Rail cum Road Bridge across the Ganga near Munger

39
RAIL CUM ROAD BRIDGE MUNGER WELCOMES YOU ALL M/S P&R INFRAPROJECTS LTD QUIET OFFICE NO 7, 1 ST AND 2 ND FLOOR CHANDIGARH, 160035

description

The Bridge Fabrication and Erection is executing by P & R. The presesntation contains only brief about bridge.

Transcript of Rail cum Road Bridge across the Ganga near Munger

Page 1: Rail cum Road Bridge across the Ganga near Munger

RAIL CUM ROAD BRIDGEMUNGER

WELCOMES YOU ALL

M/S P&R INFRAPROJECTS LTDQUIET OFFICE NO 7, 1ST AND 2ND FLOOR

CHANDIGARH, 160035

Page 2: Rail cum Road Bridge across the Ganga near Munger

INTRODUCTION TO PROJECTLOCATION MALHIPUR ,SHAHIBPUR KAMAL

DISTT.BEGUSARAI ,BIHAR INDIA

PROJECT SUPER STRUCTURE OF RAIL CUM ROAD BRIDGE PROJECT OVER RIVER

GANGA

PRINCEPLE EMPOLOYER EAST CENTRAL RAILWAY (ECR)

CONTRACTOR BRETHWET BURN JOSOPH (BBJ)

SUB-CONTRACTOR GAMMON INDIA LTD.

SUB-SUB CONTRACTOR P&R INFRA PROJECTS LTD.

TOTAL AWARDED SPANS 125 MTR LONG X 14 NOS .32 MTRS LONG X 1 NO.

TOTAL DIMENSION OF AWARDED BRIDGE

1782 MTRS LONG ,12.25 MTRS WIDE & 18.5MTR HIGHT

TOTAL QTY. OF STEEL INVOLVED

28000 MT(APROX)

WT.OF A SINGLE SPAN 1866 MT(APROX)

TOTAL NO.OF PANNELS IN A SPAN

16 NOS (116.625 MT EACH)

CONTRACTUAL VALUE OF PROJECT.

120 CR.(INR) FABRICATION & ERECTION.

Page 3: Rail cum Road Bridge across the Ganga near Munger

INTRODUCTION TO PROJECT SR NO.

TOTAL NO. OF PRINCIPLE MEMBERS IN 1 SPAN

QUANTITY

1 BOTTOM CHORD 32

2 BOTTOM CROSS GIRDER 17

3 BOTTOM LATERAL BRACING 16

4 BOX DIAGONAL 12

5 BRAKING BRACING 8

6 END RAKER 4

7 END VERTICAL 4

8 KNEE BRACING 6

9 LOWER DIAGONAL 24

10 MIDDLE CROSS GIRDER 17

11 MIDDLE HORIZONTAL 32

12 PORTAL BRACING 2

13 RAIL STINGER BRACING 16

14 RAIL STRINGER 32

15 ROAD STINGER 80

Page 4: Rail cum Road Bridge across the Ganga near Munger

INTRODUCTION TO PROJECT SR. NO. TOTAL NO. OF PRINCIPLE MEMBERS IN 1

SPANQUANTIT

Y

1 LOWER DIAGONAL 24

2 MIDDLE CROSS GIRDER 17

3 MIDDLE HORIZONTAL 32

4 PORTAL BRACING 2

5 RAIL STINGER BRACING 16

6 RAIL STRINGER 32

7 ROAD STINGER 80

8 TOP CHORD 28

9 TOP CROSS GIRDER 15

10 TOP LATERAL BRACING 14

11 UPPER DIAGONAL 24

12 VERTICAL POST 34

Page 5: Rail cum Road Bridge across the Ganga near Munger

PHYSICAL PROGRESSS OF SITE AS ON DATE 31.07.12

SR.NO JOB DISCRIPTION WORK DONE

1 CUTTING 13,640.859 MT

2 FITUP 12,063.466 MT

3 WELDING 11,679.465 MT

4 DRILLING 10,698.97 MT

5 INSPECTION 9230.42 MT

6 PAINTING 6726.98 MT

7 ERECTION 5150.49 MT

8 RIVETING 2,39,341 NOS

Page 6: Rail cum Road Bridge across the Ganga near Munger

FINANCIAL PROGRES OF SITE AS ON DATE 31.07.12

1 TOTAL GROSS BILL CLAIMED

2 TOATL GROSS BILL CERTIFIED FROM M/S GIL

3 TOATL BILL PAID

4 WCT RECOVERED

5 TDS RECOVERED

6 OTHER RECOVERIES

7 BALANCE DUE

8 EXTRA CLAIM

Page 7: Rail cum Road Bridge across the Ganga near Munger

MACHINERY AND EQUIPMENT

SR.NO. ITEM CAPACITY QUANTITY

1 AMERICAN CRANE 9260 125 TON 1 NOS

2 TATA 655 CRANE 45 TON 1 NOS

3 DERRIK CRANE 25 MT AT 25 M RADIUS

02 NOS

4 HYDRA ESCORT 07 NOS

5 TATA TAILOR 02 NOS

6 ELECTRIC TROLLEY AT ERECTIN

02 NOS

7 DEEP LORRY 10 SET

Page 8: Rail cum Road Bridge across the Ganga near Munger

MACHINERY AND EQUIPMENT

SR. NO.

EQUIPMENTS QUANTITY

CAPACITY

1 ARC WELDING MACHINE 19 NOS 400 Amp

2 SAW WELDING MACHINE FIDDER (OUTER)

05 NOS

3 SAW WELDING MACHINE FIDDER (INNER)

02 NOS

4 MIG WELDING MACHINE 09 NOS

5 MOTHER OVEN 09 NOS

6 BLOWER MACHINE 07 NOS

7 CARRY OVEN 05 NOS

Page 9: Rail cum Road Bridge across the Ganga near Munger

MACHINERY AND EQUIPMENT SR.NO EQUIPMENTS QUANTIT

YCAPACIT

Y

1 PUG CUTTING MACHINE 15 NOS

2 RADIAL DRILL MACHINE 11 NOS

3 RADIAL DRILL MACHINE 03 NOS

4 GANTRY CRANE 01 SET 45 MT

5 D.G. SETS TOATL CAPACITY 01 NOS

6 END MILLING MACHINE 01 NOS

7 CNC CUTTING MACHINE 01 NOS

8 H-BEAM ASSEMBLER 01 NOS

9 FLANGE STRAIGHTNOR 01 NOS

10 PLATE STAGIHTINING PRESS 01 NOS

11 LATHE MACHINE 01 NOS

Page 10: Rail cum Road Bridge across the Ganga near Munger

MACHINERY AND EQUIPMENT SR. NO. ITEM QUANTIT

Y

1 AIR COMPRESSOR (DIESEL) 10 NOS

2 AIR COMPRESSOR (ELECTRIC 02 NOS

3 MAGNETIC DRILL MACHINE 26 NOS

4 GRINDING MACHINE 24 NOS

5 OIL CUT DRILL MACHINE 01 NOS

6 HYDRAULLIC JACK OF DIFFERENT CAPACITY

18 NOS

7 JACKS OF DIFFERENT CAPACITY 26 NOS

8 TRAVSE JACK 750 TON 04 NOS

9 HYDRAULLIC PUMP 12NOS 12 NOS

10 BAREL PUMP 03 NOS

11 POWER PACK 04 NOS

12 Ff 2 MACHINE 02 NOS

13 HOOPER 04 NOS

Page 11: Rail cum Road Bridge across the Ganga near Munger

MACHINERY AND EQUIPMENT SR. NO. ITEM QUANTITY

1 CHAIN PULLY BLOCK 17 NOS

2 Pp ROPE PULLY 22 NOS

3 STEEL WIRE ROPE PULLKY 3 LINE 04 NOS

4 RACHET 10 NOS

5 CONTAINER 01 NOS

6 HAND WINCH MACHINE 02 NOS

7 ELECTRIC WINCH MACHINE 01 NOS

8 TURN BUCLKLE 33 NOS

9 HOOK CHOOK MACHINE 08 NOS

10 D SHACKLE 136 NOS

11 GREASSE GUN 05 NOS

Page 12: Rail cum Road Bridge across the Ganga near Munger

MACHINERY AND EQUIPMENT SR. NO. ITEM QUANTITY

1 METALIZING GUN 06 NOS2 PLATE CATCHER ( VERTICAL 11 NOS3 PLATE CATCHER ( HORIZONTAL 08 NOS4 RIVETING GUN 29 NOS5 RIMMER MACHINE 13 NOS6 IMPACT WRENCH- 14 NOS7 TORQUE WRENCH 09 NOS8 MULTIPLY TORQUE WRENCH 06 NOS9 WEB SLING 02 NOS10 DOLLY MACHINE 28 NOS11 RIVET BUSTER 07 NOS12 SCREW LONG JACK 03 NOS13 PENCIL GRINDING MACHINE 04 NOS14 JIM SCREW 01 NOS15 ROCKET JACK 04 NOS16 WINCH MOTOR WITH TWO HANDLE 02 NOS17 FIRE EXTINGUSHIER 08 NOS

Page 13: Rail cum Road Bridge across the Ganga near Munger

PLATE STACKING YARD PLATE ARE KEPT THICKNESS WISE AND

GRADE WISE AND WILL BE ISSUED ON ISSUE SLIP FROM STORES ON APPROVAL OF PLANING ENGINEER.

Page 14: Rail cum Road Bridge across the Ganga near Munger

PLATE MARKING MARKING OF PLATES IS BEING DONE AS PER

CUTTING PLAN APPROVED BY PLANING ENGINEER

Page 15: Rail cum Road Bridge across the Ganga near Munger

PLATE CUTTING AFTER MARKING INSPECTION AS PER

CUTTING PLAN WILL BE CHECKED THEN ONLY CUTTING WILL BE CARRIED OUT

CNC CUTTINGPUG CUTTING

Page 16: Rail cum Road Bridge across the Ganga near Munger

PLATE GRINDING

Page 17: Rail cum Road Bridge across the Ganga near Munger

FITUP MEMBER IS BEING CARRIED OUT AS PER B1-2001

BOTTOM CHORD FITUP BOTTOM CHORD FITUP COMPLETE

FITUP OF BOX DIAPHARAGMI GIRDER FITUP

Page 18: Rail cum Road Bridge across the Ganga near Munger

WELDING OF MEMBERS

3 TYPES OF WELDING CONSUMBLES ARE BEING USED FOR SAW. 1 :W1 & F1 FOR IS – 2062 E-250.2: W2 & F2 FOR IS -2062 E-350.3: W4 & F4 FOR IS – 2062 E-450. MIG WELDING

MIG WELDING OF VERTICLE POST DAPHARAGM

TACK WELD BY SMAW

Page 19: Rail cum Road Bridge across the Ganga near Munger

MEMBER DESTORTION CONTROL

DISTORTION CONTROL OF END X GIRDER

DISTORTION CONTROL OF END RACKER

DISTORTION CONTROL OF ST.PLATE FOR FITUP OF BOTTOM CHORD.

Page 20: Rail cum Road Bridge across the Ganga near Munger

MARKING FOR DRILLING

MARKING OF BOTTOM CHORD FOR DRILLING WITH BODY JIG.

Page 21: Rail cum Road Bridge across the Ganga near Munger

DRILLING OF MEMBER

DRILLING OF GUSSET BY RADILL

DRILLING OF BOX DIAGONAL

DRILLING OF BOTTOM CHORD DRILLING OF MID.HORIZONTAL

Page 22: Rail cum Road Bridge across the Ganga near Munger

ULTRASONIC TESTING OF N-CROSS GIRDER OF SPAN 4

ULTRASONIC TESTING

Page 23: Rail cum Road Bridge across the Ganga near Munger

INSPECTION BY GIL ,BBJ,ECR

INSPECION OF VERTICAL POST WITH GIL ,BBJ,ECR & PLANT DEPO.

Page 24: Rail cum Road Bridge across the Ganga near Munger

SAND BLASTING

SAND BLASTING OF BLB SA-2.1/2

SAND BLASTING OF DIAGONAL SA-2.1/2

Page 25: Rail cum Road Bridge across the Ganga near Munger

METALIZING

METTALIZING OF ROAD STRINGER

INSPECTION OF DFT BY ELCOMETER

Page 26: Rail cum Road Bridge across the Ganga near Munger

PAINTING

PAINTING OF MEMBERS BY SPRAY GUN

Page 27: Rail cum Road Bridge across the Ganga near Munger

FINESHED MATERIAL

MEMBERS READY FOR ASSEMBLY

Page 28: Rail cum Road Bridge across the Ganga near Munger

MEMBER ASSEMBLY FOR ERECTION

ASSEMBLY OF END VERTICLE IN PROGRESS FOR ERECTION

ASSEMBLED MEMBER BEING READY FOR YARD RIVETING FOR ERECTION

Page 29: Rail cum Road Bridge across the Ganga near Munger

DISPATCH TO ERECTION SITE

DISPATCH OF END RACKER TO ERECTION SITE

Page 30: Rail cum Road Bridge across the Ganga near Munger

MEMBER LOADING FOR ERECTION MEMBER ARE LOADED FOR ERECTION

POINT THROUGH AMERICAN CRANE 125 TON TO TROLLEY FOR ERECTION

LIFTING OF MEMBER LOADING POINT

LIFTING OF MEMBER FOR ERECTION

ERECTION POINT

Page 31: Rail cum Road Bridge across the Ganga near Munger

MEMBER TRANSPORTATION FROM LOADING POINT TO ERECTION POINT

MEMBER ARE TRANSPORTED THROUGH TROLLEY TO ERECTION POINT FOR ERECTION

TRANSPORTATION OF MEMBER TO ERECTION POINT BY MANNUAL TROLEY

LIFTING OF MEMBER FOR ERECTION

Page 32: Rail cum Road Bridge across the Ganga near Munger

LIFTING OF MEMBER FOR ERECTION

MEMBER IS LIFTED TROUGH DERRIK CRANE FOR ERECTION AT ERECTION PIOINT

ERECTION OF MEMBER IN PROGRESS

ERECTED MEMBERTRAVERSE JACK 750 MT CAP.FOR

LIGTING OF SPAN

Page 33: Rail cum Road Bridge across the Ganga near Munger

RIVETING AT ERECTION SITE

RIVETING OF JOINTS IN PROGRESS AT ERECTION FRONT

RIVETED JOINT

Page 34: Rail cum Road Bridge across the Ganga near Munger

ACHIEVEMENTS

FABRICATION OF 9500 MT IN JUST 10 MONTHS

SUCCESSFUL LANDING OF 3 SPANSTIMELY ERECTION OF TWO NO.DERICK CRANES

WELDING QUALITY APPRICIATED BY C.E (ECR)

HOLE MATCHING APPRICIATED BY C.E (ECR)

Page 35: Rail cum Road Bridge across the Ganga near Munger

HURDLES

LOCAL INTERFERANCE SHORTAGE OF STEEL ADMINISTRATION PROBLEMS CASH FLOW MAINTANENCE OF EQUIEPMENTS WITH OUT FUNDS

NON CO-OPERATION OF M/S GIL. WRONG DEPLOYMENT OF CONTRACTORS

Page 36: Rail cum Road Bridge across the Ganga near Munger

SAFETY DAY

FLAG HOISTING FOR SAFETY DAY

SAFETY SPEECH BY DGM

PRIZE DISTRIBUTION BY DGM FOR SAFETY DAY CLOSING CERMONEY

Page 37: Rail cum Road Bridge across the Ganga near Munger

ENVIRNOMENTAL DAY

PLANTATION BY HONERABLE M.D ON ENVIRNOMENTAL DAY

Page 38: Rail cum Road Bridge across the Ganga near Munger

TEAM P&R AT SITE

Page 39: Rail cum Road Bridge across the Ganga near Munger

WITH THANKS AND REGARDS

MR. R.S. YADAV (G.M.)MR. AFROZ KAPRA

(D.G.M) AND

TEAM P&R MUNGER SITEM/S P&R INFRAPROJECT

LTD MUNGER