Ra-03_gail Gas (Mecon)

129
CHECKLIST OWNER : GAIL GAS LIMITED CONTRACTOR : ADVANCE INFRASTRUCTURES PVT. LTD WORK ORDER NO. : GAIL/85/13-14/5600000116 DATED 02.0 RA-03 A. INVOICE PART 1 INVOICE : 2 CENVATABLE INVOICE : 3 ABASTRACT OF PAYMENT : 4 ABASTRACT OF MEASUREMENT : 5 MEASUREMENT SHEETS : B. SUPPORTING DOCUMENTS 1 WORK ORDER : 2 PBG : 3 LABOUR LICENCE : 4 WC POLICY : 5 PF CHALLAN : For Advance Infrastructures Pvt. Ltd. NAME OF THE PROJECT : CNG AND CITY GAS DISTRIBUTION PIPELINE VADODARA CITY

description

dddddddd

Transcript of Ra-03_gail Gas (Mecon)

CHECKLISTCHECKLISTNAME OF THE PROJECT : CNG AND CITY GAS DISTRIBUTION PIPELINE PROJECT AT VADODARA CITY

OWNER : GAIL GAS LIMITEDCONTRACTOR : ADVANCE INFRASTRUCTURES PVT. LTD.WORK ORDER NO. : GAIL/85/13-14/5600000116 DATED 02.01.2014 RA-03A.INVOICE PART1INVOICE:2CENVATABLE INVOICE:3ABASTRACT OF PAYMENT:4ABASTRACT OF MEASUREMENT:5MEASUREMENT SHEETS:

B.SUPPORTING DOCUMENTS1WORK ORDER:2PBG:X3LABOUR LICENCE:X4WC POLICY:5PF CHALLAN:

For Advance Infrastructures Pvt. Ltd.

INVOICE INVOICE ADVANCE INFRASTRUCTURES PVT. LTD.

INVOICE NO.:AIPL/GAIL/BRC/RA/03INVOICE. DATE : 1-Apr-15

NAME OF WORK: CNG AND CITY GAS DISTRIBUTION PIPELINE PROJECT AT VADODARA CITYWORK ORDER NO.: GAIL/85/13-14/5600000116 DATED 02.01.2014CLIENT: GAIL GAS LIMITEDCONSULTANT: MECON LIMITEDCONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTD.

SL. NO.PARTICULARSUP TO PREV. (Rs)THIS BILL (Rs)CUMULATIVE (Rs)1BASIC AMOUNT PAYABLE2,919,238.851,876,524.844,795,763.69SERVICE TAX @ 4.944%144,327.1792,775.39237,102.56TOTAL AMOUNT INCL. OF SERVICE TAX3,063,566.021,969,300.235,032,866.25

2RECOVERIESANY RECOVERIES 0.00.00.03TOTAL RECOVERIES0.00.00.0NET AMOUNT PAYABLE AFTER RECOVERIES (1-3)3,063,566.021,969,300.235,032,866.25

For AIPLFor MECON For GAIL GAS

CEN

CENVATABLE INVOICE

Invoice No. : AIPL/GAIL/BRC/RA/03DATE : 01.04.2015

Name of the Project : CNG & City Gas Distribution Project of M/s GAIL Gas

Work Order No. : GAIL/85/13-14/5600000116 DATED 02.01.2014

Service Tax Reg. No. : AAFCA9837PST001

Category of service: Construction services in respect of commercial or industrial Building and civil structures.M/s VADODARA GAS Limited

S.NO.DESCRIPTIONAMOUNT PAYABLE IN RS.BSummary of Installation & Construction Services1,876,524.84B1Add Service Tax @ 4.8% 90,073.19B2Educational Cess @ 2 %1,801.46B3SHE Cess @ 1 %900.73CTotal (B+B1+B2+B3)1,969,300.23

Net amount payable in words : Rs. Six Lakhs Seventy Nine Thousand Nine Hundred Eighty Nine and Eighty Paise Only.

For Advance Infrastructures Pvt. Ltd.

Authorized Signatory

a. welding (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.10DESCRIPTION: Pipeline Laying - 12" X 4.975 KM

Sr.No.DateReport No.DescriptionUnitQuantityRemarks10.130/7/2012AttachedCompletion of Stringing , Trenching, Welding, Field joint coating, Lowering and Backfilling / Restoration (at least 1 Km) including supply and laying OFC Duct, Supply of OFC cable, Blowing, Splicing, OTDR of OFCM25.75

TOTALMTRS25.75Quantity Taken upto Previous Bill MTRS3518.61Quantity taken in this Bill MTRS25.75Total Claimed Qty. upto This Bill MTRS3544.36

For AIPL.For JP KennyFor GSPL

b.hydrotesting (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/13

SOR ITEM NO.10DESCRIPTION: Pipeline Laying - 12" X 4.975 KM

Sr.No.DateReport No.DescriptionUnitQuantityRemarks10.230/7/2012AttachedCompletion of Hydrotesting M25.75

TOTALMTRS25.75Quantity Taken upto Previous Bill MTRS3518.61Quantity taken in this Bill MTRS25.75Total Claimed Qty. upto This Bill MTRS3544.36

For AIPL.For JP KennyFor GSPL

1.Completion of hydrotestin (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.10DESCRIPTION: Pipeline Laying - 12" X 4.975 KM

Sr.No.DateReport No.DescriptionUnitQuantityRemarks10.330/7/2012Attached Completion of Swabing & DryingM324.38

TOTALMTRS324.38Quantity Taken upto Previous Bill MTRS3219.98Quantity taken in this Bill MTRS324.38Total Claimed Qty. upto This Bill MTRS3544.36

For AIPL.For JP KennyFor GSPL

Pre Comm. (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.10DESCRIPTION: Pipeline Laying - 12" X 4.975 KM

Sr.No.DateReport No.DescriptionUnitQuantityRemarks10.630/7/2012AttachedPre-commissioningLS1103.190

TOTALLS1103.190Quantity Taken upto Previous Bill LS2441.17Quantity taken in this Bill LS1103.19Total Claimed Qty. upto This Bill LS3544.36

For AIPL.For JP KennyFor GSPL

NOC (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 10DESCRIPTION: Pipeline Laying - 12" X 4.975 KM

Sr.No.DateReport No.DescriptionUnitQuantityRemarks10.830/7/2012AttachedNOC'Sfrom concern AuthoritiesLS25.75

TOTALLS25.75Quantity Taken upto Previous Bill LS3518.61Quantity taken in this Bill LS25.75Total Claimed Qty. upto This Bill LS3544.36

For AIPL.For JP KennyFor GSPL

4.Completion of design (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 50DESCRIPTIONTemporary Cathodic Protection

Sr.No.DateReport No.DescriptionUnitQuantityRemarks50.130/7/2012AttachedCompletion of Design and EngineeringLS0.05

TOTALLS0.05Quantity Taken upto Previous Bill LS0.90Quantity taken in this Bill LS0.05Total Claimed Qty. upto This Bill LS0.95

For AIPL.For JP KennyFor GSPL

supply of material (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 50DESCRIPTIONTemporary Cathodic Protection

Sr.No.DateReport No.DescriptionUnitQuantityRemarks50.230/7/2012AttachedSupply of MaterialLS0.05

TOTALLS0.05Quantity Taken upto Previous Bill LS0.90Quantity taken in this Bill LS0.05Total Claimed Qty. upto This Bill LS0.95

For AIPL.For JP KennyFor GSPL

installation at site (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 50DESCRIPTIONTemporary Cathodic Protection

Sr.No.DateReport No.DescriptionUnitQuantityRemarks50.330/7/2012AttachedInstallation at site on Prorata basisLS0.05

TOTALLS0.05Quantity Taken upto Previous Bill LS0.90Quantity taken in this Bill LS0.05Total Claimed Qty. upto This Bill LS0.95

For AIPL.For JP KennyFor GSPL

Final Acceptance (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 50DESCRIPTIONTemporary Cathodic Protection

Sr.No.DateReport No.DescriptionUnitQuantityRemarks50.430/7/2012AttachedTesting,Commissioning and on Final AcceptanceLS0.39

TOTALLS0.39Quantity Taken upto Previous Bill LS0.56Quantity taken in this Bill LS0.39Total Claimed Qty. upto This Bill LS0.95

For AIPL.For JP KennyFor GSPL

earthing supply of material (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 90DESCRIPTIONEarthing and Lighting Protection System

Sr.No.DateReport No.DescriptionUnitQuantityRemarks90.130/7/2012AttachedSupply of MaterialLS0.05

TOTALLS0.05Quantity Taken upto Previous Bill LS0.90Quantity taken in this Bill LS0.05Total Claimed Qty. upto This Bill LS0.95

For AIPL.For JP KennyFor GSPL

Erection & installation (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 90DESCRIPTIONEarthing and Lighting Protection System

Sr.No.DateReport No.DescriptionUnitQuantityRemarks90.230/7/2012AttachedErection & InstallationLS0.05

TOTALLS0.05Quantity Taken upto Previous Bill LS0.90Quantity taken in this Bill LS0.05Total Claimed Qty. upto This Bill LS0.95

For AIPL.For JP KennyFor GSPL

earthing final acceptance (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 90DESCRIPTIONEarthing and Lighting Protection System

Sr.No.DateReport No.DescriptionUnitQuantityRemarks90.330/7/2012AttachedFinal acceptanceLS0.51

TOTALLS0.51Quantity Taken upto Previous Bill LS0.44Quantity taken in this Bill LS0.51Total Claimed Qty. upto This Bill LS0.95

For AIPL.For JP KennyFor GSPL

erection &installation (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 100DESCRIPTIONOutdoor Lighting

Sr.No.DateReport No.DescriptionUnitQuantityRemarks100.230/7/2012AttachedErection & InstallationLS0.15

TOTALLS0.15Quantity Taken upto Previous Bill LS0.85Quantity taken in this Bill LS0.15Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

outdoor final acceptance (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 100DESCRIPTIONOutdoor Lighting

Sr.No.DateReport No.DescriptionUnitQuantityRemarks100.330/7/2012AttachedFinal acceptanceLS0.40

TOTALLS0.40Quantity Taken upto Previous Bill LS0.60Quantity taken in this Bill LS0.40Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

indoor final acceptance (3)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 110DESCRIPTIONIndoor Lighting

Sr.No.DateReport No.DescriptionUnitQuantityRemarks110.330/7/2012AttachedFinal acceptanceLS0.34

TOTALLS0.34Quantity Taken upto Previous Bill LS0.66Quantity taken in this Bill LS0.34Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

Gas detection final aceptan (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 140DESCRIPTIONGas Detection Panel

Sr.No.DateReport No.DescriptionUnitQuantityRemarks140.330/7/2012AttachedFinal acceptanceLS0.34

TOTALLS0.34Quantity Taken upto Previous Bill LS0.66Quantity taken in this Bill LS0.34Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

fire final acceptance (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 150DESCRIPTIONFire Supression System

Sr.No.DateReport No.DescriptionUnitQuantityRemarks150.330/7/2012AttachedFinal acceptanceLS0.34

TOTALLS0.34Quantity Taken upto Previous Bill LS0.66Quantity taken in this Bill LS0.34Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

PG erection (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 160DESCRIPTIONPressure Gauge

Sr.No.DateReport No.DescriptionUnitQuantityRemarks160.230/7/2012AttachedErection & InstallationLS1.00

TOTALLS1.00Quantity Taken upto Previous Bill LS3.00Quantity taken in this Bill LS1.00Total Claimed Qty. upto This Bill LS4.00

For AIPL.For JP KennyFor GSPL

5.Ele Items Install..ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/12

SOR ITEM NO.: 60DESCRIPTION: Electrical items excluding UPS & DG

Sr.No.DateReport No.DescriptionUnitQuantityRemarks60.314/05/2012AttachedFinal AcceptanceLS0.14

TOTALLS0.14Quantity Taken upto Previous Bill LS0.66Quantity taken in this Bill LS0.14Total Claimed Qty. upto This Bill LS0.80

For AIPL.For JP KennyFor GSPL

6.DGADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/12

SOR ITEM NO.: 70DESCRIPTION: DG Set

Sr.No.DateReport No.DescriptionUnitQuantityRemarks70.314/05/2012AttachedFinal AcceptanceLS0.24

TOTALLS0.24Quantity Taken upto Previous Bill LS0.66Quantity taken in this Bill LS0.24Total Claimed Qty. upto This Bill LS0.90

For AIPL.For JP KennyFor GSPL

7.UPS SYSTEMADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/12

SOR ITEM NO.: 80DESCRIPTION: UPS System

Sr.No.DateReport No.DescriptionUnitQuantityRemarks80.314/05/2012AttachedFinal AcceptanceLS0.34

TOTALLS0.34Quantity Taken upto Previous Bill LS0.66Quantity taken in this Bill LS0.34Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

8.Earthing ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/12

SOR ITEM NO.90DESCRIPTION: Earthing and Lighting Protection System

Sr.No.DateReport No.DescriptionUnitQuantityRemarks90.114/05/2012AttachedSupply of MaterialLS0.10

TOTALLS0.10Quantity Taken upto Previous Bill LS0.90Quantity taken in this Bill LS0.10Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

9.EarthingADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/12

SOR ITEM NO.90DESCRIPTION: Earthing and Lighting Protection System

Sr.No.DateReport No.DescriptionUnitQuantityRemarks90.314/05/2012AttachedSupply of MaterialLS0.22

TOTALLS0.22Quantity Taken upto Previous Bill LS0.44Quantity taken in this Bill LS0.22Total Claimed Qty. upto This Bill LS0.66

For AIPL.For JP KennyFor GSPL

8.UPSADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/10

SOR ITEM NO.: 80DESCRIPTION: UPS System

Sr.No.DateReport No.DescriptionUnitQuantityRemarks80.220/01/2012AttachedErrection and installationLS1.00

TOTALLS1.00Quantity Taken upto Previous Bill LS0.00Quantity taken in this Bill LS1.00Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

7.Outdoor lighting ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/12

SOR ITEM NO.: 100DESCRIPTION: Outdoor Lighting

Sr.No.DateReport No.DescriptionUnitQuantityRemarks100.214/05/2012AttachedErection and InstallationLS0.10

TOTALLS0.10Quantity Taken upto Previous Bill LS0.85Quantity taken in this Bill LS0.10Total Claimed Qty. upto This Bill LS0.95

For AIPL.For JP KennyFor GSPL

12 Indoor lightingADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/12

SOR ITEM NO.: 110DESCRIPTION:Indoor Lighting

Sr.No.DateReport No.DescriptionUnitQuantityRemarks110.314/05/2012AttachedFinal AcceptanceLS0.24

TOTALLS0.24Quantity Taken upto Previous Bill LS0.66Quantity taken in this Bill LS0.24Total Claimed Qty. upto This Bill LS0.90

For AIPL.For JP KennyFor GSPL

15Point gas (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/12

SOR ITEM NO.: 120DESCRIPTION:Point Gas Detector

Sr.No.DateReport No.DescriptionUnitQuantityRemarks120.314/05/2012AttachedFinal AcceptanceNo.2.00

TOTALNo.2.00Quantity Taken upto Previous Bill No.2.00Quantity taken in this Bill No.2.00Total Claimed Qty. upto This Bill No.4.00

For AIPL.For JP KennyFor GSPL

16Gas detection panel (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/12

SOR ITEM NO.: 140DESCRIPTION:Gas Detection Panel

Sr.No.DateReport No.DescriptionUnitQuantityRemarks140.314/05/2012AttachedFinal AcceptanceLS0.24LSLSTOTALLS0.24Quantity Taken upto Previous Bill LS0.66Quantity taken in this Bill LS0.24Total Claimed Qty. upto This Bill LS0.90

For AIPL.For JP KennyFor GSPL

17 Fire supression (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/12

SOR ITEM NO.: 150DESCRIPTION:Fire Supression System

Sr.No.DateReport No.DescriptionUnitQuantityRemarks150.314/05/2012AttachedFinal AcceptanceLS0.34LSLSTOTALLS0.34Quantity Taken upto Previous Bill LS0.66Quantity taken in this Bill LS0.34Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

22 Control panel (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/12

SOR ITEM NO.: 211DESCRIPTION:Control Panel

Sr.No.DateReport No.DescriptionUnitQuantityRemarks211.314/05/2012AttachedFinal AcceptanceLS0.24

TOTALLS0.24Quantity Taken upto Previous Bill LS0.66Quantity taken in this Bill LS0.24Total Claimed Qty. upto This Bill LS0.90

For AIPL.For JP KennyFor GSPL

bhersam-finishing ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/10

SOR ITEM NO.: 230.1DESCRIPTION:Civil & Structural Work-Bhersam

Sr.No.DateReport No.DescriptionUnitQuantityRemarks230.1.720/01/2012AttachedOn completion of building finishingLS0.05

TOTALLS0.05Quantity Taken upto Previous Bill LS0.90Quantity taken in this Bill LS0.05Total Claimed Qty. upto This Bill LS0.95

For AIPL.For JP KennyFor GSPL

DG FoundADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/10

SOR ITEM NO.: 230.1DESCRIPTION:Civil & Structural Work-Bhersam

Sr.No.DateReport No.DescriptionUnitQuantityRemarks230.1.820/01/2012AttachedOn completion of DG foundation and Bore-wellLS0.10

TOTALLS0.10Quantity Taken upto Previous Bill LS0.90Quantity taken in this Bill LS0.10Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

misslaneous ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/10

SOR ITEM NO.: 230.1DESCRIPTION:Civil & Structural Work-Bhersam

Sr.No.DateReport No.DescriptionUnitQuantityRemarks230.1.920/01/2012AttachedOn completion of miscellaneous items & stability certificateLS0.20

TOTALLS0.20Quantity Taken upto Previous Bill LS0.70Quantity taken in this Bill LS0.20Total Claimed Qty. upto This Bill LS0.90

For AIPL.For JP KennyFor GSPL

terminal workADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/10

SOR ITEM NO.: 230.2DESCRIPTION:Terminal work - Bhersam

Sr.No.DateReport No.DescriptionUnitQuantityRemarks230.2.520/01/2012AttachedOn Commissioning, reconciliation and Final AcceptanceLS0.20

TOTALLS0.20Quantity Taken upto Previous Bill LS0.60Quantity taken in this Bill LS0.20Total Claimed Qty. upto This Bill LS0.80

For AIPL.For JP KennyFor GSPL

25 Civil & structural (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/12

SOR ITEM NO.: 230.1DESCRIPTIONCivil & Structural Work

Sr.No.DateReport No.DescriptionUnitQuantityRemarks230.1.1014/05/2012AttachedOn Final AcceptanceLS0.34

TOTALLS0.34Quantity Taken upto Previous Bill LS0.66Quantity taken in this Bill LS0.34Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

28Terminal mechanical (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/12

SOR ITEM NO.: 240.2DESCRIPTIONTerminal Mechanical Work

Sr.No.DateReport No.DescriptionUnitQuantityRemarks240.2.514/05/2012AttachedOn Commissioning ,reconciliation and Final AcceptanceLS0.20

TOTALLS0.20Quantity Taken upto Previous Bill LS0.80Quantity taken in this Bill LS0.20Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

5.Civil & structural ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/13

SOR ITEM NO.: 250.1DESCRIPTIONCivil & Structural Work

Sr.No.DateReport No.DescriptionUnitQuantityRemarks250.1.429/6/2012AttachedOn completion of Roads (Internal & External) with CulvertLS1.00

TOTALLS1.00Quantity Taken upto Previous Bill LS0.00Quantity taken in this Bill LS1.00Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

6.Civil & structuralADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/13

SOR ITEM NO.: 250.1DESCRIPTIONCivil & Structural Work

Sr.No.DateReport No.DescriptionUnitQuantityRemarks250.1.629/6/2012AttachedOn completion of Miscellaneous itemLS0.80

TOTALLS0.80Quantity Taken upto Previous Bill LS0.00Quantity taken in this Bill LS0.80Total Claimed Qty. upto This Bill LS0.80

For AIPL.For JP KennyFor GSPL

6a.Civil & structuralADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/13

SOR ITEM NO.: 250.1DESCRIPTIONCivil & Structural Work

Sr.No.DateReport No.DescriptionUnitQuantityRemarks250.1.529/6/2012AttachedOn completion of Guard RoomLS0.10

TOTALLS0.10Quantity Taken upto Previous Bill LS0.90Quantity taken in this Bill LS0.10Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

7.terminalADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/13

SOR ITEM NO.: 250.2DESCRIPTIONTerminal Mechanical Work

Sr.No.DateReport No.DescriptionUnitQuantityRemarks250.2.229/6/2012AttachedOn Completion of Welding, Erection and NDT including hydrostatic testingLS0.80

TOTALLS0.80Quantity Taken upto Previous Bill LS0.00Quantity taken in this Bill LS0.80Total Claimed Qty. upto This Bill LS0.80

For AIPL.For JP KennyFor GSPL

8.terminal ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/13

SOR ITEM NO.: 250.2DESCRIPTIONTerminal Mechanical Work

Sr.No.DateReport No.DescriptionUnitQuantityRemarks250.2.329/6/2012AttachedOn completion Pneumatic testingLS0.80

TOTALLS0.80Quantity Taken upto Previous Bill LS0.00Quantity taken in this Bill LS0.80Total Claimed Qty. upto This Bill LS0.80

For AIPL.For JP KennyFor GSPL

AOPABSTRACT OF PAYMENT (BILLING SCHEDULE)CNG AND CITY GAS DISTRIBUTION PROJECT FOR VADODARA CITYCLIENT: GAIL GAS LIMITEDBILL NO.: AIPL/GAIL/BRC/RA/03CONSULTANT: M/S MECON LIMITEDLOA / WO No : DATE: 01.04.2015CONTRACTOR: M/S ADVANCE INFRASTRUCTURES PVT. LTD.VENDOR CODEDATE :: 101000577LOA/WO. NO.: GAIL/85/13-14/5600000116, Dtd. 02.01.2014INSTALLATION AND CONSTRUCTION SERVICESMEASUREMENT PERIOD : 09/04/2014 TO 31.03.2015ItemService/DescriptionQty.UnitBasic Price (INR)Basic AmountService [email protected]% of Basic AmountTotal AmountPayment Breakup %AmountQTYAMOUNT ( INR )Prev.This BillCumm.Prev.This BillCumm.0Mobilization Advance @ 10% of total contract price. Mobilization Advance shall bear interest of 10% p.a. The Mobilization Advance shall be recovered proportionately from each RA Bill. The interest amount shall be adjusted from the RA Bill payments.1.00LSERROR:#REF!0.00ERROR:#REF!1.00ERROR:#REF!00001Pipeline Laying/ Installation, Dia-168.3 (6.62) WT 6.4mm API 5L Gr. X-42 (PSL-2)1.25.1On completion of Site development , Stacking, clearing, grading of ROU2100M201.7515.00%ERROR:#REF!2,100.005.872,105.87423,675.001,184.27424,859.272,105.091.25.2On Completion of Fabrication, Alignment, Stringing, Field Welding, Radiography, NDT2100M336.2525.00%ERROR:#REF!1,959.57146.302,105.87658,905.4149,193.38708,098.791.25.3On completion of Joint coating, Trenching & Lowering 2100M269.0020.00%ERROR:#REF!1,381.89723.982,105.87371,728.41194,750.62566,479.03179.302,105.87Normal Laying1,381.891,451.711.25.4On completion of Tie-ins, Backfilling 2100M134.5010.00%711.451,394.422,105.8795,690.03187,549.49283,239.52215.00moling215.00215.001.25.5On hydro testing, dewatering, swabbing2100M201.7515.00%0.02,105.872,105.870.0424,859.27424,859.27240.00HDD240.00240.001.25.6On magnetic cleaning plus eletronic geometry and pigging and restroration2100M67.255.00%0.00.00.00.00.00.02,560.871,836.891,906.711.25.7On commissioning and final acceptance2100M134.510.00%0.00.00.00.00.00.0(89.82)00001Pipeline Laying / Installation, Dia-114.3 (4.5) WT 6.4mm, API 5L Gr. X-42 (PSL-2)0.00.01.25.8On completion of Site Development, Stacking, Clearing and grading of ROU125M141.0015.00%0.00.00.00.00.00.01.25.9On completion of Fabrication, Alignment, Stringing, Field Welding, Radiography, NDT125M235.0025.00%0.00.00.00.00.00.01.25.10On completion of Joint coating, Trenching & Lowering 125M188.0020.00%0.00.00.00.00.00.01.25.11On completion of tie-ins, back filling 125M94.0010.00%0.00.00.00.00.00.01.25.12On completion of Hydro testing, Dewatering, Swabbing125M141.0015.00%0.00.00.00.00.00.01.25.13On completion of Magnetic Cleaning Plus Electronic Geometry Pigging and Restoration125M47.005.00%0.00.00.00.00.00.01.25.14On completion of Commissioning and Final Acceptance125M94.0010.00%0.00.00.00.00.00.02.0Crossing (UNCASED) by Manual Moling Methoda.Installation of 6" NB-PE0.00.02.2.1On Installation215M1,832.0080.00%215.00117.00332.00393,880.00214,344.00608,224.002.2.2On Hydrotesting & Dewarting etc.215M229.0010.00%0.0332.00332.000.076,028.0076,028.002.2.3On Commissioning and Final Acceptance215M229.0010.00%0.00.00.00.00.00.0b.Installation of 4" NB-PE0.00.00.00.02.2.4On Installation45M1,544.0080.00%0.00.00.00.00.00.02.2.5On Hydrotesting & Dewarting etc.45M193.0010.00%0.00.00.00.00.00.02.2.6On Commissioning and Final Acceptance45M193.0010.00%0.00.00.00.00.00.03.0Crossing (Cased) - Installation of 4" carrier pipe with 10" casing pipe by jacking / boring / open cut0.00.00.03.3.1On Installation45M2,588.0080.00%0.00.00.00.00.00.03.3.2On Hydro testing & Dewarting, etc. 45M323.5010.00%0.00.00.00.00.00.03.3.3On commissioning and final acceptance45M323.5010.00%0.00.00.00.00.00.04.0Supply of steel casing pipe - 10" NB, 6.4 thk0.00.04.1On completion of individual items of work45M3,073.5090.00%0.059.0059.000.0181,336.50181,336.504.2On completion of all works in all respects including commissioning and final accetance45M341.5010.00%0.00.00.00.00.00.05.0Continuous Concrete Coating (For CS pipe)0.00.00.05.1.1On installation 30M1,364.0080.00%0.00.00.00.00.00.05.1.2On hydrotesting & dewarting etc 30M170.5010.00%0.00.00.00.00.00.05.1.3On commissioning and final acceptance. 30M170.5010.00%0.00.00.00.00.00.06.0Installation of 6" carrier pipe by HDD method at crossing without casing pipe.0.00.06.5.1On installation 260M4,064.0080.00%240.000.0240.00975,360.000.0975,360.006.5.2On hydro testing & dewarting etc 260M508.0010.00%0.0240.00240.000.0121,920.00121,920.006.5.3On commissioning and final acceptance. 260M508.0010.00%0.00.00.00.00.00.07.0Final clean-Up and restoration0.00.07.0On Completion of work on prorata basis785EA522.0090.00%0.00.00.00.00.00.07.1On commissioning and final acceptance785EA58.0010.00%0.00.00.00.00.00.08.0Pipeline laying / installation of above ground / under ground pipeline at hook- up station / CNG Station / DRS / Metering Station / SV Station / Tap off point etc.0.00.00.06" NB, 300#0.00.08.15.1On completion of individual item of work10M4,410.0090.00%0.00.00.00.00.00.08.15.2On completion of all works in all respects including commissioning and final acceptance .10M490.0010.00%0.00.00.00.00.00.04" NB, 300#0.00.08.15.3On completion of individual item of work15M3,519.0090.00%0.00.00.00.00.00.08.15.4On completion of all works in all respects including commissioning and final acceptance.15M391.0010.00%0.00.00.00.00.00.02" NB, 300#0.00.08.15.5On completion of individual item of work32M2,646.0090.00%0.00.00.00.00.00.08.15.6On completion of all works in all respects including commissioning and final acceptance.32M294.0010.00%0.00.00.00.00.00.03" NB, 300#0.00.08.15.7On completion of individual item of work10M1,737.0090.00%0.00.00.00.00.00.08.15.8On completion of all works in all respects including commissioning and final acceptance .10M193.0010.00%0.00.00.00.00.00.09.0Supply of following items, (ASTM A 106 GrB) 0.00.00.0a.4" NPS Pipe size Sch. 400.00.09.1On completion of individual item of work15M1,534.5090.00%0.00.00.00.00.00.09.2On completion of all works in all respects including commissioning and final acceptance .15M170.5010.00%0.00.00.00.00.00.0b.2" NPS Pipe Size Sch. XS0.00.09.3On completion of individual item of work.32M724.5090.00%0.00.00.00.00.00.09.4On completion of all works in all respects including commissioning and final acceptance .32M80.5010.00%0.00.00.00.00.00.0c.3/4" NPS Pipe Size Sch. XXS0.00.09.5On completion of individual item of work.10M684.0090.00%0.00.00.00.00.00.09.6On completion of all works in all respects including commissioning and final acceptance.10M76.0010.00%0.00.00.00.00.00.0d.2" Ball Valve-300#, flanged end0.00.09.7On completion of individual item of work.3NUM14,697.0090.00%0.00.00.00.00.00.09.8On completion of all works in all respects including commissioning and final acceptance.3NUM1,633.0010.00%0.00.00.00.00.00.0e.2" Ball Valve-800#, flanged end0.00.09.9On completion of individual item of work.4NUM3,519.0090.00%0.00.00.00.00.00.09.10On completion of all works in all respects including commissioning and final acceptance .4NUM391.0010.00%0.00.00.00.00.00.0f.2" Plug Valve-300#, Flanged,0.00.09.11On completion of individual item of work.2NUM31,140.0090.00%0.00.00.00.00.00.09.12On completion of all works in all respects including commissioning and final acceptance .2NUM3,460.0010.00%0.00.00.00.00.00.0g.1/2" Needle Valve-300#, Flanged,0.00.09.13On completion of individual item of work.2NUM1,291.5090.00%0.00.00.00.00.00.09.14On completion of all works in all respects including commissioning and final acceptance .2NUM143.5010.00%0.00.00.00.00.00.0h.4"X4" Equal Tee, BW, Sch. XS,0.00.09.15On completion of individual item of work.4NUM1,332.0090.00%0.00.00.00.00.00.09.16On completion of all works in all respects including commissioning and final acceptance .4NUM148.0010.00%0.00.00.00.00.00.0i.4"X2" Unequal Tee, BW, Sch. XS, 0.00.09.17On completion of individual item of work.2NUM1,332.0090.00%0.00.00.00.00.00.09.18On completion of all works in all respects including commissioning and final acceptance.2NUM14810.00%0.00.00.00.00.00.0j.2'X2" Equal Tee, BW, Sch. XS,0.00.09.19On completion of individual item of work.2NUM481.590.00%0.00.00.00.00.00.09.20On completion of all works in all respects including commissioning and final acceptance .2NUM53.510.00%0.00.00.00.00.00.0k.4" - 90 Degree, BW Sch. XS,0.00.09.21On completion of individual item of work.8NUM68490.00%0.00.00.00.00.00.09.22On completion of all works in all respects including commissioning and final acceptance .8NUM7610.00%0.00.00.00.00.00.0l.2" - 90 Degree, BW Sch. XS,0.00.09.23On completion of individual item of work.12NUM238.590.00%0.00.00.00.00.00.09.24On completion of all works in all respects including commissioning and final acceptance .12NUM26.510.00%0.00.00.00.00.00.0m.6" WNRF, 300 #,0.00.09.25On completion of individual item of work.2NUM351990.00%0.00.00.00.00.00.09.26On completion of all works in all respects including commissioning and final acceptance .2NUM39110.00%0.00.00.00.00.00.0n.4"WNRF, 300#, 0.00.09.27On completion of individual item of work.4NUM2,46690.00%0.00.00.00.00.00.00.09.28On completion of all works in all respects including commissioning and final acceptance .4NUM27410.00%0.00.00.00.00.00.0o.2" WNRF, 300#0.00.09.29On completion of individual item of work12NUM1,048.5090.00%0.00.00.00.00.00.09.30On completion of all works in all respects including commissioning and final acceptance .12NUM116.510.00%0.00.00.00.00.00.0p.3/4" WNRF, 300# 0.00.09.31On completion of individual item of work.6NUM400.5090.00%0.00.00.00.00.00.09.32On completion of all works in all respects including commissioning and final acceptance .6NUM44.5010.00%0.00.00.00.00.00.0q.4" Blind Flanges, RF, 300# 0.00.09.33On completion of individual item of work.3NUM1,372.5090.00%0.00.00.00.00.00.09.34On completion of all works in all respects including commissioning and final acceptance .3NUM152.5010.00%0.00.00.00.00.00.0r.2" Blind Flange, RF, 300# 0.00.09.35On completion of individual item of work.4NUM643.5090.00%0.00.00.00.00.00.09.36On completion of all works in all respects including commissioning and final acceptance .4NUM71.5010.00%0.00.00.00.00.00.0s.6"X6" - Equal Tee, Sch. XS 0.00.09.37On completion of individual item of work.2NUM3,35790.00%0.00.00.00.00.00.09.38On completion of all works in all respects including commissioning and final acceptance .2NUM37310.00%0.00.00.00.00.00.0t.6"X4", Concentric Reducer, BW0.00.09.39On completion of individual item of work.2NUM189990.00%0.00.00.00.00.00.09.40On completion of all works in all respects including commissioning and final acceptance .2NUM21110.00%0.00.00.00.00.00.0u6"X2", Concentric Reducer, BW0.00.09.41On completion of individual item of work.4NUM1,129.5090.00%0.00.00.00.00.00.09.42On completion of all works in all respects including commissioning and final acceptance .4NUM125.5010.00%0.00.00.00.00.00.0v.4"X2" Weldolet Shc. 40 X Sch. XS 0.00.09.43On completion of individual item of work.4NUM805.5090.00%0.00.00.00.00.00.09.44On completion of all works in all respects including commissioning and final acceptance .4NUM89.5010.00%0.00.00.00.00.00.0w.4"x3/4" -Sockolet Sch 40X Sch XXS 0.00.09.45On completion of individual item of work.8NUM238.590.00%0.00.00.00.00.00.09.46On completion of all works in all respects including commissioning and final acceptance .8NUM26.510.00%0.00.00.00.00.00.0x.6" Insulating Joint 300#0.00.09.47On completion of individual item of work.1NUM54,306.0090.00%0.00.00.00.00.00.09.48On completion of all works in all respects including commissioning and final acceptance .1NUM6,034.0010.00%0.00.00.00.00.00.00.0y.4" Insulating Joint 300# 0.00.09.49On completion of individual item of work.1NUM34,744.5090.00%0.00.00.00.00.00.09.50On completion of all works in all respects including commissioning and final acceptance .1NUM3,860.5010.00%0.00.00.00.00.00.0z.Pressure Gauge 6" Dial size 0.00.09.51On completion of individual item of work.5NUM17,20890.00%0.00.00.00.00.00.09.52On completion of all works in all respects including commissioning and final acceptance .5NUM1,91210.00%0.00.00.00.00.00.0a.a6" Blind Flange, RF, 300#0.00.09.53On completion of individual item of work.1NUM2,911.5090.00%0.00.00.00.00.00.09.54On completion of all works in all respects including commissioning and final acceptance .1NUM323.510.00%0.00.00.00.00.00.010.0Civil Work(Valve Pits)0.00.010.1.1On completion of work for Valve Pit Type-33NUM88,65090.00%0.00.00.00.00.00.010.1.2On completion of all works in all respects including commissioning and final acceptance .3NUM9,85010.00%0.00.00.00.00.00.011.0Repair of Defect in bevels exceeding 3mm in depth for pipe size.a.6" NB N Pipes11.2.1On Fabrication and completion of installation 15NUM10.4080.00%0.00.00.00.00.00.011.2.2On Flushing, Testing, Draining, Drying etc.15NUM1.3010.00%0.00.00.00.00.00.01,950On completion of all works in all respects including commissioning and final acceptance.15NUM1.3010.00%0.00.00.00.00.00.0b.4" NB N Pipes0.00.011.2.3On Fabrication and completion of installation 15NUM10.4080.00%0.00.00.00.00.00.011.2.4On Flushing, Testing, Draining, Drying etc.15NUM1.3010.00%0.00.00.00.00.00.01,980On completion of all works in all respects including commissioning and final acceptance.15NUM1.3010.00%0.00.00.00.00.00.0Repair of Defect in bevels between 1mm and 3mm in depth for pipe size.0.00.0a6" NB N Pipes0.00.011.3.1On Fabrication and completion of Installation 15NUM10.4080.00%0.00.00.00.00.00.011.3.2On Flushing , Testing, Draining, Drying etc.15NUM1.3010.00%0.00.00.00.00.00.02,020On completion of all works in all respects including commissioning and final acceptance.15NUM1.3010.00%0.00.00.00.00.00.0b.4" NB N Pipes0.00.011.3.3On Fabrication and completion of Installation 15NUM10.4080.00%0.00.00.00.00.00.011.3.4On Flushing, Testing, Draining, Drying etc.15NUM1.3010.00%0.00.00.00.00.00.02,050On completion of all works in all respects including commissioning and final acceptance.15NUM1.3010.00%0.00.00.00.00.00.00.012.0Permanent Markers - Supply, Fabrication and Installation0.00.012.1Warning Marker0.00.012.1.1On completion of works on prorata basis13NUM457290.00%0.012.0012.000.054,864.0054,864.0012.1.2On completion of all works in all respects including commissioning and final acceptance.13NUM50810.00%0.00.00.00.00.00.012.1Concrete Marker/ Boundary Marker0.00.012.1.3On completion of works on prorata basis16NUM92790.00%0.00.00.00.00.00.012.1.4On completion of all works in all respects including commissioning and final acceptance.16NUM10310.00%0.00.00.00.00.00.013.0Pre-Commissioning and Commissioning of line0.00.013.1Purging with Nitrogen network0.00.013.1.1On Fabrication and completion of Installation for 6" Line2,575M17.6080.00%0.00.00.00.00.00.013.1.2On Flushing, Testing, Draining, Drying etc.2,575M2.2010.00%0.00.00.00.00.00.013.1.3On completion of all works in all respects including commissioning and final acceptance.2,575M2.2010.00%0.00.00.00.00.00.013.1.4On Fabrication and completion of Installation for 4" Line215M17.6080.00%0.00.00.00.00.00.013.1.5On Flushing, Testing, Draining, Drying etc.215M2.2010.00%0.00.00.00.00.00.013.1.6On completion of all works in all respects including commissioning and final acceptance.215M2.2010.00%0.00.00.00.00.00.014.0Filling upwith Nitrogen for Preservation0.00.014.1Filling up With Nitrogen0.00.014.1.1On Fabrication and completion of Installation - 6" Line2,575M17.6080.00%0.00.00.00.00.00.014.1.2On Flushing, Testing, Draining, Drying etc.2,575M2.2010.00%0.00.00.00.00.00.014.1.3On completion of all works in all respects including commissioning and final acceptance .2,575M2.2010.00%0.00.00.00.00.00.014.1.4On fabrication and completion of installation - 4" Line215M17.6080.00%0.00.00.00.00.00.014.1.5On Flushing, Testing, Draining, Drying, etc.215M2.2010.00%0.00.00.00.00.00.014.1.6On completion of all works in all respects including commissioning and final acceptance.215M2.2010.00%0.00.00.00.00.00.015.0Cathodic Protection System (TCP)0.00.0a.6" NB Line0.00.015.2.1On Completion of Installation2,575M17680.00%0.02,105.092,105.090.0370,495.31370,495.3115.2.2On testing2,575M2210.00%0.00.00.00.00.00.015.2.3On completion of all works in all respects including commissioning and final acceptance.2,575M2210.00%0.00.00.00.00.00.0b.4" NB Line0.00.015.2.4On Completion of Installation215M24880.00%0.00.00.00.00.00.015.2.5On testing215M3110.00%0.00.00.00.00.00.015.2.6On completion of all works in all respects including commissioning and final acceptance.215M3110.00%0.00.00.00.00.00.015.0Permanent Cathodic Protection System (PCP)0.00.0a.6" NB Line0.00.015.5.1On Completion of Installation2,575M24880.00%0.00.00.00.00.00.015.5.2On testing2,575M3110.00%0.00.00.00.00.00.015.5.3On completion of all works in all respects including commissioning and final acceptance .2,575M3110.00%0.00.00.00.00.00.0b.4" NB Line0.00.015.5.4On Completion of Installation215M57280.00%0.00.00.00.00.00.015.5.5On testing215M71.510.00%0.00.00.00.00.00.015.5.6On completion of all works in all respects including commissioning and final acceptance .215M71.510.00%0.00.00.00.00.00.015.6Post Commissioning Survey of Both TCP & PCP System0.00.015.7On Fabrication and completion of Installation 2,790M17.680.00%0.00.00.00.00.00.015.8On Flushing, Testing, Draining, Drying etc.2,790M2.210.00%0.00.00.00.00.00.015.9On completion of all works in all respects including commissioning and final acceptance.2,790M2.210.00%0.00.00.00.00.00.016.10Hook - Up With Existing Pipeline after shut down of operating pipeline0.00.0a.4"X4" Hookup of new pipeline0.00.016.1.1On fabrication and completion of installation 2NUM190,40080.00%0.00.00.00.00.00.016.1.2On Flushing, Testing, Draining, Drying etc.2NUM23,80010.00%0.00.00.00.00.00.016.1.3On completion of all works in all respects including commissioning and final acceptance .2NUM23,80010.00%0.00.00.00.00.00.0

BASIC AMOUNT (INR)2,919,238.851,876,524.844,795,763.69SERVICE TAX @ 4.944%144,327.1792,775.39237,102.56TOTAL AMOUNT3,063,566.021,969,300.235,032,866.2514402632.5

For AIPLPage &P of &NFor GAIL Gas/MECON

AOMABSTRACT OF MEASUREMENTCNG AND CITY GAS DISTRIBUTION PROJECT FOR VADODARA CITYCLIENT: GAIL GAS LIMITED: AIPL/GAIL/BRC/RA/01BILL NO.: AIPL/GAIL/BRC/RA/03CONSULTANT: M/S MECON LIMITEDDATE: 15.05.2014CONTRACTOR: M/S ADVANCE INFRASTRUCTURES PVT. LTD.DATE :VENDOR CODE: 101000577LOA/WO. NO.: GAIL/85/13-14/5600000116, Dtd. 02.01.2014INSTALLATION AND CONSTRUCTION SERVICESMEASUREMENT PERIOD : 09/04/2014 TO 15/05/2014ItemService/DescriptionQty.UnitAmountQTYPrev.This BillCumm.Remarks0Mobilization Advance @ 10% of total contract price. Mobilization Advance shall bear interest of 10% p.a. The Mobilization Advance shall be recovered proportionately from each RA Bill. The interest amount shall be adjusted from the RA Bill payments.1.00LSERROR:#REF!00001Pipeline Laying/ Installation, Dia-168.3 (6.62) WT 6.4mm API 5L Gr. X-42 (PSL-2)1.25.1On completion of Site development , Stacking, clearing, grading of ROU2100MERROR:#REF!2,100.000.02,100.001,304.641.25.2On Completion of Fabrication, Alignment, Stringing, Field Welding, Radiography, NDT2100MERROR:#REF!1,959.570.01,959.571.25.3On completion of Joint coating, Trenching & Lowering 2100MERROR:#REF!1,381.89289.001,670.891,152.0096.001.25.4On completion of Tie-ins, Backfilling 2100M711.45959.001,670.451.25.5On hydro testing, dewatering, swabbing 2100M0.00.00.01.25.6On magnetic cleaning plus eletronic geometry and pigging and restroration2100M0.00.00.01.25.7On commissioning and final acceptance2100M0.00.00.000001Pipeline Laying / Installation, Dia-114.3 (4.5) WT 6.4mm, API 5L Gr. X-42 (PSL-2)0.00.01.25.8On completion of Site Development, Stacking, Clearing and grading of ROU125M0.00.00.01.25.9On completion of Fabrication, Alignment, Stringing, Field Welding, Radiography, NDT125M0.00.00.01.25.10On completion of Joint coating, Trenching & Lowering 125M0.00.00.01.25.11On completion of tie-ins, back filling 125M0.00.00.01.25.12On completion of Hydro testing, Dewatering, Swabbing125M0.00.00.01.25.13On completion of Magnetic Cleaning Plus Electronic Geometry Pigging and Restoration125M0.00.00.01.25.14On completion of Commissioning and Final Acceptance125M0.00.00.02.0Crossing (UNCASED) by Manual Moling Method0.0a.Installation of 6" NB-PE0.00.02.2.1On Installation215M215.000.0215.002.2.2On Hydrotesting & Dewarting etc.215M0.00.00.02.2.3On Commissioning and Final Acceptance215M0.00.00.0b.Installation of 4" NB-PE0.00.02.2.4On Installation45M0.00.00.02.2.5On Hydrotesting & Dewarting etc.45M0.00.00.02.2.6On Commissioning and Final Acceptance45M0.00.00.03.0Crossing (Cased) - Installation of 4" carrier pipe with 10" casing pipe by jacking / boring / open cut0.00.03.3.1On Installation45M0.00.00.03.3.2On Hydro testing & Dewarting, etc. 45M0.00.00.03.3.3On commissioning and final acceptance45M0.00.00.04.0Supply of steel casing pipe - 10" NB, 6.4 thk0.00.04.1On completion of individual items of work45M0.00.00.04.2On completion of all works in all respects including commissioning and final accetance45M0.00.00.05.0Continuous Concrete Coating (For CS pipe)0.00.05.1.1On installation 30M0.00.00.05.1.2On hydrotesting & dewarting etc 30M0.00.00.05.1.3On commissioning and final acceptance. 30M0.00.00.06.0Installation of 6" carrier pipe by HDD method at crossing without casing pipe.0.00.06.5.1On installation 260M240.0020.00260.006.5.2On hydro testing & dewarting etc 260M0.0260.00260.006.5.3On commissioning and final acceptance. 260M0.00.00.07.0Final clean-Up and restoration0.00.07.0On Completion of work on prorata basis785EA0.00.00.07.1On commissioning and final acceptance785EA0.00.00.08.0Pipeline laying / installation of above ground / under ground pipeline at hook- up station / CNG Station / DRS / Metering Station / SV Station / Tap off point etc.0.00.06" NB, 300#0.00.08.15.1On completion of individual item of work10M0.00.00.08.15.1On completion of all works in all respects including commissioning and final acceptance .10M0.00.00.04" NB, 300#0.00.08.15.2On completion of individual item of work15M0.00.00.08.15.2On completion of all works in all respects including commissioning and final acceptance.15M0.00.00.02" NB, 300#0.00.08.15.3On completion of individual item of work32M0.00.00.08.15.3On completion of all works in all respects including commissioning and final acceptance.32M0.00.00.03" NB, 300#0.00.08.15.4On completion of individual item of work10M0.00.00.08.15.4On completion of all works in all respects including commissioning and final acceptance .10M0.00.00.09.0Supply of following items, (ASTM A 106 GrB) 0.00.0a.4" NPS Pipe size Sch. 400.00.09.1On completion of individual item of work15M0.00.00.09.1On completion of all works in all respects including commissioning and final acceptance .15M0.00.00.0b.2" NPS Pipe Size Sch. XS0.00.09.2On completion of individual item of work.32M0.00.00.09.2On completion of all works in all respects including commissioning and final acceptance .32M0.00.00.0c.3/4" NPS Pipe Size Sch. XXS0.00.09.3On completion of individual item of work.10M0.00.00.09.3On completion of all works in all respects including commissioning and final acceptance.10M0.00.00.0d.2" Ball Valve-300#, flanged end0.00.09.4On completion of individual item of work.3NUM0.00.00.09.4On completion of all works in all respects including commissioning and final acceptance.3NUM0.00.00.0e.2" Ball Valve-800#, flanged end0.00.09.5On completion of individual item of work.4NUM0.00.00.09.5On completion of all works in all respects including commissioning and final acceptance .4NUM0.00.00.0f.2" Plug Valve-300#, Flanged,0.00.09.6On completion of individual item of work.2NUM0.00.00.09.6On completion of all works in all respects including commissioning and final acceptance .2NUM0.00.00.0g.1/2" Needle Valve-300#, Flanged,0.00.09.7On completion of individual item of work.2NUM0.00.00.09.7On completion of all works in all respects including commissioning and final acceptance .2NUM0.00.00.0h.4"X4" Equal Tee, BW, Sch. XS,0.00.09.8On completion of individual item of work.4NUM0.00.00.09.8On completion of all works in all respects including commissioning and final acceptance .4NUM0.00.00.0i.4"X2" Unequal Tee, BW, Sch. XS, 0.00.09.9On completion of individual item of work.2NUM0.00.00.09.9On completion of all works in all respects including commissioning and final acceptance.2NUM0.00.00.0j.2'X2" Equal Tee, BW, Sch. XS,0.00.09.10On completion of individual item of work.2NUM0.00.00.09.10On completion of all works in all respects including commissioning and final acceptance .2NUM0.00.00.0k.4" - 90 Degree, BW Sch. XS,0.00.09.11On completion of individual item of work.8NUM0.00.00.09.11On completion of all works in all respects including commissioning and final acceptance .8NUM0.00.00.0l.2" - 90 Degree, BW Sch. XS,0.00.09.12On completion of individual item of work.12NUM0.00.00.09.12On completion of all works in all respects including commissioning and final acceptance .12NUM0.00.00.0m.6" WNRF, 300 #,0.00.09.13On completion of individual item of work.2NUM0.00.00.09.13On completion of all works in all respects including commissioning and final acceptance .2NUM0.00.00.0n.4"WNRF, 300#, 0.00.09.14On completion of individual item of work.4NUM0.00.00.00.09.14On completion of all works in all respects including commissioning and final acceptance .4NUM0.00.00.0o.2" WNRF, 300#0.00.09.15On completion of individual item of work12NUM0.00.00.09.15On completion of all works in all respects including commissioning and final acceptance .12NUM0.00.00.0p.3/4" WNRF, 300# 0.00.09.16On completion of individual item of work.6NUM0.00.00.09.16On completion of all works in all respects including commissioning and final acceptance .6NUM0.00.00.0q.4" Blind Flanges, RF, 300# 0.00.09.17On completion of individual item of work.3NUM0.00.00.09.17On completion of all works in all respects including commissioning and final acceptance .3NUM0.00.00.0r.2" Blind Flange, RF, 300# 0.00.09.18On completion of individual item of work.4NUM0.00.00.09.18On completion of all works in all respects including commissioning and final acceptance .4NUM0.00.00.0s.6"X6" - Equal Tee, Sch. XS 0.00.09.19On completion of individual item of work.2NUM0.00.00.09.19On completion of all works in all respects including commissioning and final acceptance .2NUM0.00.00.0t.6"X4", Concentric Reducer, BW0.00.09.20On completion of individual item of work.2NUM0.00.00.09.20On completion of all works in all respects including commissioning and final acceptance .2NUM0.00.00.0u6"X2", Concentric Reducer, BW0.00.09.21On completion of individual item of work.4NUM0.00.00.09.21On completion of all works in all respects including commissioning and final acceptance .4NUM0.00.00.0v.4"X2" Weldolet Shc. 40 X Sch. XS 0.00.09.22On completion of individual item of work.4NUM0.00.00.09.22On completion of all works in all respects including commissioning and final acceptance .4NUM0.00.00.0w.4"x3/4" -Sockolet Sch 40X Sch XXS 0.00.09.23On completion of individual item of work.8NUM0.00.00.09.23On completion of all works in all respects including commissioning and final acceptance .8NUM0.00.00.0x.6" Insulating Joint 300#0.00.09.24On completion of individual item of work.1NUM0.00.00.09.24On completion of all works in all respects including commissioning and final acceptance .1NUM0.00.00.00.0y.4" Insulating Joint 300# 0.00.09.25On completion of individual item of work.1NUM0.00.00.09.25On completion of all works in all respects including commissioning and final acceptance .1NUM0.00.00.0z.Pressure Gauge 6" Dial size 0.00.09.26On completion of individual item of work.5NUM0.00.00.09.26On completion of all works in all respects including commissioning and final acceptance .5NUM0.00.00.0a.a6" Blind Flange, RF, 300#0.00.09.27On completion of individual item of work.1NUM0.00.00.09.27On completion of all works in all respects including commissioning and final acceptance .1NUM0.00.00.010.0Civil Work(Valve Pits)0.00.010.1.1On completion of work for Valve Pit Type-33NUM0.00.00.010.1.1On completion of all works in all respects including commissioning and final acceptance .3NUM0.00.00.011.0Repair of Defect in bevels exceeding 3mm in depth for pipe size.0.00.0a.6" NB N Pipes0.00.011.2.1On Fabrication and completion of installation 15NUM0.00.00.011.2.1On Flushing, Testing, Draining, Drying etc.15NUM0.00.00.011.2.1On completion of all works in all respects including commissioning and final acceptance.15NUM0.00.00.0b.4" NB N Pipes0.00.011.2.2On Fabrication and completion of installation 15NUM0.00.00.011.2.2On Flushing, Testing, Draining, Drying etc.15NUM0.00.00.011.2.2On completion of all works in all respects including commissioning and final acceptance.15NUM0.00.00.0Repair of Defect in bevels between 1mm to 3mm in depth for pipe size.0.00.0a6" NB N Pipes0.00.011.3.1On Fabrication and completion of Installation 15NUM0.00.00.011.3.1On Flushing , Testing, Draining, Drying etc.15NUM0.00.00.011.3.1On completion of all works in all respects including commissioning and final acceptance.15NUM0.00.00.0b.4" NB N Pipes0.00.011.2.4On Fabrication and completion of Installation 15NUM0.00.00.011.2.4On Flushing, Testing, Draining, Drying etc.15NUM0.00.00.011.2.4On completion of all works in all respects including commissioning and final acceptance.15NUM0.00.00.00.012.0Permanent Markers - Supply, Fabrication and Installation0.00.012.1Warning Marker0.00.012.1.1On completion of works on prorata basis13NUM0.00.00.012.1.1On completion of all works in all respects including commissioning and final acceptance.13NUM0.00.00.012.1Concrete Marker/ Boundary Marker0.00.012.1.2On completion of works on prorata basis16NUM0.00.00.012.1.2On completion of all works in all respects including commissioning and final acceptance.16NUM0.00.00.013.0Pre-Commissioning and Commissioning of line0.00.013.1Purging with Nitrogen network0.00.013.1.1On Fabrication and completion of Installation for 6" Line2,575M0.00.00.013.1.1On Flushing, Testing, Draining, Drying etc.2,575M0.00.00.013.1.1On completion of all works in all respects including commissioning and final acceptance.2,575M0.00.00.013.1.2On Fabrication and completion of Installation for 4" Line215M0.00.00.013.1.2On Flushing, Testing, Draining, Drying etc.215M0.00.00.013.1.2On completion of all works in all respects including commissioning and final acceptance.215M0.00.00.014.0Filling upwith Nitrogen for Preservation0.00.014.1Filling up With Nitrogen0.00.014.1.1On Fabrication and completion of Installation - 6" Line2,575M0.00.00.014.1.1On Flushing, Testing, Draining, Drying etc.2,575M0.00.00.014.1.1On completion of all works in all respects including commissioning and final acceptance .2,575M0.00.00.014.1.2On fabrication and completion of installation - 4" Line215M0.00.00.014.1.2On Flushing, Testing, Draining, Drying, etc.215M0.00.00.014.1.2On completion of all works in all respects including commissioning and final acceptance.215M0.00.00.015.0Cathodic Protection System (TCP)0.00.0a.6" NB Line0.00.015.2.1On Completion of Installation2,575M0.00.00.015.2.1On testing2,575M0.00.00.015.2.1On completion of all works in all respects including commissioning and final acceptance.2,575M0.00.00.0b.4" NB Line0.00.015.2.2On Completion of Installation215M0.00.00.015.2.2On testing215M0.00.00.015.2.2On completion of all works in all respects including commissioning and final acceptance.215M0.00.00.015.0Permanent Cathodic Protection System (PCP)0.00.0a.6" NB Line0.00.015.5.1On Completion of Installation2,575M0.00.00.015.5.1On testing2,575M0.00.00.015.5.1On completion of all works in all respects including commissioning and final acceptance .2,575M0.00.00.0b.4" NB Line0.00.015.5.2On Completion of Installation215M0.00.00.015.5.2On testing215M0.00.00.015.5.2On completion of all works in all respects including commissioning and final acceptance .215M0.00.00.015.7Post Commissioning Survey of Both TCP & PCP System0.00.015.7On Fabrication and completion of Installation 2,790M0.00.00.015.7On Flushing, Testing, Draining, Drying etc.2,790M0.00.00.015.7On completion of all works in all respects including commissioning and final acceptance.2,790M0.00.00.016.0Hook - Up With Existing Pipeline after shut down of operating pipeline0.00.0a.4"X4" Hookup of new pipeline0.00.016.1.1On fabrication and completion of installation 2NUM0.00.00.016.1.1On Flushing, Testing, Draining, Drying etc.2NUM0.00.00.016.1.1On completion of all works in all respects including commissioning and final acceptance .2NUM0.00.00.0

For AIPLPage &P of &NFor GAIL Gas/MECON

HDDADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEETPROJECT: CNG AND CITY GAS DISTRIBUTION PIPELINE PROJECT AT VADODARA CITYCLIENT: GAIL GAS LIMITEDPipe Dia&Thk- 6''x6.4mmCONSULTANT: MECON LIMITEDPipe Grade - API5LGrx42EPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDSOR ITEM NO6.5.1LOI . NO.: GAIL/85/13-14/5600000116, Dtd. 02.01.2014MEASUREMENT PERIODE - 09.04.2014 TO 10.05.2014MEASUREMENT DATE - 10.05.2014DESCRIPTION: HDDRA BILL NO - 02Sr.No.DateReport No.Quantity(Mtrs)Remarks105.04.142140.00Total Quantity (Mtrs)140.00Quantity Taken upto Previous Bill (Mtrs)120.00Quantity taken in this Bill (Mtrs)140.00Total Claimed Qty (Mtrs) 260.00

For AIPLFor MECON For Gail GasSignatureSignatureSignatureNameNameNameDateDateDate

WELDING (T)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEETPROJECT: CNG AND CITY GAS DISTRIBUTION PIPELINE PROJECT AT VADODARA CITYCLIENT: GAIL GAS LIMITEDPipe Dia&Thk- 6''x6.4mmCONSULTANT: MECON LIMITEDPipe Grade - API5LGrx42EPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDSOR ITEM NO1.25.4LOI . NO.: GAIL/85/13-14/5600000116, Dtd. 02.01.2014MEASUREMENT PERIODE -13.03.2014 TO 08.04.2014MEASUREMENT DATE - 08.04.2014DESCRIPTION: TIE-IN WELDINGRA BILL NO - 02Sr.No.DateReport No.Quantity(Nos)Quantity(Mtrs)Remarks108.11.2014T4476.33219.02.2015T46213.07319.02.2015T46430.18

Total Quantity (Nos/Mtrs)1349.586Quantity Taken upto Previous Bill (Nos/Mtrs)3612.44Quantity taken in this Bill (Mtrs/Nos)1349.586Total Claimed Qty (Nos/Mtrs) 4962.026

For AIPLFor MECON For Gail GasSignatureSignatureSignatureNameNameNameDateDateDate

WELDING (M)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEETPROJECT: CNG AND CITY GAS DISTRIBUTION PIPELINE PROJECT AT VADODARA CITYCLIENT: GAIL GAS LIMITEDPipe Dia&Thk- 6''x6.4mmCONSULTANT: MECON LIMITEDPipe Grade - API5LGrx42EPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDSOR ITEM NO1.25.2LOI . NO.: GAIL/85/13-14/5600000116, Dtd. 02.01.2014MEASUREMENT PERIODE - 09.04.2014 TO 10.05.2014MEASUREMENT DATE - 10.05.2014DESCRIPTION: MAIN LINE WELDINGRA BILL NO - 03Sr.No.DateReport No.Quantity(Nos)Quantity(Mtrs)Remarks128.02.201531929.51218.02.201530635.11318.02.20153117.80411.01.201529224.86510.01.201528224.48609.01.201527225.17

Total Quantity (Nos/Mtrs)929.51Quantity Taken upto Previous Bill (Nos/Mtrs)651959.57Quantity taken in this Bill (Nos/Mtrs)929.51Total Claimed Qty (Nos/Mtrs) 741989.08

For AIPLFor MECON For Gail GasSignatureSignatureSignatureNameNameNameDateDateDate

RADIOGRAPHYADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEETPROJECT: CNG AND CITY GAS DISTRIBUTION PIPELINE PROJECT AT VADODARA CITYCLIENT: GAIL GAS LIMITEDPipe Dia&Thk- 6''x6.4mmCONSULTANT: MECON LIMITEDPipe Grade - API5LGrx42EPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDSOR ITEM NO1.25.2LOI . NO.: GAIL/85/13-14/5600000116, Dtd. 02.01.2014MEASUREMENT PERIODE - 09.04.2014 TO 10.05.2014MEASUREMENT DATE - 10.05.2014DESCRIPTION: RADIOGRAPHYRA BILL NO - 02Sr.No.DateReport No.Quantity (Nos)Remarks111.11.2014447214.01.2015456320.02.20154612420.02.2015462502.03.2015479678910111213Total Quantity (Nos)36Quantity Taken upto Previous Bill (Nos)145Quantity taken in this Bill (Nos)36Total Claimed Qty (Nos) 181

For AIPLFor MECON For Gail GasSignatureSignatureSignatureNameNameNameDateDateDate

JOINT COATINGADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEETPROJECT: CNG AND CITY GAS DISTRIBUTION PIPELINE PROJECT AT VADODARA CITYCLIENT: GAIL GAS LIMITEDPipe Dia&Thk- 6''x6.4mmCONSULTANT: MECON LIMITEDPipe Grade - API5LGrx42EPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDSOR ITEM NO1.25.3LOI . NO.: GAIL/85/13-14/5600000116, Dtd. 02.01.2014MEASUREMENT PERIODE - 09.04.2014 TO 10.05.2014MEASUREMENT DATE - 10.05.2014DESCRIPTION: JOINT COATINGRA BILL NO - 02Sr.No.DateReport No.Quantity(Nos)Remarks103.03.2015229220.02.20152111315.01.2015206412.11.2014197Total Quantity (Nos)33Quantity Taken upto Previous Bill (Nos)138Quantity taken in this Bill (Nos)33Total Claimed Qty (Nos) 171

For AIPLFor MECON For Gail GasSignatureSignatureSignatureNameNameNameDateDateDate

BACKFILLINGADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEETPROJECT: CNG AND CITY GAS DISTRIBUTION PIPELINE PROJECT AT VADODARA CITYCLIENT: GAIL GAS LIMITEDPipe Dia&Thk- 6''x6.4mmCONSULTANT: MECON LIMITEDPipe Grade - API5LGrx42EPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDSOR ITEM NO1.25.4LOI . NO.: GAIL/85/13-14/5600000116, Dtd. 02.01.2014MEASUREMENT PERIODE -13.03.2014 TO 08.04.2014MEASUREMENT DATE - 08.04.2014DESCRIPTION: BACKFILLINGRA BILL NO - 02Sr.No.DateReport No.Quantity(Mtrs)Remarks113.11.2014238.720221.11.201424153.388305.03.20152517.190456789Total Quantity (Mtrs)179.298Quantity Taken upto Previous Bill (Mtrs)711.450Quantity taken in this Bill (Mtrs)179.298Total Claimed Qty (Mtrs) 890.748

For AIPLFor MECON For Gail GasSignatureSignatureSignatureNameNameNameDateDateDate

TRENCHINGADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEETPROJECT: CNG AND CITY GAS DISTRIBUTION PIPELINE PROJECT AT VADODARA CITYCLIENT: GAIL GAS LIMITEDPipe Dia&Thk- 6''x6.4mmCONSULTANT: MECON LIMITEDPipe Grade - API5LGrx42EPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDSOR ITEM NO1.25.3LOI . NO.: GAIL/85/13-14/5600000116, Dtd. 02.01.2014MEASUREMENT PERIODE -13.03.2014 TO 08.04.2014MEASUREMENT DATE - 08.04.2014DESCRIPTION: TRENCHINGRA BILL NO - 02Sr.No.DateReport No.Quantity(Mtrs)Remarks104.03.201529.570220.02.2015157.1268Total Quantity (Mtrs)186.696Quantity Taken upto Previous Bill (Mtrs)1224.92Quantity taken in this Bill (Mtrs)186.696Total Claimed Qty (Mtrs) 1411.616

For AIPLFor MECON For Gail GasSignatureSignatureSignatureNameNameNameDateDateDate

LOWERING (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEETPROJECT: CNG AND CITY GAS DISTRIBUTION PIPELINE PROJECT AT VADODARA CITYCLIENT: GAIL GAS LIMITEDPipe Dia&Thk- 6''x6.4mmCONSULTANT: MECON LIMITEDPipe Grade - API5LGrx42EPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDSOR ITEM NO1.25.3LOI . NO.: GAIL/85/13-14/5600000116, Dtd. 02.01.2014MEASUREMENT PERIODE - 09.04.2014 TO 10.05.2014MEASUREMENT DATE - 10.05.2014DESCRIPTION: LOWERINGRA BILL NO - 03Sr.No.DateReport No.Quantity(Mtrs)Remarks104.03.20155217.19221.02.201551153.39312.11.2015502.9345678910Total Quantity (Mtrs)173.508Quantity Taken upto Previous Bill (Mtrs)1381.89Quantity taken in this Bill (Mtrs)173.508Total Claimed Qty (Mtrs) 1555.398

For AIPLFor MECON For Gail GasSignatureSignatureSignatureNameNameNameDateDateDate

STRINGINGADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEETPROJECT: CNG AND CITY GAS DISTRIBUTION PIPELINE PROJECT AT VADODARA CITYCLIENT: GAIL GAS LIMITEDPipe Dia&Thk- 6''x6.4mmCONSULTANT: MECON LIMITEDPipe Grade - API5LGrx42EPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDSOR ITEM NO1.25.2LOI . NO.: GAIL/85/13-14/5600000116, Dtd. 02.01.2014MEASUREMENT PERIODE - 09.04.2014 TO 10.05.2014MEASUREMENT DATE - 10.05.2014DESCRIPTION: STRINGING RA BILL NO - 03Sr.No.DateReport No.Quantity(Nos)Quantity(Mtrs)Remarks110.02.201533337.120209.01.201531112.250309.01.201532897.560409.01.201532449.980

Total Quantity (Nos/Mtrs)337.120Quantity Taken upto Previous Bill (Nos/Mtrs)1622008.900Quantity taken in this Bill (Nos/Mtrs)337.12Total Claimed Qty (Nos/Mtrs) 1652046.02

For AIPLFor MECON For Gail GasSignatureSignatureSignatureNameNameNameDateDateDate

earthing supply of materialADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 90DESCRIPTIONEarthing and Lighting Protection System

Sr.No.DateReport No.DescriptionUnitQuantityRemarks90.14/8/12AttachedSupply of MaterialLS0.10

TOTALLS0.10Quantity Taken upto Previous Bill LS0.90Quantity taken in this Bill LS0.10Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

Erection & installationADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 90DESCRIPTIONEarthing and Lighting Protection System

Sr.No.DateReport No.DescriptionUnitQuantityRemarks90.24/8/12AttachedErection & InstallationLS0.10

TOTALLS0.10Quantity Taken upto Previous Bill LS0.90Quantity taken in this Bill LS0.10Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

earthing final acceptanceADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 90DESCRIPTIONEarthing and Lighting Protection System

Sr.No.DateReport No.DescriptionUnitQuantityRemarks90.34/8/12AttachedFinal acceptanceLS0.56

TOTALLS0.56Quantity Taken upto Previous Bill LS0.44Quantity taken in this Bill LS0.56Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

outdoor erection &installationADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 100DESCRIPTIONOutdoor Lighting

Sr.No.DateReport No.DescriptionUnitQuantityRemarks100.24/8/12AttachedErection & InstallationLS0.15

TOTALLS0.15Quantity Taken upto Previous Bill LS0.85Quantity taken in this Bill LS0.15Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

outdoor final acceptanceADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 100DESCRIPTIONOutdoor Lighting

Sr.No.DateReport No.DescriptionUnitQuantityRemarks100.34/8/12AttachedFinal acceptanceLS0.40

TOTALLS0.40Quantity Taken upto Previous Bill LS0.60Quantity taken in this Bill LS0.40Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

Indoor final acceptance ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.110DESCRIPTIONIndoor Lighting

Sr.No.DateReport No.DescriptionUnitQuantityRemarks110.34/8/12AttachedFinal acceptanceLS0.34

TOTALLS0.34Quantity Taken upto Previous Bill LS0.66Quantity taken in this Bill LS0.34Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

point gas finalADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 120DESCRIPTIONPoint Gas Detector

Sr.No.DateReport No.DescriptionUnitQuantityRemarks120.34/8/12AttachedFinal acceptanceLS2.00

TOTALLS2.00Quantity Taken upto Previous Bill LS2.00Quantity taken in this Bill LS2.00Total Claimed Qty. upto This Bill LS4.00

For AIPL.For JP KennyFor GSPL

Sheet9

Gas detection final aceptanceADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 140DESCRIPTIONGas Detection Panel

Sr.No.DateReport No.DescriptionUnitQuantityRemarks140.34/8/12AttachedFinal acceptanceLS0.34

TOTALLS0.34Quantity Taken upto Previous Bill LS0.66Quantity taken in this Bill LS0.34Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

fire final acceptanceADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 150DESCRIPTIONFire Supression System

Sr.No.DateReport No.DescriptionUnitQuantityRemarks150.34/8/12AttachedFinal acceptanceLS0.34

TOTALLS0.34Quantity Taken upto Previous Bill LS0.66Quantity taken in this Bill LS0.34Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

PG erectionADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 160DESCRIPTIONPressure Gauge

Sr.No.DateReport No.DescriptionUnitQuantityRemarks160.24/8/12AttachedErection & InstallationLS1.00

TOTALLS1.00Quantity Taken upto Previous Bill LS3.00Quantity taken in this Bill LS1.00Total Claimed Qty. upto This Bill LS4.00

For AIPL.For JP KennyFor GSPL

PG final acceptanceADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 160DESCRIPTIONPressure Gauge

Sr.No.DateReport No.DescriptionUnitQuantityRemarks160.34/8/12AttachedFinal acceptanceLS0.50

TOTALLS0.50Quantity Taken upto Previous Bill LS0.50Quantity taken in this Bill LS0.50Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

PT final acceptance ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 180DESCRIPTIONPressure Transmitter

Sr.No.DateReport No.DescriptionUnitQuantityRemarks180.34/8/12AttachedFinal acceptanceLS0.33

TOTALLS0.33Quantity Taken upto Previous Bill LS0.67Quantity taken in this Bill LS0.33Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

TT final acceptance (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 190DESCRIPTIONTemperatureTransmitter

Sr.No.DateReport No.DescriptionUnitQuantityRemarks190.34/8/12AttachedFinal acceptanceLS0.33

TOTALLS0.33Quantity Taken upto Previous Bill LS0.67Quantity taken in this Bill LS0.33Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

Control panelADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 211DESCRIPTIONControl Panel

Sr.No.DateReport No.DescriptionUnitQuantityRemarks211.34/8/12AttachedFinal acceptanceLS0.34

TOTALLS0.34Quantity Taken upto Previous Bill LS0.66Quantity taken in this Bill LS0.34Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

27 Civil & structural ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 230.1DESCRIPTIONCivil & Structural Work

Sr.No.DateReport No.DescriptionUnitQuantityRemarks230.1.104/8/12AttachedOn final acceptanceLS0.17

TOTALLS0.17Quantity Taken upto Previous Bill LS0.66Quantity taken in this Bill LS0.17Total Claimed Qty. upto This Bill LS0.83

For AIPL.For JP KennyFor GSPL

26 Terminal mechanical ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 230.2DESCRIPTIONTerminal Mechanical Work

Sr.No.DateReport No.DescriptionUnitQuantityRemarks230.2.54/8/12AttachedOn Commissioning ,reconciliation and Final AcceptanceLS0.10

TOTALLS0.10Quantity Taken upto Previous Bill LS0.80Quantity taken in this Bill LS0.10Total Claimed Qty. upto This Bill LS0.90

For AIPL.For JP KennyFor GSPL

27 Civil & structural JUBILIANTADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 240.1DESCRIPTIONCivil & Structural Work

Sr.No.DateReport No.DescriptionUnitQuantityRemarks240.1.74/8/12AttachedOn final acceptanceLS0.17

TOTALLS0.17Quantity Taken upto Previous Bill LS0.66Quantity taken in this Bill LS0.17Total Claimed Qty. upto This Bill LS0.83

For AIPL.For JP KennyFor GSPL

26 Terminal mechanical jubilianADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 240.2DESCRIPTIONTerminal Mechanical Work

Sr.No.DateReport No.DescriptionUnitQuantityRemarks240.2.54/8/12AttachedOn Commissioning, Reconciliation and Final AcceptanceLS0.10

TOTALLS0.10Quantity Taken upto Previous Bill LS0.80Quantity taken in this Bill LS0.10Total Claimed Qty. upto This Bill LS0.90

For AIPL.For JP KennyFor GSPL

27 Civil & structural 250.1.3ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 250.1DESCRIPTIONCivil & Structural Work

Sr.No.DateReport No.DescriptionUnitQuantityRemarks250.1.34/8/12AttachedOn completion of Equipment and Piping foundation including process Area DevelopmentLS0.10

TOTALLS0.10Quantity Taken upto Previous Bill LS0.80Quantity taken in this Bill LS0.10Total Claimed Qty. upto This Bill LS0.90

For AIPL.For JP KennyFor GSPL

27 Civil & structural grasimADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 250.1DESCRIPTIONCivil & Structural Work

Sr.No.DateReport No.DescriptionUnitQuantityRemarks250.1.64/8/12AttachedOn completion of miscellaneous itemsLS0.20

TOTALLS0.20Quantity Taken upto Previous Bill LS0.80Quantity taken in this Bill LS0.20Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

250.1.7 Civil & structuralADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 250.1DESCRIPTIONCivil & Structural Work

Sr.No.DateReport No.DescriptionUnitQuantityRemarks250.1.74/8/12AttachedOn final acceptanceLS0.60

TOTALLS0.60Quantity Taken upto Previous Bill LS0.00Quantity taken in this Bill LS0.60Total Claimed Qty. upto This Bill LS0.60

For AIPL.For JP KennyFor GSPL

Terminal mechanical grasim weldADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 250.2DESCRIPTIONTerminal Mechanical Work

Sr.No.DateReport No.DescriptionUnitQuantityRemarks250.2.24/8/12AttachedOn completion of Welding, Erection and NDT including hydrostatic testingLS0.10

TOTALLS0.10Quantity Taken upto Previous Bill LS0.80Quantity taken in this Bill LS0.10Total Claimed Qty. upto This Bill LS0.90

For AIPL.For JP KennyFor GSPL

Terminal mechanical grasim pneuADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 250.2DESCRIPTIONTerminal Mechanical Work

Sr.No.DateReport No.DescriptionUnitQuantityRemarks250.2.34/8/12AttachedOn completion Pneumatic testingLS0.20

TOTALLS0.20Quantity Taken upto Previous Bill LS0.80Quantity taken in this Bill LS0.20Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

Terminal mechanical grasim painADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 250.2DESCRIPTIONTerminal Mechanical Work

Sr.No.DateReport No.DescriptionUnitQuantityRemarks250.2.44/8/12AttachedOn completion of paintingLS0.20

TOTALLS0.20Quantity Taken upto Previous Bill LS0.80Quantity taken in this Bill LS0.20Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

Terminal mechanical grasim finaADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 250.2DESCRIPTIONTerminal Mechanical Work

Sr.No.DateReport No.DescriptionUnitQuantityRemarks250.2.54/8/12AttachedOn Commissioning,Reconciliation and Final AcceptanceLS0.60

TOTALLS0.60Quantity Taken upto Previous Bill LS0.00Quantity taken in this Bill LS0.60Total Claimed Qty. upto This Bill LS0.60

For AIPL.For JP KennyFor GSPL

10.Detail engineering drawin ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 260.1DESCRIPTIONDetailed Engg Drawing/Document

Sr.No.DateReport No.DescriptionUnitQuantityRemarks260.14/8/12Attachedd) Grasim Cellulogic LS0.05

TOTALLS0.05Quantity Taken upto Previous Bill LS0.95Quantity taken in this Bill LS0.05Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

as-builtADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 260.2DESCRIPTIONAs-Built Drawing / Document (Based on number of Drawings)

Sr.No.DateReport No.DescriptionUnitQuantityRemarks260.24/8/12Attachedb) Beshram TOP-4LS0.10

TOTALLS0.10Quantity Taken upto Previous Bill LS0.90Quantity taken in this Bill LS0.10Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

as-built (2)ADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/14 (PRE FINAL)

SOR ITEM NO.: 260.2DESCRIPTIONAs-Built Drawing / Document (Based on number of Drawings)

Sr.No.DateReport No.DescriptionUnitQuantityRemarks260.24/8/12Attachedd) Grasim CellulogicLS1.00

TOTALLS1.00Quantity Taken upto Previous Bill LS0.00Quantity taken in this Bill LS1.00Total Claimed Qty. upto This Bill LS1.00

For AIPL.For JP KennyFor GSPL

34 As built drawingADVANCE INFRASTRUCTURES PVT. LTD.

MEASUREMENT SHEET

PROJECT: VILAYAT GIDC SPURLINE PROJECTCLIENT: GUJARAT STATE PETRONET LTD.CONSULTANT: JP KennyTPIA: CEILEPC CONTRACTOR: ADVANCE INFRASTRUCTURES PVT. LTDRA BILL NO.: AIPL/GSPL/VGSL/RA/12

SOR ITEM NO.: 260.1DESCRIPTIONDetailed Engg Drawing/Document

Sr.No.DateReport No.DescriptionUnitQuantityRemarks260.114/05/2012Attachedd) Grasim CellulogicLS0.50

TOTALLS0.50Quantity Taken upto Previous Bill LS0.00Quantity taken in this Bill LS0.50Total Claimed Qty. upto This Bill LS0.50

For AIPL.For JP KennyFor GSPL