R103/2019 : Construction of Link Road between Dubai- Hatta Road and Sharjah -
Kalpa Road Passing through Wadi Al Qawr Area, Package -2Pre-Qualification for Water Works
Dear Sir,
With reference to your letter ref. no. 215/R103/2019/20A0006A, dated on 15 June 2020 regarding the above
mentioned subject, please note that your request to appoint M/s. ARAR INFRA Contracting Co. LLC is APPROVED
to carry out the works related to DEWA water pipe lines networks subject to compliance with the following
conditions: DEWA reserves the right to withdraw this approval if the subcontractor’s performance is not satisfactory.
The consultants and main contractor will not be relieved of their respective contractual obligations.
Strict Adherence to the standards Quality measures of works.
Satisfactory performance in terms of Quality on the site.
Pipe and other material required for the works shall be new and the contractor shall submit sample/catalogues for
the same, along with the shop drawing for our review and approval.
Work shall be carried out in compliance with our standards and specifications as well as RTA/DM regulation.
Material for existing Network shall be available prior to the commencement of work in case of any breakage or leak.
List of staff shall be provided prior to the commencement of the work for DEWA’s review and comment.
Moreover, instruct M/s. ARAR INFRA Contracting Co. LLC to submit shop drawings for our review and approval.
Yours faithfully,
Abdul Aziz Jassem A AlmarzouqiSr Mgr - Water Engg
P a g e 1 | 1
Date: 19-May-2020 Ref. : W&C-4729-2020
M/s Al GURG Consultant Dubai U.A.E
Tel: 04-3024999
Attention: Mr. Emad Bander – Resident Engineer
Construction Office Block Phase-01 on Plot No. 2420195 Al Qusais Ind. First, Dubai for
Emirates General Petroleum Corporation ( Emarat )Request for Prequalification Approval for 900mm dia Water Line
Dear Sir,
With reference to your letter ref. no. EB/SA/2643/DEWA-007, dated on 17 May 2020 regarding the above
mentioned subject, please note that your request to appoint M/s. ARAR INFRA CONTRACTING CO. L.L.C is
APPROVED to carry out the works related to DEWA water pipe lines networks subject to compliance with the
following conditions: DEWA reserves the right to withdraw this approval if the subcontractor’s performance is not satisfactory.
The consultants and main contractor will not be relieved of their respective contractual obligations.
Strict Adherence to the standards Quality measures of works.
Satisfactory performance in terms of Quality on the site.
Pipe and other material required for the works shall be new and the contractor shall submit sample/catalogues for
the same, along with the shop drawing for our review and approval.
Work shall be carried out in compliance with our standards and specifications as well as RTA/DM regulation.
Material for existing Network shall be available prior to the commencement of work in case of any breakage or leak.
List of staff shall be provided prior to the commencement of the work for DEWA’s review and comment.
Moreover, instruct M/s. ARAR INFRA CONTRACTING CO. L.L.C to submit shop drawings for our review and approval.
Yours faithfully,
Abdul Aziz Jassem A AlmarzouqiSr Mgr - Water Engg
P a g e 1 | 1
Date: 27-Apr-2020 Ref. : W&C-4201-2020
To: M/s. VX Studio Consultancy.
Dubai, U.A.E.
Tel. 043708909
Attention: Mr. Santhosh Subramanl , Projects Director
MAG-EYE MEYDAN – Roads and infrastructure works on PLOT no. 6310140,MBR City District-7
Request of Pre-qualification Approval
Dear Sir,
With reference to your letter no. MCM-PH1-INF/VX-SS/DEWA/GC-003 dated 21 April 2020 regarding the above-
mentioned subject, please note that your request to appoint M/s. Arar Infra Contracting Co. LLC. is approved to carry
out the works related to DEWA water pipe lines networks up to 300 mm dia as per your request subject to compliance
with the following conditions:
DEWA reserves the right to withdraw this approval if the subcontractor’s performance is not satisfactory.
The consultants and main contractor will not be relieved of their respective contractual obligations.
Strict Adherence to the standards Quality measures of works.
Satisfactory performance in terms of Quality on the site.
Pipe and other material required for the works shall be new and the contractor shall submit sample/catalogues
for the same, along with the shop drawing for our review and approval.
Work shall be carried out in compliance with our standards and specifications as well as RTA/DM regulation.
Material for existing Network shall be available prior to the commencement of work in case of any breakage
or leak.
List of staff shall be provided prior to the commencement of the work for DEWA’s review and comment.
Moreover, instruct M/s. Arar Infra Contracting Co. LLC. to submit shop drawings for our review and approval.
Yours faithfully,
Abdul Aziz Jassem A AlmarzouqiSr Mgr - Water Engg
P a g e 1 | 1
Date: 16-Apr-2020 Ref. : W&C-3873-2020
M/s Al GURG Consultant Dubai U.A.E
Tel: 04-3024999
Attention: Mr. Emad Bander – Resident Engineer
Construction of Office Block Phase -01 on Plot No. 2420195 Al Qusais Ind. First, Dubai Emirates
General Petroleum Corporation (Emarat)Request of Pre-qualification Approval
Dear Sir,
With reference to your letter ref. no. EB/SA/2643/DEWA-005, dated on 06 April 2020 regarding the above-mentioned
subject, please note that your request to appoint M/s ARAR Infra Contracting CO. L.L.C is APPROVED to carry out the
works related to DEWA water pipe lines networks up to 300dia subject to compliance with the following conditions:
DEWA reserves the right to withdraw this approval if the subcontractor’s performance is not satisfactory.
The consultants and main contractor will not be relieved of their respective contractual obligations.
Strict Adherence to the standards Quality measures of works.
Satisfactory performance in terms of Quality on the site.
Pipe and other material required for the works shall be new and the contractor shall submit sample/catalogues
for the same, along with the shop drawing for our review and approval.
Work shall be carried out in compliance with our standards and specifications as well as RTA/DM regulation.
Material for existing Network shall be available prior to the commencement of work in case of any breakage or
leak.
List of staff shall be provided prior to the commencement of the work for DEWA’s review and comment.
Moreover, instruct M/s ARAR Infra Contracting CO. L.L.C to submit shop drawings for our review and approval.
Yours faithfully,
Abdul Aziz Jassem A AlmarzouqiSr Mgr - Water Engg