(R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES...

85
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in No.07-05/SG-9B-II/1110 Jabalpur, dated:21.04.2018 To As per distribution list Sub: Agenda of 63 rd meeting of Operation and Coordination Committee of MP. The Agenda of 63 rd meeting of the Operation and Coordination Committee of MP scheduled on 26 th April 2018 at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur

Transcript of (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES...

Page 1: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED

STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected]

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in

No.07-05/SG-9B-II/1110 Jabalpur, dated:21.04.2018

To

As per distribution list

Sub: Agenda of 63rd meeting of Operation and Coordination Committee of MP. …

The Agenda of 63rd meeting of the Operation and Coordination Committee of MP

scheduled on 26th April 2018 at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur has

been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded.

(R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur

Page 2: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email-

[email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email-

[email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. Email-

[email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura,

Bhopal, email- [email protected]. 6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email-

[email protected] 7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email –

[email protected] 8. The Chief Engineer(EHT:Const.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2661618, E-mail-

[email protected]. 9. The Chief Engineer(EHT:Maint&insp.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2665593, E-mail-

[email protected]. 10. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749,

Email- [email protected], Email- [email protected] 11. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 12. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected] 13. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]. 14. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur,

Fax No- 0761-2668503, Email – [email protected]. 15. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited,

Bhopal, Fax No-0755-2580611,Email- [email protected]. 16. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near

Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]. 17. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email –

[email protected]. 18. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email –

[email protected] 19. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046,

[email protected] 20. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal –

462013., Fax No- 0755-4030130,Email – [email protected] 21. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical

Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected], [email protected], M-9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR).

22. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected]

23. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected], [email protected], [email protected].

24. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551,

Fax No. 07791-243667 / 243669, Email – [email protected] 25. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina-

470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected] 26. The Chief Executive Officer, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt.

Hoshangabad, Email – [email protected] 27. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :[email protected] 28. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row,

Email- [email protected], Indore – 452010, [email protected]

Page 3: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on 27th FEBRUARY 2018 at SLDC, MPPTCL, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/983 Jabalpur dated 04.04.2018.

[OCC may confirm the minutes]

ITEM NO. 2 : REVIEW OF SYSTEM OPERATION DURING THE MONTHS FEB 2017 TO MAR 2018. 2.1. Frequency Particulars: During FEB 2018 the system frequency was below 49.90 Hz for 9.69% of time against 12.99 % of time during MAR 2018. The system frequency was above 50.05 Hz for 10.06 % of time during FEB 2018 against 7.72 % of time during MAR 2018. The system frequency was within the IEGC range of 49.90-50.05 Hz for 80.25 % of the time during FEB 2018 against 79.29% of time during MAR 2018. The average monthly frequency was 49.98 Hz during month of FEB 2018 and 49.97 Hz during month of MAR 2018. The system frequency did not touch 49.20 Hz during the above period.

The detailed frequency particulars for the month of FEB 2018 and MAR 2018 are enclosed at

Annexure-2.1. The brief detail of frequency profile is given here under:

Month Average frequency

Minimum Integrated frequency over an hour

Maximum integrated frequency over an hour

Instantaneous Minimum Frequency

Instantaneous Maximum Frequency

FEB 2018 49.98 Hz 49.86 Hz 50.06 Hz 49.70 Hz 50.20 Hz MAR 2018 49.97 Hz 49.85 Hz 50.08 Hz 49.66 Hz 50.20 Hz

[Committee may like to note]

2.2 Operational Matters 2.2.1 Operational Discipline : System operated in terms of frequency profile for the months FEB 2018

and MAR 2018 is as given below for discussion by the committee :

Month % of time Frequency Below 49.90 Hz

% of time Frequency above 50. 05 Hz

% of time frequency within the permissible range of 49.90-50.05 Hz.

Average monthly frequency

No. of times frequency dipped below 49.20 Hz

FEB 2018 9.69% 10.06% 80.25% 49.98 Hz 0 MAR 2018 12.99% 7.72% 79.29% 49.97 Hz 0

[Committee may like to note]

AGENDA FOR 63rd MEETING OF OPERATION & COORDINATION COMMITTEE OF MP TO BE HELD ON 26th APRIL 2018 AT 11:00 AM AT CONFERENCE HALL, SLDC, MPPTCL,

NAYAGAON, JABALPUR.

Agenda of 63rd OCCM of MP 1

Page 4: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

2.2.2 Voltage Profile: During the months FEB 2018 and MAR 2018 the maximum and minimum voltage as recorded at following important 400 KV s/s in MP Grid:-

FEB 2018 MAR 2018 Max. Voltage Min. Voltage Max. Voltage Min. Voltage Name of Observed Observed Observed Observed Sr. 400 KV

Voltage Volt

No. Substation Voltage ag Voltage

Date Date Date Date KV e KV KV KV

1 Indore 421 11.02.18 400 01.02.18 418 19.03.18 397 26.03.18

2 Itarsi 423 14.02.18 400 02.02.18 414 28.03.18 395 09.03.18

3 Bina 420 11.02.18 398 03.02.18 415 14.03.18 397 28.03.18

4 Gwalior 417 12.02.18 390 05.02.18 414 20.03.18 392.5 28.03.18

5 Nagda 423 14.02.18 402 01.02.18 421 03.03.18 400 26.03.18

6 Satpura 427 11.02.18 406 03.02.18 425 23.03.18 408.6 23.03.18

7 Birsinghpur 424 12.02.18 404 03.02.18 424 19.03.18 408 08.03.18

8 ISP 426 20.02.18 409 01.02.18 426 20.03.18 409 05.03.18

9 Bhopal 424 11.02.18 402 01.02.18 419 05.03.18 398 21.03.18

10 Ashta 425 11.02.18 400 01.02.18 423 02.03.18 404 24.03.18

11 Pithampur 422 11.02.18 403 01.02.18 421 05.03.18 404 26.03.18

12 Singhaji 423 11.02.18 403 22.02.18 424 05.03.18 408 08.03.18 [Committee may please note & discuss]

2.2.3 Status of Capacitor Banks in sub-transmission system: The updated information of the status of capacitor banks in sub-transmission system as on 31th MAR 2018 as submitted by DISCOMs is detailed below:

[Action: MPPTCL , DISCOMS]

DISC

OM

Capacitor bank installed in good condition (No)

Capacitor Banks healthy but not in service due to control ckt problem

Capacitor bank installed but defective & are repairable (No)

Requirement of repair against each unit (No)

Requirement against non-repairable capacitor banks

Capacitor banks already covered under ADB T-V

Balance capacitor banks to be covered in other schemes

600 KVAR

1200 KVAR

1500 KVAR

600 KVA

R

1200 KVA

R

1500 KVA

R

600 KVAR

1200 KVAR

1500 KVAR

No of 100 KVAR Units

required

600 KVAR

1200 KVAR

600 KVAR

1200 KVAR

600 KVAR

1500 KVAR

EZ 394 139 39 32 13 1 36 18 1 23 - - - - - -

CZ 5 688 722 0 0 0 1 0 0 3 0 0 0 0 0 0

WZ 636 548 673 0 5 6 22 14 21 169 3 9 - - - 3

Agenda of 63rd OCCM of MP 2

Page 5: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

2.2.4 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The updated information of the status of installed capacitor banks (in MVAR) in EHV transmission system as on 31.03.2018 as submitted by MPPTCL is given below:-

[Action: MPPTCL]

2.2.5 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: The various ongoing Transmission Schemes completed during the financial year 2017-2018 (up to MAR 2018) and plan for completion of various ongoing Transmission Schemes for the Year 2017-2018 is enclosed as Annexure 2.2.5(i) and 2.2.5(ii) respectively.

[Action: MPPTCL]

2.2.6 U/F and df/dt Relay Operation (i) U/F and df/dt Relay Operation: Frequency did not touch 49.20 Hz during FEB 2018 and MAR 2018.

There was no df/dt operation during the same period. [Action: MPPTCL]

(ii) Defective u/f, df/dt relays: MPPTCL has informed that all the df/dt relays are in operation, where the

U/F relays are not available, the numerical relays programmed for under frequency operation. Df/dt relay at 220 KV Sagar, 220 KV Chhatarpur & 132 KV S/s Chapda is being replaced shortly, except this all U/F stages are in good/healthy condition.

[Committee may like to note] 2.3 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to

33 KV feeders: (i) Details of DISCOM wise Power supply given to various domestic categories during the period

February 2018 and March 2018 is enclosed at Annexure 2.3(i).

[Committee may like to note]

Voltage Class

Capacitor bank installed as on

31.01.18(MVAR)

Capacity Added after Last OCC

Meeting (MVAR)

Capacitor banks already covered under ADB T-V

TOTAL CAPACITY AS ON 31.01-18

(MVAR)

Capacitor Bank Installed but

defective & are not repairable (No &

MVAR) 220 KV 100.00 0.00 - 100.00 All in Service

132 KV 1238.00 0.00 - 1238.00 33 KV 5104.50 168.00 - 5272.50 Total 6442.50 0.00 - 6610.50

Agenda of 63rd OCCM of MP 3

Page 6: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

(iii) Group Allocation to Newly Commissioned existing EHV substations:- The region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV substations for which groups have not been allocated is given in Annexure 2.3 (ii). The DISCOM wise details of pending group allocation to 33 KV feeders is given below:-

SN DISCOM Region No of 33 KV feeders for which groups to be allocated

01

EAST

Jabalpur 0 02 Sagar 0 03 Rewa 0 04 Total 0 05

WEST Indore 12

06 Ujjain 04 07 Total 16 08

CENTRAL Bhopal 14

09 Gwalior 18 10 Total 33

TOTAL Grand Total 53

Discoms are requested to furnish the details as per list enclosed at Annexure-2.3(ii) in the meeting. In 62nd OCCM representative from Central Discom informed that 5 no. 33 KV feeders (i.e., 33 KV

Dord, Banbar, Chinor, Karhiya & Gharsondi) have been group allocated. Similarly representative from West Discom informed the committee that 05 no. 33 KV feeders have been group allocated.

In view of the above it is to intimate that the order copy of the above mentioned 05 no. 33 KV feeders

of Central & West Discom each has not been received to P&D and SLDC. Hence these feeders are not considered to be group allocated till date. Hence it is requested to kindly submit the order copy of all the feeders which have been group allocated.

[ACTION : DISCOMs]

ITEM NO. 3 : OPERATIONAL PLANNNING: 3.1 Generating Units under planned outage and proposed maintenance programme: The annual maintenance /outages of thermal generating units of MPPGCL during February 2018 to March 18 is Nil as intimated by ED(O&M:Gen.), MPPGCL, Jabalpur.

[Committee May like to note]

3.2 Proposed shutdown programme of Transmission lines / Transformers: The proposed shutdown of transmission elements for the period 01.03.2018 to 31.05.2018 submitted by MPPTCL is enclosed as Annexure-3.2.

[Committee May like to discuss]

3.3 Long Outages of transmission elements and protections: The status submitted by MPPGCL /MPPTCL are given below:-

Agenda of 63rd OCCM of MP 4

Page 7: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Sr. No

Line/Transformer/ etc under long Outage

Outage date Reason Response from Utility

1. 12.5 MVA, 132/66/33 KV X’mer, CGL make Sr. No. 23615 at 132 KV S/s Pichhore

19.05.2016 Transformer failed on

19.05.2016 as intimated by T&C, MPPTCL.

The load is manageable through (1x20 + 1x40) MVA X’mers in running condition at S/s Pichhore. MPPTCL informed that the 12.5MVA, transformer is out of service due to non availability of 66KV network from Matatila. As there is no 66KV network so there is no need to replace the transformer. decommissioning of transformer is under progress.The latest status in the matter may please be submitted by MPPTCL (T&C/P&D) in the meeting.

2. 12.5MVA X mer, BBL Make (Sr. No.-1428/3) at 132 KV S/s Chapda.

Not intimated X’mer failed

The 12.5MVA BBL make Transformer Sl. No. 1428/3 failed and proposed to be withdrawn from system. MPPTCL informed that the de-commissioning proposal of this x-mer is sent to CE(P&D) vide U.O.No.851, dt 11.08.17. further , the matter is taken up by CE(P&D) with CGM(W), Central Discom vide L.No.04-02/PSS/2291 Dt 08.09.17, After receiving approval from competent authority, the transformer shall be de-commissioned. The latest status in the matter may please be submitted by MPPTCL (T&C/P&D) in the meeting.

3. 40 MVA, 132/33 KV CGL make X’mer, Sr. No. T-8362-3 at 220kv s/s Ujjain.

22.06.2017 Tripped on differential indication.

transformer has been declared failed and being replaced by 20 MVA X’mer. In 62nd MPPTCL informed the committee that the X’mer will be replace by end of March 2018. Latest status may please be submitted by MPPTCL in the meeting.

4 16 MVA, 132/11KV EMCO X’mer at 132 KV S/s Sanwer.

14.07.16

X’mer taken out from service since 14-07-16

due to aging and no 11KV network at S/S (unserviceable as

132/11KV Capacity).

MPPTCL informed that the X’mer has to be decommissioned and the correspondence for decommissioning is under process. Latest status in the matter may please be submitted by MPPTCL (T&C/P&D) in the meeting.

5 7.5MVA 132/11KV X’mer at 132 KV S/s Suwasra

- Out of service due to

non availability of 11KV network

MPPTCL informed that transformer is out of service due to non-availability of 11KV network, so there is no need to replace the transformer. Decommissioning of transformer is under progress. Latest status may please be submitted by MPPTCL in the

Agenda of 63rd OCCM of MP 5

Page 8: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

meeting.

6 315MVA, 400/220,BHEL X’mer-I at 400kv S/s Bina 15.01.2018 Differential, Buchholz

and PRV indications

In 62nd OCC MPPTCL informed the committee that the transformer is being replaced by new X’mer by end of May 2018. Latest status may please be submitted by MPPTCL in the meeting.

7 315MVA, 400/220 X’mer-II at 400kv S/s Bina. 14.02.2018 Differential, Buchholz.

Committee may like to discuss & MPPTCL is requested to submit the further action plan and status.

8. 40MVA 132/33KV ECE at 132 KV S/s Lakhnadon.

24.02.2018 Tripped on Differential indications

Committee may like to discuss & MPPTCL is requested to submit the further action plan and status.

9 STPS Unit #9-GT 24.08.2017 GT Burnt

MPPGCL informed that Order placed to M/s Aditya Elect., Mumbai on 31.10.17. GT sent for repair on 10.11.17 which reached Mumbai on 22.11.17. MPPGCL informed that GT received at site, commissioning work under progress and will be completed by 15th April 18. Latest status may please be submitted by MPPGCL in the meeting.

10. 400 KV Generator Breaker of Unit # 9 of Satpura 24.08.2017 Fire in Bushing of GT MPPGCL informed that the Work

completed on 23.12.17.

11 UAT-B, U#11, STPS, Sarni Feb-18 - Work has been completed. It will be taken in to service whenever the unit is under shutdown.

12 500 MVA, 400/220 KV X’mer at STPS. 19.04.2018 X’mer tripped at 21:55

Hrs. due to LA Burst.

Committee may like to discuss & MPPGCL is requested to submit the further action plan and status.

13 400 KV Transfer Bus Coupler at SGTPS 13.12.17 Nitrogen Leakage

MPPGCL is requested to indicate the reason for not indicating the outage timely to SLDC. Latest status may also be intimated by MPPGCL in the meeting.

Any transmission element/ EHV element under outage, which has not been intimated/included under aforesaid outage list, should be invariably intimated to SLDC. All entities are requested to ensure the same. The utility may submit the latest status.

[Action:MPPGCL/MPPTCL]

ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF FEBRUARY 2018 AND MARCH 2018: The details of actual generation, Schedule from Central Sector, demand etc. are given in the following Annexures: Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of

MPPGCL & NHDC Hydel Units.

Agenda of 63rd OCCM of MP 6

Page 9: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Annex. 4.2 Power Supply Position. Annex. 4.3 Hourly Average of Availability and Demand. Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs.

[Committee may like to note] ITEM NO. 5 : SYSTEM DISTURBANCE IN MP DURING OF FEBRUARY 2018 AND MARCH 2018: The Grid Disturbances and Grid Incidents in MP during these months are given in Annexure 5.

[Committee May like to discuss] ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:- 6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS / TRANSMISSION ELEMENTS:- The present status regarding schedule and commissioning of reactors / transmission elements is as below:-

S.No. 400 KV S/s Size MVAR

Implementing Agency

Expected Date of Commissioning as intimated in last OCC

1. Bus Reactor : ISP 125 MVAR NHDC

In 62nd OCC NHDC informed that committee that the reactor has been received and will be commissioned by March 2018. Latest status may please be submitted by NHDC in the meeting.

2. Line Reactor on 400 kV Satpura–ISP line at STPS

50 MVAR MPPGCL

MPPGCL informed that the price bid has to be opened and the reactor will be commissioned by December 2018. Latest status may please be submitted by MPPGCL in the meeting.

3. Bus Reactor at SSTPS

125 MVAR MPPGCL

Work will be carried out under PSDF as intimated by MPPGCLin 62nd OCC MPPGCL informed the committee that the reactor is under procurement and will be commissioned by December 2018. Latest status may please be submitted by MPPGCL in the meeting.

The latest status may be submitted in the meeting.

[Action: MPPGCL/NHDC]

6.2 Load Dropping Scheme at 400 KV substations to handle emergency condition: - On dtd.

17.04.2018 at 12:15 hrs 315 MVA 400/220 KV ICT No.-II at 400 KV substation (PG) Gwalior tripped and

caught fire. The fire was rapidly spread nearby area. Therefore 315 MVA 400/220 KV ICT No-I was also

hand tripped at 13:32 hrs. to safeguard the ICT. Thereafter the loading of 315 MVA ICT No.III rushed

dangerous level of 390 MW. The contingency arrangements were made to handle the emergency situation

immediately as detailed below: -

Agenda of 63rd OCCM of MP 7

Page 10: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

1. The load of 220 KV Mehgaon substation shifted to Auriya supply of NR BY by opening of 220 KV

Malanpur-Mehgaon and 132 KV Malanpur-Mehgaon lines. The load of Mehgaon, Bhind, Ron, Lahar,

Seondha, Gormi, Porsa, Ambha met from Auraiya supply.

2. 220 KV supply extended to Datia substation from 400 KV substation Bina . This supply also extended up

to 220 KV substation Mahalgaon . 220 KV Gwalior (PG) Mahalgaon circuit were kept off.

3. The load of Sheyopur & Sabalgarh substations were fed from 400 KV substation Bina (PG). The 132

KV link from Motizeel substation to Sabalgarh substation kept off.

4. The load of Guna, Ashoknagar and 220 KV substation Bina were fed from 220 KV Sagar supply. This

supply was also kept parallel with Vidisha supply.

5. The 220 KV Malanpur and Morena substation were made available supply from 315 MVA 400/220 KV

ICTNO.I at Gwalior (PG).

At around 22.00Hrs ICT No I at PG Gwalior restored and supply arrangement made as per

original scheme except at Mehgaon S/S .

Further on dtd. 18.04.2018, the emergency situation again arise at Gwalior area as 315 MVA

ICT No.II which was under breakdown and the PG Gwalior has requested for availing emergency

shutdown on ICT No.I as Tan Delta of B-Ph. 220 KV bushing was found high and the same bushing of

the ICT required to be replaced immediately. To manage the emergency condition again contingency

arrangements were made to handle the load of Gwalior Region. As the shut down was requested for

three days on continuous basis therefore extra arrangement felt needed in order to ensure uninterrupted

supply to Gwalior area, therefore following arrangements were made.

i. 220 KV Bina had been fed from Bhopal supply through 220 KV Vidisha and Ganjbosoda feeder.

The 220 KV Bina interconnector No. I & II kept off.

ii. 220 KV Sagar supply was extended to Datia substation through split bus arrangement at 400

KV substation Bina. The Ashoknagar and Guna substation were also kept on Sagar supply.

iii. The supply of 400 KV substation Bina extended to Mehalgaon substation. Thus Mehalgaon

substation was made available, Bina supply as well as Sagar supply (through Datia substation).

6. The load of 220 KV Mehgaon substation was already on Auriya supply and 220 KV Malanpur-Mehgaon

and 132 KV Malanpur-Mehgaon lines were off. The load of Mehgaon, Bhind, Ron, Lahar, Seondha,

Gormi, Pursa, Amba met from Auraiya supply.

i. The load of Sheopur , Sabalgarh substations were fed from 400 KV substation Bina (PG) . The

132 KV link from Motizeel substation to Sabalgarh substations were kept off.

ii. The 220 KV Malanpur and Morena substation were made available supply from 315 MVA

400/220 KV ICTNO.I at Gwalior (PG). Nevertheless, the MP Demand was minimum at time of

incidence, therefore situation could be possible to control. Obviously, in case of high Demand

period, such situation may adversely affect the system and it may not have possible to maintain

uninterrupted supply during such situation.

In view of above it becomes necessary that in every 400 KV substation, load dropping scheme

invariably made functional so that in case of any emergency situation under N-1 condition, the loading on

ICT should not crossed dangerous level. It is therefore, MPPTCL is requested to review the load dropping

Agenda of 63rd OCCM of MP 8

Page 11: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

schemes and furnish details of scheme available with all important substations at least upto 400 KV level.

However, if load dropping scheme have not been made, so far, it is requested to formulate suitable load

dropping scheme to handle sudden emergency as elaborated above in Gwalior area.

The Committee may discuss the matter

[Action: MPPTCL]

6.3 Frequent Tripping Of 132 KV VSTPS- Waidhan Ckt –I & II:- On 11.04.2018 following lines tripped

at 21:10 Hrs :- 1. 132 KV VSTPS- Waidhan Ckt-I (through auxiliary bus at Waidhan substation feeding to Morwa

substation). 2. 132 KV VSTPS-Waidhan Ckt-II. 3. 132 KV Morwa –Jayant Ckt- I & II .

The supply was resumed from Annupur substation, this caused 23 minutes interruption to Waidhan, 20

minutes to Rajmilan substation and 26 minutes interruption to Morwa s/s & Jayant feeders. It is mentioned

that when 132 KV Morwa-Jayant Ckt-II charged, after 3 minutes this line again tripped alongwith 132 KV

Morwa-Rajmilan and 132 KV Annupur-Rajmilan Ckt. This caused 22 minutes interruption to Morwa

substation and 27 minutes interruption to Jayant feeders .

In the above context it is mentioned that 132 KV VSTPS –Waidhan Ckt-I &II along with other EHV lines

radiating from Waidhan / Morwa substation are being tripped frequently during recent past , resulting

interruption to mines area. The frequent interruption to mines area is not desirable. The details of trippings

on EHV elements at Waidhan Morwa area are annexed. The CE (EHT-M&I) is therefore requested to look

into the matter and thorough patrolling of aforesaid lines may be arranged. Earlier also this office has made

request to ensure adequate maintenance of the lines in this matter , so that uninterrupted supply to mines

area could be ensured.

It is also mentioned that whenever any line from Waidhan substation got tripped, tripping on other EHV

lines radiating from Waidhan / Morwa substation are also taking place. As Waidhan substation is adjacent

to Vindhayachal Super Power Station, therefore multiple tripping on EHV elements at these area is not

desirable, looking to system security and reliability of integrated system. The Chief Engineer (T&C) is

requested that relay coordination at Morwa / Waidhan and Rajmilan substations may please be examined

and remedial action may kindly be ensured. Further frequent tripping at Morwa/ Waidhan area may please

be analyzed and report thereon may please be provided so that same may be appraised to WRLDC

Mumbai. The matter may be discussed and needed action may be ensured. The tripping details are

enclosed as Annexure-6.3.

[Action: MPPTCL]

6.4 Formation of State Level Relay setting group- Review and Coordination of relay setting in state of MP:- As decided in 128th Protection Committee meeting of WRPC held on 06th & 07th Dec.

2016 , relay review group for state of MP has been constituted vide this officer letter No.07-05/RPC-14/596

Jabalpur dtd 22.05.2017. In the above context all entities are requested to provide relay settings of all

Agenda of 63rd OCCM of MP 9

Page 12: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

important nodes & all other nodes where relay settings are required to be examined considering protection

issues. As desired by WRLDC important nodes like Indore PG, Bhopal etc. required to be examined first,

which have huge effect on reliability and security of Grid.

The first meeting of State Level Relay Setting Group convened on 18th August 2017 at SLDC for review

the existing relay settings of critical state network and state network incidental to ISTS and to provide

necessary interface between utilities/entities.

All the members were requested to make arrangement to furnish details of relay settings of all important

nodes, so that same may be communicated to all members and existing setting of critical nodes could be

reviewed & corrective measures may be taken. Attention was also invited to members that SLDC have

made multiple correspondences in this regard, however except MPPGCL, no any other utility has provided

the desired data. It is accordingly desired that the data may please be provided immediately to SLDC.

During discussions, it was envisaged that relay setting of ISPs, OSP nodes required to be examined

first, as in recent past, frequent undesirable trappings were observed due to probable mismatch of relay

coordination issue. Accordingly, ISP, OSP representatives were requested to provide relay setting of ISP,

OSP nodes so that same could be validated by the committee in the next meeting. The consolidated relay

setting data has not been received by the entities. The desired data may kindly be submitted in the meeting

by all the entities. It has now been decided that the meeting of the State Level Relay Setting Group of MP

shall be organized on 10th May 2018 to discuss relay coordination issue at Omkareshware and Damoh

node therefore MPPTCL. NHDC, PGCIL may furnish the desired details of relay settings provided at these

nodes so that the matter may be discussed on 15th May 2018 and needed action on the matter may be

initiated.

[Action: MPPTCL/MPPGCL/ISP/OSP/JP BINA/BLA]

6.5 Procedure for availing outage on ISTS EHV elements and OCC approval thereof: - As per

standard procedure of WRPC, all EHV elements which have been listed under the list of important grid

elements of Western Region, the outages for such elements required OCCM approval. All such proposed

outages of interstate and 400 KV transmission elements of next months should be got approved in the

OCCM of WRPC in the current month. All the constituents of WR shall inform to the WRPC for readiness for

availing outage of transmission elements on D-3 basis. Further, as decided non-OCCM outages should be

discouraged. Only under exceptional cases, the request for transmission outage after issue of OCCM

minutes must be posted through email for concurrence of WRPC Member at least three days in advance. The matter has also been discussed in various OCC meetings of MP and it is observed that the

standard procedure for availing outages on interstate and 400 KV elements is not followed by the utilities. It

is observed that routine maintenance shutdown proposal and the shutdown proposal of construction

activities are being sent to SLDC on D-3 basis, whereas such proposal should have been incorporated in

OCCM proposal. Such practice should be strictly avoided. It is worthwhile to mention here that WRPC

Agenda of 63rd OCCM of MP 10

Page 13: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

/WRLDC are reluctant to entertain non-OCCM outages for maintenance / construction activities. Only

emergency outages are considered on D-3 basis. It is therefore desired that all utilities may please ensure

that all maintenance/ construction activities may be planned well in advance and such proposal should have

invariably incorporated in OCCM proposal. It is also mentioned that due to any reason if any OCC approved

outage could not be availed, in that case such proposed outages could be rescheduled and approval of

WRPC/WRLDC could be obtained. However, no any outages could be considered which has not been

incorporated in OCCM proposal. The aforesaid instruction may kindly be complied by Eht-Const wing also

as WRLDC/WRPC is reluctant to accord approval on D-3 basis for construction activities. The Committee

may discuss the matter.

[Action: MPPTCL/MPPGCL/ISP/OSP/JP BINA/BLA/All State Entities]

6.6 Integration of Satna-Satna (PG) Inter-connector After LILO of 220 KV Satna-Chhatarpur Line From Satna (PG) S/s:- 220 KV Satna-Chhatarpur line which was initially radiating from Satna S/s, now

has been LILO at 400 KV Satna (PG). Thereafter, 220 KV Satna (PG)-Chhatarpur line and 220 KV Satna-

Satna(PG) Inter connector are integrated in the system. It is also mentioned that 220 KV Satna-Katni line as

a stop gap arrangement, is being utilized as 220 KV Satna-Satna(PG) Inter-connector-III. Now after

integration of Satna-Satna (PG) Inter connector consequent of LILO of Satna-Chhatarpur line, 220 KV

Satna-Katni line required to be restored as per approved configuration. It is also mentioned that newly

connected Satna-Satna(PG) Inter connector is carrying less than half load in comparison to other three no.

inter connector. After conversion of Satna-Satna Inter connector No.3 as 220 KV Satna-Katni line, only 2 &

half carrying capacity will be available between Satna-Satna( PG). Looking to prevailed load pattern

reduced capacity inter connector will create over loading problem. On dtd. 28.11.2017 at 12:54 Hrs, loading

recorded between inter connector Satna-Satna(PG) are indicated below-

220 KV Satna-Satna (PG) Ckt.I - 141 MW (approximate line length is about 1 KM)

220 KV Satna-Satna (PG) CktI.II - 139 MW (approximate line length is about 1 KM)

220 KV Satna-Satna (PG) Ckt-III - 129 MW (approximate line length is about 1 KM)

(This Ckt. No.III shall be converted as 220 KV Satna-Katni line.)

220 KV Satna-Satna (PG) Ckt-.IV - 56 MW (approximate line length is about 4 KM)

Considering loading of EHV elements at Satna-Rewa area, it would not be appropriate to run one inter

connector with half capacity. It is therefore felt that some modifications are required in 220 KV Satna-Satna

inter connectors. It may please be verified whether newly constructed Satna-Satna(PG) ckt. (having half

load capacity as inter connector due to higher line length) could be utilized for connecting Satna(PG) - Katni

line, so that existing arrangement of 220 KV Satna-Satna(PG) Ckt. III could be continued and uniform

loading on all 3 Nos. inter connector could be ensured.

The above matter have been discussed during 59th meeting of OCCM, however the fruitful response

from MPPTCL still have not been received. It is therefore desired that the matter may be discussed and

suitable result on the matter may be evolved so that system constrained at Satna area may be addressed.

[Action: MPPTCL: T&C/P&D]

Agenda of 63rd OCCM of MP 11

Page 14: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

6.7 Delay In Submission of Documents For First Time Charging of Elements:- Procedure for

interconnection of new transmission elements is briefly narrated hereunder:- • Intimation by Transmission Licensee to RLDC / SLDC(Annexure A1-A5): 10 days prior to anticipated date

of first time charging.

• Acknowledgement and comments of RLDC/ SLDC to Tr. Licensee ( Format-II): Within 3 days.

• Submission of request for first time charging by Tr. Licensee to RLDC//SLDC (Annexure B1-B5): 3 days

prior to anticipated date of first time charging.

• RLDC shall issue Provisional Charging Approval for first time charging to licensee and in case of

interregional element RLDC to issue consent/ request to NLDC for IR lines. In case of intrastate line

charging approval shall be conveyed by SLDC: (within 2 days).

• Licensee to submit dummy SEM reading to RLDC to ensure that the Meter processing Software is able to

read the SEM data from the new meters.

• Licensee to take Operational Code from RLDC /SLDC Control Room for switching operations. The code

shall be issued keeping view of grid reliability.

• Transmission Licensee submit Post Charging documents (Annexure C1 to C4).

• RLDC/ N LDC shall verify the post charging documents and issue certificate for interstate / Interregional

lines / ISTS lines.

• The respective testing department shall furnish regarding measures taken to take care new element

interconnection for protection co-ordination for adjacent s/s and accordingly undertaking shall be

provided.

It is requested that licensee / utilities shall strictly adhere with time schedule for documentation of first

time charging of new transmission elements of all interstate line and all EHV elements 400kv and above..

[Action: MPPTCL/MPPGCL/ISP/OSP/JP BINA/BLA/All State Entities]

6.8 Delay In Conveying Information of Tripping /Disturbance At Sarni End:- 220 KV Sarni –

Handia line tripped at 17:10 hrs on 15.04.2018 from Sarni Power House. The line could be normalized at

18:07 hrs on 15.04.2018 after 57 minutes of tripping. The abnormal delay in normalization of the line was

due to delay in conveying the tripping details to Handia substation as well as to MP SLDC.

In the above context, it is to mention that indications of aforesaid lines were received at SLDC after

repeated pursuance by SLDC. It is generally observed that whenever tripping/disturbance took place at

Sarni Power House, the details are not conveyed timely, resulting delay in process of normalization. Thus,

outage of lines is increased unnecessarily and hampers grid security.

It is requested that the concerned officials may please be instructed suitably that whenever any tripping

or disturbance occurred on EHV elements, the same should be conveyed with relay indications and all

relevant details to SLDC within reasonable time slot so that remedial action could be taken in due course of

time and could be avoided undesired delay in restoration of EHV elements. As prolong outage of EHV

Agenda of 63rd OCCM of MP 12

Page 15: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

elements also involved commercial issue therefore MPPTCL / MPPGCL and all utilities are requested to

ensure timely restoration of tripped EHV elements. The matter may please be discussed.

[Action: MPPGCL]

6.9 PROVISION OF SYNCHRONISATION FACILITY AT EHV SUB-STATIONS OF MPPTCL:- As per

Grid Code, the synchronization facility should be available at all the Power Stations, 400 KV Sub-stations

and 220 KV Sub-stations and 132 KV sub-stations in the path of black start. In last OCC meeting MPPTCL

representative informed the committee that order for 69 no. synchronization trolleys has been placed and 1

no. synchronization trolley has been delivered for checking and testing purpose at 220KV S/S Barwaha. In last 59th OCCM MPPTCL informed the committee that the status will be intimated shortly to SLDC.

The status of installation and commissioning of synchronization trolleys at different substations to be

submitted by the MPPTCL.

Further MPPTCL is also requested to submit the list of Sub-stations where the synchronization trolley

has been installed/installation work of synchronization trolley has been completed.

[Action: MPPTCL]

6.10 TEN DAILY RESERVIOR OPERATION TABLE OF MPPGCL:- In the meeting held in Regional

Office of MPPMCL at Bhopal on 24.09.2016 to discuss availability from Sardar Sarovar Project, ISP & OPS

and State Hydel Plants for Rabi season, MPPGCL had agreed to obtain ten daily reservoir operation table

from WRD and NVDA for their operation of their hydro generators. In last 54th to 59th, OCCMs, request has

been made to MPPGCL for furnishing the same to SLDC. The Tan Daily programme of hydel power stations

is necessary for planning of Load Generation Balance.

MPPGCL has not submitted the ten Daily Reservoir Operation Table of all the power stations of

MPPGCL for the year 2017-18. It is requested that MPPGCL shall submit the Ten Daily Reservoir Table of

all hydel power stations in coordination with NVDA and WRD for optimum utilisation of available water in the

reservoirs during real time operation.

[Action: MPPGCL]

6.11 MONITORING OF SCHEMES FUNDED FROM PSDF :- It was decided in the 6th meeting of

NPC held on 19th December 2016 at Bengaluru, that all the RPCs in the monthly OCC meetings may follow

up with the utilities to expedite the completion of schemes by giving due priority. The implementation of most

of the schemes are based on the recommendation of the enquiry committee on grid disturbance of July

2012 headed by Chairperson, CEA. Therefore timely implementation of these schemes would enhance the

grid security and reliability. Accordingly the details of grant sanctioned from PSDF for the schemes of MP is

enclosed at Annexure- 6.11A. The status of implementation of above schemes (physical as well as financial

progress) may please be reviewed and the entities are requested to expedite implementation of the

schemes. The utilities were advised to furnish the information in the format enclosed at Annexure – 6.11B

by first week of every month on regular basis to Member Convener, PSDF project monitoring group (AGM,

NLDC, POSOCO) with a copy to NPC, WRPC division and SLDC. The status of the same is being

monitored by WRPC in OCC meeting of WRPC every month.

Agenda of 63rd OCCM of MP 13

Page 16: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

It is observed that MPPTCL and MPPGCL are not submitting the requisite information to SLDC in first

week of every month for onward transmission to WRPC. It is therefore requested that concerned official may

please instructed to submit the same regularly to SLDC within time.

[Action: MPPGCL/MPPTCL] 6.12 Charging of 132 KV Chhegaon- Nepanagar Circuit without obtaining real time code from

Sub-SLDC:- On dtd. 27.03.2018, at around 20:28 Hrs., 132 KV Chhegaon-Nepanagr Ckt – I & II tripped

from both end. Thereafter at 20:34 Hrs.,132 KV Chhegaon – Nepanagar Ckt – I was charged from

Nepanagar end but circuit did not hold and again tripped. Further 132 KV Chhegaon – Nepanagar Ckt – II

was charged at 20:33 Hrs.

In view of the above it is to inform that the complete incident was reported late to Sub-SLDC Indore i.e.,

at 20:38 Hrs. Further it is also intimated that the complete switching operations (i.e., trial charging of 132 KV

Chhegaon – Nepanagr Ckt – II at 20:34 Hrs. and charging of 132 KV Chhegaon – Nepanagar Ckt – II at

20:33 Hrs.) without obtaining the code & intimating sub-SLDC Indore.

The switching operation of transmission elements without obtaining code and intimation to SLDC is not

desirable for safe, secure and smooth operation of integrated grid and also violation of IEGC section 1.5,

5.6.2(b) and MPEGC clause 1.14. Such violation was also noticed in past also were charged without

obtaining real time code from SLDC/sub-SLDC. The same was also informed vide this office letter no.

EE/Sub-LDC/381 dtd-28.03.18.

It is therefore requested that the substation officials may please be instructed to strictly comply to the

Grid Code to ensure safety of the integrated system and to avoid such occurrences in future. Repeated

violation of grid code, is required to be reported to Hon’ble commission, which may please be noted.

[Action: MPPTCL]

6.13 POWER SYSTEM STABILIZER (PSS) IN AVR TUNING OF GENERATOR AND ITS RESPONSE PLOT:- In 129th Protection Committee Meeting of WRPC, it has been decided that all

generators would furnish PSS settings and step-test response plot of time Vs terminal voltage in excel

sheets to WRLDC/ WRPC. As a sequel to above, MPSLDC vide various e-mail communication all

generators under our periphery were .requested to provide PSS settings and the step test response plot of

time Vs terminal voltage in excel sheet to WRLDC/ WRPC. Inspite of repeated pursuance, the details of

SGTPS Birsinghpur Power House only receipt, no any other generators have provided the desired

information. However, SGTPS has also not provided desired graph plot in excel sheet. The above data

/plot required to be provided to WRLDC/ WRPC on urgent basis, it is therefore desired that all generators

may provide the same so that the same may be forwarded to WRLDC/ WRPC. The OCC may discuss the matter and the compliance of Protection Committee Meeting may kindly be

ensured.

[Action: MPPGCL/NHDC]

Agenda of 63rd OCCM of MP 14

Page 17: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

6.14 RGMO/FGMO compliance by generators in the region:- It is to intimated that as per IEGC

5.2(f), RGMO/FGMO is mandatory for all thermal Units above 200MW & Hydro Units above 10MW for grid

security and reliable grid operation. Further vide 5th amendment to IEGC dtd-12.04.2017, it has been

provided in clause-5.2(h) that “ RLDCs/SLDCs shall not schedule the generating station or unit(s) thereof

beyond ex-bus generation corresponding to 100% of the installed capacity of the generating station or

unit(s) thereof and that the generating station shall not resort to Valve Wide Open operation of units” so that

primary response is ensured. In view of the above it is requested to kindly submit the required details in prescribed format enclosed

as Annexure- 6.14 to SLDC at immediately.

[Action: MPPGCL/NHDC/JP Bina/BLA]

ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS :

Black Start mock drill of Hydel stations of MPPGCL:- During 2017-18 the black start mock drill successfully carried out at Bargi and Pench Hydel power station on dtd 23.05.2017 and 06.06.2017 respectively. The Black Start Mock drill exercise at Gandhi Sagar Power station was also carried out on dtd 30.05.2017 but synchronization of islanded system with national grid was not successfully done due to problem in bus coupler breaker at Gandhi sagar Power Station. Black Start Mock Drill at Birsinghpur HPS, Tons HPS & ISP HPS was successfully carried out on 17.10.2017, 23.01.2018 & 10.02.2018 respectively. MPPGCL may apprise the same in the meeting. The Joint Black Start Mock Drill of Pench & Bargi was successfully conducted on 11.04.2018. The black start mock drill exercise of other power stations was proposed to be held in April 2018 but to non-availability of Bus Coupler Breaker at OSP the Mock Drill date cannot be finalized. The OSP HPS may kindly inform the status of Bus Coupler Breaker so that at the earliest Mock Drill exercise may be organized. [Action : MPPGCL/NHDC] ITEM NO. 08: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES: 8.1 Status of AMR system installed at SLDC: In the month of March 2018, the complete data of 589 meters was received through AMR system and data of 35 Nos meters (Monthly- 24 & Partial - 11) was not received through AMR system. M/s Secure Meters Ltd. have been adviced to examine the reasons of 35 Nos. meters not read during the month. The status of data received through AMR system is invariably sent to all concerned offices including SE(T&C) offices through email for furnishing the missing data alongwith monthly JMR data latest by 4th of every month. The Committee may like to

Agenda of 63rd OCCM of MP 15

Page 18: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

discuss the following as an action plan for receiving the complete data through AMR system in in a time bound manner.

1. CE(T&C) office is requested to take up the matter with M/s Secure Meters Ltd for

resolving the site related issues of the 35 Nos meters not read during the month of March 2018. Details are shown in enclosed Annexure-8.1.i.

2. Around 138 Nos. ABT meters are installed at the interface points of newly commissioned substation / Xmers / HT consumers / OACs. After repeated pursuance with M/s Secure Meters Ltd. 72 Nos meters are successfully integrated with AMR system of SLDC and balance 66 Nos meters are yet to be integrated with AMR system. CE(T&C) office is requested to advice M/s Secure Meters Ltd. and field offices for integrating the balance ABT meters (66 Nos). The list of 66 Nos. meters required to be integrated with AMR system is shown in Annexure-8.1.ii. Further, CE(T&C) office is requested to take up the matter with CE(Procurement) office for including the new meters installed at the interface points under AMC contract of M/s Secure Meters Ltd.

3. As per Regulations 10 and 18 of Central Electricity Authority (Installation and operation of meter) Regulation 2010, The interface meter are to be tested at least once in five years. MPPTCL is requested to advise the site officials for testing / calibration of meters installed at the Sub-Stations.

4. CE(T&C) office is requested to issue instructions to all circle offices for furnishing the JMR data in standard format enclosed herewith as Annexure-8.1.iii to SLDC on email id- [email protected]

[Action : CE(T&C) MPPTCL] 8.2 AMR facility for the ABT meters installed at MPPGCL :

In compliance to state commission directives for computation of weekly transmission losses and Deviation charges, SLDC has requested the MPPGCL for providing the AMR facility on the meters installed at the interface points for data downloading through AMR System installed at SLDC. Accordingly MPPGCL has provided AMR facility on 107 Nos ABT meters installed at the interface points as intimated by CE(Thermal), O/o ED(O&M:Gen), MPPGCL vide letter No. 426 dated 01.03.2016. The status of March 2018 of ABT meter data (44 Nos) not received through AMR system of SLDC has been emailed to GCC, MPPGCL on 21th April-2018. MPPGCL is requested to take up the matter with M/s Secure Meters Ltd. to resolve the problems related with non-readability of meters integrated successfully and provide AMC of AMR facility installed at Power Houses to M/s Secure Meters Ltd so that complete data of meters is received at SLDC. MPPGCL is also requested to instruct the Gandhi Sagar HPS & Silpara HPS officials for considering the ABT meters with AMR facility as main meters and shall furnish the JMR data accordingly.

Agenda of 63rd OCCM of MP 16

Page 19: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

MPPGCL is requested to furnish the meter master of ABT meters installed at the interface points as main, check and standy meters alongwith modem and SIM details. In case of Thermal Power Stations of MPPGCL, the injection recorded by the ABT meters installed at the outgoing feeders generally do not match with the generation recorded at Generator end. MPPGCL is requested to advise the site officials for monthly checking / verification of feeder wise data with Generator and Station Xmer wise data and testing / calibration of meters installed at the Power Stations as per CEA regulations.

[Action : MPPGCL ]

8.3 Non receipt of monthly injection data (JMR) of newly commissioned Wind & Solar Power Project for issuance of monthly State Energy Account : The concerned SE(O&M)’s do not furnish the monthly injection data of following newly commissioned Wind & Solar Power Project connected at 33KV level. However, SLDC is incorporating the injection data recorded in ABT meter in SEA, but, verification of data could not be done.

i) 15MW Solar Power Project of M/s Simcom Pvt. Ltd. (Simcom(1MW), Eastman(4MW) & Made Easy(10MW) connected at 220KV Ganjbasoda. –SE(O&M) Vidisha.

ii) 6MW Biomass Power Project M/s Ramnik Power & Alloy connected at 33KV Wara Seoni substation - SE(O&M) Chhindwara.

iii) 12.8MW Baggase Power Project of M/s Mahakaushal Sugar Mills connected at 220KV Narsinghpur substation - SE(O&M) Narsinghpur.

iv) 30MW Baggase Power Project of M/s Narmada Sugar Mills connected at 132KV Ponder substation - SE(O&M) Narsinghpur.

DDC, Jabalpur and Bhopal is requested to take up the matter with their CE(Comml), office for issuance of directives to concerned SE(O&M)’s to furnish the JMR generation data by 3rd or 4th of every month. SLDC has already issued instructions to Renewable Energy Generators not integrated with AMR server of SLDC and connected at 33KV level for providing separate modem & SIM for data downloading at SLDC remotely. All the Discoms are requested to coordinate with Renewable Energy Generators (REG’s) for installation of separate modem & SIMs and integrating with AMR Server for data downloading at SLDC. Further, the JMR injection data of the following wind & solar generators connected at 132KV level and above is not furnished by the concerned EE(T), MPPTCL. SLDC consider the data received through AMR or through MRI by site official in monthy SEA, but verification of data could not be done.

i) 42MW Wind Power Project of M/s Suzlon Gujrat Wind Park Ltd. connected at 220KV Badnagar substation through 132KV Ckt.

Agenda of 63rd OCCM of MP 17

Page 20: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

ii) 21MW Wind Power Project of M/s Sarjan Realities Ltd. connected at 220KV Badnagar substation through 132KV Ckt.

iii) 11.5MW MSW Plant of M/s Essel Power Ltd., Marhotal, Jabalpur connected at 132KV Marhotal substation through 132KV Ckt.

iv) 50 MW Kukru Wind Power Project connected at 132KV Gudgaon substation through 132KV Ckt.

v) 49.5 MW Betul Wind Power Project connected at 132KV Gudgaon substation through 132KV Ckt.

vi) 51MW ReNew Clean Solar Power Project connected at 132KV Kotiya substation through 132KV Ckt.

CE(T&C) office is requested to issue necessary instructions to concerned filed offices for furnishing the JMR data to SLDC by 3rd or 4th of every month.

[Action : DISCOMS & MPPTCL]

ITEM NO. 9: SCADA and E&T RELATED ISSUES: 9.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & 132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS & HAVING TRACTION FEEDERS-

The telemetry of new 220KV S/s, important 132KV S/s having injection from renewable generating Stations, Captive Power Plant & Railway Traction feeders is to be provided through Dongfeng RTUS installed and commissioned under MPPTCL SCADA project. Total 50 Nos. Sub Stations has already been identified and forwarded to MPPTCL for arranging integration of telemetry. The integration of around Twelve RTUs (132KV Biora, 132KV Mungaoli S/s, 132 kv Malhargrah, 132KV Pansemal, 132 KV Chourai, 132 KV Nainpur, 132 KV Mandla, 132 KV Raghogarh, 132 KV Isagarh, 132 KV Pratappura, 132 KV Maneri, 132 KV Dabra ) is required to be integrated with SLDC SCADA system.

In addition to the above telemetry of Birsingpur HPS and Zinna HPS is also not available and same needs to be provided by MPPGCL.

MPERC vide Letter dated 09-08-2017 has directed to ensure proper functioning of RTUs.

The telemetry of these identified Sub Stations is urgently required for monitoring of grid. Hence the progress in the matter as well as further schedule of commissioning, including data channel, plan for arrangement of modems, and rectification of SOE issue may please be provided by T&C.

[Action: - CE (T&C)/CE (T&P), MPPTCL] 9.2 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS & The present status of telemetry discrepancy including upgradation requirement is enclosed herewith as Annexure-1. The list of important locations where RTU upgradation is required to accommodate renewable feeders/other feeders/transformers is detailed is also given hereunder:- Sl Name of Substation Name of feeders/transformers required to be

Agenda of 63rd OCCM of MP 18

Page 21: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

No. whose RTU is required to be upgraded

included in telemetry

01 400 KV Birsingpur TPS

1.Wrong telemetry of 400/220 KV Xmer CB status (Both Sides), Bus Coupler CB status, Station Xmer 5A & 5B CB status,Gen-1 CB status, 220 KV Panagar CB status, Gen-2 CB status. 2. Wrong values of 220 KV Bus-II Voltage & frequency. 3.Non availability of telemetry of 220/33 KV Xmer. These discrepancies are persisting since long time

02 400 KV Satpura TPS

Telemetered values of 1.Generating Transformer 6,7,8,9 MW,MVAR, 2.400 Satpura-Astha I & II Line Reactors, 3. 220 KV Bus I & II Voltage & frequency, 4.CB Status of 220KV Satpura- Sarni -1,2, 220 KV Satpura-Itarsi 2,3 & 4, 220 KV Satpura-Handia, Station Xmer I, II & III. 5.Wrong CB status of GT 6, & 220 KV Transfer Bus Coupler & 220 KV Bus Tie. 6.SOE to be verified.

03 220 KV ATPS Station Transformer 5A & 5B CB & 132/33 KV transformer CB.

04 Singhaji TPS Values of Generating Unit 1 & 2 jumps to zero for a short duration.

05 Pench HPS & Deolond HPS Telemetry not available since long time.

06

220 KV Tons

Telemetered values of following feeders is wrong:- 1. 220 KV Tons-Sirmour 2. 220 KV Tons-Rewa 3. 220 KV Tons-Satna 4. 220 KV Tons-Kotar

Above discrepancy is pending since more than year. In Last OCCM it was ensured by MPPGCL that the same shall be rectified within a week but no action has been taken till now. CB status of 220 KV Tons-Rewa II.

07 Rajghat HPS Wrong CB status of Gen-3

08 400 KV ISP Telemetered values of 400 KV Nagda MVAR is 10 times of actual value.

09 220KV Birsingpur S/s

The telemetry of 220KV IC-3 & 4 feeder is not available since last one year.

10 400 KV Chhegaon Breaker status of 400 KV Bus Coupler, 315 KVA Xmer II (Primary) & 160 MVA Xmer III (primary)

11 220 KV Rewa S/s 1.CB status of 220 KV bus coupler, 132 KV Rampur Naikin.

12 220KV Anuppur S/s 1.132KV TRF 2 telemetry not available. 2.Wrong CB status of 220 KV Amarkantak-II, 220 KV Amarkantak-I, 160 MVA Xmer II, 132 KV Kotma-I, 132 KV Kotma II, 132 KV Shahdol, 40 MVA Xmer.

Agenda of 63rd OCCM of MP 19

Page 22: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

13 132KV Kotma S/s 1.132KV Anuppur feeder II telemetry not available. 2. Wrong CB status of 132 KV Anuppur-1 & 2.

14 220 KV Seoni i.Wrong CB status of 160 MVA Xmer II (Secondary side) ii.Wrong value of 220 KV Bus II Voltage iii. Wrong value of 220 KV Seoni-Seoni(PG)-1.

15 220 KV Sabalgarh Telemetry of 132 KV Motijheel not available.

16 400 KV Bhopal 80 MVAR Reactor I & II Main CB 18 132 KV Khategaon Wrong values of 132 KV Tap (Handia – Kannod)

19 400 KV Astha (i)400/220 ICT-1 MW Value is wrong. (ii)400 KV Satpura-II CB status & Line Reactor MVAR. (iii) 400 KV Bus Coupler CB Status (iv)220 KV Shajapur-II CB Status (v) SOE to be verified.

The above discrepancy list is almost similar to the list in last OCCM & no rectification has been observed. The commissioning of new SCADA/EMS system at SLDC is completed and for successful functioning of EMS system the availability of complete telemetry including CB status is a prerequisite. Hence the work regarding telemetry discrepancy mentioned in enclosed annexure is to be taken up on highest priority. MPERC vide Letter dated 09-08-2017 has directed to ensure proper functioning of RTUs. MPPGCL and MPPTCL may please provide completion schedule regarding rectification of telemetry discrepancy and upgradation of RTU’s.

ACTION: T&C, MPPTCL & O&M: GEN, MPPGCL

9.3 Extension of RGMO/FGMO signal to SLDC/WRLDC :-

As per IEGC 5.2(f), RGMO/FGMO is mandatory for all thermal units above 200 MW and hydro units above 10 MW. Further considering the high penetration of renewable to grid and also the Government target to achieve 175 GW, it is essential to monitor operation of RGMO/FGMO at SLDC/RLDC for ensuring grid security and compliance of regulation. Subsequently SLDC vide letter no. 07-05/RPC-27/3739 dated 18-01-2017, letter No. SE/LD:E&T/693 dated 23-01-2017, letter No. SE/LD:E&T/34 dated 13-04-2017, letter No. SE/LD:E&T/143 dtd.26-05-17, , letter No. SE/LD:E&T/309 dtd.19-07-17, letter No. SE/LD:E&T/980 dtd.14.03.18 requested MPPGCL/NHDC for integration of telemetry of RGMO/FGMO in RTU installed at power station and forward the object address configured in RTU so that same may also be configured in SLDC SCADA and RGMO/FGMO status may be displayed in SCADA system. The matter was again taken up vide this office UO No.38 dated 21/08/2017. However, extension of RGMO/FGMO signal of following generating units is still to be extended to SLDC SCADA system:-

S.No. Name of Generating Station Unit.No. 1 Satpura TPS 6,7,8,9 2 SGTPS 1,2,3,4 4 BARGI HPS 1,2

Agenda of 63rd OCCM of MP 20

Page 23: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

5 PENCH HPS 1,2

In addition to above, the RGMO/FGMO status of Tons HPS is showing incorrect. MPPGCL is thus requested to kindly arrange for integration of telemetry of RGMO/FGMO in RTU installed at power stations & rectification of incorrect RGMO/FGMO status of Tons HPS. 9.4 Non Availability/ Unreilable telemetry of Hydel Power Stations :-The telemetry of Bansagar III, Tons, Pench, Bargi, Bansagar II is very unreliable & frequent long outage with abnormal delay in restoration of same is observed. The RTU availability of MPPGCL HPS is as detailed here under :-

Name of HPS Present Status Availability

in Feb-18 Availability in

March-18 Pench Out since last one year 0 % 0% Bansagar-III Out since last 10 months 0 % 0% Bansagar-II Intermittent 37% 39% Madikheda Intermittent 63% 58% Rajghat Intermittent 90% 85% Gandhisagar Intermittent 24% 75% Bargi Intermittent 92% 95% Tons Intermittent 96% 98% Birsingpur HPS Telemetry not provided to SLDC. Zinna HPS It is to mention that as per CERC communication regulation 2017, availability of telemetry is

required to be ensured more than 99.9% but as indicated above the telemetry availability of Hydel Power Stations is very low.

SLDC vide letter SE/LD:E&T/38 dtd.12.04.18 requested MPPGCL to provide the contact details

of officers at each power house looking after telemetry work & also provide the list of spares (PLCC/RTU/MFM etc.)

Action :- ED(O&M:Gen),MPPGCL

9.5 NON AVAILABLITY OF SOE AT SLDC SCADA SYSTEM WRLDC vide letters dtd. 03.05.17 & 15.05.17 intimated that SOE of grid disturbance at 220 KV

S/s Mahalgaon & 400 KV S/s Indore is not received in Back-up LDC SCADA/Sub-LDC SCADA system respectively. SLDC is carrying out data validation of various substations periodically & it is observed that SOE from various substations like 400 KV S/s Satpura, 400 KV S/s Astha, 220 KV S/s Damoh, 220 KV Itarsi, 220 KV Barwaha, 220 KV Chhindwara, 220 KV Pandhurna, 220 KV Sabalgarh, 220 KV Shivpuri, 220 KV S/s Tikamgarh, 220 KV S/s Mahalgaon, 220 KV S/s Hoshangabad, 220 KV Shujalpur, 220 KV S/s Badod was not received at SLDC SCADA system. Subsequently SLDC vide letter SE/LD:E&T/200 dtd. 14-06-17 requested MPPTCL to arrange simulation testing for SOE of all RTUs.

Receiving of SOE is very essential for analysis & investigation of major trippings in the grid.

MPPTCL is thus requested to arrange simulation testing for SOE of all RTU’s in coordination with SLDC SCADA/Back Up SLDC/Sub LDC SCADA system & also issue necessary instructions to sort out the issues for ensuring proper receipt of SOE in SLDC SCADA system.

Agenda of 63rd OCCM of MP 21

Page 24: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

9.6 INTERMITTENT TELEMETRY DUE TO NOISE IN COMMUNICATION CHANNEL :-

It has been observed that the telemetry of Singhaji TPS, 400KV Pithampur,132 KV Chhindwara, 220KV Sirmore, 220 KV Tons HPS, 220Kv Sidhi,220 KV Rewa, Madikheda HPS, 132 KV Khapaswami ,220 KV Pithampur I & II , 132 KV Morwa, 220 KV Sabalgarh, 132 KV Sheopur Kalan, Madikheda HPS, 132 KV Pondar is intermittent due to heavy noise in the communication channel. Further these noisy channels interrupt the functioning of FEP at the SLDC/Back Up LDC/Sub LDC which leads to inconvenience in system operation & control.

It is to mention that as per CERC communication regulation 2017, availability of telemetry is required to be ensured more then 99.9%. However, presently, availability of most of the RTUs is less then 50%. MPPGCL and MPPTCL is required to initiate necessary action to ensure availability as per CERC regulation.

MPPTCL is thus requested to arrange for alignment of PLCC Channel & identify/replace the outdoor equipments which injects the noise in the channel/system.

9.7 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS The long outage of telemetry of following S/s is discussed in detail:-

Sl No. Name of Sub Station Out from /Remark

01

132KV Morwa S/s

More than one and half Year.

02 132KV Beohari S/s Out from more than one year

03 132 KV Waidhan S/s Out from last 5 months

04 Pench HPS Out from more than a year

05 Bansagar III HPS Out from ten months.

MPERC vide Letter dated 09-08-2017 has directed to submit reason for long outage for RTU & also directed to ensure proper functioning of RTUs. MPPTCL, MPPGCL are requested to sort out rectification of above RTU/data channel on top most priority. It is to mention that as per CERC communication regulation 2017, availability of telemetry is required to be ensured more then 99.9%. However, presently, availability of most of the RTUs is less then 50%. MPPGCL and MPPTCL is required to initiate necessary action to ensure availability as per CERC regulation.

Agenda of 63rd OCCM of MP 22

Page 25: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

9.8 TELEMETRY OF RAILWAY TSS SUB STATIONS:-

The telemetry of existing 38 Nos railway Traction Sub Stations & upcoming 25 new railway TSS is required to be provided by railway for monitoring of drawal by each TSS and also monitoring of demand of railway in MP. In last OCC, the railway representative informed that the tendering for telemetry of twenty railway traction substation is under progress and shall be commissioned in next six month. It was also informed by railway representative that action to arrange telemetry of balance traction sub stations shall also be initiated shortly. Railway is requested to provide current progress in the matter along with the timeline. Further railway is also requested to expedite the progress of providing telemetry of existing 38 Railway TSS & upcoming 25 New Railway TSS.

9.9 INFORMATION REQUIRED FOR PMU ANALYTICS UNDER URTDSM PROJECT:- Under the “Unified Real Time Dynamic State Measurement” URTDSM Project, the analytics applications has been installed at SLDC MP for which the relay setting details are required for its configuration from all the sub-stations where PMU’s are installed and its adjacent sub-stations (list of S/s enclosed as Annexure-9.9.1). The format for submitting the required details is enclosed as Annexure-9.9.2. ITEM NO 10 : DATE AND VENUE OF NEXT OCC MEETING :

It is proposed to hold 64st Operation and Coordination Committee meeting of MP on 29-06-2018. The host and venue of the same shall be decided in the meeting.

***********

Agenda of 63rd OCCM of MP 23

Page 26: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

S. No. Particulars

1

1.1 Maximum Frequency 50.06 HzBetween 01.00 hrs & 02.00 Hrs on 12.02.18

50.08 HzBetween 06.00 hrs & 07.00 Hrs on 31.03.18

1.2 Minimum Frequency 49.86 HzBetween 10.00 hrs & 11.00 Hrs on 28.02.18

49.85 HzBetween 10.00 hrs & 11.00 Hrs on 09.03.18

1.3 Average Frequency 49.98 Hz 49.97 Hz

2

2.1 Maximum Frequency 50.2 HzAT 13.02.30 HRS ON 17.02.18

50.2 Hz AT 13.03:20 HRS ON 21.03.18

2.2 Minimum Frequency 49.7 HzAT 06.43:30 HRS ON 17.02.18

49.68 Hz AT 21.19:30. HRS ON 14.03.18

3 Percentage of time when frequency was :-

%age of time when frequency was Feb-18 Mar-18

3.1 Below 48.5 Hz 0.00 0

3.2 Between 48.50 Hz and 48.8 Hz 0.00 0

3.3 Between 48.80 Hz and 49.2 Hz 0.00 0

3.4 Between 49.20 Hz and 49.5 Hz 0.00 0

3.5 Between 49.50 Hz and 49.7 Hz 0.00 0

3.6 Between 49.70 Hz and 49.9 Hz 9.69 12.99

3.7 Between 49.9 Hz and 50.05 Hz 80.25 79.29

3.8 Between 50.05 Hz AND 51.5 Hz 10.06 7.72

3.9 Above 51.5 Hz 0.00 0.00

4 No. of times frquency touched 48.80 Hz 0 0

4.1 No. of times frquency touched 48.60 Hz 0 0

4.2 No. of times frquency touched 51.0 Hz 0 0

FREQUENCY PARTICULARS

INTEGRATED OVER AN-HOUR

INSTANTANEOUS FREQUENCY

Feb-18 Mar-18

Agenda of 63rd OCCM of MP 24

Page 27: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

I S.

No. NAME OF THE TRANSMISSION LINE / (FINANCED BY)

TYPE OF CIR CUITS

ROUTE LENGTH

CIRCUIT KMS.

DATE OF COMPLETION

DATE OF COMMI-SSIONING

A. 400 KV TRANSMISSION LINESNIL 0 0

B. 220 KV TRANSMISSION LINES

1(a).220Kv DCDS line for inter-connection of 400Kv S/s Betul with 220Kv S/s Betul (2x1.88) (ADB-III Saving)

DCDS 1.88 3.76 July'2017 21.07.2017

2LILO of 2nd circuit of Damoh (MPPTCL) - Sagar 220KV line at Damoh (PGCIL) 400 kV Sub-station Damoh (2x0.592)

DCDS 0.59 1.184 Aug'2017 28.08.2017

3LILO of 2nd ckt. Of Itarsi(MPPTCL) - Hoshangabad 220Kv line at Itarsi(PGCIL) 400 KV S/s. (2X0.060)

DCDS 0.06 0.12 Aug'2017 09.08.2017

4LILO of one circuit of Satna (MPPTCL) - Chhatarpur 220KV line at Satna (PGCIL) 400 kV Sub-station (2x1.96) (PGCIL DOWN)

DCDS 1.96 3.92 Oct'17 05.10.2017

5LILO of 2nd ckt. Of Bansagar - Satna 220Kv line at Kotar 220 KV S/s. (4x3.321+2x2.462)(ADB-III Saving) LILO arrangement 4x0.035+2x0.959 completed

DCDS 4.70 17.848 Oct'17 16.10.2017

6220kV DCDS line for LILO of one ckt of 220kV DCDS Indore - Indore-II(Jaitpura) line at Mangliya (2x0.198) (PFC-III)

DCDS 0.20 0.396 Oct'17 30.10.2017

7LILO of one circuit of Malanpur - Mehgaon at 400Kv S/s CWRTL (Adani) (2x7.396) (ADB-III Saving)

DCDS 7.40 14.792 Jan'18 16.01.2018

8LILO of 2nd ckt. Of Birsinghpur - Amarkantak 220kV line at Shahdol 220 KV S/s. (4X5.6+ 2x0.198) ADB-III Saving DCDS 5.80 22.796 Feb'2018 06.02.2018

9Part line : Morena 400kV CWRTL Adani Group - Morena 220 (Jarerua) (2x24.685cktkm) charged on 31.03.2018) (ADB-III Saving)

DCDS 24.685 49.370 March'2018 31.03.2018

C. 132 KV TRANSMISSION LINES

1132 kv DCDS Ujjain(220 kv) -Chandrawatiganj line (2x33.191) (JICA) (Note: 18.40cktkm One ckt charged by tapping arrangement on 30.03.2015)

DCDS 33.19 47.982 June'17 06.06.2017

2 2nd Ckt of 132 kv Badnagar - Gautampura line (1x23.24)(JICA) 2ND CKT 23.24 23.24 June'17 30.06.2017

3132 kv DCSS line from220Kv S/s Chichli - 132Kv Karapgaon (1x31.058)(PFC-II)

DCSS 31.06 31.058 June'17 18.06.207

4132Kv DCSS line from proposed 132Kv s/s Tamot to Sagar Yarn plant of M/s Sagar Manufacturer (P) Ltd.(1x3.1) (contributory work)

DCSS 3.10 3.1 June'17 30.06.2017

5132Kv DCSS line from 220kV s/s Pithampur for supply of 5MVA to M/s SRF Ltd.(1x2.421) (contribution work)

DCSS 2.42 2.421 June'17 29.06.2017

6 2nd Ckt of 132 kv Pithampur - Betama line (1x14) (JICA)2nd

ckt.km.14.00 14 July'2017 02.07.2017

7132Kv DCSS line from 220Kv S/s Rajgarh to 132Kv S/s Jhabua (1x67.790) (PFC-III)

DCSS 67.79 67.79 Aug'2017 09.08.2017

8132Kv DCDS line for extension of 132Kv line from Manliya(132) - Mangliya (220) (2x0.736) (PFC-III)

DCDS 0.74 1.472 Aug'2017 05.08.2017

9LILO of 132KV Gwalior- Dabra/Karera line at Chinour (132KV DCSS Dabra- Chinour line) (2X13.682) (ADB-III)

DCDS 13.68 27.364 Aug'2017 04.08.2017

10 132KV DCSS Sabalgarh - Kelaras line (1x19.655) (ADB-III) DCSS 19.66 19.655 Aug'2017 14.08.2017

11 132 kv Sagar-Rahatgarh DCSS line (1x54.790) (PFC-II) 54.79 54.79 Sept'2017 28.09.2017

ANNEXUR-2.2.5(i)

M.P POWER TRANSMISSION COMPANY LIMITED TRANSMISSION WORKS COMPLETED DURING 2017-18 (UP TO 31.03.2018)

EHV TRANSMISSION LINES

Agenda of 63rd OCCM of MP 25

Page 28: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

12 132 KV DCSS Kukshi - Jobat line (1x33.74)(REC) 33.74 33.74 Sept'2017 21.09.2017

13132Kv DCSS 2 phase 2wire line from 132Kv s/s Umreth to RTS Parasiya (1x13.623) (Contributory)

13.62 13.623 Sept'2017 05.09.2017

14132kV DCSS line from 220kV S/s Kothiya to 51 MW Solar Power Project of M/s Re New Clean Energy Pvt.Ltd. District Ashoknagar. (Contributory)

18.90 18.9 Sept'2017 29.09.2017

15132Kv DCSS 2 phase 2wire line from 132Kv s/s Bankhedi for PS to RTS Bankhedi (1x7.9) (Contribution)

DCSS 7.9 7.9 Oct'17 11.10.2017

16132Kv DCSS 2 phase 2wire line from 132Kv s/s Majhgawan for PS to TSS Majhgawan(1x0.19) (Note: 1x0.190 charged on 24.10.2017) (Contribu)

DCSS 0.19 0.19 Oct'17 24.10.2017

17 132kv DCSS Chhanera -Khirkiya line (1x30.42) (ADB-Saving) DCSS 30.42 30.42 Nov'2017 14.11.2017

18LILO of 132kv Nagda - Ratadiya line at Unhel 132KV Sub-station (2x1.244) (ADB-Saving)

DCDS 1.24 2.488 Nov'2017 18.11.2017

19LILO of 132Kv Vidisha- Bairasiya line at salamatpurr (2x0.162) (ADB-III)

DCDS 0.16 0.324 Nov'2017 29.11.2017

20132kv DCSS line from Kolaras - Mada line (1x20.293) (ADB-III (Saving)

DCSS 20.293 20.293 Dec'2017 24.12.2017

21132 kv DCSS line from 132Kv S/s Kymore-132Kv S/s Barhi (1x32.393) (PFC-II)

DCSS 32.393 32.393 Dec'2017 30.12.2017

22132 kv DCSS Line from 220Kv S/s Shivpuri-132Kv Bairad (1x32.970) (PFC-II)

DCSS 32.97 32.97 Dec'2017 23.12.2017

23132 kv DCDS Beragarh - Intkhedi (2x8.7+4x1.5) (1st ckt. 1x9.025 charged on 14.12.2017) (ADB-III)

DCDS 9.025 9.03 Dec'20171st ckt.

14.12.2017

24LILO of Gadarwara - Bankhedi SC line for Pondar Substation (1x1.995)

DCSS 1.995 2.00 Dec'2017 06.12.2017

25132Kv DCSS 2 phase 2wire line from proposed 220Kv s/s Narsinghpur 5MVA PS to RTS Narsinghpur (1x7.325) (Contributory work)

DCSS 7.325 7.325 Dec'2017 15.12.2017

26132kV DCSS 2 phase 2wire line from 132kV s/s Mansakra for PS to RTS Sihora road (1x1.704) (contributory work)

DCSS 1.704 1.704 Dec'2017 30.12.2017

27132 kv DCSS from 220Kv S/s Datiya-132kv S/s Indergarh (1x27.198) PFC-II

DCSS 27.20 27.198 Jan'18 22.01.2018

28132 kV line from Manawar to upcoming plant of M/s Ultra tech Cement village Tonki Tehsil Manawar District Dhar

DCSS 5.64 5.644 Jan'18 25.01.2018

29132 kv DCDS Beragarh - Intkhedi (2x8.7+4x1.5) (1st ckt. 1x9.025 charged on 14.12.2017) (Iind ckt. Charged on 21.02.2018)(ADB-III)

2nd ckt 9.049 Feb'2018 21.02.2018

30 132kv DCSS line Bhonra - Kapasi (1x22.569) (ADB-III Saving) DCSS 22.569 22.569 Feb'2018 09.02.2018

312nd ckt. Stringing of 132kV Shivpuri - Kolaras line (34.262) (ADB-III Saving) 2nd ckt 34.262 34.262 Feb'2018 26.02.2018

322nd ckt.stringing of 132kV Sagar - Sagar interconnection (8.77) (ADB-III Saving)

2nd ckt 8.77 8.77 Mar'2018 28.03.2018

33 132kv DCSS Chhegaon -Singot line (1x58) (ADB-III Saving) DCSS 57.853 57.853 Mar'2018 30.03.2018

34 2nd ckt. 132kV Pithampur - Jamli line (JICA) (1x20) 2nd ckt 21 21 Mar'2018 28.03.2018

35 2nd ckt. 132kV Pithampur - Bagdi line (JICA) (1x21.794) 2rd ckt 21.79 21.794 Mar'2018 27.03.2018

36 132 kv DCSS Ghatabillod-Betma line (JICA) (1x16.145) DCSS 16.145 16.145 Mar'2018 27.03.2018

372nd ckt. of 132kV Malanpur - Morar line (28.708) (ADB-III Saving)

2nd ckt 28.708 28.708 Mar'2018 31.03.2018

382nd circuiting of 132kV Jhabua - Meghnagar DCSS line (GEC)

DCSS 25.9 25.9 Mar'2018 25.03.2018

39132kV DCSS line from 220kS/s Barwaha - water pumping station 1 & 2 NVDA at village Sirley Tehsil Barwaha Dist. Khargone (1x1.76) (Contrbution suprvision only)

DCSS 1.76 1.76 Mar'2018 08.03.2018

Agenda of 63rd OCCM of MP 26

Page 29: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

II.

S. No.

NAME OF SUBSTATION / (DISTRICT) / (FINANCED BY)

VOLTAGE

RATIO (KV)

No.OF X-mer & Cap.(MVA)

EFFECTIVE

CAPACITY MVA

DATE OF COMPL-ETION

DATE OF COMMI-

SSIONING

A. 400 KV SUBSTATIONS

1Chhegaon 400/220 kv s/s Addl. 315 MVA X-mer (Distt.Khandwa) (ADB-III)

400/220 1x315 315 Nov'2017 17.11.2017

B. 220 KV SUBSTATIONSa. 220 KV NEW SUBSTATIONS 1 220/132 KV S/s Mangliya with 1x160MVA (PFC-III) 220/132 1x160 160 Oct'17 30.10.2017

2 Upgradation of Shahdol 132Kv S/s to 220kv with 1x160MVA ADB-III (Saving) 220/132 1x160 160 Dec'2017

05.12.2017 (132kV side)

C. 132 KV SUBSTATIONSa. 132KV NEW SUBSTATIONS 1 Kelaras 132kv s/s with 1x63 MVA (ADB-III) 132/33 1x63 63 Aug'2017 14.08.2017

2Jobat 132kv s/s with 1x50 MVA (REC-I) Note: initial 50MVA X-mer charged but replaced by 40MVA X-mer after failed on 22.11.17

132/33 1x50 40 Sept'2017 26.09.2017

3 Salamatpur 132kv s/s with 1x40 MVA (ADB-III) 132/33 1x40 40 Nov'2017 30.11.2017

4 Karapgaon 132kv s/s (Distt- Narsinghpur) (PFC-II) 132/33 1x40 40 Dec'2017 29.12.2017

5 Unhel 132kv s/s with 1x50 MVA (ADB-III(Saving) 132/33 1x50 50 Dec'2017 15.12.20176 Mada 132kv s/s with 1x50 MVA (ADB-III Saving) 132/33 1x50 50 Dec'2017 24.12.2017

7 Barahi 132kv s/s (Distt. Katni) PFC-II 132/33 1x40 40 Jan'18 20.01.2018

8 Agrod 132kv s/s 1x40 MVA ADB-III 132/33 1x40 40 Jan'1805.01.2018 (from 33kV)

9 Intkhedi 132kv s/s 1x63 MVA ADB-III 132/33 1x63 63 Jan'18 08.01.2018

10 Chhayan 132kv s/s1x40 MVA ADB-III 132/33 1x40 40 Feb'201821.02.2018

(from 33 kV)

11 Kapasi 132kv s/s with 1x50 MVA (ADB-III Saving) 132/33 1x50 50 Feb'2018 09.02.2018

12 Singot 132kv s/s with 1x50 MVA (ADB-III Saving) 132/33 1x50 50 Mar'2018 30.03.2018

EHV SUB - STATIONS

Agenda of 63rd OCCM of MP 27

Page 30: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

ANNEX-2.2.5.ii

S. No. NAME OF THE TRANSMISSION LINEFUNDING AGENCY

PROGRESS IN %

A. 400 KV TRANSMISSION LINES

1400kV DCDS (Quad moose) line from Shri Singaji TPS (stage-II) - Pithampur (2x69.968+ 2x68.626)

UBI 49%

2 400kV DCDS (Quad moose) line from Pithampur - Badnawar (2x70) UBI 41%

3 LILO of 400kV Seoni - Bhilai SC line at 400kV S/s Balaghat/Kirnapur (2x3.375) ADB-III 8%

4LILO of both ckt. Of 400kV Nagda to Rajgarh line at 400kV S/s Badnawar (4x8.163)

ADB-III 36%

5 400 kV DCDS line from Nagda 400 kV S/s to Mandsaur 400 kV S/s GEC 7%

6400 kV DCDS line for LILO of one ckt of Satna(PGCIL) - Bina(PGCIL) 400 kV at Sagar 400 kV S/s

GEC 4%

7 400 kV DCDS line from Ashta 400 kV S/s to Ujjain 400 kV S/s GEC 3%8 400 kV DCDS line from Indore (PGCIL) 765 kV S/s to Ujjain 400 kV S/s GEC 24%9 400 kV DCDS line from Nagda 400 kV S/s to Ujjain 400 kV S/s GEC 5%B. 220 KV TRANSMISSION LINES1 2nd Ckt of 220kv Satna - Chhatarpur line (152) JICA-I 20%

2LILO of both Ckt of Indore-II (jaitpura) - Ujjain 220kV line at Indore (PGCIL) 765 kV S/S (4x6.012)

UBI 17%

3LILO of one Ckt of 220kv DCDS Ashta - Dewas line at 220kv S/S Chapda (DCDS) (2x32.782)

ADB-III 3%

4 220Kv DCDS line from Pithampur-Depalpur line (2X31) ADB-III 37%

5220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam D/C line at 400Kv S/s Badnawar (2x1+4x8)

ADB-III 12%

6 220Kv DCDS Julwaniya- Kukshi (2X58) ADB-III 16%7 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) ADB-III 15%8 220kV DCDS Khandwa(400 PGCIL) - Chhanera line(2x39.322) ADB-III Saving 32%

9LILO of both ckt of Badod-Kota/Modak 220kV line at 220Kv S/s Suwasara (4x4.382)

ADB-III Saving 67%

10 LILO of 2nd ckt Nagda - Neemuch 220kV line at 220Kv S/s Daloda (2x12.2) ADB-III Saving 40%

11(b).LILO of 220kV Sarni - Pandhurna at 220kV S/s Betul (2x38.864) (Note: Betul220 & Betul400 I/C line 3.76 cktkm. charged on 21.07.2017)

ADB-III Saving 37%

12

220Kv DCDS Morena(400KV S/s CWRTL Adani Group) - Sabalgarh DCDS line & lilo of Morena 400KV S/s (Adani) to Sabalgarh at Morena 220Kv s/s (2X92 + 2x0.5) (Note: Morena 400kV CWRTL Adani Group - Morena 220 (Jarerua) (2x24.685cktkm) charged on 31.03.2018)

ADB-III Saving 72%

13 220kV DCDS line from Julwaniya 400kV S/s in Sendhwa 220kV S/s GEC 22%14 220kV DCDS line from Badnawar 220kV S/s - Kanwan 220kV S/s GEC 7%15 220kV DCDS line from Kanwan 220kV S/s - Dhar 220kV S/s GEC 8%

16220kV DCDS line from Mandsaure(Sitamau) 400kV S/s - Maruti Shakti Pool 220kV S/s

GEC 4%

17 220kV DCDS line from Betul 220kV S/s - Gudgaon 220kV S/s GEC 34%18 220kV DCDS line from Neemuch 220kV S/s to Ratangarh 400kV S/s GEC 4%

19 220kV interconnector between Sailana 400kV S/s & Ratlam switching 220kV S/s GEC 28%

20 2nd circuiting of Ratlam switching - Dalod 220kV DCSS line GEC 24%220Kv DCDS line from 220kV Pooling S/s RUMS at Goojarkhedi, Suwasara (For interconnection of Solar PV Plant of RUMS) (2X43.426)

59%

a) 220kV line from 220kV S/s RUMS at Gujarkhedi, Suwasara to tap point (2x8.813)

charged on 23.05.2017

b) Tap point to 400 kV S/s Sitamau (2x34.613) 49%

22220kV DCDS Barsitadesh (220kV Pooling S/s) - 400kV Grid S/s PGCIL line (2X0.917)

RUMS 75%

23 220kV DCDS Ramnagar (220kV Pooling S/s) - 400kV Grid S/s PGCIL line (2X2.572) RUMS 60%

24 220kV DCDS Badwar (220kV Pooling S/s) - 400kV Grid S/s PGCIL line) (2X0.917) RUMS 5%

EHV TRANSMISSION WORKS UNDER PROGRESS AS ON 31.03.2018

21 RUMS

Agenda of 63rd OCCM of MP 28

Page 31: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

132 KV TRANSMISSION LINES1 132 kv DCSS Dewas-Barotha line (1x23) JICA 73%2 132kv DCSS Gautampur -Depalpur line (1x19) JICA 42%3 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) JICA 37%4 132kv Mugaliya Chaap - Sehore DCSS line (1x24) JICA 52%5 132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV Itarsi s/s(1x53.209) JICA 61%6 LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S Seoni (2x20) JICA 49%7 132 kv DCSS Guna-Eshagarh line (1x72) JICA 32%

8LILO of one circuit of 132 kv Neemuch220 - Ratangarh DCDS line at 132 KV S/s Morwan (2x1)

UBI 0%

9 132 kv Sirmour - Katra DCDS line (2x37.67) UBI 18%

10LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) - Dabra/Karera line at 220 KV S/s Gwalior II) (2x2x7.87)

Transco 40%

11 132 kv DCSS Dewas-Agrod line (1x20.76) ADB-III 42%12 132 kv DCSS Khurai- Khimlasa line (1x20.937) ADB-III 20%

13LILO of 132Kv Mungaoli Traction feeder at 132Kv S/s Mungaoli (4x7.8+2x0.7) Note: (4x7.8ckt.km line charged on 30.12.2015 by tapping )

ADB-III 99%

14 132 kv DCDS Line Chichli - Udaypura (2x47) (On 220Kv Tower) ADB-III 83%15 132 kv DCSS Panagar - Patan line (1x22.749) ADB-III 7%16 132 kv DCSS Badnagar - Chhayan Line (1x31) ADB-III 39%17 132 kv DCSS Dhar - Teesgaon line (1x15.35) ADB-III 16%18 LILO of 132 kv Ratlam - Meghnagar line at 132Kv S/s Petlawad (2x7.4) ADB-III 5%19 132 kv DCSS Udaipura - Silvani line (1x25.8) ADB-III 38%20 132 kv DCSS Narsinghpur - Devnagar (1x23) ADB-III 18%21 132 kv DCSS Karakbel - Belkheda (1x24.445) ADB-III 13%22 132 kv DCDS Narsinghpur - Karakbel line (2x23) ADB-III 25%

23 LILO of 2ND CIRCUIT OF 132KV Gwalior- Pichhore at 132Kv S/s Dabra (2X0.108) (ADB-III) (balance work) (Note: LILO at Chinour 27.364 cktkm charged on 04.08.2017)

ADB-III 97%

24LILO of one ckt.(Balaghat-Katangi ckt) Of 132 kV Balaghat - Seoni/Katangi line at 132 kV S/s Waraseoni (2x4.7)

ADB-III 14%

25LILO of both ckt. Of 132 kV Balaghat - Bhanegaon line at Balaghat/Kirnapur 400kV S/s.(2x0.774 + 4x1.216)

ADB-III 85%

26 132kV DCSS Sagar - Rehli line (1x40) ADB-III Saving 13%

27LILO of one ckt of 132kv Neemuch - Mandsore line at Budha 132KV Sub-station (2x22.077)

ADB-saving 56%

28LILO of both ckt of 132kv Gandhisagar - Suwasara/Garoth line at Bhanpura 220KV S/s (4x14)

ADB-saving 27%

29LILO of both ckt of 132kv Gandhisagar - Suwasara/Garoth line at Suwasara 220KV S/s (2x3)

ADB-saving 52%

30 132kv DCSS Mugaliyachhap - Bilkishganj line (1x17.274) ADB-saving 47%31 132kv DCDS Rajgarh - Khujner/Sindaota line (2x26.499+ 4x1.457) ADB-saving 44%32 132kv DCSS Betul-Bisnoor/Masod line (1x35.245) ADB-saving 32%33 LILO of one ckt of Vidisha - Gairatganj line at 132kV Raisen(2x18.221) ADB-saving 76%34 132kv DCDS line Guna-Bhonra (2x21.394) ADB-saving 31%

Agenda of 63rd OCCM of MP 29

Page 32: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

35 132kv DCSS line Chhindwara-Saori line (1x31.60) ADB-saving 68%36 132kv DCSS Damoh-Patera line (1x38) ADB-saving 15%

37132kv Birsinghpur -Shahdol DCSS line (1x45) (Revised Estt. Sanc.no.0187dtd.05.09.2016)

ADB-saving 62%

38 132kV MACT (Bhopal) - Mugaliachhap line (2x30.368) REC 58%39 132kV DCDS line from Sendhwa 220 kV S/s - Pansemal 132kV line GEC 5%

40132kV interconnector between Kanwan 220 kV S/s & Kanwan 132kV S/s (2x13.115)

GEC 14%

41 132kV DCDS line from Kanwan 220 kV S/s - Teesgaon 132kV line GEC 22%42 2nd ckt of 132kV Rajgarh(Dhar)220 kV S/s - Petlawad 132kV line GEC 14%

43132kV interconnector between Gudgaon 220 kV S/s & Gudgaon 132kV S/s (LILO of 132kV Betul - Gudgaon at 220kV S/s Gudgaon) (2x9.825)

GEC 7%

44132kV DCDS interconnector between Sailana 400kV S/s & Sailana 132kV S/s (2x18.344)

GEC 17%

45 132kV Julwaniya400 - Shahpura DCSS line (2nd ckt-28 + 1x46.866) JICA-II 37%

46132Kv DCSS line from GWSTPP to upcoming Make up Water Pump House river Narmada (Line-II)(1x24.152)

Contrib. 41%

47132Kv DCSS 2 phase 2wire line from 132Kv s/s Shahpura(JBP) for 5MVA PS to RTS Bhitoni (1x5.968)

Contrib. 13%

48 132Kv DCSS line from 400Kv s/s Katni - RTS Patwara (1x19.417) RTS 82%

49132Kv DCSS 2 phase 2wire line from 220Kv s/s Maihar for PS to TSS Bhadanpur(1x13.1)

Contrib. 82%

50132Kv DCSS 2 phase 2wire line from 220Kv s/s KOtar for PS to RTS kaima1x26.938)

Contrib. 58%

51132Kv DCSS 2 phase 2wire line from 132Kv s/s Majhgawan for PS to TSS Majhgawan(1x0.19) (Note: 1x0.190 charged on 24.10.2017)

Contrib. 93%

52 132Kv DCSS 2 phase 2wire line from 132Kv s/s Rewa for PS to TSS Rewa(1x0.4) Contrib. 82%

53132Kv DCDS 2 phase 4wire line from 220Kv s/s Ashoknagar for PS to 132kV RTS Ashoknagar (2x4.474)

Contrib. 91%

54 132kV DCSS Sirmore - RTS Dabhaura line (1x56.1) Contrib. 48%

55132Kv DCDS line from 132Kv s/s Morwa for Power supply of 21.6MVA in pfase manner on 132kV for RTS Singroli (1x1.809)

Contrib. 68%

56 2nd ckt of 132Kv 2ph 2 wire line from 220Kv s/s Bina - RTSA Mungaoli RVNL Contrib. 99%

57132Kv DCSS line from 220kV s/s Rajgarh(Biora) - Birampura Pumping station Distt- Rajgarh of water Resources Department. (1x7.796)

(Supervision only)

94%

58132Kv DCSS line from 132Kv s/s Chhegaon - 50MW Soalar Power Project of M/s Sky Power Solar South-East Asia-One Pvt'Ltd At vill. Chhirbel/Khajuri, Khandwa (1x11.226)

(Supervision only)

100%

59132kV DCSS line from 132kV Balwada - water pumping station No.2 of NVDA at village Mukhtyara (1x2.401)

(Supervision only)

98%

Agenda of 63rd OCCM of MP 30

Page 33: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

S.No.

NAME OF THE SUBSTATIONFUNDING AGENCY

PROGRESS IN %

A. 400 KV SUBSTATIONS

1400 KV sub-station Balaghat/Kirnapur with 2x100MVA 400/220 kv x-MER+ 1X40 MVA X-mer

ADB-III 78%

2 400 KV sub-station Badnawar with 2x315MVA 400/220 KV X-mer ADB-III 79%3 400 KV sub-station Sagar with 2x315MVA 400/220 KV X-mer GEC 2%4 Bhopal (Sukhi Sewaniya) 400/220 kv s/s Addl. 315 MVA X-mer ADB-III 74%

B. a 220 KV SUBSTATIONS1 Upgradation of Chapda 132Kv S/s to 220kv with 1x160MVA ADB-III 2%2 Upgradation of Depalpur 132Kv S/s to 220kv with 1x160MVA ADB-III 9%3 Adampur 220/33kv S/s 2x50MVA ADB-III 8%4 Upgradation of Kukshi 132Kv S/s to 220kv with 1x160MVA ADB-III 11%

5Upgradation of Chhanera 132Kv S/s to 220kv with 2x160MVA +1x50MVA 132KV X-mer

ADB-III Saving 53%

6 220/132kV S/s Suwasara (2x160MVA + 1x50) ADB-III Saving 60%7 220 kV Indore N/Z (Upgradation) with 2x160MVA UBI 9%8 220/132kV S/s Sailana (2x160MVA + 1x63) GEC 3%9 220/132kV S/s Jaora (Upgradation) (2x160MVA + 1x40) GEC 10%

10 220/132kV S/s Sendhwa (Upgradation) (1x160MVA + 1x63) GEC 7%11 220/132kV S/s Kanwan (Upgradation) (1x160MVA + 1x63) GEC 1%12 33/220 Kv Pooling Sub-station at Barsitadesh 3x100MVA RUMS-I 75%13 33/220kV Pooling Sub-station at Ramnagar 3x100 RUMS-I 52%

14 220/33Kv Pooling Sub-station at Suwasara (Gujarkhedi) 3x100 RUMS-I1st (24.05.2017,

2nd (12.08.2017) & 3RD (27.03.2018)

C. 132 KV SUBSTATIONS(a) NEW SUBSTATIONS1 Biston 132kv s/s1x40 MVA ADB-III 9%2 Teesgaon 132kv s/s 1x40MVA ADB-III 10%3 Waraseoni 132kv s/s1x40 MVA (Dist- Balaghat) ADB-III 15%4 Devnagar 132kv s/s 1x40 MVA (Dist- Narsighpur) ADB-III 35%5 Belkheda 132kv s/s 1x40 MVA (Dist- Jabalpur) ADB-III 6%6 Khimlasa 132kv s/s 1x40 MVA ADB-III 3%7 Karakbel 132kv s/s1x40 MVA (Dist. Narsinghpur) ADB-III 17%8 Narsinghgarh 132kv s/s with 1x40 MVA ADB-III 7%9 Silvani 132kv s/s with 1x40 MVA ADB-III 12%

10 Udaipura 132kv s/s with 1x40 MVA ADB-III 65%11 Bilkishganj 132kv s/s with 1x50 MVA ADB-III Saving 46%12 Khujner/Sindaota 132kv s/s with 1x50 MVA ADB-III Saving 39%13 Bisnoor/Masod 132kv s/s with 1x50 MVA ADB-III Saving 16%14 Rehli 132kv s/s with 1x50 MVA ADB-III Saving 27%15 Patera 132kv s/s with 1x50 MVA ADB-III Saving 58%16 Budha 132kV S/s with 1x50MVA ADB-III Saving 56%17 Saori 132kV S/s with 1x50MVA ADB-III Saving 3%18 Satna-II 132kV S/s with 2x50MVA ADB-III Saving 20%19 Shahpura 132kv s/s with 1x40 MVA (Barwani) JICA-II 25%

20 IT Park Badwai 132kv s/s with 1x63 MVA (Bhopal) contribution

work 11%

Agenda of 63rd OCCM of MP 31

Page 34: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Feb-18 Mar-18 Feb-18 Mar-18

Commissinary HQ 23:52 23:54 23:45 23:49

District HQ 23:51 23:51 23:47 23:51

Tehsil HQ 23:48 23:48 23:38 23:42

Rural -Mixed 23:29 23:32 23:10 23:15

Rural -DLF 23:29 23:32 23:25 23:23

Rural -Irrigation 9:58 9:58 9:47 9:48

Feb-18 Mar-18 Feb-18 Mar-18

Commissinary HQ 23:45 23:45 23:48 23:50

District HQ 23:56 23:56 23:52 23:52

Tehsil HQ 23:46 23:51 23:44 23:47

Rural -3Phase 23:31 23:45 23:21 23:25

Rural -1Phase 23:35 23:42 23:30 23:32

Total Rural 9:47 9:51 9:51 9:52

Discoms wise Average Supply Hours

PARTICULARS

PARTICULARS

West Zone MP

East Zone Central Zone

Agenda of 63rd OCCM of MP 32

Page 35: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

33KV AKVN-I 21.06.2016 07.02.2017

33KV AKVN-II 21.06.2016 07.02.2017

132KV Rau 33KV Panther-I 14.03.2014 14.03.2014132KV Raukhedi 33KV Exep.Panther-III 09.07.2015 09.07.2015

132KV Chhegaon-Makhan33KV Khandwa Oil(Previously known as Chichgaon)

-- 18.11.2016

132KV Khandwa 33KV Amalpura 30.01.2011 19.08.201633KV Shri Durga Khandwari 03.04.2017 08.12.2017

33KV Bhargaon 16.11.2017 18.11.2017 33KV Bijalpur No.-I 26.05.2016 22.12.201633KV Bijalpur No.-II 26.05.2016 22.12.201633KV IT Park No.-I 04.07.2015 11.03.201733KV IT Park No.-II 04.07.2015 11.03.2017

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

33KV Mokdi 15.03.2017 18.10.201733KV Kanwas 15.03.2017 16.12.2017

132KV Makdon 33KV Rupakhedi 15.11.2017 10.01.2018132KV Ghonsla 33KV Dhabla Gori 04.04.2016 12.07.2017

400KV

400KV Julwaniya

132KV Pansemal

132KV Betma

132KV Khachrod

Annexure-2.3.(ii)

BHOPAL REGION

UJJAIN REGION

NIL

NIL

NIL

NIL

LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR

REWA REGION

(For which group to be allocated)

220KV

JABALPUR REGION

INDORE REGION

132KV

SAGAR REGION

NIL

NIL

220KV

132KV

220KV

132KVNIL

132KV

220KV

220KVNIL

132KV

Agenda of 63rd OCCM of MP 33

Page 36: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Annexure-2.3.(ii)

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

220 KV Ganjbasoda 33 KV Simcon Solar Power 18.11.2016 --

132 KV Bareli 33 KV Boras 19.02.2014 --132 KV Gopalpur 33 KV AE, PHE 27.02.2015 --132 KV Amrawad- Khurd 33 KV Katara Hills-II 01.06.2016 --

33 KV Obedullaganj 05.05.2016 02.02.201733 KV AKVN-1 05.05.2016 05.10.201633 KV AKVN-2 05.05.2016 05.10.201633 KV AKVN-1 29.12.2015 02.07.201633 KV AKVN-2 29.12.2015 24.02.201633 KV Aligarh Kotra 28.08.2017 20.12.201733 KV Madankhedi 27.06.2017 05.01.201833 KV Dewanganj 04.12.2017 04.12.201733 KV Aamkheda 04.12.2014 04.12.2017

132 KV Entkhedi, Bhopal 33 KV Entkhedi 10.01.2018 10.01.2018

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

220 KV Sagalgarh 33 KV Mangrol 30.05.2014 --

220 KV Gwalior-II 33 KV DIG Nayagaon (CRPF) 13.11.2017 13.11.2017

132 KV Datia 33 KV Karapura 17.05.2014 --132 KV Ron 33 KV Mangarh 21.11.2013 --132KV Gohad 33kV Gohad 03.12.2015 11.07.2016

33kV Ater 22.10.2016 24.10.201633kV Pratappura 22.10.2016 23.12.2016

132KV Vijaypur 33kV Dord 22.08.2011 29.07.201633kV Banbar 05.08.2017 06.08.201733kV Chinor 05.08.2017 06.08.201733kV Karhiya 05.08.2017 06.08.201733kV Gharsondi 05.08.2017 10.08.201733kV Dimani 18.07.2017 18.07.201733kV Khadiyahar 05.08.2017 05.08.201733kV Ajnodha 29.12.2017 29.12.2017

132KV Kailaras 33kV Dipera 14.08.2017 02.01.2018132KV Bairad 33kV Bairad 23.12.2017 24.12.2017132KV Mada 33kV Mada 24.12.2017 25.12.2017

132KV Badagaon

132KV Pratappura

132KV Chinor

132 KV Bagroda

132 KV Lateri

132 KV Salamatpur

GWALIOR REGION

132 KV

220 KV

132 KV Tamot

132 KV

220KV

Agenda of 63rd OCCM of MP 34

Page 37: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Annexure-3.2

Date Time Date Time

1 400 315MVA X-MER NO-03 at 400KV S/s Bhopal 04-Jun-18 09:00 14-Jun-18 17:00 ContinueFor CT replacement , attending oil leakage ,transformer painting work

2 400 315MVA X-MER I&II at 400KV S/s Bhopal 18-Jun-18 09:00 19-Jun-18 17:00 Continue FOR CT replacement and bay maintenance work

3 400 315MVA X-MER I&II at 400KV S/s Bhopal 20-Jun-18 09:00 21-Jun-18 17:00 Continue FOR CT replacement and bay maintenance work

4 400 315MVA ICT -III at 400KV S/s Indore 14-Jun-18 09:00 15-Jun-18 18:00 continue for 220KV C.T Replacement work

5 400 315MVA ICT -II at 400KV S/s Indore 19-Jun-18 09:00 20-Jun-18 18:00 continue for 220KV C.T Replacement work

1 400400KV 125 MVAR Bus Recator at 400KV S/s Nagda

15-May-18 07:00 15-May-18 18:00 11:00 For Insulation Disc Replacement Work

2 40080MVAR REACTOR NO -01 at 400KV S/s Bhopal

14-May-18 09:00 24-May-18 17:00 Continue For scheduled maintenance work

3 400400/220kv 125 MVAR BHEL REACTOR at 400KV S/s Katni

10-May-18 10.00 12-May-18 18.00 56.00For Recommisioning of reactor conservator by M/S BHEL

4 400400/220kv 125 MVAR BHEL REACTOR at 400KV S/s Katni

04-Jun-18 10.00 06-Jun-18 18.00 56.00 For attending air cell and oil leakage problem

5 400 BUS REACTORS BAY at 400KV S/s Ashta 05-Jun-18 09:00 05-Jun-18 18:00 DAILY For bay maintenance and testing work

6 400 50 MVAr BUS Reactor at 400KV S/s Bina 04-Jun-18 08:00 04-Jun-18 17:00 Daily For pre monsoon maintenance work

1 400400KV TBC bay, 315 MVA X'MER-I bay Make-CGL & 400KV MAIN BUS-II (400KV Julwaniya S/s)

15-May-18 09.00 15-May-18 18.00 DailyTo attend problem in 400KV main bus-II pantograph isolator of 400KV TBC bay and 315mva X'mer-I bay make-CGL.

2 400 400KV Main Bus-I at 400KV S/S Nagda 07-May-18 07:00 09-May-18 18:00 Continue For Insulation Disc String Replacement Work

3 400 400KV Main Bus-II at 400KV S/S Nagda 14-May-18 07:00 16-May-18 18:00 Continue For Insulation Disc String Replacement Work

4 400400KV Nagda-Rajghar-II Line at 400KV S/S Nagda

14-May-18 07:00 14-May-18 18:00 Daily For Insulation Disc Replacement Work

Planned shutdown of transmisison element for the duration 01-05-18 TO 30-06-18,

Sr. No

KV Transformers / Reactor /Bays From To Basis(Daily/

Reason

A- 400 KV TRANSFORMERS

B- 400 KV REACTORS

C- 400 KV FEEDER & BAYS OF 400 KV- S/S-

Agenda of 63rd OCCM of MP 35

Page 38: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Date Time Date TimeSr. No

KV Transformers / Reactor /Bays From To Basis(Daily/

Reason

5 400400KV Nagda-Rajghar-II Line at 400KV S/S Nagda

15-May-18 07:00 16-May-18 18:00 Continue For Insulation Disc Replacement Work

6 400 400KV Nagda - Rajghar-I line 06-Jun-18 08:00 06-Jun-18 18:00 Daily For Wave Trap Clamp Repleacment Work

7 400 400KV Nagda - Rajghar-II line 08-Jun-18 08:00 08-Jun-18 18:00 Daily For Wave Trap Clamp Repleacment Work

8 400 400 BDTCL-1 02-May-18 09:00 02-May-18 17:00 Daily For scheduled miantenance work

9 400 400 BDTCL-2 03-May-18 09:00 03-May-18 17:00 Daily For scheduled miantenance work

10 400 TIE CB 400KV BDTCL-2 X-MER-2 04-May-18 09:00 04-May-18 17:00 Daily For scheduled miantenance work

11 400 TIE CB 400KV BDTCL-1 X-MER-1 07-May-18 09:00 07-May-18 17:00 Daily For scheduled miantenance work

12 400 TIE CB ITARSI -1 X-MER-3 08-May-18 09:00 08-May-18 17:00 Daily For scheduled miantenance work

13 400 TIE CB ITARSI -2 BINA-2 09-May-18 09:00 09-May-18 17:00 Daily For scheduled miantenance work

14 400 400 BDTCL-1 CB 23-Jun-18 09:00 30-Jun-18 17:00 Continue For CB and CT replacement work

15 400 400 KV Bus-I at 400KV S/s Indore 01-Jun-18 09:00 02-Jun-18 18:00 continueFor ICT II will be on TBC for 400KV CVT Replacement work

16 400 400 KV Bus-II at 400KV S/s Indore 04-Jun-18 09:00 05-Jun-18 18:00 continueFor Asoj II will be on TBC for 400 KV CVT Replacement work

17 400 400KV Indore-Nagda 07-Jun-18 09:00 08-Jun-18 18:00 continue for 400 KV CVT Replacement work

18 400 400 KV Main Bus II at 400KV S/s Indore 11-Jun-18 09:00 13-Jun-18 18:00 continue for 400 KV PG Isolator of ISP I Replacement work

Agenda of 63rd OCCM of MP 36

Page 39: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Date Time Date TimeSr. No

KV Transformers / Reactor /Bays From To Basis(Daily/

Reason

19 400 400KV Indore-ISP-I 11-Jun-18 09:00 13-Jun-18 18:00 continue for 400 KV PG Isolator of ISP I Replacement work

20 400 400 KV ISP II at 400KV S/s Indore 22-May-18 09:00 25-May-18 18:00 Continue ISP II on TBC for Replacement of 400 KV C.B

21 400 400 KV ISP II at 400KV S/s Indore 26-May-18 09:00 26-May-18 18:00 Daily ISP II off for testing & Commissioning of New C.B

22 400 400 KV Main Bus I at 400KV S/s Indore 28-May-18 09:00 29-May-18 18:00 Continue For 400 KV PG Isolator of ISP II Replacement work

23 400 400 KV ISP-II at 400KV S/s Indore 28-May-18 09:00 29-May-18 18:00 Continue For 400 KV PG Isolator of ISP II Replacement work

24 400 400 KV Main Bus II at 400KV S/s Indore 30-May-18 09:00 31-May-18 18:00 ContinueFor 400 KV PG Isolator of Buscoupler Replacement work

25 400 400 KV buscoupler at 400KV S/s Indore 30-May-18 09:00 31-May-18 18:00 ContinueFor 400 KV PG Isolator of Buscoupler Replacement work

26 400 BUS TIE BAY at 400KV S/s Ashta 06-Jun-18 09:00 06-Jun-18 18:00 Daily For bay maintenance & testing work

27 400 BUS COUPLER BAY at 400KV S/s Ashta 07-Jun-18 09:00 07-Jun-18 18:00 Daily For bay maintenance & testing work

28 400 MAIN BUS-1 & CVT NO.-1 at 400KV S/s Ashta 08-Jun-18 09:00 08-Jun-18 18:00 Daily For bay maintenance & testing work

29 400 MAIN BUS-2 & CVT NO.-2 at 400KV S/s Ashta 11-Jun-18 09:00 11-Jun-18 18:00 Daily For bay maintenance & testing work

30 400 AUX.BUS at 400KV S/s Ashta 12-Jun-18 09:00 12-Jun-18 18:00 Daily For bay maintenance & testing work

31 400 400 KV Bhopal Ckt-I at 400KV S/s Bina 11-Jun-18 08:00 11-Jun-18 17:00 Daily For pre monsoon maintenance work

32 400 400 KV Bhopal Ckt-II at 400KV S/s Bina 14-Jun-18 08:00 14-Jun-18 17:00 Daily For pre monsoon maintenance work

Agenda of 63rd OCCM of MP 37

Page 40: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Date Time Date TimeSr. No

KV Transformers / Reactor /Bays From To Basis(Daily/

Reason

33 400 400 KV BPSCL (J.P.) at 400KV S/s Bina 15-Jun-18 08:00 15-Jun-18 17:00 Daily For pre monsoon maintenance work

1 220 220KV PGCIL-I ( at 220KV S/s Shujalpur ) 01-May-18 10:00 01-May-18 17:00 Daily For pre monsoon maintenance work

2 220 220KV PGCIL-II ( at 220KV S/s Shujalpur ) 02-May-18 10:00 02-May-18 17:00 Daily For pre monsoon maintenance work

3 220Chhegaon- Omkareshwar (400kV Chhegaon S/s)

10-May-18 10:00 10-May-18 17:00 Daily For pre monsoon maintenance work

4 220 Chhegaon-SSTPH Ckt-I (400kV Chhegaon S/s) 12-May-18 10:00 12-May-18 17:00 Daily For pre monsoon maintenance work

5 220 Chhegaon-SSTPH Ckt-II (400kV Chhegaon S/s) 15-May-18 10:00 15-May-18 17:00 Daily For pre monsoon maintenance work

6 220Bus Transfer(400kV Chhegaon S/s )

18-May-18 10:00 18-May-18 17:00 Daily For pre monsoon maintenance work

7 220 Bus-Tie (400kV Chhegaon S/s) 22-May-18 10:00 22-May-18 17:00 Daily For pre monsoon maintenance work

8 220220KV INTERCONNECTOR -I(400KV Julwaniya S/s)

02-May-18 09:00 02-May-18 17:00 Daily For pre monsoon maintenance work

9 220220KV INTERCONNECTOR -II (400KV Julwaniya S/s)

03-May-18 09:00 03-May-18 17:00 Daily For pre monsoon maintenance work

10 220 220KV BUS TIE (400KV Julwaniya S/s) 07-May-18 09:00 07-May-18 17:00 Daily For pre monsoon maintenance work

11 220220KV TRANSFER BUS COUPLER (400KV Julwaniya S/s)

08-May-18 09:00 08-May-18 17:00 Daily For pre monsoon maintenance work

12 220220KV JULWANIYA-NIMRANI (400KV Julwaniya S/s)

11-May-18 09:00 11-May-18 17:00 Daily For pre monsoon maintenance work

13 220220KV JULWANIYA-OMKARESHWAR (400KV Julwaniya S/s)

12-May-18 09:00 12-May-18 17:00 Daily For pre monsoon maintenance work

14 220 220KV Chhindwara -PGCIL-I 05-Jun-18 09:00 05-Jun-18 16:00 Daily For pre monsoon maintenance work

15 220 220KV Chhindwara -PGCIL-II 06-Jun-18 09:00 06-Jun-18 16:00 Daily For pre monsoon maintenance work

16 220 220KV Pandhurna Kalmeahwar 07-Jun-18 09:00 07-Jun-18 16:00 Daily For pre monsoon maintenance work

D- 220 KV FEEDER & BAYS-

Agenda of 63rd OCCM of MP 38

Page 41: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Date Time Date TimeSr. No

KV Transformers / Reactor /Bays From To Basis(Daily/

Reason

17 220 220KV Seoni -PGCIL-I 05-Jun-18 09:00 05-Jun-18 16:00 Daily For pre monsoon maintenance work

18 220 220KV Seoni -PGCIL-II 06-Jun-18 09:00 06-Jun-18 16:00 Daily For pre monsoon maintenance work

19 220 220KV- Bina- I at 220KV s/s sagar 09-May-18 09:00 09-May-18 17:00 Daily For pre monsoon maintenance work

20 220 220KV- Bina- II at 220KV s/s sagar 10-May-18 09:00 10-May-18 17:00 Daily For pre monsoon maintenance work

21 220 220KV PGCIL-I at 220KV s/s sagar 07-May-18 09:00 07-May-18 17:00 Daily For pre monsoon maintenance work

22 220 220KV PGCIL-II AT 220kv s/s sagar 08-May-18 09:00 08-May-18 17:00 Daily For pre monsoon maintenance work

23 220 22KV Traction -I at 220kv s/s sagar 14-May-18 09:00 14-May-18 17:00 Daily For pre monsoon maintenance work

24 220 22KV Traction -II at 220kv s/s sagar 15-May-18 09:00 15-May-18 17:00 Daily For pre monsoon maintenance work

25 220 PGCIL-I at 220kv s/s Damoh 19-May-18 09:00 19-May-18 17:00 Daily For pre monsoon maintenance work

26 220 PGCIL-II at 220kv s/s Damoh 25-May-18 09:00 25-May-18 17:00 Daily For pre monsoon maintenance work

27 220 PGCIL-III at 220kv s/s Damoh 28-May-18 09:00 28-May-18 17:00 Daily For pre monsoon maintenance work

28 220 220KV SAGAR-BINA - 1 04-Jun-18 10:00 04-Jun-18 17:00 Daily For pre monsoon maintenance work

29 220 220KV SAGAR-BINA - 2 05-Jun-18 10:00 05-Jun-18 17:00 Daily For pre monsoon maintenance work

30 220 220KV SAGAR-PGCIL DAMOH - 1 06-Jun-18 10:00 06-Jun-18 17:00 Daily For pre monsoon maintenance work

31 220 220KV SAGAR-PGCIL DAMOH - 2 07-Jun-18 10:00 07-Jun-18 17:00 Daily For pre monsoon maintenance work

32 220 220KV DAMOH-KATNI 02-Jun-18 10:00 02-Jun-18 17:00 Daily For pre monsoon maintenance work

33 220 220KV DAMOH-400KV PGCIL DAMOH - 1 05-Jun-18 10:00 05-Jun-18 17:00 Daily For pre monsoon maintenance work

Agenda of 63rd OCCM of MP 39

Page 42: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Date Time Date TimeSr. No

KV Transformers / Reactor /Bays From To Basis(Daily/

Reason

34 220 220KV DAMOH-400KV PGCIL DAMOH - 2 09-Jun-18 10:00 09-Jun-18 17:00 Daily For pre monsoon maintenance work

35 220 220KV DAMOH-400KV PGCIL DAMOH - 3 11-Jun-18 10:00 11-Jun-18 17:00 Daily For pre monsoon maintenance work

36 220 220KV DAMOH-TIKAMGARH 15-Jun-18 10:00 15-Jun-18 17:00 Daily For pre monsoon maintenance work

37 220 220KV DAMOH-TRACTION -1 26-Jun-18 10:00 26-Jun-18 17:00 Daily For pre monsoon maintenance work

38 220 220KV DAMOH-TRACTION -2 28-Jun-18 10:00 28-Jun-18 17:00 Daily For pre monsoon maintenance work

39 220160 MVA X-mer Make Areva at 220KV S/s Sabalgarh

06-Jun-18 09:00 07-Jun-18 18:00 Daily For Transformer painting work

40 220 160 MVA-I at 220KV S/s Mehgaon 15-May-18 09:00 15-May-18 17:00 Daily For pre monsoon maintenance work

41 220 160 MVA-II at 220KV S/s Mehgaon 16-May-18 09:00 16-May-18 17:00 Daily For pre monsoon maintenance work

42 220 160MVA X-mer-I At 220KV s/s DATIA 26-Jun-18 09:00 26-Jun-18 17:00 Daily For pre monsoon maintenance work

43 220 160MVA X-mer-I At 220KV s/s Mehgaon 15-Jun-18 09:00 15-Jun-18 17:00 Daily For pre monsoon maintenance work

44 220 160MVA X-mer-II At 220KV s/s DATIA 30-Jun-18 09:00 30-Jun-18 17:00 Daily For pre monsoon maintenance work

45 220 160MVA X-mer-II At 220KV s/s Mehgaon 16-Jun-18 09:00 16-Jun-18 17:00 Daily For pre monsoon maintenance work

46 220 220KV Datia-Bina 22-May-18 09:00 22-May-18 17:00 Daily For pre monsoon maintenance work

47 220 220KV Main Bus-I at 220KV S/s Shivpuri 11-Jun-18 10:00 11-Jun-18 17:00 Daily For pre monsoon maintenance work

48 220 220KV Main Bus-II at 220KV S/s Shivpuri 13-Jun-18 10:00 16-Jun-18 17:00 Daily For pre monsoon maintenance work

49 220 220KV Mehgaon-Auraiya 08-May-18 09:00 08-May-18 17:00 Daily For pre monsoon maintenance work

50 220 220KV Mehgaon-Malanpur 07-May-18 09:00 07-May-18 17:00 Daily For pre monsoon maintenance work

Agenda of 63rd OCCM of MP 40

Page 43: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Date Time Date TimeSr. No

KV Transformers / Reactor /Bays From To Basis(Daily/

Reason

51 220 220KV Morena-Malanpur-I 02-May-18 09:00 02-May-18 17:00 Daily For pre monsoon maintenance work

52 220 220KV Morena-Malanpur-II 03-May-18 09:00 03-May-18 17:00 Daily For pre monsoon maintenance work

53 220 220KV Shivpuri-Bina MPPTCL 09-May-18 09:00 09-May-18 17:00 Daily For pre monsoon maintenance work

54 220 220KV Shivpuri-Bina PGCIL 07-May-18 09:00 07-May-18 17:00 Daily For pre monsoon maintenance work

55 220 220KV Shivpuri-Sabalgarh-I 11-May-18 09:00 11-May-18 17:00 Daily For pre monsoon maintenance work

56 220 220KV Shivpuri-Sabalgarh-II 14-May-18 09:00 14-May-18 17:00 Daily For pre monsoon maintenance work

57 220 220KV Mehgaon --Malanpur 07-Jun-18 09:00 07-Jun-18 17:00 Daily For pre monsoon maintenance work

58 220 220KV Datia- Bina 22-Jun-18 09:00 22-Jun-18 17:00 Daily For pre monsoon maintenance work

59 220 220KV Mahalgaon - Bina 17-May-18 10:00 17-May-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

60 220 220KV Mahalgaon - Bina 18-May-18 10:00 18-May-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

61 220 220KV Mahalgaon - Bina 27-Jun-18 09:00 27-Jun-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

62 220 220KV Mahalgaon - Bina 28-Jun-18 09:00 28-Jun-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

63 220 220KV Mahalgaon - Datia 22-May-18 10:00 22-May-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

64 220 220KV Mahalgaon - Datia 23-May-18 10:00 23-May-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

65 220 220KV Mahalgaon - Datia 20-Jun-18 09:00 20-Jun-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

66 220 220KV Mahalgaon - Datia 21-Jun-18 09:00 21-Jun-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

67 220 220KV Mahalgaon - PGCIL-I 09-May-18 10:00 09-May-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

Agenda of 63rd OCCM of MP 41

Page 44: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Date Time Date TimeSr. No

KV Transformers / Reactor /Bays From To Basis(Daily/

Reason

68 220 220KV Mahalgaon - PGCIL-I 10-May-18 10:00 10-May-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

69 220 220KV Mahalgaon - PGCIL-I 06-Jun-18 09:00 06-Jun-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

70 220 220KV Mahalgaon - PGCIL-I 07-Jun-18 09:00 07-Jun-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

71 220 220KV Mahalgaon - PGCIL-II 15-May-18 10:00 15-May-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

72 220 220KV Mahalgaon - PGCIL-II 16-May-18 10:00 16-May-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

73 220 220KV Mahalgaon - PGCIL-II 13-Jun-18 09:00 13-Jun-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

74 220 220KV Mahalgaon - PGCIL-II 14-Jun-18 09:00 14-Jun-18 17:00 Daily For 220 KV Isolator replacement work under PSDF Scheme

75 220 220KV Mehgaon-Auraiya 08-Jun-18 09:00 08-Jun-18 17:00 Daily For pre monsoon maintenance work

76 220 220KV ICT-I (220KV SUKHA) 16-May-18 09:00 16-May-18 17:00 Daily For bay maintnance work.

77 220 220KV ICT-II (220KV SUKHA) 17-May-18 09:00 17-May-18 17:00 Daily For bay maintnance work.

78 220 220KV Main Bus I at 400KV S/s Indore 01-May-18 09:00 05-May-18 18:00 Continue For replacement of Bus I Isolator

79 220 220KV TBC at 400KV S/s Indore 01-May-18 09:00 01-May-18 18:00 Daily For replacement of Bus I Isolator

80 220 220KV Dewas at 400KV S/s Indore 02-May-18 09:00 02-May-18 18:00 DailyFor replacement of Bus I Isolator (Load will be on TBC)

81 220 220KV Badnagar at 400KV S/s Indore 03-May-18 09:00 05-May-18 18:00 Continue For replacement of3 Nos. C.T & 1 No. Bus-I Isolator

82 220 220KV Barwaha II at 400KV S/s Indore 05-May-18 09:00 05-May-18 18:00 DailyFor replacement of Bus I Isolator (Load will be on TBC)

83 220 220KV Bus II at 400KV S/s Indore 07-May-18 09:00 11-May-18 18:00 Continue For replacement of Bus-II Isolator

84 220 220KV TBC at 400KV S/s Indore 07-May-18 09:00 07-May-18 18:00 Daily For replacement of Bus-II Isolator

Agenda of 63rd OCCM of MP 42

Page 45: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Date Time Date TimeSr. No

KV Transformers / Reactor /Bays From To Basis(Daily/

Reason

85 220 220KV Jetpura I at 400KV S/s Indore 08-May-18 09:00 09-May-18 18:00 Continue For replacement of Bus-II Isolator & 3Nos. C.T

86 220 220KV Jetpura II at 400KV S/s Indore 10-May-18 09:00 11-May-18 18:00 DailyFor replacement of Bus-II Isolator (Load will be on TBC)

87 220 220KV S/Z II at 400KV S/s Indore 11-May-18 09:00 11-May-18 18:00 ContinueFor replacement of Bus-II Isolator (Load will be on TBC)

88 220 220KV Main BuS I at 400KV S/s Indore 14-May-18 09:00 19-May-18 18:00 Continue For replacement of Bus-I Isolator

89 220 220KV S/Z I at 400KV S/s Indore 14-May-18 09:00 14-May-18 18:00 DailyFor replacement of Bus-I Isolator (Load will be on TBC)

90 220 220KV S/Z II at 400KV S/s Indore 15-May-18 09:00 15-May-18 18:00 DailyFor replacement of Bus-I Isolator (Load will be on TBC)

91 220 220KV Jetpura I at 400KV S/s Indore 16-May-18 09:00 16-May-18 18:00 DailyFor replacement of Bus-I Isolator (Load will be on TBC)

92 220 220KV Jetpura II at 400KV S/s Indore 17-May-18 09:00 17-May-18 18:00 DailyFor replacement of Bus-I Isolator (Load will be on TBC)

93 220 220KV Barwaha I at 400KV S/s Indore 18-May-18 09:00 18-May-18 18:00 DailyFor replacement of Bus-I Isolator (Load will be on TBC)

94 220 220KV Pithampur at 400KV S/s Indore 19-May-18 09:00 19-May-18 18:00 DailyFor replacement of Bus-I Isolator (Load will be on TBC)

95 220 160MVA X-MER - I (AREVA) at 400KV S/s Ashta

08-May-18 09:00 08-May-18 18:00 Daily For pre monsoon maintenance work

96 220 160MVA X-MER - II (BHEL) at 400KV S/s Ashta

09-May-18 09:00 09-May-18 18:00 Daily For pre monsoon maintenance work

97 220 100MVA X-MER - II (CGL) at 400KV S/s Ashta 10-May-18 09:00 10-May-18 18:00 Daily For pre monsoon maintenance work

98 220220KV INDORE (JETPURA) CKT-1 at 400KV S/s Ashta

11-May-18 09:00 11-May-18 18:00 Daily For pre monsoon maintenance work

99 220220KV INDORE (JETPURA) CKT-2 at 400KV S/s Ashta

14-May-18 09:00 14-May-18 18:00 Daily For pre monsoon maintenance work

100 220 220KV DEWAS CKT-1 at 400KV S/s Ashta 15-May-18 09:00 15-May-18 18:00 Daily For pre monsoon maintenance work

101 220 220KV DEWAS CKT-2 at 400KV S/s Ashta 16-May-18 09:00 16-May-18 18:00 Daily For pre monsoon maintenance work

Agenda of 63rd OCCM of MP 43

Page 46: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Date Time Date TimeSr. No

KV Transformers / Reactor /Bays From To Basis(Daily/

Reason

102 220 BHOPAL at 400KV S/s Ashta 17-May-18 09:00 17-May-18 18:00 Daily For pre monsoon maintenance work

103 220 MUNGALLIYA CHHAP at 400KV S/s Ashta 18-May-18 09:00 18-May-18 18:00 Daily For pre monsoon maintenance work

104 220 SHAJAPUR CKT-1 at 400KV S/s Ashta 19-May-18 09:00 19-May-18 18:00 Daily For pre monsoon maintenance work

105 220 SHAJAPUR CKT-2 at 400KV S/s Ashta 21-May-18 09:00 21-May-18 18:00 Daily For pre monsoon maintenance work

106 220 BUS COUPLER at 400KV S/s Ashta 22-May-18 09:00 22-May-18 18:00 Daily For pre monsoon maintenance work

107 220 BUS TIE at 400KV S/s Ashta 23-May-18 09:00 23-May-18 18:00 Daily For pre monsoon maintenance work

108 220 24-May-18 09:00 24-May-18 18:00 Daily For pre monsoon maintenance work

109 220 25-May-18 09:00 25-May-18 18:00 Daily For pre monsoon maintenance work

110 220 26-May-18 09:00 26-May-18 18:00 Daily For pre monsoon maintenance work

111 220 28-May-18 09:00 28-May-18 18:00 Daily For pre monsoon maintenance work

112 220 29-May-18 09:00 29-May-18 18:00 Daily For pre monsoon maintenance work

113 220 30-May-18 09:00 30-May-18 18:00 Daily For pre monsoon maintenance work

114 220 220KV Bina- Guna 18-Jun-18 08:00 18-Jun-18 17:00 Daily For pre monsoon maintenance work

115 220 220KV Bina-Ashoknagar 19-Jun-18 08:00 19-Jun-18 17:00 Daily For pre monsoon maintenance work

116 220220KV Bina-I (Inter connected) at 400KV S/s Bina

20-Jun-18 08:00 20-Jun-18 17:00 Daily For pre monsoon maintenance work

117 220220KV Bina-II(Inter connected) at 400KV S/s Bina

21-Jun-18 08:00 21-Jun-18 17:00 Daily For pre monsoon maintenance work

22OKV MAIN BUS NO. -2 at 400KV S/s Ashta

22OKV MAIN BUS NO. -1 at 400KV S/s Ashta

Agenda of 63rd OCCM of MP 44

Page 47: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

A. ThermalStn. Name UNIT No. Capacity

MW Feb-18 Mar-185 210 137.58 151.94

PH III 210 137.58 151.94TOT 210 137.58 151.94

6 200 68.59 123.797 210 45.36 88.01

PH II 410 113.95 211.808 210 62.23 119.879 210 0.00 0.00

PH III 420 62.23 119.8710 250 150.42 185.2211 250 158.92 180.87

PH IV 500 309.34 366.09TOT 1330 485.52 697.76

1 210 114.57 130.602 210 85.44 116.32

PH I 420 200.01 246.923 210 115.92 126.254 210 98.23 118.53

PH II 420 214.16 244.785 500 319.68 307.13

PH III 500 319.68 307.13TOT 1340 733.84 798.83

1 600 299.94 260.132 600 222.75 228.60

PH1 1200 522.69 488.73

4080 1879.63 2137.26

B. HydelCapacity

MW Feb-18 Mar-18115.0 63.39 60.39172.0 62.87 40.3599.0 39.49 26.20

386.0 165.75 126.93193.0 82.87 63.47160.0 6.30 4.89107.0 4.20 3.2690.0 4.74 6.09

315.0 28.68 28.1120.0 0.00 0.0060.0 0.00 0.0030.0 3.13 3.3845.0 9.63 0.0022.5 4.81 0.0020.0 7.01 6.1960.0 2.23 0.00

1186.0 227.44 175.60915.0 125.08 109.06917.5 137.66 110.50

CapacityMW Feb-18 Mar-18

Indira Sagar Hydel Project 1000 38.51 31.27Omkareshwar Hydel Project 520 14.82 14.62

Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014. 2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015.

TOTAL HYDELMPPGCL HydelMPSEB HYDEL Share

M.P.CHAMBALPENCHM.P.PENCHBARGI

C. NHDC (Ex-Bus)Station Name

B.SGR(DEOLONDH)B.SGR(SILPARA)RAJGHATM.P.RAJGHATB.SGR(JINHA)MADIKHEDA

TONSBIRSINGHPUR

Station NameGANDHISAGARR.P.SAGARJ.SAGARCHAMBAL

Unitwise / Stationwise Genration in MUAnn 4.1

AM

AR

KA

NSA

TPU

RA

SAN

JAY

GA

ND

HI

MPPGCL THERMAL

SSTP

S

Agenda of 63rd OCCM of MP 45

Page 48: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

S No. Source Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 TotalA.

1 Thermal 1034.52 1374.20 922.84 823.71 1282.62 1291.48 1294.29 1350.14 1657.17 1851.49 1736.88 1961.34 16580.692 Hydel 138.81 65.34 111.66 135.12 90.17 70.87 167.18 147.00 175.99 177.60 131.97 109.08 1520.813 Total 1173.34 1439.54 1034.51 958.83 1372.80 1362.34 1461.47 1497.14 1833.16 2029.09 1868.86 2070.41 18101.49

B.1 Indira Sagar 129.51 156.20 150.63 68.70 18.97 101.94 35.38 52.42 29.61 35.04 35.91 28.39 842.722 Omkareshwar 65.48 77.85 77.46 41.31 24.01 56.48 20.58 22.96 10.60 15.75 14.82 14.62 441.913 MPPMCL Schedule from Central Sector of WR 1833.79 1792.95 1558.13 1599.06 1745.85 1752.78 2046.04 1862.07 1858.44 1812.41 1514.30 1862.58 21238.414 MPPMCL Schedule from Central Sector ER 19.03 18.18 12.01 9.83 35.49 29.17 42.39 46.88 42.57 29.31 17.02 31.15 333.055 Total MPPMCL Schedule from Central Sector (WR+ER) 1852.82 1811.13 1570.14 1608.89 1781.35 1781.95 2088.43 1908.95 1901.01 1841.73 1531.33 1893.74 21571.466 Deviation Energy of (WR+ER) -31.86 -26.91 -38.23 -6.99 11.43 66.52 63.84 17.32 -12.96 -14.67 -14.46 -44.64 -31.607 Schedule From DVC ER 194.38 208.97 112.45 128.21 175.36 160.34 151.31 155.18 175.75 145.10 126.26 0.00 1733.318 Schedule From Sugen 0.00 0.00 0.00 0.00 0.19 12.94 11.04 5.71 4.99 5.31 3.36 0.86 44.409 LANCO Amk 196.56 178.13 122.84 113.23 77.35 87.18 124.11 140.94 197.24 200.70 180.37 154.86 1773.51

10 SASAN 1014.14 899.33 838.39 965.33 836.99 918.72 920.70 981.34 956.89 1020.78 877.91 1004.86 11235.3911 ESSAR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0012 J P Nigri 327.32 332.81 304.49 146.14 322.43 248.89 339.66 319.26 231.99 271.15 227.27 223.22 3294.6213 MB Power 80.31 140.94 117.90 131.21 199.79 165.90 113.14 203.65 165.07 152.88 168.46 219.64 1858.8914 JHABUA Power 9.94 23.88 6.85 0.00 28.08 33.72 43.09 76.38 53.40 76.19 31.80 57.95 441.2815 Other Open Access Schedule other than MPPMCL Incl. Seci -129.92 -138.00 -129.55 -81.03 -76.42 -38.08 -37.68 -48.90 -106.81 -89.46 -123.32 -100.99 -1100.1716 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0017 BARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0018 Schedule from Sardar Sarovar 67.97 59.81 151.66 12.69 15.99 24.85 47.43 56.83 44.02 28.48 9.79 -0.72 518.7819 SCH to Railway from RGPPL_ebid 154.54 149.12 157.11 163.53 159.41 155.50 162.14 154.53 162.11 161.60 148.23 158.88 1886.6820 Schedule from SEZ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0021 Schedule from Rihand+Matatila 6.47 9.44 10.06 12.01 13.47 15.47 20.85 8.59 12.20 14.00 12.20 9.46 144.23

22 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA CSPDCCL dtd. 18.09.2012

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

23 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 18.09.2012 Including Short term purchase against MTOA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

24 Additional Power Purchase 0.22 7.22 7.97 10.28 22.18 63.75 261.07 116.87 28.02 64.34 10.15 5.63 597.7125 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0026 Banking of Energy -168.43 -7.60 -23.96 -235.96 -355.19 -334.61 111.71 982.80 898.28 422.21 85.16 -247.51 1126.9127 Sale of Power -321.90 -670.25 -592.09 -341.76 -205.62 -189.34 -33.15 -45.31 -107.83 -100.97 -244.08 -632.14 -3484.4528 Total MP Schedule (Including Railway) 3284.41 3004.91 2654.27 2632.78 2995.37 3107.17 4323.84 5016.82 4616.34 4214.04 3044.88 2747.72 41642.5529 Total MP Drawal (Including Railway) 3252.55 2978.01 2616.04 2625.79 3006.80 3173.69 4387.69 5034.14 4603.38 4199.36 3030.41 2703.09 41610.9530 Wheeled Energy of Tawa HEG 0.00 0.00 0.00 0.04 0.00 0.00 1.45 8.32 6.79 2.14 0.00 0.00 18.7231 Wheeled Energy of Wind Farm 8.61 7.99 6.45 10.15 6.11 2.14 5.69 4.88 8.80 6.52 4.81 12.32 84.4732 Wheeled Energy of Solar Plant 27.57 29.46 24.81 31.11 36.97 41.12 49.24 55.00 52.31 66.73 63.36 79.28 556.9733 Wheeled Energy of Bio-Mass 0.00 0.00 0.00 1.82 2.17 2.34 2.11 2.81 0.74 0.00 0.00 0.00 12.0034 Wheeled Energy of Ascent Hydro 1.35 1.32 1.12 1.07 1.19 1.24 1.43 0.90 1.13 1.21 1.18 1.22 14.3635 Export to MSEB (Nepa-Dharni) 0.00 0.00 0.00 -2.86 -3.19 -3.58 -3.40 -5.51 -5.15 -4.71 -4.06 -6.35 -38.8036 Deviation Energy of MPPGCL Thermal -11.71 -19.44 -25.21 -17.55 -15.53 -1.71 5.16 3.01 -5.93 0.43 -3.32 3.64 -88.1437 Energy Purchased by MP from Wind Farm 505.01 525.74 530.63 682.35 421.87 209.86 139.72 138.62 251.95 148.73 150.49 352.39 4057.3638 Energy Purchased by MP from Solar Plant 100.86 94.32 101.32 69.53 82.89 99.28 92.97 112.15 101.88 122.11 137.71 173.04 1288.07

39 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. purchase by MP +Wheeled enrgy of CPP / IPP

171.01 173.70 169.69 121.87 95.94 55.03 29.25 38.68 98.47 87.95 111.87 76.76 1230.21

40Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW

5.16 2.32 1.21 4.63 2.96 0.10 3.48 4.45 6.41 12.10 24.57 28.67 96.05

41 Deviation Energy of ISP 5.44 4.77 -6.02 3.43 1.72 3.89 2.83 3.33 2.82 3.08 2.59 2.88 30.7442 Schedule Energy of BLA Power against LTOA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0043 Schedule Energy of JP BINA Power against LTOA 55.54 73.35 45.22 19.30 59.63 91.73 122.92 135.41 129.64 139.86 70.89 164.66 1108.1444 Import from bargi Left Bank Canal Power House + ISP NVDA 0.03 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.0845 Chambal Complex Excess / less Overshare by MP -0.40 -1.77 3.92 4.86 -6.75 -6.98 -45.68 -38.53 -39.60 -21.26 -19.02 -3.10 -174.3346 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.03 -0.12 -0.03 -0.03 -0.02 1.13 1.78 3.70 1.86 3.57 2.10 -0.02 13.9047 State Supply (Ex-Power st. Bus) 5489.33 5543.27 4731.74 4624.36 5108.53 5190.06 6314.06 7073.87 7088.87 6847.70 5493.18 5701.91 69206.8848 AVERAGE DAILY (Ex-Bus) 182.98 178.82 157.72 149.17 164.79 173.00 203.68 235.80 228.67 220.89 196.18 183.93 189.6149 MINIMUM DAILY (MP Periphery) 162.70 149.61 138.02 1301.53 142.05 139.16 172.13 225.15 195.07 207.09 157.40 168.21 138.0250 MAXIMUM DAILY (MP Periphery) 182.74 179.81 170.82 160.33 180.11 181.08 226.10 235.51 231.42 222.31 212.13 195.34 235.5151 State Supply (Ex-Power st. Bus):- YEAR : 2016-17 5419.09 5106.72 4765.81 4189.32 4099.10 4743.50 5173.59 6415.66 6773.42 6418.88 5617.69 5524.78 64247.5752 Year ((17-18)-(16-17))*100/Year (16-17) 1.30 8.55 -0.72 10.38 24.63 9.41 22.04 10.26 4.66 6.68 -2.22 3.21 7.7253 Unshedule L/S : Year-2017-18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0054 Frequency Correction 2.97 3.19 2.06 2.26 2.40 4.42 5.88 7.07 5.77 5.03 4.14 4.94 50.1255 Restricted Requirement : Year-2017-18 5492.30 5546.46 4733.79 4626.62 5110.93 5194.48 6319.94 7080.94 7094.64 6852.73 5497.31 5706.86 69257.0056 Shedule L/S : Year-2017-18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0057 Un-Restricted Requirement : Year-2017-18 5492.30 5546.46 4733.79 4626.62 5110.93 5194.48 6319.94 7080.94 7094.64 6852.73 5497.31 5706.86 69257.00

ENERGY BALANCE SHEETYear : 2017 - 18

All figures in Million Unit

M.P. Availability

Exchange with other States / Systems

Agenda of 63rd OCCM of MP 46

Page 49: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

S.NO. Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Yr 17-18

C.1 DEMAND MET 8328 8181 7075 6977 7763 7770 10520 11888 12240 12091 11409 9732 122402 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0D.1 DEMAND MET 8106 7936 7571 7372 8189 8211 9503 10221 10084 10071 8906 8165 102212 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0F. REGISTERED MAXIMUM 8349 8181 7659 7372 8189 8232 10520 11888 12240 12091 11409 9732 12240G. COMPUTED MAXIMUM DEMAND 8364 8181 7689 7412 8251 8252 10533 11920 12277 12123 11409 9752 12277H. UNRESTRICTED MAXIMUM DEMAND 8364 8181 7689 7412 8251 8252 10533 11920 12277 12123 11409 9752 12277I.1. Div. Head Quarters 23:49 23:41 23:42 23:40 23:45 23:44 23:47 23:48 23:47 23:46 23:48 23:50 23:462. District Head Quarters 23:51 23:45 23:43 23:44 23:49 23:46 23:50 23:53 23:53 23:52 23:52 23:52 23:493. Tahsil Head Quarters 23:44 23:38 23:33 23:37 23:42 23:39 23:43 23:47 23:45 23:44 23:44 23:47 23:424. Rural -Mixed 23:07 22:57 22:41 22:57 23:11 23:07 23:17 23:23 23:25 23:24 23:21 23:25 23:115. Rural -DLF 23:23 23:15 23:00 23:10 23:21 23:15 23:26 23:32 23:34 23:33 23:30 23:32 23:236. Rural -Irrigation 9:46 9:41 9:31 9:47 9:46 9:43 9:49 9:52 9:52 9:53 9:51 9:52 9:47J LOAD FACTOR % 91.32 91.07 85.81 84.31 83.85 87.57 80.67 82.64 77.84 76.12 71.65 78.75 82.63

S.N PARTICULARS Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Yr 17-18

A. INTGRATED FREQUENCY1 MAXIMUM 50.14 50.18 50.15 50.09 50.10 50.07 50.08 50.07 50.13 50.07 50.06 50.08 50.182 MINIMUM 49.83 49.78 49.85 49.82 49.81 49.80 49.85 49.70 49.84 49.83 49.86 49.85 49.70

B. INSTANTANEOUS FREQUENCY1 MAXIMUM 50.26 50.26 50.26 50.26 50.20 50.20 50.20 50.20 50.20 50.20 50.20 50.20 50.262 MINIMUM 49.66 49.64 49.72 49.82 49.65 49.62 49.65 49.62 49.70 49.62 49.70 49.68 49.62

C. AVG FREQUENCY 49.99 49.99 50.00 49.99 49.99 49.97 49.97 49.97 49.98 49.62 49.98 49.97 49.95D. % TIME WHEN FREQUENCY WAS

1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.002 50.05 TO 51.5 Hz 16.45 19.46 18.69 17.29 15.98 9.73 9.21 9.56 13.28 10.92 10.06 7.72 13.223 49.9 TO 50.05 Hz 74.49 71.45 75.50 76.15 76.82 78.50 77.18 73.53 73.86 77.94 80.25 79.29 76.224 49.7 TO 49.9 Hz 9.06 9.09 5.81 6.56 7.20 11.77 13.61 16.91 12.86 11.05 9.69 12.99 10.555 49.5 TO 49.7 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.006 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.007 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.008 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.009 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

ENERGY BALANCE SHEET : Demand & Sypply HoursYear : 2017 - 18

MORNING PEAK (MAX)

EVENING PEAK (MAX)

Average Power Supply per day to

FREQUENCY ANALYSIS YEAR 2017-18

Agenda of 63rd OCCM of MP 47

Page 50: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSPTotal IPPs

Injection

Total CPPs Injecti

on

Total CSS DVC ER Sugen Lanco Sasan Essar JP

NigriMB

Power

Jhabua

PowerSSP

SCH to

Railway

SEZ Banking Sale Pur

Total MTO

Aat

MP

STOA

Rihand+Matatila-Rajghat

Total SCH UN SCH

TOTALDEMAND

MET

1:00 49.99 2646 2447 141 0 0 261 403 3252 1843 153 0 246 1267 3 329 131 22 14 205 0 -25 -301 0 0 -226 14 3674 6926 3572 -103 -4 6819 0 0 0 6823 6823 6819

2:00 50.00 2590 2395 137 0 0 261 377 3170 1678 134 0 246 1265 2 324 109 2 14 206 0 -25 -219 0 0 -228 14 3522 6692 3404 -118 -4 6570 0 0 0 6572 6572 6569

3:00 49.99 2574 2380 143 0 0 261 364 3148 1695 139 0 251 1253 0 324 63 0 15 206 0 -25 -175 0 0 -228 14 3530 6678 3488 -42 -4 6633 0 0 0 6636 6636 6633

4:00 50.01 2555 2362 140 4 2 264 351 3123 1716 134 0 251 1257 1 324 58 1 15 204 0 -25 -156 0 0 -228 14 3566 6689 3534 -32 -4 6653 0 0 0 6655 6655 6653

5:00 49.99 2585 2390 142 37 21 268 338 3195 1783 151 0 251 1262 1 324 112 9 14 205 0 -25 -248 0 0 -228 14 3623 6818 3575 -48 -4 6766 0 0 0 6770 6770 6766

6:00 49.99 2683 2481 162 53 27 269 328 3321 2153 180 3 255 1255 7 324 197 30 14 204 0 -25 -529 0 0 -228 14 3853 7174 3900 47 -4 7217 0 0 0 7221 7221 7217

7:00 49.93 2860 2648 237 106 41 285 323 3641 2410 218 26 260 1259 10 324 297 83 14 206 0 -16 -317 0 0 -19 14 4769 8410 4993 224 -6 8629 0 0 0 8647 8647 8629

8:00 50.00 2945 2728 340 188 81 284 482 4102 2487 221 33 263 1272 13 324 328 98 14 206 0 356 -151 0 0 -40 14 5440 9542 5422 -18 -7 9517 0 0 0 9522 9522 9517

9:00 49.97 2950 2733 348 261 94 283 697 4416 2530 221 32 263 1260 14 324 330 106 14 206 0 361 -36 53 0 -87 14 5606 10021 5543 -63 -7 9951 0 0 0 9962 9962 9951

10:00 49.99 2950 2733 291 204 71 284 847 4431 2482 215 10 263 1257 13 324 325 96 15 206 0 360 -52 53 0 -124 14 5457 9888 5315 -142 -6 9740 0 0 0 9746 9746 9740

11:00 49.99 2920 2705 193 96 36 281 976 4287 2430 211 0 263 1254 12 324 315 86 15 200 0 349 -216 16 0 -174 14 5101 9387 4974 -127 -6 9255 0 0 0 9261 9261 9255

12:00 49.99 2824 2615 177 74 34 270 1034 4203 2275 188 0 263 1251 12 324 277 51 15 203 0 349 -390 7 0 -266 14 4574 8777 4336 -238 -6 8533 0 0 0 8537 8537 8533

13:00 50.00 2807 2598 154 20 12 272 1041 4097 2283 201 3 263 1250 14 324 266 62 15 196 0 341 -384 0 0 -303 14 4547 8643 4541 -6 -6 8632 0 0 0 8634 8634 8632

14:00 50.00 2756 2550 150 33 14 273 999 4019 2201 178 0 263 1252 14 324 259 30 15 195 0 341 -367 0 0 -315 14 4405 8424 4276 -129 -6 8289 0 0 0 8293 8293 8289

15:00 49.96 2759 2552 159 37 19 273 871 3911 2213 166 0 259 1248 15 324 274 23 15 202 0 341 -471 0 0 -294 14 4329 8240 4312 -17 -6 8217 0 0 0 8228 8228 8217

16:00 49.95 2780 2573 158 33 18 271 672 3725 2287 191 0 263 1254 14 324 290 38 16 200 0 341 -551 0 0 -258 14 4424 8149 4450 27 -7 8169 0 0 0 8181 8181 8169

17:00 49.96 2898 2683 162 25 19 274 392 3555 2358 193 3 259 1251 14 324 298 56 16 202 0 341 -558 0 0 -143 14 4629 8184 4491 -138 -7 8039 0 0 0 8050 8050 8039

18:00 50.02 2956 2738 209 45 28 278 191 3488 2418 214 5 263 1257 14 324 326 89 16 210 0 -32 -512 0 0 -55 14 4551 8039 4363 -188 -7 7845 0 0 0 7847 7847 7845

19:00 49.95 2947 2730 216 37 12 278 256 3528 2452 218 10 263 1251 13 329 344 63 16 210 0 -32 -461 0 0 -45 14 4645 8173 4634 -12 -7 8155 0 0 0 8167 8167 8155

20:00 49.98 2884 2669 200 40 9 276 323 3519 2349 193 0 263 1257 11 332 290 47 16 209 0 -32 -399 0 0 -65 14 4485 8004 4324 -161 -7 7837 0 0 0 7843 7843 7837

21:00 49.98 2846 2634 175 12 5 275 384 3484 2270 197 0 263 1253 10 332 242 33 15 210 0 -40 -618 0 0 -87 14 4094 7578 3908 -186 -6 7386 0 0 0 7392 7392 7386

22:00 50.05 2786 2577 145 8 2 268 422 3422 2199 176 0 263 1257 6 331 197 17 15 208 0 -40 -772 0 0 -202 14 3669 7091 3485 -184 -6 6901 0 0 0 6902 6902 6901

23:00 49.99 2784 2576 173 21 5 264 430 3468 2308 195 3 259 1259 7 331 252 36 15 202 0 -32 -608 0 0 -238 14 4000 7469 3942 -58 -5 7405 0 0 0 7410 7410 7405

24:00 49.99 2741 2535 167 8 2 260 423 3396 1885 145 0 255 1259 7 331 160 12 14 202 0 -32 -203 0 0 -233 14 3816 7213 3647 -169 -4 7039 0 0 0 7043 7043 7039

Avg. 49.99 2793 2585 188 56 23 272 538 3663 2196 185 5 259 1257 10 326 239 46 15 204 0 128 -362 5 0 -180 14 4346 8009 4268 -78 -6 7925 0 0 0 7931 7931 a

00 TO 06 HRS.

49.99 2605 2409 144 16 8 264 360 3201 1811 149 0 250 1260 2 325 112 11 15 205 0 -25 -271 0 0 -228 14 3628 6830 3579 -49 -4 6776 0 0 0 6780 6780

06 TO 12 HRS.

49.98 2908 2694 264 155 60 281 726 4180 2436 212 17 263 1259 12 324 312 87 15 204 0 293 -194 21 0 -118 14 5158 9338 5097 -60 -6 9271 0 0 0 9279 9279

12 TO 18 HRS.

49.98 2826 2616 165 32 18 274 694 3799 2293 190 2 262 1252 14 324 285 50 16 201 0 279 -474 0 0 -228 14 4481 8280 4406 -75 -6 8198 0 0 0 8206 8206

06TO 18 HRS.

49.98 2867 2655 215 94 39 277 710 3990 2365 201 9 262 1255 13 324 299 68 15 203 0 286 -334 11 0 -173 14 4819 8809 4751 -68 -6 8735 0 0 0 8742 8742

18 TO 24 HRS.

49.99 2831 2620 179 21 6 270 373 3470 2244 187 2 261 1256 9 331 247 35 15 207 0 -35 -510 0 0 -145 14 4118 7588 3990 -128 -6 7454 0 0 0 7459 7459

Deviation

Intra State STO

A

DEMAND MET

Load Shedding

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- February 2018

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

TotAvl.

Act.Drl

Agenda of 63rd OCCM of MP 48

Page 51: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs

Injection

Total CPPs Injectio

n

Total CSS DVC ER Sugen Lanco Sasan Essar JP

NigriMB

Power

Jhabua

PowerSSP

SCH to

Railway

SEZ Banking Sale Pur

Total MTO

Aat

MP

STOA

Rihand+Matatila-Rajghat

Total SCH UN SCH TOTAL

DEMAND MET

1:00 49.97 2846 2624 125 11 4 312 679 3755 2404 0 0 203 1299 5 290 265 64 0 206 0 -315 -739 0 0 -110 12 3584 7339 3514 -69 -7 7262 0 0 0 7270 7270 7262

2:00 49.98 2835 2613 122 7 4 311 653 3711 2355 0 0 203 1299 4 290 254 58 0 208 0 -315 -825 0 0 -123 12 3420 7131 3224 -196 -7 6928 0 0 0 6933 6933 6928

3:00 49.98 2820 2600 109 7 4 311 635 3667 2371 0 0 203 1300 3 283 252 54 0 209 0 -315 -866 0 0 -220 12 3286 6953 3227 -59 -7 6887 0 0 0 6892 6892 6887

4:00 49.99 2823 2603 106 7 4 311 611 3643 2331 0 0 203 1303 3 283 250 61 0 207 0 -315 -833 0 0 -220 12 3285 6928 3214 -71 -6 6851 0 0 0 6855 6855 6851

5:00 49.97 2843 2622 107 22 12 313 576 3652 2331 0 0 203 1299 4 283 269 65 0 208 0 -315 -874 0 0 -220 12 3265 6917 3271 6 -6 6916 0 0 0 6922 6922 6916

6:00 50.00 2875 2652 118 33 14 318 558 3692 2462 0 0 203 1300 7 284 289 80 0 208 0 -315 -891 0 0 -89 12 3550 7242 3558 8 -7 7244 0 0 0 7247 7247 7243

7:00 49.99 2926 2700 172 76 31 321 568 3868 2568 0 5 203 1302 7 285 314 97 0 209 0 -315 -231 5 0 -28 12 4432 8300 4472 40 -9 8331 0 0 0 8337 8337 8331

8:00 50.00 2945 2718 238 116 57 322 728 4179 2633 0 9 203 1304 10 285 328 108 0 209 0 -300 -178 13 0 -50 12 4586 8765 4472 -115 -9 8641 0 0 0 8645 8645 8641

9:00 49.96 2945 2718 245 120 63 321 816 4282 2610 0 6 203 1304 9 285 333 107 0 209 0 -336 -254 18 0 -93 12 4413 8696 4324 -89 -9 8597 0 0 0 8608 8608 8597

10:00 50.00 2931 2705 230 83 42 321 1010 4392 2617 0 0 203 1304 7 285 334 113 0 208 0 -337 -458 8 0 -147 12 4150 8542 3871 -279 -9 8254 0 0 0 8258 8258 8254

11:00 49.96 2898 2673 166 44 22 318 1139 4362 2593 0 0 200 1304 8 286 328 106 0 206 0 -356 -820 0 0 -199 12 3668 8030 3453 -214 -8 7807 0 0 0 7817 7817 7807

12:00 49.99 2851 2629 142 33 16 314 1171 4305 2397 0 0 200 1304 4 291 262 63 0 206 0 -358 -1116 0 0 -223 12 3040 7345 2816 -223 -8 7113 0 0 0 7118 7118 7113

13:00 50.00 2800 2581 132 29 16 313 1149 4220 2425 0 0 200 1303 4 290 278 46 0 202 0 -358 -1233 0 0 -233 12 2937 7158 2913 -24 -8 7126 0 0 0 7129 7129 7126

14:00 49.99 2788 2571 119 22 14 313 1109 4148 2414 0 0 200 1301 3 290 246 42 0 200 0 -358 -1257 0 0 -232 12 2862 7010 2753 -109 -7 6894 0 0 0 6898 6898 6894

15:00 49.95 2826 2606 101 18 10 316 999 4051 2450 0 0 200 1305 4 291 270 50 0 204 0 -374 -1359 0 0 -215 12 2837 6888 2802 -36 -8 6845 0 0 0 6856 6856 6845

16:00 49.93 2858 2636 129 18 10 317 805 3916 2459 0 0 200 1311 7 291 281 68 0 201 0 -374 -1378 0 0 -179 12 2899 6815 2974 75 -8 6881 0 0 0 6895 6895 6881

17:00 49.97 2881 2658 127 25 12 319 556 3696 2456 0 0 200 1314 7 292 266 66 0 206 0 -374 -1134 0 0 -111 12 3200 6896 3163 -37 -8 6851 0 0 0 6859 6859 6851

18:00 50.01 2889 2666 190 43 25 322 332 3578 2454 0 0 200 1308 6 292 280 78 0 204 0 -358 -1272 0 0 -37 12 3167 6745 3139 -28 -9 6708 0 0 0 6709 6709 6708

19:00 49.93 2925 2699 197 58 39 357 358 3708 2557 0 5 200 1313 8 295 300 103 0 204 0 -317 -988 0 0 -52 12 3642 7351 3719 76 -9 7418 0 0 0 7433 7433 7418

20:00 49.98 2875 2652 183 73 35 354 465 3761 2453 0 2 200 1316 7 296 285 90 0 204 0 -315 -619 0 0 -67 12 3865 7626 3720 -145 -9 7472 0 0 0 7477 7477 7473

21:00 49.95 2824 2604 126 33 16 352 601 3732 2445 0 0 200 1311 6 298 276 78 0 204 0 -315 -808 0 0 -82 12 3624 7356 3448 -176 -9 7171 0 0 0 7181 7181 7171

22:00 50.02 2786 2569 131 32 10 352 682 3776 2398 0 0 200 1311 6 299 251 55 0 205 0 -315 -951 0 0 -104 12 3367 7143 3244 -123 -9 7011 0 0 0 7012 7012 7012

23:00 49.97 2842 2621 149 33 16 352 720 3890 2533 0 0 200 1311 8 301 297 90 0 202 0 -315 -663 0 0 -103 12 3873 7764 3741 -132 -8 7624 0 0 0 7632 7632 7624

24:00 49.97 2856 2633 126 22 16 320 725 3842 2390 0 0 200 1309 5 298 281 67 0 199 0 -315 -696 0 0 -94 12 3657 7499 3544 -113 -7 7379 0 0 0 7387 7387 7379

Avg. 49.98 2862 2640 150 40 21 324 735 3910 2463 0 1 201 1306 6 290 283 75 0 205 0 -333 -852 2 0 -135 12 3525 7435 3441 -85 -8 7342 0 0 0 7349 7349 a

00 TO 06 HRS. 49.98 2840 2619 114 15 7 313 619 3687 2376 0 0 203 1300 4 286 263 64 0 208 0 -315 -838 0 0 -164 12 3398 7085 3335 -63 -7 7015 0 0 0 7020 7020

06 TO 12 HRS. 49.98 2916 2690 199 79 38 320 906 4231 2569 0 3 202 1304 7 286 316 99 0 208 0 -334 -510 7 0 -123 12 4048 8280 3901 -147 -9 8124 0 0 0 8130 8130

12 TO 18 HRS. 49.97 2840 2620 133 26 15 317 825 3935 2443 0 0 200 1307 5 291 270 58 0 203 0 -366 -1272 0 0 -168 12 2984 6919 2957 -26 -8 6884 0 0 0 6891 6891

06TO 18 HRS. 49.98 2878 2655 166 52 27 318 865 4083 2506 0 2 201 1305 6 289 293 79 0 205 0 -350 -891 4 0 -146 12 3516 7599 3429 -87 -8 7504 0 0 0 7511 7511

18 TO 24 HRS. 49.97 2851 2630 152 42 22 348 592 3785 2463 0 1 200 1312 7 298 282 80 0 203 0 -316 -787 0 0 -84 12 3671 7456 3569 -102 -8 7346 0 0 0 7354 7354

Deviation

Intra State STO

A

DEMAND MET

Load Shedding

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- March 2018

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

TotAvl.

Act.Drl

Agenda of 63rd OCCM of MP 49

Page 52: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 49.99 2135 2166 31 0 0 2168 2168 2339 2368 29 0 0 2369 2369 2235 2071 -164 0 0 2072 2072 205 215

2:00 50.00 2024 2012 -12 0 0 2013 2013 2234 2228 -5 0 0 2229 2229 2207 2108 -99 0 0 2109 2109 206 221

3:00 49.99 1993 2001 8 0 0 2002 2002 2143 2182 40 0 0 2183 2183 2313 2236 -78 0 0 2237 2237 206 213

4:00 50.01 1975 2011 36 0 0 2012 2012 2142 2149 7 0 0 2149 2149 2339 2288 -51 0 0 2289 2289 204 205

5:00 49.99 1977 2027 50 0 0 2028 2028 2159 2189 30 0 0 2191 2191 2399 2341 -58 0 0 2343 2343 205 209

6:00 49.99 2044 2065 21 0 0 2066 2066 2266 2356 90 0 0 2357 2357 2622 2583 -40 0 0 2584 2584 204 213

7:00 49.93 2282 2409 126 0 0 2414 2414 2580 2800 220 0 0 2806 2806 3245 3196 -49 0 0 3203 3203 206 224

8:00 50.00 2527 2541 14 0 0 2543 2543 3033 3066 33 0 0 3068 3068 3765 3690 -75 0 0 3691 3691 206 220

9:00 49.97 2575 2501 -75 0 0 2503 2503 3289 3328 39 0 0 3331 3331 4026 3908 -118 0 0 3912 3912 206 215

10:00 49.99 2605 2495 -110 0 0 2496 2496 3290 3298 8 0 0 3301 3301 3862 3734 -128 0 0 3737 3737 206 213

11:00 49.99 2587 2506 -81 0 0 2508 2508 3176 3169 -7 0 0 3171 3171 3525 3377 -148 0 0 3379 3379 200 202

12:00 49.99 2416 2274 -142 0 0 2275 2275 2943 2872 -71 0 0 2874 2874 3277 3179 -97 0 0 3181 3181 203 207

13:00 50.00 2388 2323 -65 0 0 2323 2323 2746 2811 65 0 0 2812 2812 3338 3304 -34 0 0 3305 3305 196 194

14:00 50.00 2298 2184 -114 0 0 2185 2185 2719 2673 -46 0 0 2674 2674 3268 3238 -31 0 0 3239 3239 195 194

15:00 49.96 2215 2155 -60 0 0 2158 2158 2600 2576 -24 0 0 2580 2580 3235 3284 49 0 0 3289 3289 202 201

16:00 49.95 2188 2140 -48 0 0 2143 2143 2545 2541 -4 0 0 2545 2545 3198 3288 90 0 0 3293 3293 200 199

17:00 49.96 2226 2151 -75 0 0 2155 2155 2607 2593 -14 0 0 2597 2597 3105 3091 -14 0 0 3096 3096 202 203

18:00 50.02 2262 2217 -45 0 0 2218 2218 2601 2539 -63 0 0 2539 2539 2893 2877 -16 0 0 2877 2877 210 212

19:00 49.95 2547 2582 35 0 0 2586 2586 2533 2605 72 0 0 2609 2609 2874 2745 -128 0 0 2749 2749 210 223

20:00 49.98 2546 2567 21 0 0 2569 2569 2576 2545 -31 0 0 2547 2547 2669 2508 -161 0 0 2510 2510 209 217

21:00 49.98 2436 2441 5 0 0 2443 2443 2428 2371 -58 0 0 2372 2372 2510 2362 -148 0 0 2364 2364 210 212

22:00 50.05 2287 2260 -27 0 0 2260 2260 2281 2261 -20 0 0 2261 2261 2319 2171 -147 0 0 2171 2171 208 209

23:00 49.99 2336 2351 14 0 0 2352 2352 2475 2567 92 0 0 2569 2569 2431 2292 -139 0 0 2293 2293 202 195

24:00 49.99 2219 2246 28 0 0 2248 2248 2417 2433 16 0 0 2434 2434 2338 2157 -180 0 0 2158 2158 202 203

Avg. 49.99 2295 2276 -19 0 0 2278 2278 2588 2605 17 0 0 2607 2607 2916 2835 -82 0 0 2837 2837 204 209

00 TO 06 HRS. 49.99 2025 2047 22 0 0 2048 2048 2214 2245 32 0 0 2247 2247 2352 2271 -81 0 0 2272 2272 205 213

06 TO 12 HRS. 49.98 2499 2454 -45 0 0 2457 2457 3052 3089 37 0 0 3092 3092 3616 3514 -102 0 0 3517 3517 204 214

12 TO 18 HRS. 49.98 2263 2195 -68 0 0 2197 2197 2636 2622 -14 0 0 2624 2624 3173 3180 7 0 0 3183 3183 201 201

06TO 18 HRS. 49.98 2381 2325 -56 0 0 2327 2327 2844 2856 11 0 0 2858 2858 3395 3347 -47 0 0 3350 3350 203 207

18 TO 24 HRS. 49.99 2395 2408 13 0 0 2410 2410 2452 2464 12 0 0 2466 2466 2523 2373 -151 0 0 2374 2374 207 210

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- February 2018

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Agenda of 63rd OCCM of MP 50

Page 53: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 49.97 2345 2375 30 0 0 2377 2377 2411 2417 5 0 0 2419 2419 2400 2258 -142 0 0 2260 2260 206 213

2:00 49.98 2288 2219 -70 0 0 2220 2220 2349 2306 -43 0 0 2308 2308 2316 2183 -133 0 0 2184 2184 208 221

3:00 49.98 2224 2214 -10 0 0 2215 2215 2261 2233 -28 0 0 2235 2235 2327 2220 -107 0 0 2222 2222 209 220

4:00 49.99 2211 2210 -1 0 0 2211 2211 2240 2201 -39 0 0 2202 2202 2327 2222 -105 0 0 2223 2223 207 218

5:00 49.97 2186 2215 29 0 0 2217 2217 2213 2211 -2 0 0 2213 2213 2335 2270 -65 0 0 2272 2272 208 220

6:00 50.00 2218 2213 -5 0 0 2214 2214 2278 2326 48 0 0 2327 2327 2543 2485 -59 0 0 2486 2486 208 220

7:00 49.99 2470 2454 -17 0 0 2456 2456 2565 2621 56 0 0 2622 2622 3099 3029 -70 0 0 3031 3031 209 228

8:00 50.00 2510 2424 -87 0 0 2425 2425 2738 2663 -75 0 0 2664 2664 3343 3324 -19 0 0 3325 3325 209 230

9:00 49.96 2460 2375 -85 0 0 2378 2378 2717 2662 -55 0 0 2665 2665 3377 3340 -37 0 0 3345 3345 209 221

10:00 50.00 2483 2362 -121 0 0 2363 2363 2683 2544 -139 0 0 2545 2545 3254 3127 -127 0 0 3128 3128 208 221

11:00 49.96 2416 2349 -66 0 0 2352 2352 2525 2387 -137 0 0 2390 2390 2990 2857 -133 0 0 2861 2861 206 213

12:00 49.99 2256 2115 -141 0 0 2116 2116 2310 2146 -164 0 0 2147 2147 2710 2640 -70 0 0 2641 2641 206 213

13:00 50.00 2171 2130 -41 0 0 2131 2131 2110 2046 -64 0 0 2046 2046 2745 2748 3 0 0 2749 2749 202 202

14:00 49.99 2072 1998 -74 0 0 1999 1999 2068 1972 -96 0 0 1974 1974 2700 2720 20 0 0 2722 2722 200 203

15:00 49.95 2026 1979 -47 0 0 1982 1982 2010 1926 -84 0 0 1929 1929 2666 2729 63 0 0 2733 2733 204 211

16:00 49.93 1994 2003 9 0 0 2007 2007 1972 1928 -45 0 0 1932 1932 2639 2745 105 0 0 2750 2750 201 206

17:00 49.97 2030 2010 -20 0 0 2012 2012 2038 1981 -58 0 0 1983 1983 2609 2643 34 0 0 2646 2646 206 218

18:00 50.01 2053 2003 -50 0 0 2003 2003 2091 2048 -44 0 0 2048 2048 2422 2435 13 0 0 2435 2435 204 222

19:00 49.93 2375 2473 99 0 0 2478 2478 2221 2320 98 0 0 2325 2325 2529 2400 -130 0 0 2405 2405 204 225

20:00 49.98 2481 2513 32 0 0 2514 2514 2460 2418 -43 0 0 2419 2419 2501 2320 -180 0 0 2322 2322 204 222

21:00 49.95 2411 2439 28 0 0 2442 2442 2365 2323 -42 0 0 2326 2326 2366 2193 -173 0 0 2196 2196 204 217

22:00 50.02 2323 2334 11 0 0 2334 2334 2290 2263 -27 0 0 2263 2263 2355 2200 -156 0 0 2200 2200 205 215

23:00 49.97 2471 2493 21 0 0 2495 2495 2515 2546 31 0 0 2549 2549 2543 2382 -161 0 0 2384 2384 202 203

24:00 49.97 2404 2422 18 0 0 2425 2425 2484 2472 -12 0 0 2474 2474 2441 2283 -158 0 0 2285 2285 199 202

Avg. 49.98 2287 2263 -23 0 0 2265 2265 2330 2290 -40 0 0 2292 2292 2647 2573 -74 0 0 2575 2575 205 216

00 TO 06 HRS. 49.98 2245 2241 -5 0 0 2243 2243 2292 2282 -10 0 0 2284 2284 2374 2273 -102 0 0 2275 2275 208 219

06 TO 12 HRS. 49.98 2433 2346 -86 0 0 2348 2348 2589 2504 -86 0 0 2506 2506 3129 3053 -76 0 0 3055 3055 208 221

12 TO 18 HRS. 49.97 2058 2021 -37 0 0 2023 2023 2048 1983 -65 0 0 1985 1985 2630 2670 40 0 0 2673 2673 203 210

06TO 18 HRS. 49.98 2245 2184 -62 0 0 2185 2185 2319 2244 -75 0 0 2246 2246 2879 2861 -18 0 0 2864 2864 205 216

18 TO 24 HRS. 49.97 2411 2446 35 0 0 2448 2448 2389 2390 1 0 0 2393 2393 2456 2296 -160 0 0 2299 2299 203 214

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- March 2018

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Agenda of 63rd OCCM of MP 51

Page 54: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

System Disturbance / System Incidence of FEB-2018

1. System Disturbance on 14.02.2018 in Bina, MPPTCL area: On dated 14.02.2018

at around 01:43 Hrs. M.P system was normal, weather was foggy and frequency of National Grid was 50.03 Hz , 315 MVA ICT-no 1 was out of service due to tripping and all feeders were in charged condition and normally loaded. At 01:44 hrs, 220kv Bina-Bina interconnector-II tripped from both end , also 400/220KV 315MVA ICT-II at 400kv s/s Bina got tripped on Differential protection and Buchholz relay indication.

On patrolling on 220kv Bina I/C-II ckt location no.-26 R- phase string found failed .

After the tripping ,Bina remained with only 1 ICT, for the load management several 220kv and 132kv ckts has been shifted towards Bhopal , Gwalior , Sagar area. Due to above tripping there was no load loss and no generation loss . Faulty transformer is presently out of service.

2. System Disturbance on 14.03.2018 in Birsinghpur area: On dated 14.03.2018 at

around 16:35 Hrs. M.P system was normal and frequency of National Grid was 49.97 Hz. At 16:35 Hrs, R-ph PT of 220kv Main bus- II Burst at 220kv s/s Birsinghpur resulting in the tripping of multiple feeders at 220kv s/s Birsinghpur. This caused the total interruption in 220kv s/s Birsinghpur and 132kv s/s Umaria for 24 min.

System Disturbance resulting into tripping of following ckts- From Remote end only- 220kv Birsinghpur-Birsinghpur I/C-I 220kv Birsinghpur-Birsinghpur I/C-II 220kv Birsinghpur-Birsinghpur I/C-III

220kv Birsinghpur-Birsinghpur I/C-IV 220kv Birsinghpur-Birsinghpur Hydel ckt 220kv Birsinghpur-Jabalpur ckt I 220kv Birsinghpur- Jabalpur ckt II

Along with this Unit#3 of SGTPS, MPPGCL also tripped in

jerk leading to the generation loss of 188 MW and load loss of 30 MW. Bus bar protection not operated due to check zone kept out due to wiring modification and testing work of new DPR of Railway traction-2 ckt. Damaged 220kv R phase PT replaced.

3. System Disturbance on 20.03.2018 in Bhopal area: On dated 20.03.2018 at

around 09:55 Hrs. M.P system was normal and frequency of National Grid was 50.11 Hz. At 09:58 Hrs, During changeover of 220kv Vidisha ckt from bus 1 to bus 2, LBB Protection operated at 400kv s/s Bhopal .

System Disturbance resulting into tripping of following X-mers/ckts-

315 MVA , 400/220KV ICT-I

Agenda of 63rd OCCM of MP 52

Page 55: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

315 MVA , 400/220KV ICT-II 315 MVA , 400/220KV ICT-III 400KV Bhopal-Damoh ckt 400KV Bhopal-Bina ckt-I 400KV Bhopal-Bina ckt-II 220kv Bhopal-Bhopal ckt-I 220kv Bhopal-Bhopal ckt-II 220kv Bhopal-Bairagarh ckt-I 220kv Bhopal-Bairagarh ckt-II 220kv Bhopal-Ganjbasoda ckt 220kv Bhopal-Vidisha ckt 220kv Bhopal-Shujalpur ckt-I 220kv Bhopal-Mungaliachhap ckt 220kv Bus tie

This caused the total interruption in 220kv s/s Mungaliachhap 25 min. There was No generation loss, and load loss of about 6 MW. Supply to 220kv s/s Mungaliachhap restored through 220kv Ashta ckt, later other elements restored gradually.

4. System Disturbance on 28.03.2018 in Julwaniya area: On dated 28.03.2018 at around 14:38 Hrs. M.P system was normal and frequency of National Grid was 49.88 Hz. At 14.39 hrs, Y-ph CVT, Make-CDC, of 132kv Julwaniya interconnector – II Burst at 220kv s/s Julwaniya resulting in the tripping of multiple feeders and 160 MVA x-mer at 220kv s/s Julwaniya. This caused the total interruption in 220kv s/s Julwaniya for 32 min. Supply to all the nearby s/s remain managed from the other 132kv linkages.

System Disturbance resulting into tripping of following ckts- From Remote end- 132kv Julwaniya-Talakpura ckt 13v2k Julwaniya-Julwaniya I/C- ckt-I 132kv Julwaniya-Barwani ckt 132kv Julwaniya-Sendhwa ckt From Both ends- 132kv Julwaniya- Julwaniya I/C -ckt-II

There was load loss of 21.6 MW and No generation loss and 132 kV Y-Phase CT Burst causing damage to R Phase CT & Y Phase PI of line side Isolator.Supply to 220kv s/s Julwaniya restored by charging 132kv Julwaniya-Barwani ckt. Later other 132kv ckts got charged. Faulty ckt charged after replacement of R & Y Phase CTs of 132kV Interconnector-II at 00.22 on dated 30.03.18.

Agenda of 63rd OCCM of MP 53

Page 56: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Agenda of 63rd OCCM of MP 54

low dicpach
Text Box
Annexure-6.3
Page 57: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Agenda of 63rd OCCM of MP 55

Page 58: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Annexure-6.11A

Schemes of Western Region funded under PSDF

State I UT Sr. Details of the Scheme Nos. of Grant Date of Funds %age of

No. Schemes Sanctioned Sanction released fund

(in Rs (in Rs Crores) Disbursed

Crores) as on against

30.11.2016 Grant

sanctioned

Madhya 1. Implementation of 2 3.6 17/03/2016 0 0%

Pradesh Integrated system for

availability based

tariff. 92.7

2. Renovation and 17/03/2016 0 0%

Upgradation of

protection system of

substations of

MPPTCL

Madhya 3. Renovation and 2 47.11 5/9/2016 0 0%

Pradesh Upgradation of

protection system of

substations MPPGCL

4. Installation of 5.59 0 0%

125MVARBus

Reactor at SSTPP

Khandwaand

50MVARLine

Reactor at SGSTPS

Birsinghpur

substation of

MPPGCL.

Chhattisgarh 5. Renovation and 1 61.67 5/9/2016 0 0%

Upgradation of

protection system of

substations 1.50

Gujarat 6. Automatic Demand 3 11105/2015 1.35 89.82%

Management Scheme 3.70

17/03/2015

7. Load Forecasting 04/08/2015 0 0%

Scheme

8. Wind generation 1.62 17/03/2015 0 0%

forecasting project

for State of Gujarat.

TOTAL 8 217.49

Agenda of 63rd OCCM of MP 56

Page 59: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Annexure-6.11B Reporting Format to the PSDF Project Monitoring Group

1. Name of the Scheme

1.1 Name of the substation and its Location

1.2 Executing Agency

1.3 State/Region

2. Date of Sanction Order

2.1 Date of Agreement of Entity with State Govt. / NLDC

2.2 Total Approved Cost of Scheme

2.3 Approved Grant by Monitoring Committee (Rs. In Lakhs)

2.4 Date of Requisition by the Entity

2.4 a) Date and Reference of LOA

2.4 b) Amount of LOA

2.5 Date of Disbursement and amount

2.5.1 Ist Installment

2.5.2 IInd Installment

2.5.3 IIIrd Installment

2.6 Date of Scheduled completion of work

2.7 Date of Handling over of Site to entity ( In case of Turn key project)

Report for the Month of JANUARY 2017

Quantity CUMMULATIVE

PROGRESS till date

Qty. AS PER Received during

No. Supply Discription LOA Month Sch. Act. Balance Remark

1 Item Details (As per Annexure-II)

1.1

1.2

Erection Discription works as per Progress During CUMMULATIVE

Balance

LOA Month PROGRESS till date

2 Work Details

2.1

2.2

3 Others

Signature With Seal of The Nodal Officer

Agenda of 63rd OCCM of MP 57

Page 60: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

ANNEXURE-6.14

YES/NOIF NOT COMMISSIONED THEN REASON

FOR NOT COMMISSIONINGYES/NO

IF NOT WORKING CONDITION THEN REASON FOR NOT

WORKINGYES/NO

IF NOT IN SERVICE CONDITION THEN REASON FOR NOT IN

SERVICE

RGMO COMMISSIONED WORKING CONDITION IN SERVICE

S.NO.NAME OF ELIGIBLE

UNITS

INSTALLED CAPACITY

IN MW

Agenda of 63rd OCCM of MP 58

Page 61: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Annexure-8.1.i

SNO Meter No Location Feeder Name District T & C Circle T & C Division Data Not Available Dates

1 MPE51834 132KV S/S BARWANI 40MVA 132/33KV XMER BBL S.NO.3072/1 BARWANI 400KV Indore Testing Division - II Indore 01/03/2018 to 31/03/2018

2 MPE51793 132KV S/S PITHAMPUR 40MVA 132/33KV X'MER-I BHEL S.NO. 2009745 DHAR 400KV Indore Testing Division - II Indore 01/03/2018 to 31/03/2018

3 MPE51761 32KV S/S AYODHYANAGAR BHOPA 40MVA MAKE TELK SN 120459-16 BPL BHOPAL 400 KV Testing Division Bhopal 01/03/2018 to 31/03/2018

4 MPM06718 132KV S/S BIORA 40MVA MAKE BBL SN 3072/7 RAJGARH BHOPAL Testing Division -I Bhopal-S/s DN Beora 01/03/2018 to 31/03/2018

5 MP924844 132KV S/S GAIRATGANJ 63MVA MAKE BBL SN 5038/01 RAISEN BHOPAL Testing Division -II Bhopal 01/03/2018 to 31/03/2018

6 MSP44327 132KV S/S GOPALPUR 40MVA TRANSFORMER PC0100096 T&R SEHORE BHOPAL Testing Division -II Bhopal 01/03/2018 to 31/03/2018

7 XB577396 132KV S/S SHAMSHABAD 20MVA MAKE NGEF VIDISHA BHOPAL Testing Division -II Bhopal 05/03/2018 to 31/03/2018

8 MPE51945 132KV S/S MOTIZEEL 40 MVA MAKE BBL SN 4910/5 GWL GWALIOR Testing Division -I Gwalior 01/03/2018 to 31/03/2018

9 MPE51950 132KV S/S TIGHRA 40 MVA MAKE BBL SN 4732/2 GWL GWALIOR Testing Division -I Gwalior 01/03/2018 to 31/03/2018

10 DEPALPUR_NEW 132KV S/S DEPALPUR 40 MVA BHEL IND INDORE Testing Division - I Indore 01/03/2018 to 31/03/2018

11 MPE51707 132KV S/S MANSAKARA 40MVA MAKE TELK SN 120459-1 KATNI JABALPUR Testing Division -Katni 01/03/2018 to 31/03/2018

12 MPP28814 132KV S/S SHUJALPUR Tr.132KV M. Kheda Rly.Tra. SHAJAPUR RAILWAY Testing Division - Shujalpur 05/03/2018 to 31/03/2018

13 MPE51722 132KV S/S BIJAWAR 40MVA MAKE NGEF SN 5076/12 CHATARPUR SAGAR Testing Division -II Sagar 01/03/2018 to 31/03/2018

14 MPP28381 132KV S/S PRITHVIPUR 20 MVA MAKE NGEF SN 2800034786 TIKAMGARH SAGAR Testing Division -II Sagar 03/03/2018 to 31/03/2018

15 ABB01789 220 KV S/S KOTAR 63MVA XMER SATNA SATNA Testing Division - Satna 02/03/2018 to 31/03/2018

16 Y0221275 132KV S/S BEOHARI 50 MVA X-mer SN 204292 SHAHDOL SATNA Testing Division - Satna- S/S DN Shahdol 01/03/2018 to 31/03/2018

17 MPE51662 132KV S/S BAIHAR BIRSA FEEDER/HCL MALAJKHAND BALAGHAT SEONI Testing Division -II Chindwara 01/03/2018 to 31/03/2018

18 MPE51655 132KV S/S BALAGHAT 40MVA NGEF XMER BALAGHAT SEONI Testing Division -II Chindwara 01/03/2018 to 31/03/2018

19 MPC58840 132KV S/S PANWADI 50MVA MAKE BBL SN 5406/02 SHAJAPUR UJJAIN Testing Division - Dewas 01/03/2018 to 31/03/2018

20 MPE51892 132KV S/S MANASA 40MVA MAKE TELK S.NO.120271/3 NEEMUCH UJJAIN Testing Division - Ratlam-S/S DN Neemuc 01/03/2018 to 31/03/2018

21 MPE51874 132KV S/S NEEMUCH 40MVA MAKE GEC SN B-27790 NEEMUCH UJJAIN Testing Division - Ratlam-S/S DN Neemuc 01/03/2018 to 31/03/2018

22 MPE53429 132KV S/S GHONSLA 40MVA MAKE BBL SN 5033/2 UJJ UJJAIN Testing Division - Ujjain 01/03/2018 to 31/03/2018

23 MPE51895 132KV S/S TARANA 63MVA MAKE BBL TRANSFORMER UJJ UJJAIN Testing Division - Ujjain 01/03/2018 to 31/03/2018

24 Y0221427 220KV S/S UJJAIN 40MVA MAKE CROMPTON SN T-8362/3 UJJ UJJAIN Testing Division - Ujjain 01/03/2018 to 31/03/2018

25 MPE51752 132KV S/S BHONRA 40 MVA XMER EMCO GUNA 400KV BINA Testing Division Guna 24/03/2018 to 31/03/2018

26 MPE53490 132KV S/S CHANDERI 40MVA BBL MAKE XMER ASHOKNAGAR 400KV BINA Testing Division Guna 24/03/2018 to 31/03/2018

27 MPE51928 220KV S/S GUNA 40MVA,BHEL-II GUNA 400KV BINA Testing Division Guna 24/03/2018 to 31/03/2018

28 MPE51809 220KV S/S S/Z, INDORE 40 MVA 132/33 KV XMAR-III CGL S.NO. 24791 IND 400KV Indore 440 KV Testing Division, Indore 09/03/2018 to 31/03/2018

29 GEC08895 132KV S/S BAGDI 40 MVA MAKE BBL DHAR 400KV Indore Testing Division - II Indore 14/03/2018 to 31/03/2018

30 MPE51964 132KV S/S BARELI 40MVA MAKE TELK SN 120356-1 RAISEN BHOPAL Testing Division -II Bhopal 24/03/2018 to 31/03/2018

31 MPP28350 220KV S/S BIRSINGPUR Tr.220 KV NOROWZABAD TRACTION II UMARIYA RAILWAY Testing Division - Satna- S/S DN Shahdol 11/03/2018 to 18/03/2018

32 MPP28387 220KV S/S KATNI Tr.TRACTION-I FEEDER KATNI RAILWAY Testing Division -Katni 10/03/2018 to 30/03/2018

33 MPE51750 132KV S/S REWA 132 KV SATNA (for JP BELA Cement ) REWA SATNA Testing Division - Rewa 07/03/2018 to 31/03/2018

34 MPE51742 132KV S/S LAKHANADON 40MVA BBL XMER SEONI SEONI Testing Division -II Jabalpur 11/03/2018 to 12/03/2018

35 MPE53468 132KV S/S ARNIAKALA 40MVA MAKE BBL SN 5076/5 SHAJAPUR UJJAIN Testing Division - Dewas - S/S Dn Shujalpu 06/03/2018 to 31/03/2018

Agenda of 63rd OCCM of MP 59

Page 62: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Annexure-8.1.ii

SNO Meter No Location Feeder Name T & C Circle T & C Division

1 MP924834 132KV S/S KHURAI 40 MVA BHEL 400KV BINA 400 KV Testing Division Bina

2 MPC58874 132KV S/S CHANDERI 20MVA EMCO SN 1023/10789 400KV BINA Testing Division Guna

3 MPP28723 220 KV BINA DISCOM_33KV VIDISHA FEEDER ( EZ TO CZ) 400KV BINA 400KV Testing Division -BINA

4 MPC57149 132KV S/S ANJAD 40MVA XMER BHEL S.NO. 2037088 400KV Indore Testing Division - II Indore

5 MPE51799 132KV S/S DHAR 40MVA BHEL 400KV Indore Testing Division - II Indore

6 GEC88970 220KV S/S HOSANGABAD SPM M/S SPM BHOPAL Testing Division Hoshangabad

7 XB577467 132KV S/S BANKHEDI 40MVA MAKE IMP BHOPAL Testing Division Hoshangabad

8 XB577430 132KV S/S SEMRI HARCHAND 40 MVA IMP PT6722 BHOPAL Testing Division Hoshangabad

9 XB577404 220KV S/S PIPARIA 12.5MVA BHEL MAKE 6001776 BHOPAL Testing Division - Itarsi

10 XB577379 132KV LATERI 40MVA IMP SN PT-7282 BHOPAL Testing Division -II Bhopal

11 XB577712 132KV HASTINAPUR 40MVA BHEL SN 2037087 GWALIOR Testing Division -I GWL

12 XB569562 132KV S/S BARODA 40MVA ABB GWALIOR Testing Division Guna-S/S Dn Shivpuri

13 XB577730 220KV S/S DATIA 40MVA GWALIOR Testing Division -II Gwalior

14 Y0221431 132KV S/S KARERA 20MVA BHEL MAKE SN 6004351 GWALIOR Testing Division Guna-S/S Dn Shivpuri

15 XB577385 132KV S/S BADAGAON 40MVA IMP GWALIOR Testing Division -I Gwalior

16 MSP56852 132KV S/S BANMORE 132 kv AMBA SHAKTI GWALIOR Testing Division -I Gwalior

17 XB583341 132KV GOHAD 63 MVA MAKE IMP SN PT7479 GWALIOR Testing Division -II Gwalior

18 MPP28712 132KV KOLARAS 20MVA CGL GWALIOR Testing Division -GUNA S/S Shivpuri

19 MPE51942 132KV S/S MORAR 63 MVA MAKE BBL Sno. 5308/9 GWALIOR Testing Division -I Gwalior

20 GEC88916 132KV S/S SENDHWA 20MVA CGL SN 24400 INDORE Testing Division - II Barwaha

21 MPE51805 132KV S/S CHHANERA 20MVA MAKE CGL SN 24641 INDORE Testing Division - Khandwa

22 MPC59861 132KV S/S ALIRAJPUR 20MVA BBL 1991/3 INDORE Testing Division - Rajgarh

23 MPC57146 132KV S/S ANJOD CH GANJ 40 MAVA BHEL INDORE Testing Division - I Indore

24 MPC58410 132KV S/S BICHHUA 40MVA BHEL XMER JABALPUR Testing Division -II Chindwara

25 MP925055 220KV S/S PANAGAR 220KV PANAGAR JABALPUR Testing Division - JABALPUR

26 MPP28518 220KV S/S CHHINDWARA 50MVA XMER JABALPUR Testing Division -II Chindwara

27 XB577406 132KV S/S BADGAON 40MVA BBL 5423/5 KHANDWA Testing Division - Khandwa

28 MPE22595 132KV S/S JEERAPUR 20MVA NGEF RAJGARH Testing Division -I Bhopal-S/s DN Beora

29 XB549199 132KV S/S DONGARITAL 20 MVA EMCO SN 1058 B/10930 REWA Testing Division - Rewa

30 XB552535 132KV S/S SIRMOUR 40MVA IMP REWA Testing Division - Rewa

31 MPC60964 132KV S/S DIGODA 20MVA SAGAR Testing Division -II Sagar

32 MPC57148 132KV BUDERA 40MVA SAGAR Testing Division -II Sagar

33 XB583338 132KV MUNGAOLI 63MVA SAGAR Testing Division -II SAGAR

34 GEC88948 132KV S/S MAIHAR 132 KV RELIANCE FEEDER SATNA Testing Division - Satna

35 MP924832 132KV S/S RAMPUR NAIKIN 40 MVA X-mer (33 kv side) SATNA Testing Division - Satna

36 KA907077 220KV S/S ANUPUR 132KV MOSERBEAR SATNA Testing Division - Satna- S/S DN Shahdol

37 MPC58838 220KV S/S SIDHI 220KV S/S SIDHI SATNA Testing Division - Rewa

38 KA904800 220KV S/S ANUPUR 132KV OPM SATNA Testing Division - Satna- S/S DN Shahdol

39 XB577419 132KV S/S UMARIYA 20 MVA NGEF SATNA Testing Division - Rewa

40 MPP28662 132KV S/S TARANA 20MVA MAKE GEC TRANSFORMER UJJAIN Testing Division - Ujjain

41 MPC58871 132KV S/S MAXI 40MVA MAKE UJJAIN Testing Division - Dewas

42 XB580676 132KV S/S BHERUGARH 63MVA MAKE IMP UJJAIN UJJAIN

43 MP924841 220KV S/S SHANKARGARH 40MVA MAKE BHEL UJJAIN Testing Division - Dewas

44 MP924848 132KV S/S BAROTHA 40MVA MAKE BHEL SN 2037 UJJAIN Testing Division - Dewas

45 MPC58406 132KV SATWAS 40MVA MAKE BHEL SN 2037078 UJJAIN Testing Division - Dewas

List of newly commissioned substations / recently connected HT Consumers required to be included in supplementary list.

Agenda of 63rd OCCM of MP 60

Page 63: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

46 MPC58408 132KV SHAJAPUR 40MVA BHEL S.N. 2037089 UJJAIN Testing Division - Dewas

47 XB593845 132KV NALKHEDA 40MVA ALSTOM S.N. B-30818 UJJAIN Testing Division - UJJAIN

48 XB583619 132KV KALAPIPAL 40MVA TOSHIBA SN 90153 UJJAIN Testing Division - Shujalpur

49 MPC58866 132KV PORSA 12.5MVA MAKE EMCO SN 969B/10463 GWALIOR Testing Division -I Gwalior, S/S DN Morena

50 XB577443 132KV S/S BHERUGARH 40MVA MAKE BBL SN-4732/4 UJJAIN Testing Division - Ujjain

51 MPC72357 132KV S/S SHIVANI 40 MVA XMER ALSTOM 400KV Indore Testing Division - II Indore

52 BENEGAON_ 132KV BENEGAON 12.5MVA JABALPUR Testing Division -II Chindwara

53 MPC74042 132KV TAMOT 40MVA MAKE CGL SN 24788 BPL Testing Division -II Bhopal

54 XB577473 132KV S/S MAKSUDANGARH 63MVA MAKE BBL SN 5442/07 GWALIOR Testing Division Guna

55 MPP08529 220KV S/S CHHEGAON MAKHA63MVA 132/33KV BBL S.No. 5442/11 IND Testing Division - Khandwa

56 XB577425 132KV S/S SLEEMANABAD 12.5MVA NGEF SN2800022226 JBP Testing Division -Katni

57 XC530817 132KV S/S LALBARRA 40MVA IMP JBP Testing Division -II Chindwara

58 XC548595 132KV S/S UMRETH 40MVA BBL XMER JBP Testing Division -II Chindwara

59 KA909252 132KV S/S LAUNDI 40MVA IMP SGR Testing Division -II Sagar

60 MPP28606 132KV S/S RATLAM 50MVA X-mer BBL SN 5406/10 UJJ Testing Division - Ratlam

61 XB577773 220KV S/S GWALIOR-II 40 MVA MAKE GWALIOR Testing Division -I Gwalior

62 XB577474 132KV AMARWARA 50MVA BHEL JABALPUR Testing Division -Chhindwara

63 MPC58407 220KV S/S JULWANIYA 40MVA BHEL SN 2037620 INDORE Testing Division - II Barwaha

64 XB560307 220KV S/S MUNGALIYA CHHAP 40MVA BHEL SN 2037622 BHOPAL Testing Division - I Bhopal

65 XB577435 132KV S/S KATNI 50MVA MAKE BHEL JABALPUR Testing Division - Katni

66 XB577453 220KV S/S SEONI 50MVA BHEL JABALPUR Testing Division - Seoni

67 MPP28396 132KV S/S KATRA 50MVA BHEL MAKE XMER SATNA Testing Division - Rewa

68 XB577438 132KV S/S NAGOD 40 MVA X-mer SATNA Testing Division - Satna

69 XC573291 132 KV ANDHAD 40MVA INDORE Testing Division - II Indore

70 ESAGARH_N 132KV S/S ESAGARH_NEW 40MVA GWALIOR Testing Division Guna

71 XB583342 132KV S/S KOTHIYA 20MVA GWALIOR Testing Division Guna

72 XC573290 132KV S/S TAL 40MVA MAKE IMP UJJAIN Testing Division - Ratlam

73 XB583343 132KV PRATAPURA 40MVA GWALIOR Testing Division -II Gwalior

74 JHABUA_NEW132KV JHABUA 40 MVA MAKE NGEF INDORE Testing Division - II Indore

75 XB577383 132KV S/S GUDGAON 50MVA BHEL SN 2042484 BHOPAL Testing Division Itarsi

76 MPP28696 132KV S/S SHIVPURI 40MVA,BBLSN 5033/1 GWALIOR Testing Division Guna-S/S Dn Shivpuri

77 XB577374 132KV S/S BOREGAON 50MVA BHEL SN.2042482 JBP Testing Division -II Chindwara

78 MPC73878 132KV PANDHANA 63MVA IMP INDORE Testing Division KHANDWA

79 KASRAWAD_132KV S/S KASRAWAD 20MVA INDORE Testing Division - I Indore

80 XB577371 220KV BHANPURA 50MVA BHEL SN 2042485 UJJAIN Testing Division - Neemuch

81 XB577434 132KV S/S REWA-II 50MVA BHEL SATNA Testing Division - Rewa

82 XB577412 132KV S/S NARSINGPUR 50MVA BHEL SN2042481 JABALPUR Testing Division -II Jabalpur

83 Y0221147 220KV S/S CHICHLI 50MVA XMER MAKE BHEL SR. 2042480 JABALPUR Testing Division -II Jabalpur

84 Y0221433 132KV S/S BARODA 40MVA NGEF GWALIOR Testing Division Guna-S/S Dn Shivpuri

85 ICHHAWAR_N132KV S/S ICHHAWAR 40MVA BBL SN 1448/3 BHOPAL Testing Division - I Bhopal

86 SATWAS_NE 132KV S/S SATWAS 20MVA NGEF SN 280002-2214 UJJAIN Testing Division - Dewas

87 XB577472 220 KV S/S KOTAR 50MVA BHEL SATNA Testing Division - Satna

88 XB569347 220KV S/S ANUPUR 50MVA BHEL SATNA Testing Division - Satna- S/S DN Shahdol

89 TALAKPURA_132KV S/S TALAKPURA 40 MVA INDORE Testing Division - Barwaha

90 Y0062910 132KV S/S GADARWARA 132KV TC_NTPC JABALPUR Testing Division -II Jabalpur

91 Y0221471 220KV S/S NEEMUCH 50MVA BHEL UJJAIN Testing Division - Neemuch

Agenda of 63rd OCCM of MP 61

Page 64: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

92 MPC73877 132KV S/S SINGHANA 40 MVA IMP INDORE Testing Division - II Indore

93 XB552537 132KV S/S Kishangarh 40 MVA IMP INDORE Testing Division - Dewas

94 XC559777 220KV MORENA 63MVA GWALIOR Testing Division Morena

95 XB583344 132KV BHANDER 63MVA GWALIOR Testing Division DATIA

96 MPM06716 220KV S/S RAJGARH BIAORA 20MVA BHOPAL Testing Division -I Bhopal-S/s DN Beora

97 XC530820 132KV BAGRODA 40MVA BHOPAL Testing Division -I Bhopal

98 MPC57144 132KV S/S RUNAHA 63MVA MAKE BBL SN 5308/10 BHOPAL Testing Division -II Bhopal

99 MPC59988 220KV S/S BARNAGAR 40MVA MAKE BBL SN 3661/2 UJJAIN Testing Division - Ujjain

100 XC559792 132KV S/S MORENA 40 MVA MAKE BBL SN 4910/7 GWALIOR Testing Division -I Gwalior, S/S DN Morena

101 MPP28683 220KV S/S BINA 132KV BINA-BORL CKT-I 400KV BINA 400 KV Testing Division Bina

102 MPP28684 220KV S/S BINA 132KV BINA-BORL CKT-II 400KV BINA 400 KV Testing Division Bina

103 MPP28697 132KV S/S DABRA 63MVA MAKE BHEL SN 2042500 GWALIOR Testing Division -II Gwalior

104 MPC58835 132KV S/S POLAIKALAN 20 MVA EMCO UJJAIN Testing Division - Shujalpur

105 Y0221529 220KV S/S UJJAIN 63MVA MAKE BBL SN 5442/9 UJJAIN Testing Division - Ujjain

106 MPM08323 132KV S/S SHIVPURI 40MVA,BBLSN 5033/1 GWALIOR Testing Division Guna

107 MPC58403 132KV S/S PANSEMAL 40MVA BBL MAKE SN 5076/10 INDORE Testing Division - II Barwaha

108 ABB06601 132KV S/S BALWADA 63MVA INDORE Testing Division - II Barwaha

109 MPC75135 220KV S/S DHAR 132 KV VACMAT UJJAINI INDORE Testing Division - II Indore

110 XC582192 132KV S/S SUSNER 50MVA BBL MAKE SN 5406/1 UJJAIN Testing Division - Ujjain

111 Y0280030 132KV S/S AMLA Tr.132KV RLY. TR. BORDAHI_AMLA BHOPAL Testing Division - I Bhopal

112 XB577712 132 KV S/s Hastinapur 40 MVA MAKE BHEL SN 2037087 GWALIOR Testing Division -I Gwalior

113 XB583340 132KV S/S CHINNOR 50MVA MAAKE BBL SN 5406/04 GWALIOR Testing Division -II Gwalior

114 Y0221830 132KV S/S Makdone 40 MVA BHEL UJJAIN Testing Division - Ujjain

115 KAILARAS_N 132KV S/S KAILARAS 40 MVA GWALIOR Testing Division -I Gwalior

116 RAHATGARH 132KV S/S RAHTGARH 40 MVA SAGAR Testing Division -II SAGAR

117 Y0221711 132KV S/S SALAMATPUR 40MVA IMP BHOPAL Testing Division -I Bhopal-S/s DN Beora

118 MPC74039 220KV S/S PITHAMPUR 63MVA SEZ_II 400KV Indore Testing Division - II Indore

119 X0209252 132KV S/S UMRETH 132KV Rly Trac.Umreth RAILWAY Testing Division -II Chindwara

120 XC530820 132KV S/S BAGRODA 40MVA BHOPAL Testing Division -II Bhopal

121 XB577480 220KV S/S GUNA 63MVA BBL SN 5442/10 400KV BINA Testing Division Guna

122 BAROD_NEW132KV S/S BAROD 40MVA BBL S.NO 5564/05 UJJAIN Testing Division - Ratlam

123 Y0221711 132KV S/S SALAMATPUR 40MVA IMP BHOPAL Testing Division -II Bhopal

124 PAWAI_NEW 132KV S/S PAWAI 40MVA BBL SAGAR Testing Division - Satna

125 X0209247 220KV S/S NARSINGHPUR Tr.TRACTION-NARSINGHPUR RAILWAY Testing Division -Katni

126 MPP28790 132KV S/S BANKHEDI 132KV RLY TRAC BANKHEDI RAILWAY Testing Division Itarsi

127 MPC73855 132KV S/S ENTKHEDI 63 MVA BHOPAL Testing Division -II Bhopal

128 MP925355 132KV S/S BARHI 40 MVA IMP JABALPUR Testing Division Katni

129 Y0221370 132KV S/S INDERGARH 50 MVA BHEL GWALIOR Testing Division -II Gwalior

130 BAIRAD_NEW132KV S/S BAIRAD 40MVA BHOPAL Testing Division Guna-S/S Dn Shivpuri

131 MADA_NEW 132KV S/S MADA 50MVA GWALIOR Testing Division Guna-S/S Dn Shivpuri

132 BANDA_NEW132KV S/S BANDA 50MVA BHEL SGR Testing Division -II Sagar

133 KARPGAON_ 132KV S/S KARPGAON 50MVA BHEL JABALPUR Testing Division -II Jabalpur

134 DEPALPUR__132KV S/S DEPALPUR 40MVA INDORE Testing Division - II Indore

135 MP924845 220KV S/S MANGLIYA 63MVA INDORE Testing Division - I Indore

136 X0363187 132KV KAPSI 63MVA GWL Testing Division - Guna

137 UNHEL_NEW 132KV UNHEL 50MVA BBL UJJ Testing Division - Nagda

138 JOBAT_NEW132KV JOBAT 40MVA INDORE Testing Division RAJGARH

Agenda of 63rd OCCM of MP 62

Page 65: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Annexure-8.1.iii

132KV 466190.00 468345.00 4.00 0.00 8620.00 17.00 17.00 4.00 0.0033 KV 452973.00 457359.00 2.00 0.00 8772.00 701.00 701.00 0.67 0.00 0.00132 KV 340202.00 342884.00 1.00 0.00 2682.00 215.00 215.00 1.00 0.0033 KV 1435473.00 1446811.00 0.24 0.00 2721.12 485.00 485.00 1.33 0.00132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV

33 KV

132KV33 KV

132 KV

33KV

132KV33 KV132KV33 KV132KV33 KV132KV33 KV

21 40MVA 132/33K Xmer I

20

13

40MVA 132/33K Xmer-II

18Ichhawar

Khilchipur

Sehore

50MVA 132/33K Xmer-II

20MVA 132/33K Xmer-I

16

63MVA 132/33K Xmer-II

63MVA 132/33K Xmer-I

20MVA 132/33K Xmer-I

14

15

Ashta

12.5MVA 132/33K Xmer

Sarangpur

Pachore

50MVA 132/33K Xmer-I

20MVA 132/33K Xmer

3

40MVA 132/33K Xmer-II

40MVA 132/33K Xmer II

4

IMPORT

CONSUMPTION (MWH)

63MVA 132/33K Xmer-I

Bhopal Lalghati 63MVA 132/33K Xmer-II

40MVA 132/33K Xmer-I

40MVA 132/33K Xmer-III

DETAILS OF TRANSFORMERS METER SERIAL NO.

M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL

CONSU- MPTION (MWH)

MFSl. No.

132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) Mar-18

NAME OF SUBSTATION

ASSESEMENTASSESEMENT

5

6

11

10

9

12

7

8

1

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

MF

50MVA 132/33KV Xmer IBairagarh Bhopal

2202

EXPORT

PREVIOUS READING WITH TIME & DATE

17

22

19

40MVA 132/33K Xmer

PREVIOUS READING

WITH TIME & DATE

T&C CIRCLE BHOPAL :-

20MVA 132/33KV Xmer II

40MVA 132/33K Xmer-I

Kurawar

Biaora

40MVA 132/33K Xmer-II

40MVA 132/33K Xmer-II

REMARKS

Agenda of 63rd OCCM of MP 63

Page 66: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Annexure-8.1.iiiIMPORT

CONSUMPTION (MWH)

DETAILS OF TRANSFORMERS METER SERIAL NO.

M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL

CONSU- MPTION (MWH)

MFSl. No.

132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) Mar-18

NAME OF SUBSTATION

ASSESEMENTASSESEMENT

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

MF

EXPORT

PREVIOUS READING WITH TIME & DATE

PREVIOUS READING

WITH TIME & DATE

REMARKS

132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV

Mandideep 220

2520MVA 132/33K Xmer

24

23 40MVA 132/33K XmerShyampur

Rajgarh

24

40MVA 132/33K Xmer

20MVA 132/33K Xmer

40MVA 132/33K XmerJeerapur

Mugaliyachaap 40MVA 132/33K Xmer

40MVA 132/33K Xmer

26

26

20MVA 132/33K Xmer

Agenda of 63rd OCCM of MP 64

Page 67: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Annexure-8.1.iiiIMPORT

CONSUMPTION (MWH)

DETAILS OF TRANSFORMERS METER SERIAL NO.

M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL

CONSU- MPTION (MWH)

MFSl. No.

132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) Mar-18

NAME OF SUBSTATION

ASSESEMENTASSESEMENT

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

MF

EXPORT

PREVIOUS READING WITH TIME & DATE

PREVIOUS READING

WITH TIME & DATE

REMARKS

132KV33 KV132KV33 KV

132KV

33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV

132KV

33 KV

132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV

40 MVA 132/33KV Xmer-II

Bhopal MACT 40MVA 132/33K Xmer-II

30

28

38

27

Vidisha63MVA 132/33K Xmer 2

63 MVA 132/33K Xmer 1

37

31

29

32

34

40 40MVA(TELK) 132/33K Xmer

35

Beresia

Bareli

Raisen

42

36

39

41

43

44

45

Sironj

46Nasrullaganj

47

33

40MVA 132/33K Xmer II

GanjBasoda20MVA 132/33K Xmer

Mandideep 13240MVA 132/33K Xmer-II

Runha

20MVA 132/33K Xmer-I

63MVA 132/33K Xmer

20MVA 132/33K Xmer I

40 MVA 132/33K Xmer II

16MVA 132/33K Xmer-III

40MVA 132/33K Xmer I

20 MVA 132/33K Xmer-I

63 MVA 132/33K Xmer-III

40MVA 132/33K Xmer

40MVA(EMCO)132/33K Xmer 2

40MVA 132/33K Xmer

40MVA 132/33K Xmer-I

50MVA 132/33K Xmer 1

20MVA 132/33K Xmer-II

63MVA 132/33K Xmer-I

Agenda of 63rd OCCM of MP 65

Page 68: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Annexure-8.1.iiiIMPORT

CONSUMPTION (MWH)

DETAILS OF TRANSFORMERS METER SERIAL NO.

M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL

CONSU- MPTION (MWH)

MFSl. No.

132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) Mar-18

NAME OF SUBSTATION

ASSESEMENTASSESEMENT

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

MF

EXPORT

PREVIOUS READING WITH TIME & DATE

PREVIOUS READING

WITH TIME & DATE

REMARKS

33 KV132KV33 KV132KV33 KV

132KV

33 KV132KV33 KV

132KV

33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV

Shamshabad

47

48

52

51

51

50

50

Gopalpur

49

40MVA 132/33K Xmer II

63MVA 132/33K Xmer

49

Gairatganj

Lateri

20MVA 132/33K Xmer-II

20MVA 132/33K Xmer

40MVA 132/33K Xmer-I

40MVA 132/33K Xmer

40MVA 132/33K Xmer

40MVA 132/33K Xmer

40MVA 132/33K Xmer

40MVA 132/33K Xmer

Sarni 220

Itarsi 220

Agenda of 63rd OCCM of MP 66

Page 69: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Annexure-8.1.iiiIMPORT

CONSUMPTION (MWH)

DETAILS OF TRANSFORMERS METER SERIAL NO.

M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL

CONSU- MPTION (MWH)

MFSl. No.

132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) Mar-18

NAME OF SUBSTATION

ASSESEMENTASSESEMENT

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

MF

EXPORT

PREVIOUS READING WITH TIME & DATE

PREVIOUS READING

WITH TIME & DATE

REMARKS

132KV33 KV132KV33 KV

132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33KV

132KV

33KV

132KV

33KV

132KV

33KV

132KV

58

53

54

61

63

56

57

64

67

55

69

70

40MVA 132/33KV X-MER

40MVA 132/33K Xmer-II

40MVA 132/33K Xmer

40MVA 132/33K Xmer

20MVA 132/33K Xmer

50 MVA 132/33K Xmer

40MVA 132/33K Xmer

60

62

59

63

40MVA 132/33K Xmer-II

40MVA 132/33K Xmer-I

40MVA 132/33K Xmer-IIBetul

63 MVA 132/33K Xmer-II

40MVA 132/33K Xmer-I

40MVA 132/33K Xmer-I

Multai

40MVA 132/33K Xmer

40MVA 132/33K Xmer-II

50MVA 132/33K XmerGudgaon

Hoshangabad

20MVA 132/33K Xmer

63MVA 132/33K Xmer-I

40MVA 132/33K Xmer-I

Amla 132 40MVA 132/33KV X-MER

Seoni Malwa

Pipariya 132

Chicholi 132

Pipariya 220

40MVA 132/33KV X-MER

Bankhedi 132

63MVA 132/33KV X-MER

69

66

65

Harda

Sultanpur 132 40MVA 132/33KV X-MER

67

68

Betul 220

Agenda of 63rd OCCM of MP 67

Page 70: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Annexure-8.1.iiiIMPORT

CONSUMPTION (MWH)

DETAILS OF TRANSFORMERS METER SERIAL NO.

M.P. POWER TRANSMISSION COMPANY LTD T & C CIRCLE BHOPAL

CONSU- MPTION (MWH)

MFSl. No.

132KV INPUT/OUTPUT AT TRANSFORMERS - (ACTIVE ENERGY IN MWH) Mar-18

NAME OF SUBSTATION

ASSESEMENTASSESEMENT

PRESENT READING WITH TIME & DATE

PRESENT READING WITH TIME & DATE

132/33 KV SIDE

MF

EXPORT

PREVIOUS READING WITH TIME & DATE

PREVIOUS READING

WITH TIME & DATE

REMARKS

33KV

132KV

33KV

72 132KV

33KV

132KV

33KV

70 63MVA 132/33K Xmer 132KV33 KV

71 40MVA 132/33K Xmer 132KV

33 KV72 63MVA 132/33K Xmer-I 132KV

33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV132KV33 KV

51 Entekhedi 63MVA 132/33K Xmer

72

74

73

73

70

71

40MVA 132/33KV X-MER

20MVA 132/33K Xmer

40MVA 132/33KV X-MER

Khirkiya 132 40MVA 132/33KV X-MER

40MVA 132/33K Xmer

Bhopal Chambal

40MVA 132/33K Xmer

20MVA 132/33K Xmer

Ayodhya

40MVA 132/33K Xmer

63MVA 132/33K XmerAmarawat Khurd Bhopal

Semriharchand 132

76

81

82

Bagroda

Shahganj

SHAMSHABAD

40MVA 132/33K Xmer

75

20MVA 132/33K Xmer

78 Saharwasa 40MVA 132/33K Xmer

50 Salamatpur

Tamot

40MVA 132/33K Xmer

77

Sultanpur 132 40MVA 132/33KV X MER

Agenda of 63rd OCCM of MP 68

Page 71: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

THESE THREE S/S TELEMETRY IS OUT SINCE LONG TIME1. BEOHARI 132 KV 2. MORWA 132 KV3. WAIDHAN 132 KV

1 MORWA 132 KV S/S 1 220 KV SIDHI2 BEOHARI 132 KV S/S 2 220 KV ANUPPUR3 WAIDAN

1 ALL T.M. DATA CB ,MW,MVAR N/A2 132/33 KV(50MVA) XMER CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED

1 220 KV INTERCONNECTOR 1 & 4 MW/MVAR N/C 115/15

1 132 KV KOTMA 1 CB N/A

2 220/132 KV TR 2 (160 MVA) PRI & SEC CB N/A3 132 KV SHAHDOL CB N/A4 132 KV KOTMA 2 CB N/A5 132 /33 KV TR 2 CB ,MW,MVAR N/A

1 132 KV ANUPPUR 2 CB /MW/MVAR FAULTY PROCESSES CONNECTION REQUIRED2 132 KV ANUPPUR 1 CB FAULTY

1 220 KV ATPS MW/MVAR N/A2 220 KV SGTPS MW/MVAR N/A3 220/132 KV TR (160 MVA) PRI & SEC MW/MVAR N/A

1 220 KV BUS COUPLER CB FAULTY OPEN2 132 KV RAMPUR NIKEN CB FAULTY CLOSE

ANUPPUR 220 KV S/S

BEOHARI 132KV S/S

PROCESSES CONNECTION REQUIRED

KOTMA 132 KV S/S

SHAHDOL 220 KV S/S

PROCESSES CONNECTION REQUIRED

REWA 220 KV S/S

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

SATNA CIRCLEDATA OUT FROM LONG TIME INTERMIITENT TELEMETRY

BIRSINGHPUR 220 KV S/S

Agenda of 63rd OCCM of MP 69

Page 72: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

Sr.no. DESCRIPTION Status Telemetry value at SLDC Actual value at site

1 132/33 KV XMER 2 MW/MVAR N/A

CHINDWARA 132 KV S/S TELEMETRY MOST OF TIME OUT DUE TO PLCC CHANNEL NOISE SINCE LAST 10 DAYS

SEONI CIRCLE

SEONI 220 KV S/S

Agenda of 63rd OCCM of MP 70

Page 73: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

Sr.no. DESCRIPTION Status elemetry value at SLD Actual value at site

SAGAR CIRCLE

Agenda of 63rd OCCM of MP 71

Page 74: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Sr.no. DESCRIPTION Status Telemetry value at SLDC Actual value at site1 220 KV BINA BINA PG MW/MVAR2 220 KV GWALIOR MW/MVAR3 220 KV GUNA MW/MVAR4 220 KV DATIA MW/MVAR5 220 KV SHIVPURI MW/MVAR6 400/220 KV XMER 2 &3 MW/MVAR6 220 KV BUS VOLTAGE/FREQUENCY 0 225/50

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 132 KV ESAGARH MW/MVAR NON CURRENT

16-12-2017GUNA 220 KV S/S

BINA 400 KV S/S

BINA CIRCLE

FREQUNTLY DATA NON CURRENT

Agenda of 63rd OCCM of MP 72

Page 75: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

1 220KV Transfer Buscoupler CB FAULTY CLOSESOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

2 220/132 TR3 SEC SIDE MW,MVAR N/C3 132/33 TR3 CB FAULTY CLOSE4 220/132 TR2 PRI SIDE MW MVAR NOT COMING

1 220/132 160 MVA XMER-2 CB OPEN CIOSE

220KV S/s DHAR5 33KV K DEVI CB FAULTY CLOSE7 132KV/33KVTRF -4(sec side) CB FAULTY CLOSE

RAJGRAH (DHAR) 220 KV S/SSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

INDORE 400 KV S/S

PITAMPUR 220 KV S/S(CHEMTROL RTU)

INDORE EAST 220 KV S/S

INDORE CHAMBAL 132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDDEPALPUR 132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDNEPANAGAR 220 KV S/S

PITAMPUR 220 KV S/S-II

Agenda of 63rd OCCM of MP 73

Page 76: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

2 33KV IND NO-4 CB FAULTY CLOSE3 33KV DRP CB FAULTY CLOSE4 33KV SIYA CB FAULTY CLOSE

1 33KV BUSCOUPLER CB FAULTY CLOSE

1 132/33 KV 20MVA TR-2 CB OPEN CLOSE2 33KV DEVGARH CB FAULTY CLOSE3 132/33 KV 20MVA TR-4 SEC SIDE CB FAULTY CLOSE

1 33KV SIDE HZ N/A

1 33KV CAP. BANK 1 CB FAULTY CLOSE2 33KV CAP BANK-2 CB FAULTY CLOSE3 132/33kv TRF 4 CB FAULTY CLOSE4 33KV KYAMPUR CB FAULTY CLOSE5 33KV RAWTI CB FAULTY CLOSE

1 132 KV RLY TRC-2 CB OPEN CLOSE2 33KV CAP BANK-2 CAP. BANK 2 FAULTY CLOSE

132 KV S/S KUKSHISOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SONKATCH 132 KV S/S

132 KV S/S JAORASOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

132 KV S/S SAILANA

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

132 KV S/S CHAPDA

132 KV S/S KACHROD220 KV S/S DALODA

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

DEWAS BNP 132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED220 KV S/S BADNAGAR

MAKSI 132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/SUWASRA

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132KV BAHADARPUR

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

GHOSLA 132 KV S/SSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Agenda of 63rd OCCM of MP 74

Page 77: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

1 132 KV BUSCOUPLER CB FAULTY2 400KV BUS 2 KV N/C3 400KV BUS 2 HZ N/C4 400/220KV TRF-2PRI CB OPEN CLOSE

4 132 KV INTCC-1 CB FAULTY CLOSE

1 400 KV BUS COUPLER CB FAULTY OPEN2 220/132 TRF-3 HV Side CB FAULTY CLOSE3 132KV INTCC-2 CB FOULTY CLOSE4 33KV DONGGAON CB FAULTY CLOSE5 BHOJAKHEDI CB FOULTY CLOSE

1 132KV RAILWAY TRAC 2 MW NOT COMING2 132KV RAILWAY TRAC 2 MVAR NOT COMING

33KV SIDE CAP. BANK 1 OPEN CLOSE4 33KV SIDE CAP. BANK 2 FOULTY

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

3 132/33KV 63MVA TRF-2 CB FOULTY CLOSE

BARWAHA 220 KV S/S

NIMRANI 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

JULWANIA 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

JULWANIA 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

132 KV S/S CHHEGAON

CHHEGAON 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S BAHADURPUR

Agenda of 63rd OCCM of MP 75

Page 78: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

1 400/220KV 315MVA TRF-4 CB OPEN CLOSE

1 132kV RLY TRc 1 CB OPEN CLOSE2 132KV INTCC CB OPEN CLOSE

1 220KV BUS 2 KV, HZ N/C2 132 KV CAP BANK-2 CB FOULTY OPEN3 132KV BUS COUPLER-2 CB FOULTY OPEN5 33KV DHNERAKALAN CB FAULTY CLOSE

NAGDA 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

NAGDA 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

NEEMUCH 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Agenda of 63rd OCCM of MP 76

Page 79: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 400KV BINA-2 (PG) CB OPEN CLOSE2 80 MVAR REACTOR-1 CB OPEN CLOSE3 220KV BHOPAL-2 CB NON CURRENT CLOSE

1 132 KV BINA CB FAULTY

1 220KV BUS COUPLER MW/MVAR PROCESSES CONNECTION REQUIRED2 132 KV SANCHI R.-TRACT.-1 CB NON CURRENT3 132KV BUS COUPLER MW/MVAR PROCESSES CONNECTION REQUIRED4 220/132 KV 160 MVA XMER-2(LV CLOSE

1 132KV BUS COUPLER CB NON CURRENT

CB STATUS NON CURRENT

MANDIDEEP 132 KV S/SALL CB STATUS ARE NON CURRENT

BERASIA 132 KV S/S

16-04-2018BHOPAL 4000 KV S/S

GANJBASODA 220 KV S/S

VIDISHA 220 KV S/S

Agenda of 63rd OCCM of MP 77

Page 80: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 220/132 KV 160 MVA XMER(HV) CB FAULTY CLOSE

1 132/33KV 40 MVA XMER MW/MVAR WRONG VALUES

1 220/132 KV 160 MVA XMER-2(LV) CB FAULTY CLOSE2 132 KV HARDA-2 CB FAULTY CLOSE

1 220 KV BUSCOUPLER 2 220 KV BUS TIE3 132 KV BUSCOUPLER

1 220/132 KV 160 MVA XMER-1(LV SIDE) CB OPEN CLOSE

1 400 KV & 220 KV BUS FREQUENCY WRONG VALUES2 400 KV SATPURA-2 CB FAULTY CLOSE3 315MVA X-MER-1 MW/MVAR WRONG VALUES4 400 KV SATPURA-2 LINE REACTOR MVAR NON CURRENT5 400 KV BUS COUPLER CB FAULTY

1 132 KV ETKHEDI CB NON CURRENT CLOSE

1 220 KV BUSCOUPLER PROCESSES CONNECTION REQUIRED

.

1 132/33KV 20 MVA XMER CB NON CURRENT2

1 SOE DATA PROCESSES CONNECTION REQUIRED

16-04-2018

ALL CB STATUS ARE NON-CURRENT

HOSHANGABAD 220 KV S/S

SARNI 220 KV S/S

HARDA 132 KV S/S

HANDIA 220 KV S/S

BETUL 220 KV S/S

ICHAWAR 132 KV S/S

SARANGPUR 132 KV S/S

CB STATUS NON-CURRENT CB STATUS NON-CURRENT CB STATUS NON-CURRENT

ASHTA 400 KV S/S

BAIRAGRAH 220 KV S/S

ALL CB STATUS NON-CURRENT

RAJGARH 220 KV S/S

Agenda of 63rd OCCM of MP 78

Page 81: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 220 KV BUS COUPLER-2 CB FAULTY2 220 KV BUS COUPLER-1 MW/MVAR NON CURRENT3 132 KV BUS COUPLER-2 CB FAULTY OPEN

1 132 KV BUS VOLTAGE WRONG VALUES2 132 KB BASAI-1 & 2 CB FAULTY CLOSE3 132 KV RAJGHAT CB FAULTY

1 132 KV TIGRA CB FAULTY CLOSE2 20/132 KV 3X40 MVA XMER(LV CB FAULTY CLOSE

1 132 KV BUS COUPLER MW/MVAR NON CURRENT2 132 KV KOLARAS -2 CB FAULTY CLOSE3 132 KV KOLARAS -2 MW/MVAR NON CURRENT

1 132 KV MOTIJHEEL MW/MVAR/CB PROCESSES CONNECTION REQUIRED

1 132/33 KV 40 MVA TR CB NON CURRENT CLOSEVIJAYPUR 132 KV S/S

MALANPUR 220 KV S/S

GWALIOR 220 KV S/S

SABALGARH 220 KV S/S

ALL CB STATUS NON CURRENT

16-04-2018

SHIVPURI 220 KV S/S

PICHORE 132 KV S/S

Agenda of 63rd OCCM of MP 79

Page 82: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Name at SLDC end at site end

1 GEN 6 GT MW/MVAR 0 155 /102 GEN 7 GT MW/MVAR 0 160/103 GEN 6 GT CB FAULTY OPEN4 GEN 7 GT CB FAULTY OPEN5 220 KV TRB CB FAULTY CLOSE

1 STATION XMER 5A & 5B CB N/A2 132/33 AUTO XMER CB N/A

1 400/220 KV TR 1 & 2 (315MVA ) OLTC N/C

1 400/220 KV ICT P & S (BOTH SIDE) CB FAULTY CLOSE2 400 KV STN TRANSFORMER A & B CB NA CLOSE3 STN TR 1 ,2 (220 KV ) CB NA CLOSE4 220 KV BUS TIE CB NA CLOSE

5 220 /33 KV TR CB/MW/MVAR NA

6 GEN 1 CB FAULTY CLOSE7 400 KV BUS 1 FREQ 49.79 49.988 220 KV BUS 2 VOLTAGE 264 2309 220 KV PANAGAR CB FAULTY CLOSE

10 220 KV ATPS 2 CB FAULTY CLOSE11 220 KV SHAHDOL CB FAULTY CLOSE

1 GEN 4 CB FAULTY CLOSE

1 GEN 3 CB OPEN CLOSE

PENCH H P S RTU OUT

SATPURA T P S

AMARKANTAK TPS

SINGHA JI S T P S

S G T P S

DEOLOAN H P S Telemetry N/C

GANDHI SAGAR H P S

RAJGHAT H P S

Agenda of 63rd OCCM of MP 80

Page 83: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

1 ISP-INDORE 400KV FEEDER 2 MW/MVAR 583 58ISP H P S

Agenda of 63rd OCCM of MP 81

Page 84: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

ANNEXURE-9.9.iS.NO. NAME OF SUB-STATION VOLTAGE LEVEL

1 BINA 4002 BHOPAL 4003 KATNI 4004 INDORE 4005 NAGDA 4006 SGTPS 400 & 2207 ISP 4008 JP BINA 4009 BINA-PG 400

10 ITARSI-PG 40011 DAMOH-PG 40012 KSTPS 40013 SHUJALPUR-PG 40014 DEHGAM 40015 ASOJ 40016 RAJGARH-PG 40017 INDORE-PG 40018 BHOPAL-BDTCL 400

Agenda of 63rd OCCM of MP 82

Page 85: (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur · ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 62nd meeting of Operation & Coordination Committee of MP held on th

Reach in % Reach in Km

Resistive Reach in primary

Ohm

Reactive Reach in primary

Ohm

Time delay in msec

Reach in % Reach in Km

Resistive Reach in primary

Ohm

Reactive Reach in primary

Ohm

Time delay in msec

Reach in % Reach in Km

Resistive Reach in primary

Ohm

Reactive Reach in primary

Ohm

Time delay in msec

Reach in % Reach in Km

Resistive Reach in primary

Ohm

Reactive Reach in primary

Ohm

Time delay in msec

Forward(ZF) Reverse(ZR)

Positive sequence

impedance

Substation Name

Line Name / X'mer

CT/CVT Ratio

PT Ratioline length in

Km

Zone-I

Zone-2

Zone-3

Zone-4 Power Swing Blocking

Annexure-9.9.II

Negative sequence

impedance

Zero sequence

impedance Relay Type

Voltage Level

Agenda of 63rd OCCM of MP 83