Rail Freight Traffic in Euro-Asian Links

download Rail Freight Traffic in Euro-Asian Links

If you can't read please download the document

description

Rail Freight Traffic in Euro-Asian Links UNECE Group of Experts on Unified Railway Law St Petersburg, july 8 th 2010 Freight Department of TCDD. 1. 1. Rail Freight Traffic in Euro-Asian Links. GERMANY. KAZAKHSTAN. RUSSIAN FEDERATION. AUSTRIA. HUNGARY. ROMANIA. SLOVENIA. TURKHMENISTAN. - PowerPoint PPT Presentation

Transcript of Rail Freight Traffic in Euro-Asian Links

PowerPoint Presentation

11

Rail Freight Traffic in Euro-Asian Links

UNECE Group of Experts on Unified Railway LawSt Petersburg, july 8 th 2010

Freight Department of TCDD 11133 block freight trains (4 of which are intermodal trains) are operated per day. Turkey, Europe,Asia and Middle East railway corridors are important. Basra and North Africa corridors should also be developed..

Rail Freight Traffic in Euro-Asian Links

HUNGARYAUSTRIABULGARIAGERMANYSLOVENIAROMANIAIRANIRAQSYRIA, JORDANTURKHMENISTANKAZAKHSTANPAKISTANTURKEYNORTH AFRICA (Relevant works are going on for activating )RUSSIAN FEDERATION22

Rail Freight Traffic in Euro-Asian Links

For the intercontinental rail traffic, Turkey is the one of the most important countries as a bridge between Europe and Asia.

The volume of trade with CIS countries is remarkably increased.

But the share of railways is not increased in parallel with the other modes of transport.

33

COUNTRIES2003200420052006200720082009AZERBAIJAN744.810703.944966.9091.094.5201.101.7211.999.2141.040.803KAZAKHSTAN969.919872.992705.702964.8291.676.1252.506.9711.380.767TURKMENISTAN250.445293.828216.636282.289586.700677.820700.262UZBEKISTAN119.079160.862177.900184.940264.612280.730265.308TAJIKISTAN70.42262.17749.08679.544105.094120.491120.767KYRGYZSTAN33.81952.33645.52864.45283.62484.33463.841TOTAL2.188.4942.146.1392.161.7612.670.5743.817.8765.669.5603.571.748

Rail Freight Traffic in Euro-Asian Links

RANTURKMENISTANKAZAKHISTAN

Rail Freight Traffic in Euro-Asian LinksTURKEYPAKSTAN15.217.15514.202.42910.988.28510.302.8329.025.4699.882.168Foreign Trade378.682374.985335.419271.101358.556230.610Railways2008200720062005200420038.360.667291.8142009(TON)Freight wagons loaded on the railway ferries, are carried to the destination point by changing their bogies in Samsun after crossing the Black Sea. Ferry pier in Samsun has been completed and the construction works for bogie changing station are going on. We give great importance to the project which constitutes a new intermodal transport line between Turkey-Russia, Russia-Middle East and vv. and plan to activate it at the end of this year.

KavkazWhat is provided by this project?

VarnaPotiMersin3-NTERMODAL TAIMACILIKTA YEN KORDORLAR VE PROJELER3- NEW CORRIDORS and PROJECTS in INTERMODAL TRANSPORT39

Rail Freight Traffic in Euro-Asian Links

Taking into account the current load on trade flow between Turkey and Russia, the works to establish an efficient rail transport service by train-ferry line between Samsun Port-Kavkas Port was initiated in 2005.The Ministers of Transport of the two countries signed the Agreement between the Government of Russian Federation and the Government of Turkish Republic on the organisation of the mixed transport through Kavkas Port and Samsun Port on May 2010.A separate intergovernmental accord has been drafted at the experts groups meetings to define the rules to apply in several respects of this transport like using of wagons, liability, claims of handling procedures, consignment notes and the other technical issues. It will be submitted to competent authorities.Both Agreements will enter into force after the approval of National Parliement.Legal structure is based on COTIF and the SMGSThe freight transport will be launched shortly.It is expected to carry 250.000 tons per year.3-NTERMODAL TAIMACILIKTA YEN KORDORLAR VE PROJELER3- NEW CORRIDORS and PROJECTS in INTERMODAL TRANSPORT39

Rail Freight Traffic in Euro-Asian Links

TURKEYDerincelievskiRail-Ferry Lines

Ilievsky-Derince Ferry LineImportExportTotalWagonTonWagon TonWagon Ton200421914.2111.28675.2281.50589.43920058488.98683458.0941.68267.08020061.44152.6161.40884.2142.849136.83020071.72861.1801.702109.8363.430171.01620081.40848.8951.429108.9832.837157.878200999730.11197771.5541.974101.665We transport 150.000 tons per year

Rail Freight Traffic in Euro-Asian Links

8 RAIL-FERY LINE BETWEEN THE PORTS OF DERNCE AND ILICHEVSKOn June 2005, the Agreement For Cooperation in the field of rail transport was signed between the Ministers of the two countries. An intergovernmental convention on carrying of goods by ferry line between the ports of both countries have been prepared to be submitted for signing of the authorities of the Parties.This convention contains the provisions concerning using of wagons, liability, claims handling procedures, consignment notes and the other technical issues. It will be submitted to competent authorities.It will enter into force after the approval of National Parliament.Legal structure is based on COTIF and SMGS3-NTERMODAL TAIMACILIKTA YEN KORDORLAR VE PROJELER3- NEW CORRIDORS and PROJECTS in INTERMODAL TRANSPORT39

Rail Freight Traffic in Euro-Asian Links

VIKING TRAIN PROJECTA container train which is running regularly from Klaipeda Port (Lithuania) to lichevsk Port (Ukraine).Project aims ;to provide its connection with the ferry operated between lichesk and Derince Portto expand the carriage of goods to the Mediterranean Sea, Middle East and Central Asia. This project is being considered within the framework of intergovernmental convention on carrying of goods by ferry line between the ports of Turkey and of Ukraine. 3-NTERMODAL TAIMACILIKTA YEN KORDORLAR VE PROJELER3- NEW CORRIDORS and PROJECTS in INTERMODAL TRANSPORT39

Rail Freight Traffic in Euro-Asian Links

stanbul/HaydarpaaTahranSarakhsTashkentAlmatyLength of the Route: 6008 kmType of Goods: ContainerTotal Containers: 2.200www.ubak.gov.tr

Rail Freight Traffic in Euro-Asian LinksCONTAINER TRAIN between HAYDARPAA and ALMATYTo activate the south Trans-Asian line, the first train was launched on 20 January 2002 in the route stanbul/H.Paa-Teheran-Askabat-Uzbekistan-Almata under the umbrella of ECO (Economical Cooperation Organisation)The provisions of the CIM are valid to the Sarakhs border of Iran and SMGS provisions beyond Sarakhs Train parameters: Distance: 6208 km Transit time: 15 days3-NTERMODAL TAIMACILIKTA YEN KORDORLAR VE PROJELER3- NEW CORRIDORS and PROJECTS in INTERMODAL TRANSPORT39

Rail Freight Traffic in Euro-Asian Linkswww.ubak.gov.tr

Rail Freight Traffic in Euro-Asian Links

TURKEYIRANPAKISTANHaydarpaaTehranIslamabadKermanZahedanJourneyTurkey: 2006 KmIran : 2570 KmPakistan: 1990 KmTotal: 6566 KmTime: 13 days

HAYDARPAA-TEHRAN-ISLAMABAD CONTAINER TRAN During the meeting held on 15-17 april 2008 in Antalya, the Ministers of Transport of ECO countries have agreed on the introduction of a test train between Turkey and Pakistan.The First train was launched on 14 August 2009 from Islamabad to stanbul (H.Paa). Transit time was 14 days.The provisions of the CIM are valid to Zahedan, the border point of Iran and beyond Iran the internal regulations of Pakistan railwaysPakistan Railways is neither a member of COTIF nor of SMGSPakistan rail gauge: 1676 mm.

3-NTERMODAL TAIMACILIKTA YEN KORDORLAR VE PROJELER3- NEW CORRIDORS and PROJECTS in INTERMODAL TRANSPORT39

Rail Freight Traffic in Euro-Asian Links OTHER PROJECTS THAT WILL CONTRIBUTE TO RAIL FREIGHT TRAFFIC BETWEEN EUROPE AND ASIA

Marmaray Tunnel Project in Istanbul StraitNew line between Tekirda and MuratlKars-Tblisi-Baku Railway Line

3-NTERMODAL TAIMACILIKTA YEN KORDORLAR VE PROJELER3- NEW CORRIDORS and PROJECTS in INTERMODAL TRANSPORT39

Rail Freight Traffic in Euro-Asian Links

From Halkal to Gebze Total length of the commuter lines is approx. 77 km:The line on the European Side 19.6 kmThe line on the Asian Side 43.4 kmApproaching Tunnels 12.2 kmSink Tube Tunnel 1.4 kmThis project will provide the seamless connection of Europe and Asia21 freight trains will be operated per day in each direction

MARMARAY PROJECT

16Slayta grlen metin okunmayacaktr. Marmaray Projesi, Avrupa yakasndaki Halkaly, Anadolu yakasndaki Gebzeye kesintisiz, modern ve yksek kapasiteli bir banliy hatt sistemi ile balayarak stanbul banliy sistemini gelitirmektir. Bu proje ile her iki yakadaki demiryolu hatlar; stanbul Boaznn altndan geen bir demiryolu tneli ile birbirine balanacaktr. Hat, Yedikulede yeraltna girmekte, Yenikap ve Sirkeci yeralt istasyonlar ile devam etmekte, Boazn altndan geerek skdar yeralt istasyonuna balanmakta ve Stleme de yzeye kmaktadr. Sirkeci ve skdarda 2 ara istasyon yer alacak olup, 4 yeni yer alt istasyonu ( Yedikule, Yenikap, Sirkeci ve skdar ) yaplacaktr. yiletirilen ve yeni yaplan ksmlar ile bu rayl sistemin tamam yaklak 76 km. uzunluunda olacaktr.Bu proje ile 63km. uzunluundaki Gebze- Halkal arasndaki ift hat demiryolu 3 hatta karlacak tr. Ana yaplar ve sistemler, batrma tp tnel, delme tneller, a-kapa tneller, hemzemin hatlar, 4 yeni yeralt istasyonu, 37 hemzemin istasyon ( yenileme iyiletirme ), mevcut hatlarn iyiletirilmesi (hemzemin kesimde nc hat dahil olmak zere ), tamamen yeni elektro mekanik sistemler ile modern demiryolu tatlarnn alnmasn iermektedir. The Marmaray Project provides an upgrading of the commuter rail system in stanbul, connecting Halkali on the European side with Gebze on the Asian side with an uninterrupted modern high-capacity commuter rail system. The Project includes a railway tunnel connection under the Bosphorus. The tunnel goes underground at Yedikule, connects to the Yenikapi and Sirkeci new underground stations, passes under the Bosphorus and connects to the skdar new underground station, and emerges at Stleme. There will be two transfer stations at Sirkeci and skdar and 4 new underground stations ( Yedikule, Yenikap, Sirkeci ve skdar ) will be constructed.The entire upgraded and new railway system will be approximately 76 km long. Two track railway of 63 km between Gebze Halkal will be three tracks by means of this project. The main structures and systems include the immersed tube tunnel, bored tunnels, cut-and-cover tunnels, open cuts, four new underground stations, 37 surface stations (renovation and upgrading), upgrading of existing tracks (including a new third track on ground), completely new electrical and mechanical systems and procurement of modern railway vehicles. TCDDDEK GELMELER Blok Tren Tamaclnn Gelitirilmesi

Tekirda-Muratl LineIn Europe-Turkey and Turkey-Europe CorridorDistance is shortened app. 600km. Transport costs will be cheaperDerince

MuratlBandrmaTekirdaDerince31 km of railways have been constucted from Tekirda to Muratl.Ferryboat operation is planned between Tekirda-Derince-Bandrma By this investment;

Kars-Tbilisi-Baku Railway LineThe construction of Kars-Tblisi new railway line is one of our important projects on the East-West axis.

The Project includes construction of 76 kms in our territory and 29 kms in Georgia territory.

By this Project there will be an easy access to Middle Asia and China with a direct railway link through Turkey- Georgia and Azerbaijan.

It is envisaged to transport 6.5 million tons of cargo at the beginning by Kars-Tblisi-Baku railway line which will be an important railway corridor between Europe and Asia

Samsun-KavkazKurtalan- Iraq and Nusaybin- IraqKars-Tblisi-BakuKars-Nahivan-IranMarmarayVan Lake CrossingNorth Africa19Turkey will strengthen its location by the new investments Railway network position in the near future.

3-NTERMODAL TAIMACILIKTA YEN KORDORLAR VE PROJELER3- NEW CORRIDORS and PROJECTS in INTERMODAL TRANSPORT34

Rail Freiht Traffic between Asia and Europe and Intermodal TransportsTurkey will become a hub in her region

192020