Rouse Hill Development Area

R. Staib, RHIC Dec 06 3

Development Stages – Rouse Hill: Zoned & Serviced with Trunk Water Infrastructure

Stage Gross Area (ha)

Residential Lots Dates

1 1600 15,000 1992 – 1994

2 1060 10,000 1998 – 2002

3 1100 10,000 2003 – 2006

Total to Date 3760 35,000

R. Staib, RHIC Dec 06 4STAIB CONSULTING P.L., 2003

Rouse Hill: Trunk Water Strategy

R. Staib, RHIC Dec 06 5

Rouse Hill: Environmental Aspects & Issues

Environmental Aspect

Environmental Issues

A. Water quality

1. Urban storm water run off pollution.

2. Sewage effluent pollution.

B. Water quantity

3. Flooding from urbanisation

4. Increased potable water use.

C. Land use 5. Clearance of remnant native flora.

6. Damage to indigenous heritage sites.

R. Staib, RHIC Dec 06 6

<<< View looking upstream

1. Water Quality: In-stream wet basin to control water quality

<<< View looking upstream

R. Staib, RHIC Dec 06 7

3. Water Quantity: Stormwater Basin showing creek continuity

R. Staib, RHIC Dec 06 8

2. Water Quality: Sewage Treatment Plant, head end of plant

R. Staib, RHIC Dec 06 9

4. Water Quantity: Recycled Water Reservoir

R. Staib, RHIC Dec 06 10

5. Land Use: Construction of Sewer

Carrier through an Environmentally Sensitive Area

R. Staib, RHIC Dec 06 11

6. Land Use: Restoration in Trunk Drainage Land

R. Staib, RHIC Dec 06 12

Future Plans: Sydney Metropolitan Strategy 2005

R. Staib, RHIC Dec 06 13

Future Plans: 2006 Metropolitan Water Plan for Sydney