Rad Methodology
description
Transcript of Rad Methodology
Requirement Planning. In this stage, the researchers used
strategies and tools for development that was laid out in a specific project.
Some of the methods the researchers used were conducting interviews and
questionnaires to the faculty and to the staff who is in charge of the Student
Records of the school. The researchers worked together with the client to
know their functional and non-functional needs. The phase referred as
gathering needed requirements for the Union Christian College – Student
Records Information System.
User Design. In this stage, the researchers analyzed the client’s
needs in information processing such as handling student information in the
development of Student Records Information System. The design of the
system was outlined. The developed system was also designed in this phase
to follow the procedures in information processing. Preliminary layouts were
developed. Plan for implementing the system was prepared.
Construction. In this stage, the researchers completed the physical
application system. PHP was used for the user interface design. Wamp
Server was be used for administering, the MYSQLite database. The system
was introduced to the intended users to get their feedbacks or comments
regarding possible changes or improvements of the system. If the user wants
to alter some of the functions and design of the system, the researchers
would rework on previous phases in order to achieve the desired output. In
this phase the researchers created the system following all the steps in the
system development.
Cutover. In this stage, the researchers deployed the system. It
includes final user testing and training, data conversion and implementation
of the application system. The system was finally introduced to the
organization or to their intended user. Activities included in this phase were
the training of users, converting or installing the system, and completing the
necessary documentation. It is the Rapid Application Development phase
during which the system was finalized and released to the user.