Workshop of ITU-T Study Group 5 Regional Group for Africa,
Cotonou, Benin, 19 July 2012
VALSCH-Consulting
DALLY BRICE LANDRYTechnical Manager
PURPOSE OF THE EXPERTISE
MISSION SCOPE
REFERENCES TO STANDARDS
STRUCTURES OVERVIEW
STRUCTURING OF THE MISSION
MISSION OPERATION
OBSERVATIONS
FAULTS PICTORIAL
EXPOSURES BY THE POPULATIONS
MEASUREMENTS PICTORIAL
REPORT AND SYNTHESIS
PURPOSE OF THE EXPERTISE
MISSION SCOPE
REFERENCES TO STANDARDS
STRUCTURES OVERVIEW
STRUCTURING OF THE MISSION
MISSION OPERATION
OBSERVATIONS
FAULTS PICTORIAL
EXPOSURES BY THE POPULATIONS
MEASUREMENTS PICTORIAL
REPORT AND SYNTHESIS
CONTENT
PURPOSE OF THE EXPERTISE
Control the compliance of GSM radioelectric sites to standards
requirement in the pylon implementation, electric security, buoying and
electromagnetic compatibility;
Abide by technical prespecriptions, namely perimeters for security and
control;
Enhance ATCI basic information over technical parameters for
radioelectric operating setups;
MISSION SCOPE
The campaign covers the networks for the following mobile cellular
telephony operators: ORANGE COTE D’IVOIRE (OCI), MTN-CI, COMIUM
(Koz), ATLANTIQUE TELECOM (Moov) and ORICEL (Green).
REFERENCES TO STANDARDS FOUNDATION
DTU P 18.702: French Regulations BAEL 91 regulations for design and the
calculation of armed concrete works following the method of neighbouring
countries.
DTU 13.12 : French Regulations for the calculation of surface foundations METALLIC STRUCTURE (PYLON)
DTU P 06.002 : French Regulations NV 65 – regulations that define snow and
wind impacts on constructions/ Eurocode I.
DTU P 22.701 : French Regulations CM 66 and addendum 80 – regulations of
calculation of steel constructions / Eurocode III.
DTU P 22.703 : Justification par le calcul de la sécurité des constructions -
règles de calculs des constructions à parois minces en acier.
NFP22-430, NFP22-460 à 469 (assemblages métalliques).
SYSTEM OF OVERHEAD SIGNALLING (BUOYING)
Recommendations of the International Civil Aviation Organization, OACI annex 14
chapter 6 (11/1999).
LIGHTNING SYSTEM
Rec IUT K56 : Protection of radio base stations against lightning discharges.
(01/2010).
Standards NFC 17-100 : Protection of structures against lightning (12/1997).
Standards NFC 15-100 : Electric Installations and Cables.
DIRECTIVES : IFC (international Financial Company) / WORLD BANK GROUP
Environmental, sanitary and security directives for Telecommunications
REFERENCES TO STANDARDS
FREE STANDING PYLON
INFRASTRUCTURES OVERVIEW
INFRASTRUCTURES OVERVIEW
Guyed Pylon
INFRASTRUCTURES OVERVIEW
MAST and TRIPOD
MISSION STRUCTURING
No of activity
Designation of activity Budget(Day)
Comments
01Development workATCI-VALSCH-OPERATORS OF CELLULAR MOBILE TELEPHONY
0,5Working session, explanation on the purpose and control points related to the mission
02Receiving of fragment for engineering table and positioning of sites Mapping
0,5
-
03 Physical tracking for sites - Operation of the site implementation
04Mission performance
0,5Visual controls and measurement for IN SITU compliance, site per site
05 Draft of mission report 3 Site per site,
06 Draft of synthesis report 3Synthesis of standard gaps in percentage, for each plate covered
07Presentation of outcomes
0,5Plate per plate in line with the Operator’s DESIGN RADIO
POSITIONING OF SITES (MAP Info / Google Earth)
MISSION OPERATION
ENVIRONMENTAL CONTROL OF RADIOELECTRIC INFRASTRUCTURE
Such chapter deals with environmental verification for radioelectric sites, impacts
over environment/works done during the operational phases, rehabilitation and
re-development.
PYLON
Such chapter deals with measurements and visual controls to verify the stability of
the infrastructure (aerial plants).
SYSTEM OF AERIAL SIGNALLING
This chapter deals with the control of buoying operations night and day
according to the general prescriptions of the International Civil Aviation
Organisation (OACI) and local civil aviation authority.
MISSION’S OPERATION
SYSTEM OF LIGHTNING
This chapter deals with the system control for combatting lightning to protect
Telecom installation equipment and neighbouring.
RADIOELECTRIC DISCHARGE
This chapter is about the reading of true technical parameters, control of state
and evaluation of radioelectric discharge embarked on pylons and other
relevant structures.
SYNTHESIS AND PRESCRIPTIONS
This chapter is about the synthesis of faults and recommendations for
rehabilitation and compliance of works.
MISSION’S OPERATION
MISSION’S DETAIL : CONTROL FOR INFRASTRUCTURE RADIOELECTRIC COMPLIANCE.docx
OBSERVATIONS
Zones Concept and Signagee
Observations • Non existence of the security perimeter;• fault of security system in place;• Absence of appropriate signage.
1. ENVIRONEMENTAL CONTROL FOR RADIOELECTRIC INFRASTRUCTURE
ENVIRONMENT AND INSTALLATION
− Dirty Site;− Oxydization of shelter at some points;− Intallation of cables outside CDCH ;− Knickpoint of walls and concretes;− Grids of non secured oxdized condensers;− Electric Enclosures not secured;− Fuel leakage under generator;− Extinguisher: expired use period.
2.PYLON
− Preventers of end ofthe non existing higher ribs;− Reach of the main structure;− Advanced Oxydization of nuts and bolts;− Security Kit, oxydized, damaged or not exist;− Ladder and safety bow, oxydized, damaged or not exist;− Mechanic tensions not in compliance with prescriptions;− Vertical fault.
OBSERVATIONS
3.SYSTEM OF SIGNALLING
− Deterioated Day buoying;− Non Operative Night Buoying;− Open junction box;− Non operative dusk to dawn switch
4.LIGHTNING PROTECTION
− Measured value (isolated) higher to 10 Ohms ;− Old Lightning conductor;− Non Labelled Earthing Network;− Earthing system;− Absence of earthing system for some equipment;− Vandalized site, Site vandalisé , cut and robbed flats.
5. RADIOELECTRIC DISCHARGE
− Brake caliper, nuts and bolts, retransmission arms oxydized;− Retransmission arms not galvanized;− Antenna not well fixed / Design Radio not in compliance with
engineering table/space isolation not respected;− Deteriorated leaktightness not well completed;− Higher head discharge almost prescribed;
OBSERVATIONS
FAULTS PICTORIAL
ENVIRONMENT AND INSTALLATION
- non existing perimeter for security, home activities on radioelectric site;- Concrete cracking on radioelectric infrastructure.
PICTORIAL
PYLON
Balancing clamps not well aligned, nuts and bolts and oxydized safety kits
PICTORIAL
SYSTEM OF SIGNALLING
Non existing buoying, components of the night buoying system damaged
PICTORIAL
SYSTEM ANTI-LIGHTNING
Lightning conductor posts oxydized, ground rod oxydized, earthing
network robbed, cut and robbed strap copper, isolated measurement not
in compliance with standard prescription
PICTORIAL
RADIOELECTRIC DISCHARGE
Plug holes and GSM antenna fixing stirrup attachments damaged.
EXPOSURES BY THE POPULATIONS
- Exposure to electromagnetic waves transmitting sources (electrosmog) ;
- Electrocution ;
- Fire ;
- Houses Destruction;
- Aircraft crash (aeroplanes) ;
- Destruction of home appliances;
- Bad quality or interruption of communications;
- Etc.
MEASUREMENTS PICTORIAL
Measurement of earth resistibility.
Measurement of faulting vertical angle.
Measurement of mechanic tension of Hauban cable.
MEASUREMENTS PICTORIAL
REPORT AND SYNTHESIS DVD-OCI 28-06-
2012\001_RAPPORT_VC_ATCI_RX_OCI.xlsx
THANKS FOR YOUR ATTENTION