11machined for WDG- NR/LDH 20 0 -202 & WAG-7 to DRg. SERlKGP 30 28 -2No.06/2/11/2 WRlDHD 6 6 0

CLW 300 132 -168BHEUJHS 125 25 -100Total 492 191 -301

10 Axle rough for WDG DLW 500 439 -614 & WDP-4 to EMS-

WRlDHD 36 36 0804 to Drg. No.5061/R Total 536 475 -61

11 Axle rough GM loco SCRITPTY 6 0 -6to EMDPt.No.40076350&DLW Pt. No. Total 6 0 -617230011

12 Axle driving rough NFRlNBQ 30 0 -30machined for WDG-3A Loco to Drg. No.

Total 30 0 -30TPL-5005 Alt. 'doorlatest

13 Axle rough CRIBSL 200 197 -3machined for TAO- ERlKPA 26 24 -2659 Hitachi type NRlGZB 120 111 -9wheelset to Drg. No. SCRIRYPS 120 133 13SKEL-4516

SERlKGP 30 18 -12WR/DHD 25 24 -1Total 521 507 -14

TOTAL AXLES (1) 2827 2114 -713TO 113}IN NOS.TOTAL AXLES IN 5371 4017 -1355EQUATED NOS.IX bv 1.9\=

14 BG EMU Motor CRlMTN 50 38 -12Coach Axles to Drg. NR/GZB 20 0 -20No.DC/EMU-M-0-1- SER/KGP 15 15 0005 Total 85 53 -32

15 EMU Motor Coach ICF 150 159 9Axles to Drg. SR/CW/PER 40 0 -40No.AC/DC-EMUlB- JESSOP/KPA 12 13 102-002 Alt. A/2 item1 (WAP's Drg. No. BHEUCB 12 0 -12WAP-A-087) BESCO/KPA 8 8 0

Total 222 180 -42

16 Axle for RCF 50 37 -13MEMUlDMC to Drg. SCR/LGD 10 10 0No. EMU/M-0-1-025 Total 60 47 -13Alt ..TOTAL EMU 367 280 -87AXLES IN NOS.

TOTAL EMU 440 336 -104.4AXLES INEQUATED NOS.(X by 1.2)=

17 EMU Axles for JESSOP/KPA 24 32 8Trailor Coaches to BHEUCB 24 24 0Drg. No. BESCO/KPA 16 16 0AC/DC/EMUl02/204- ICF 300 231 -69001 00/RWF-A-157 SCRlLGD 14 14 0

Total 378 317 -61

18 BG MEMU TC Axles RCF 250 227 -23to Drg. No. WTAC3- Total 250 227 -230-2-303 AIt.F

19 Axle for YDM-4 Loco NERlIZN 15 15 0to Drg. No. DIWL- NFRlNBQ 70 70 04984 Total 85 85 0

20 Axles for BOX'N' to NFR/NBQ 0 40 40Drg. No.wIWL- SECR/RWSS 0 30 304901/R (WD-89025/SL-2) Total 0 70 70

21 MG ICF Axles sto NWRlBKN 98 98 0Drg. No. MGIT-0-2-

Total 98 98 0023 Alt. Nil or latest

22 MG ICF Axles to NER/IZN 60 134 74Drg. No. MGIT-02-

NFRlNBQ 14 14 0017 Alt. Nil or latestWRlBVP 30 87 57

Total 104 235 131

23 Axles for LHB RCF/KXH 1720 1675 -45coaches to Drg. ERlLLH 60 60 0NO.LW 021049

Eco.R/MCS 30 32 2

NRIJUDW 70 90 20

WR/PL 50 42 -8

Total 1930 1899 -31

24 BG Coaching Axles CR/MTN 0 55 55to Drg. No.WTAC-3- ERlllH 150 141 -902-303 Eco. RlMCS 0 54 54

NRlAMVlASR 300 333 33NER/GKP 150 170 20NFRlDBRT 50 30 -20NWRlAIl/JU 150 221 71SRlCW/PER/GOC/l 400 183 -217WIPERSCR/lGDITPTY 200 221 21SER/KGP 100 102 2SECRlRWSS 18 0 -18SWR/UBUAP 300 300 0SWRlUBl(For BVZI) 100 99 -1WRlBVP 50 55 5WR/CWM/Pl 400 371 -29WCR/BPl 150 185 35ICF 1000 1012 12RCF 400 400 0Total 3918 3932 14

TOTAL AXLES 6763 6863 100S.NOS.17 to 26 ININOS.

GRAND TOTAL 9967 9257 -700AXLES IN NOS.=

GRAND TOTAL 12676 11216 -1369.1AXLES INEQUATED UNITS =WHEELSETS

1 16T BG BEMl 300 288 -12CHG.wheelsets Total 300 288 -12

2 BOX 'N' Wheelsets Wagon Builders 12500 15315 2815ECRlMGS 175 36 -139NFR/NBQ 275 98 -177Total 12960 16449 2499

3 Wheelsets for Cast ERlJMP 1021 1244 223Steel Bogie of BlC NR/JUDW 100 128 28Wagon to Drg. No. NCR/JHS 100 0 -100CONTR-94Q4-S/12 SR/GOC 1000 476 -524AIt.3 SCR/RYPS 24 0 -24

WRlDHD 70 0 -70WCR/KTT 110 0 -110Total 2426 1848 -577

TOTAL 16676 17686 1910WHEELSETS

~--

ANNEXURE-IIAllocation sheet for supply of WTA items for the IInd quarter i.e.July - September, 2012 on

RWF/Bangalore.

S.NOS DRAWING & RLYS.lPUs QTY. PLANNED Consignee RemarksDESCRIPTION (JUL Y -

SEPTEMBER,2012

WHEELS1 Wheel disc. BOX 'N' Type ER 1200 900-JMP

to Drg. No. WfWL-4764/R 200-LLH(WAP/SKlM-155) 100-HLR

NR 700 JUDWNCR 1200 JHSNFR 400 NBQNWR 150 AllSR 600 CW/PERSCR 1000 GTPLSER 600 KGPSECR 700 RSWR 200 UBLWR 300 DHDWCR 700 KTT

Total 77502 BG Chg. Wheels to Drg. CR 700 MTN

NO.WfWL-1660/R ER 1000 LLHEco.R 500 MCSNR 1000 500-JUDW

500-AMV400 ASR RSP

NER 600 GKPNFR 400 NBQNWR 700 400-J U

300-AIISR 1300 800-CW/PER

300-GOC200-LW/PER

SCR 1200 600-LGD600- TPTY

SER 1000 KGPSWR 600 400-UBL

200-AP400 UBL For BVZI

WR 400 350-PL50-BVP

600 CWM/PL For BEML wheelsets

WCR 500 BPLICF 1000RCF 2700Total 15000

3 840 dia wheel for ER 60 LLHCONCOR for BLC wagon NR 500 JUDW

NCR 250 JHSSCR 48 GTPLWR 50 BVPTotal 908

4 BG Loco Wheels /DSL CR 150 PRMono Block Rough ER 200 100-JMPmachined for WDM2, 1OO-KP AWDM3 and WAG 5 to SR 100 GOCDrg. No. DIWL-4948/RtoDrg. No. SER 250 KGP

CLW 200

DMW 200

Total 1100

5 MG Chg. Wheels to NER 150 IZNRDSO's Drg. NO.CG-K NFR 100 NBQ6099 Alt. latest (WAP-W-

NWR 50 BKN031)SR 100 GOC

WR 50 BVP

Total 450

6 EMU/DEMU Wheels to CR 300 MTNDrg. No. K-4004 ER 300 KPA

NR 200 100-GZB100-CB

SR 700 CW/PER

SER 200 KGP

WR 500 PL

ICF 800

Total 3000

TOTAL WHEELS 28208AXLES

1 BG DSL Loco axle to Drg. ER 29 KPANo.WIWL-4973/R Total 29

2 Axle for WDG-2 A (Axle CR 78 PRRT (with light wt. 5002 NR 40 CBFZ) to Drg. No. TPL-5868 NER 16 GKPAlt. 'b' part No. 11231622 SCR 10 TPTY

DLW 145DMW 178Total 467

3 Axle rough turned for CLW 32WAP-4 Loco to Drg. Total 32NO.03/2/11/55

4 Axle driving rough turned DMW 56for WDM-3A Locos to Total 56Drg. No. DIWL-5058/RAlt. NIL

5 Axle rough machined for CR 42 22-BSLWDG-2 & WAG-7 to Drg. 20-PRNO.06/2/11/2 ER 22 KPA

NR 20 CB

WR 9 DHD

CLW 386

BHEL 150

Total 629

6 Axle assembly for WDP-4 NWR 4 Allwithout TM EMD pt. Total 4No.40088126 DLWNo.17230184

7 Axle rugh for WDS-6 to DLW 171Drg. No. TPL-2585 Total 171

8 Axles for WAG-9 & WAP- CLW 1487 (Rough machined) to CR 115 BSLCLW's Drg. No. 1209-01- ER 18 KPA011-002 Alt. Total 281

9 Axle rough GM Loco to CR 6 PREMD pt. No. 40077315

NR 6 CB(Geared) & DLW Part No.17230019 SCR 6 TPTY

SWR 30 UBL

Total 48

10 Axle (3 phase) for WAP-5 CR 12 BSLLoco to CLW Drg.NO.1210-01-311-025 CLW 38

Total 50

11 Axle for WDG-5 locos to DlW 37DlW's part No.

Total 3717230330

12 Axle rough machined for CR 58 BSlTAO-659 Hitachi type NR 85 GZBwheelset to Drg. No. SER 60 KGPSKEl-4516 WR 35 DHD

Total 238

TOTAL AXLES (1) TO 2042(12) IN NOS.TOTAL AXLES IN 3880EQUATED NOS.IX bv 1.9)=

13 BG EMU MTR Coach CR 50 MTNAxles to Drg. No. NR 45 GZBDC/EMU-M-0-1-005 Total 95

14 Axle for AC Motor Coach ER 28 HlRto Drg. NO.EMUlMC-1- Total 28025

15 EMU Axles for Motor ICF 300Coaches to Drg. No. NR 16 GZBAC/DC/EMU/B-02-002 SR 12 lW/PERAlt. A/2 item 1 (WAP-A- JESSOP 24 KPA087) Titagarh 24 KPA

BEMl 24Total 400

16 Axle for MEMU/DMC to RCF 60Drg. No.EMU/M-0-1-025

Total 60Alt. a

17 Axle rough turned for ICF 106Motor Coach to Drg. Total 106NO.MRB/DMC-0-2-004COl 1 Alt. Nil

TOTAL EMU AXLES IN 689NOS.TOTAL EMU AXLES IN 827EQUATED NOS. (X by1.2)=

18 BG EMU Axle to Drg. No. SR 70 CW/PERWlWl-4784/R

Total 70

19 EMU Axles for Trailor JESSOP 48 KPACoaches to Drg. No. Titagarh 48 KPAAC/DC/EMU/02/204-00 100/RWF-A-157 BEML 16 CB

ICF 300

SR 20 CW/PER

Total 432

20 Azxle rough turned for ICF 35Trailor Coach for Kolkatta Metro Rly. 25 KolkattaMetro to Drg. No. MRB-O-1-002 alt. 4/b Total 60

21 BG MEMU TC Axles to RCF 250Drg. No. WTAC3-0-2-303 NR 16 CBAIt.F SCR 4 GTPL

Total 270

22 Axel for BOX'N'/BCN SWR 48 UBLwagon to Drg. No.WD- WR 100 DHD92039/S-1 item-1, AIt.2 WCR 500 KTT

Total 648

23 BOX 'N' Axles to Drg. No. CR 45 PRW/WL-4901/R (WD- ER 200 100-JMP89025/SL-2) 50-HLR

50-LLHNR 310 JUDW

NCR 50 JHS

NFR 100 NBQ

NWR 45 AllSR 125 CW/PERSCR 24 GTPLSECR 120 RSWR 18 UBLWCR 50 KTTTotal 1087

24 20Tpowered axles for SCR 26 LGDDHMU/DPC as per ICF Total 26Drg. No.DHMU/DPC/0-2-001 item KPC 733-804-01-50 alt.(A)

25 Axles for LHB Coaches to RCF 450 KXHDrg. No.LW 021049 ER 110 LLH

WR 80 PLTotal 640

26 16 T BG Coaching Axles CR 150 100-MTNto Drg. No. CG-K 6015 50-PR

ER 350 LLH

NR 200 100-JUDW100-AMV

150 ASR RSP

NER 150 GKP

NFR 100 NBQ

NWR 100 All

SR 350 100-LW/PER150-GOC

100-CW/PERSCR 150 LGD

SER 100 KGP

SECR 100 RYPS

SWR 150 75-AP 75UBL

250 UBL For BVZI

WR 100 PL

300 CWM/PL For BEMLWheelsets

WCR 100 BPL

ICF 1000

RCF 700

Total 4500

TOTAL AXLES S.NOS. 773318 to 26 IN NOS.GRAND TOTAL AXLES 10464IN NOS.=GRAND TOTAL AXLES 12440IN EQUATEDUNITS=

I WHEELSETSI 1 16T BG Coaching W/sets BEML 400 Will be sent to HubliI for machining.

GOVERNMENT OF INDIAMINISTRY OF RAIL WAYS

RAILWAY BOARDNo. 2012/RSF/649/2/RP-II/DSP

1. Mis Steel Authority of India Ltd.,Central Marketing Organisation, S&RM Division,Ispat Bhawan, 40-Jawahar Lal Nehru Marg,Kolkata - 700 071.

2 The Controller of Stores,All India Railways & P/Units.

New Delhi, dt 03 .08.12

Sub:- Minutes of the Quarterly WTA Meeting for the planning of WTA items for theperiod II/2012-13 (July - September, 2012).

Minutes of quarterly WTA meeting for the period II/2012-13 (July - September, 2012) held withthe representatives of DSP in Rail Bhawan, New Delhi on 10.07.12 has been uploaded on IndianRailway's website www.indianrailways.gov.in. To access the Minutes kindly click on "Ministry ofRailways. Then click on "Railway Board". Then click on "About Indian Railways" Tab. Then clickon " Railway Board Directorates". Then click on "Stores". Then click on "Conferences I Meetings"to open the page containing the minutes of the meeting.

Please ensure that the statement of requirements of WTA items for the Quarter III/20 12-13(October - December, 2012) should reach this office latest by 15.09.12 positively. The exact date andvenue of the meeting would be advised later on.

Encl.:- As above.WT A 'Id cHI~ tocJi em em~Cl.\(1 -ti ('t cIG1 ~. ~

( Sanjeev Misra)Director, Railway Stores (F)

Railway Board.

Copy to:1. The Chief Mechanical Engineers, All Indian Railways/Production Units.2. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi.3. GM (BBM & WAP), Mis SAIL/DSP, Durgapur-713203.4. The DGM lIC, WAP, Mis SAIL/DSP, Durgapur-713203.5. The Chief Marketing Manager, Mis SAIL/DSP, SCOPE MINAR (1ih floor), North Block, Laxmi

Nagar District Centre, Delhi - 110092.6. Shri Vinay Kumar, Dy.GM, Mis SAIL/DSP, SCOPE MINAR (20th floor), North Block, Laxmi

Nagar District Centre, Delhi - 110 092.7. GM(I), Mis RITES (ER), Quality Assurance Division, Central Station Building (Metro), 56, CR

Avenue, 3rdFloor, Kolkata -700012.8. S.I.E(M) Incharge, Inspection Wing, Mis RITES clo DSP, Durgapur-713203.9. Mis Jessop & Co. Ltd., 21 & 22, Jessore Road, Kolkata -700028.10. Mis Titagarh Wagons Ltd., 113, Park Street, Kolkata-700 016.11. Mis Bharat Heavy Electrical Ltd., (Transportation Business Deptt.), Integrated Office Complex,

Lodhi Road, New Delhi-l10 00312. Mis BESCO Ltd., Wagon Division, Baruipur Works, Railway Station, Baruipur, Eastern Railway,

West Bengal.13. Adv./RS, AM/ME, AM/PU, Adv(L)RS, Adv.RS(P), EDRS (C), EDME(W), EDEE(RS),

DME(PU), DME(P)-I, DRS(W), DRS(M) & RS(WTA) Branch.

1000 BOX "N" wheels allotted in 1st quarter could not be supplied bRWP/BELA.. YD' ndUf1~g 2 quarter CAOIWPO indicated that 4000 BOX "N"

Wh 1.11 bsupplIed. ee s WI e

The Wheelset pressing capacity £ BOXNRWF/Bangalore. Thus it would be dif~~ult t . w~eelsets is available atwheels from RWP/Bela when production of ~ mamtam supply of only BOXN35000/per annum in 2013-14. Th RWP OXN wheels reaches more than

producing BG Coaching Wheels.us /Bela must explore possibility 01

CAO/WPO d .requeste zonal RaIlways to maintain supply ofHMS to RWP/BELA.

DSP/SAIL

.

.

.

DSP MINUTE~-

/WPOlPatna CME & COSI\t~tPresent : AMlPU, ADV.(RS), ADV.RS(P), ~AO te & M;cbanica\ Directorate,

Banglore, EDs & Directors of 8'tRor~: Dtre~t<;:oduction units, SAG Officers of

COS/CMMlJAG Officers of Zona al ways P d f Units GM/WAP,Mechanical Department of Zonal Railways & ro uc Ion ,SAILIDSP.

RWF/Bangalore

Supply performance of RWF IBangalore was commendable for 1st Quarter of 20 12-

13. RWF supplied 53000 wheels & 26000 axles in 1st Quarter.It was decided that RWF will produce 1000 loco wheels in 2nd Quarter andconcentrate on supply of loose wheels & axles in this quarter, RWF will be allotted15000 BG chg. Wheels, 7000 BOXN wheels & 3000 EMU wheels in this quarter.With the availability of forgings & forged axles from MSF and VISL, it has beenpossible for RWF to increase production of axles. CME/RWF requested foradditional allocation of BOX 'N' axles.Maintenance shutdown of Axle & Wheelshops are to be taken in 3rdquarter.EDME/Frt. Requested for the allotment of wheels needed or BLC Wagons (840mm dia) to Northern Railway.Availability of HMS in RWF is to be monitored and ensured.

.

.

.

.

.

.

RWPIBELA

.

.

.

DS~ supplied only 10776 nos. wheels & 1143 .sttheIr annual commitment of68000 wheels & 12~~~ a~les durmg 1 quarter against

GM/DSP/SAIL assured that in 2nd . ax es.and atleast 12000 wheels will be su

PqpUIl~ed

e: thth

~Ir supply performance will improvem IS quarter.

S.No. Item Supply Position1. WDG-4 loco wheels . 717 nos. received (DLW-400, SWR-

317).. 561 nos. dispatched on 10.07.12. 685 nos. are yet to come

2. WDP-4 loco wheels . 2456 nos. received (DLW-1821,NWR-65, SWR-470, WR-200, NFR-200)

. 572 nos. dispatched on 10.07.12

. 868 nos. are yet to come3. WAG-9 loco wheels . 839 nos. received (CLW-363,

NR-156, SCR-120, CR-200). 351 nos. dispatch on 10.07.12. 357 nos. are yet to come

S.No. Item Supply Position1. WAP-5 loco wheels 221 nos. already reached at Kolkatta Port

(CLW-161, NR-60)

-2-

BG Coaching Wheels

. Critical review of the requirement of BG coaching wheels is required to be undertaken by Railways as requirement projected by Railways is 70 to 80% higher incomparison to consumption during previous years.

· CWM/Matunga requested for additional allotment of BG Coaching wheels. It wasadvised to them that requirement should be supported with indents and supply willbe made as per quantity indented.

Imported WT A Items

. Supply of loco wheels against contract on Mis Bonatrans is as follows:

. Supply ofW AP-5 loco wheels against contract on Mis KLW is as follow:

. Tender for 12054 nos. LHB coaching wheels has been decided, LOA has beenissued.

. Contract for 2997 nos. WDG-4 & 2523 nos. WAG-9 loco wheels has been issued.

. For 172 nos. WAP-5 loco wheels LOA has been issued, contract is under issue.

. Tender for 10000 nos. EMU wheels has opened on 07.06.12.

. Tender for 10000 nos. 's' profile Loco Wheels (conventional type) has opened on20.07.12.

. Tender for 10000 nos. BG Coaching Wheels is due to open on 7th September,2012.

S.Nos. Item Quantity Actual Variation TotalPlanned Supplies (+) excess Supplies(April - (April - (-)shortfall from April,

June, 2012) June, 2012) - June,2012

A ASSEMBLEDWHEEL SETS

(i) 16TBO Coaching 300 39 -261 39Wheelsets

B LOOSEWHEELS

(i) BO Chg. Wheels 4950 2676 -2274 2676W/WL-1660/R

(ii) BO Loco Wheels 6120 3919 -2201 3919W/WL-4948/R

(iii) BO Loco Wheels 4030 1914 -2116 1914"S" Shaped

(iv) MO Loco Wheels 390 365 -25 365W/WL-4955/R

(v) EMU/DEMU 3354 1824 -1530 1824Wheels to Drg.No.K-4004TOTAL 18844 10698 -8146 10698WHEELS

-3-

. Tender for 4000 nos. MG Coaching wheels is due to open on 30th August, 2012.

. Tender for 909 nos. Kolkatta Metro wheels has opened on 22.06.12.

. DME/PU requested for early finalization of tenders for EMU and "S" shapedwheels and early issue of BG Coaching & MG Coaching Wheels tenders.

Submission of Indents

. All the Railways and Production Units were advised to ensure to submit theirindents for the WTA items for contract Period 2014-15 by 31.07.12. In caserequirement is nil, same may also be confirmed in writing. Instructions forsubmission of indents, position of Buffer stock etc. were detailed in Board'sminutes of the WTA meeting held on 13.04.12 circulated vide Board's letter ofeven no. dated 03.05.12.

Other issues

. ICF & RCF were requested to use Cast EMU wheels for trailor coaches.

The position regarding supplies made by Mis SAIL/DSP during the previousquarter i.e. April - June, 2012 was discussed. The same is tabulated as under:-

SUPPLIES DURING APRIL -JUNE. 2012

C LOOSE AXLES(i) 16T BG Coaching 2070 1104 -966 1104

Axles CG-K-6015(ii) Axles forgings 0 0 0 0

(heat treated andtempered butwithout machining)TOTAL AXLES 2070 1104 -966 1104

-4-

The detailed supply position (Railway wise/Consignee wise) IS gIVen III theenclosed Annexure-I.

The item-wise planning for July - September, 2012 is shown in Annexure - II.

I ANNEXURE -IPosition regarding quantities planned vis a - vis actual supplies made by MIs SAILIDSP during the 1stQuarter (April - June, 2012).S.NOS. DRAWING & RLY./CONSIGNEE QTY.PLANNED QTY. SUPPLIED VARIATION

DESCRIPTION (APRIL -JUNE, (APRIL -JUNE, (+) EXCESS12) 12) (-) SHORTFALL

AXLES1 BG Chg. Axles to CR/MTN 50 40 -10

Drg. No. WTAC-3- ER/LLH 100 100 002-303 ECR/MGS 45 0 -45

Eco.R/MCS 75 54 -21NR/AMV/JUDW 200 100 -100NER/GKP 100 0 -100NFR/NBQ 50 0 -50SR/CW/PER 250 0 -250ICF 800 483 -317RCF 400 327 -73TOTAL 2070 1104 -966

TOTAL AXLES 2070 1104 -966WHEELS

1 BG Chg. Wheels CR/MTN/PR 400 41 -359to Drg. NO.WIWL- ER/LLH/HLR 400 389 -111660/R ECR/MGS 150 0 -150

Eco.R/MCS 100 82 -18NR/JUDW/AMV 400 90 -310NERlGKP 500 491 -9NFR/DBRT 200 141 -59NWR/JU . 200 80 -120SR/CW/PER 500 411 -89SCRITPTY 200 150 -50SER/KGP 200 200 0SWR/AP 100 0 -100SWR/UBL 100 0 -100WR/PL 100 96 -4WCR/BPL 200 132 -68ICF 700 303 -397RCF 500 70 -430TOTAL 4950 2676 -2274

2 BG Loco Wheels CR/BSUPR 800 577 -223IDSL Mono Block ER/KPAlJMP 600 264 -336Rough machined NRlCB/ASR 450 297 -153WDM2, WDM3 NCR/CNB 100 66 -34and WAG5 to Drg. NER/GKP 50 0 -50No. DIWL-4948/R NWR/AII 150 150 0

SR/GOC/L WIPER 600 404 -196SCRITPTY 200 200 0

SER/KGP 700 400 -300

SECR/RWSS 120 0 -120SWR/AP 100 0 -100WRlDHD 600 390 -210

CLW 600 297 -303DMW 800 688 -112BHEUJHS 250 186 -64TOTAL 6120 3919 -2201

3 BG Loco Wheels CR/PR 400 30 -370"S" Shaped to Drg. ER/JMP 200 98 -102No. D/WL-5060/R NR/CB 200 137 -63

NER/GKP 50 0 -50SR/GOC 200 67 -133SER/KGP 200 188 -12CLW 200 142 -58DLW 300 0 -300DMW 500 153 -347TOTAL 2250 815 -1435

4 BG Loco Wheels NFR/NBQ 100 0 -100"S" Shaped to NWR/AII 100 93 -7DLW's Drg. No. SCRITPTY 80 80 017230251 "C" SWR/UBUAP 500 158 -342

WR/DHD 100 58 -42DLW 900 710 -190TOTAL 1780 1099 -681

5 MG Loco Wheels NER/IZN 50 50 0to Drg. NO.W/WL- NFR/NBQ 100 95 -54955/R NWR/AII 50 50 0

SR/GOC 90 84 -6WRISBI 100 86 -14TOTAL 390 365 -25

6 EMU/DEMU CR/MTN 230 114 -116Wheels to Drg. ER/HLR 500 446 -54NO.K-4004 NR/GZB/CB 150 89 -61

NWR/AII 54 38 -16SR/CW/PER 400 261 -139SCRITPTY 100 87 -13SER/KGP 100 100 0WR/PL 400 261 -139ICF 800 124 -676RCF 500 304 -196JESSOP/KPA 72 0 -72BESCO/KPA 48 0 -48TOTAL 3354 1824 -1530

TOTAL WHEELS 18844 10698 -8146WHEELSETS

1 16T BG Coaching RCF 300 39 -261Wheelsets TOTAL 300 39 -261

I ANNEXURE-IIAllocation sheet for supply of WTA Items for the IInd quarter I.e. July - September, 2012 on MIsSAIUDSP.

S.NOS. DRAWING & RL YS./PUs QTY.PLANNED Consignee RemarksDESCRIPTION (JULY -

SEPTEMBER,2012\

AXLES1 BG Chg. Axles to Drg. No. CR 50 MTN

WTAC-3-02-303 75-HLRER 200 125-LLHEco.R 100 MCSNR 50 JUDW

150 ASRNER 100 GKPNFR 50 DBRTNWR 100 JUSR 200 CW/PERSCR 75 TPTYSECR 50 RWSSWR 60 BVPWCR 80 BPLICF 200RCF 200TOTAL 1665

WHEELS1 BG Chg. Wheels to Drg. CR 200 MTN

NO.WIWL-1660/R ER 400 250-LLH150-HLR

Eco.R 200 MCSNR 300 AMV

NFR 200 DBRTNWR 300 200-AII

100-JUSR 600 300-CW/PER

200-GOC100-LW/PER

SCR 400 200-TPTY200-LGD

SER 400 KGPSECR 60 RSWR 200 APWR 100 PLWCR 200 BPLICF 300RCF 600TOTAL 4460

2 MG Loco Wheels to Drg. NER 150 IZNNo.WIWL-4955/R SR 80 GOC

WR 150 SBITOTAL 380

3 BG Loco Wheels IDSL CR 600 100-PRMono Block Rough 500-BSLmachined WDM2, WDM3 ER 600 200-JMPand WAG5 to Drg. No. 400-KPA

WIWL-4948/R Eco.R 100 VSKPNR 400 300-CB

100-ASRNCR 150 CNBNWR 150 AllSR 600 200-GOC

400-LW/PERSCR 150 TPTYSER 700 150-TATA

550-KGPSECR 120 RWR 400 DHDCLW 400DMW 600BHEL 300TOTAL 5270

4 BG Loco Wheels "S" ER 200 100-KPAShaped to Drg. No. DIWL- 100-JMP5060/R SER 200 KGP

WR 200 DHDCLW 200DLW 240DMW 200TOTAL 1240

5 BG Loco Wheels "S" NR 84 CBShaped to Drg. No. SWR 200 UBL17230251 "c" DLW 400

TOTAL 6846 EMUIDEMU Wheels to CR 150 MTN

Drg. No. K-4004 ER 150 HLR

NR 100 GZB

NWR 50 All

SR 400 CW/PER

SCR 135 LGD

SER 100 KGP

WR 300 PL

ICF 400

RCF 360

JESSOP 72 KPA

TOTAL 2217TOTAL WHEELS 14251WHEELSETS

1 Complete Wheelsets RCF 300(Forced) TOTAL 300

--.-------

GOVERNMENT OF INDIAMINISTRY OF RAILWAYS

RAILWAY BOARD

No.2012/RSF/649/2/RP-II/BELA New Delhi, dt. 03.08.12

The CAO/WP,Ministry of Railways,CHAMBER BHAWAN,1st Floor, J.C. Road,Patna-800 001

Sub:- Minutes of the Quarterly WTA Meeting for the planning of items forthe period II/2012-13 (July - September, 2012).

Minutes of quarterly WTA meeting for the period II/2012-13 (July - September,2012) held with the representatives of RWF and Zonal Railways/PUs in Rail Bhawan,New Delhi on 10.07.12 has been uploaded on Indian Railway's websitewww.indianrailways.gov.in. To access the Minutes kindly click on "Ministry ofRailways. Then click on "Railway Board". Then click on "About Indian Railways"Tab. Then click on " Railway Board Directorates". Then click on "Stores". Thenclick on "Conferences / Meetings" to open the page containing the minutes of themeeting.

Please ensure that the statement of requirements of WTA items for the QuarterIII/2012-13 (October - December, 12) should reach this office latest by 15.09.12positively. The exact date and venue of the meeting would be advised later on.

Encl.:- As above.WTA ~cHJ~ ~ em ~ tt('tdGi ~.

(S 'eev Misra)Director, Railway Stores (F)

Railway Board.1. The Chief Mechanical Engineers, ER, NCR, NFR, SCR & WCR.2. The Controller of Stores, ER, NCR, NFR, SCR & WCR.3. The Comptroller & Auditor General ofIndia, Room No.222, Rail Bhawan, New

Delhi.4. AM(ME), Adv.(RS), Adv(L)/RS, EDRS(C), Adv.RS(P), EDME(Chg.),

EDME(W), EDME (Tr.), EDEE(RS), DME(PU), DME(P)-l, DEE/G, DRS(W),DRS(M), DF(S)-l and RS(WTA) Branches of Railway Board.

RWPIBELA

Present : AM/PU, ADV.(RS), ADV.RS(P), CAO/WPO/Patna, CME &COSIRWF, Bangalore, EDs & Directors of Stores Directorate & MechanicalDirectorate, COS/CMM/JAG Officers of Zonal Railways & Production units,SAG Officers of Mechanical Department of Zonal Railways & ProductionUnits, GM/WAP, SAILIDSP.

RWFIBangalore

. Supply performance of RWF/Bangalore was commendable for 1st Quarter of2012-13. RWF supplied 53000 wheels & 26000axles in 1st Quarter.

. It was decided that RWF will produce 1000 loco wheels in 2ndQuarter andconcentrate on supply of loose wheels & axles in this quarter, RWF will beallotted 15000 BG chg. Wheels, 7000 BOXN wheels & 3000 EMU wheels inthis quarter. .

. With the availability of forgings & forged axles from MSF and VISL, it hasbeen possible for RWF to increase production of axles. CME/R WF requestedfor additional allocation of BOX 'N' axles.

. Maintenance shutdown of Axle & Wheelshops are to be taken in 3rdquarter.

. EDME/Frt. Requested for the allotment of wheels needed or BLC Wagons(840 mm dia) to Northern Railway.

. Availability of HMS in RWF is to be monitored and ensured.

RWPIBELA

. 1000 BOX "N" wheels allotted in 1st quarter could not be supplied byRWP/BELA..

. During 2nd quarter CAO/WPO indicated that 4000 BOX "N" Wheels will besupplied.

. The Wheelset pressing capacity for BOXN wheel sets is available atRWF/Bangalore. Thus it would be difficult to maintain supply of only BOXNwheels from RWP/Bela when production ofBOXN wheels reaches more than35000/per annum in 2013-14. Thus RWP/Bela must explore possibility ofproducing BG Coaching Wheels.

. CAO/WPO requested zonal Railways to maintain supply of HMS toRWP/BELA.

DSP/SAIL

. DSP supplied only 10776 nos. wheels & 1143 nos. axles during 1stquarteragainst their annual commitment of 68000 wheels & 12000 axles.

. GM/DSP/SAIL assured that in 2nd quarter their supply performance willimprove and atleast 12000 wheels will be supplied in this quarter.