1 Project Managers Guide For Release 15 of AtTask 2 3 Copyright © 2010 AtTask, Inc. All rights reserved. No part of this publication may be reproduced, stored in any retrieval system, or transmitted, in any form, or by any means, whether electronic, mechanical, photocopying, sound recording, or otherwise, without the prior written consent of AtTask, Inc., except as permitted by law. Printed in the United States of America. First Edition, September 2010 (rev. 20101110) Introduction Stream is the latest innovation in web-based, collaborative Project Management tools. The primary purposes of Stream are to provide: 1. An easy-to-use interface for Team Members, Project Managers, and other stakeholders to communicate progress on work, 2. Substantive updates to work assignments, and 3. End-users with greater control over daily activities. One important part of this shift to Stream is providing Project Managers the ability to communicate with their Team Members in an interface designed especically to meet everyones needs. The Team Member Home was built to simplify an end-user’s interaction with Project Managers, Team Members, and the Project and Portfolio Management side of @task. Stream introduces new concepts Project Managers need to understand. These include the practice of receiving creating tasks through Work Requests and Team Requests, and Negotiating Commit Dates. The Project Managers Reference Manual is designed to provide specic instructions on how to accomplish these and other typical Project Manager activities using Stream. Table of Contents 1 Navigation 4 2 Assigning Tasks 7 3 Reviewing and Approving 9 Commit Dates 4 Stream Notes 10

Transcript of R15 Project Managers Guide

8/3/2019 R15 Project Managers Guide

http://slidepdf.com/reader/full/r15-project-managers-guide 1/6

Project Managers GuideFor Release 15 of AtTask

8/3/2019 R15 Project Managers Guide

http://slidepdf.com/reader/full/r15-project-managers-guide 2/6

2

Copyright © 2010 AtTask, Inc.

All rights reserved.

No part of this publication may be reproduced, stored in any retrieval system, or transmitted, in any form, or by any means, whether electronic,mechanical, photocopying, sound recording, or otherwise, without the prior written consent of AtTask, Inc., except as permitted by law.

Printed in the United States of America.

First Edition, September 2010 (rev. 20101110)

IntStreamcollab

The p

1.

2. 3.

One imProjecMembeveryo

The TinteracProjec

Streamunderstasks tNegot

The Pprovidother t

8/3/2019 R15 Project Managers Guide

http://slidepdf.com/reader/full/r15-project-managers-guide 3/6

4

This section of the manual provides a brief introduction toProject Manager activities for Stream. There are several waysto navigate to different areas of Stream. This chapter providesstep-by-step directions to access specic locations throughtraditional methods.

Unlike @task Education course material, it does not provide anexplanation of the @task features, nor does it present scenariosof how or why the feature might be utilized.

Here is a visual of the Stream Home page as it appears whenyou log into @task.

1. My Stream Tab

2. Working On Tab3. My Tasks Tab4. More Tab

1 NavigationMy St

The MIf you add th

Filteri

On thetool thProjec

By clicin the

anyon

Clickinto and

8/3/2019 R15 Project Managers Guide

http://slidepdf.com/reader/full/r15-project-managers-guide 4/6

6

Working On Tab

The Working On tab allows you to see all of the teams in your system. You can scroll through the list and see what each teammember is working on.

You can lter the users displayed in the Working On tab byclicking on any of the teams listed to the left. Only the usersassigned to that team will appear under the tab.

2

In Strespeci

If a Prup on then h

To Ass

1. 2.

3.

4.

8/3/2019 R15 Project Managers Guide

http://slidepdf.com/reader/full/r15-project-managers-guide 5/6

8

If a Project Manager assigns a team to a task, the task will showup on each team member’s Team Requests tab. The individualwill then have the ability to accept the team task.

To Assign a Task to a Team in the Gantt Chart

1. Add the Team column to the Gantt Chart by clickingon the Add or Remove icon and selecting Team.

2. Type the name of the team you wish to assign in theTeam column.

3. Click Save. The task will now show under the TeamRequests.

NOTE: You can also assign a team to a task or issue through theBulk Edit options.

3

Once team, negoti

In othebelievthe Pr

As a Pthere will apcan thchang

If a neyou reWhenportionand coorigina

8/3/2019 R15 Project Managers Guide

http://slidepdf.com/reader/full/r15-project-managers-guide 6/6

10

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

 ___________________________________

Stream Notes4

 ____

 ____

 ____

 ____

 ____

 ____

 ____

 ____

 ____

 ____

 ____

 ____

 ____

 ____

 ____

 ____

 ____

 ____

 ____