    Quantity Surveyor

    A quantity surveyor(QS) is a professional

    working within the construction industry

    concerned with Project costs.

    The profession is one that provides a

    qualification gained following formal education,

    specific training and experience that provides a

    general set of skills that are then applied to adiverse variety of problems.1Predominantly

    these relate to costs and contracts on

    construction projects.

    http://en.wikipedia.org/wiki/Construction_industryhttp://en.wikipedia.org/wiki/Construction_industry
  • 8/11/2019 R-quantity Surveyors as Profit Center

    3/29

    Quantity Surveyor

    Job description

    A quantity surveyor manages all costs relating

    to building and civil engineering projects, from

    the initial calculations to the final figures

    Surveyors seek to minimize the costs of a

    project and enhance value for money, while still

    achieving the required standards and quality

    Many of these are specified by statutory

    building regulations, which the surveyor needs

    to understand and adhere to.

  • 8/11/2019 R-quantity Surveyors as Profit Center

    4/29

    QS Typical Work Activities

    Preparing tender and contract documents, BOQ

    Costs analysis, Control Assist in establishing a clients requirements

    and undertaking feasibility studies

    Prepare Analyze costing for tenders

    Allocating work to subcontractors

    Advice on contractual claims

    Progress reports, value completed work

    Aware of the different contracts in use Understand Health & Safety Regulations

    Risk and Value Management

    Advise on procurement strategy;

  • 8/11/2019 R-quantity Surveyors as Profit Center

    5/29

    QS Typical Work Activities A surveyor calculates all related costs so that

    companies will be well informed about howmuch each portion of their building will cost andthe areas where they can minimize their costs

    Quantity surveyors goal is to enhance the value

    of a building in relation to the amount of moneyspent building it

    The surveyor looks at the construction process& determine Standards and Regulations to

    meet minimum statutory building regulations Will also determine areas most important to

    maintaining the quality of the new building.

  • 8/11/2019 R-quantity Surveyors as Profit Center

    6/29

    QS Work Activities- Options

    A quantity surveyor can find business from either acontractor or the client, and they also have the optionof choosing to work on-site or away in an office.

    Once chosen, he is involved in the entire buildingprocess from start to finish. At the beginning, he willevaluate the property and prepare estimates on thetotal costs involved in the project

    He will continue to prepare contractual documents,bills, and other tender documents. He will perform costanalysis, perform a risk and value managementassessment of the property, as well as provide insighton cost control and procurement strategies

  • 8/11/2019 R-quantity Surveyors as Profit Center

    7/29

    Entry Requirements for a

    Quantity Surveyor

    A first degree will give the best opportunities asa quantity surveyor

    Accredited institutions like the Royal Institutionof Chartered Surveyors (RICS) or the similarlywell-known Chartered Institute of Building(CIOB) offer many degree programs

    With such a degree, One will probably be ableto secure a better position and earn moremoney, but may not necessarily need a degreein quantity surveying in order to be successful

    in this career.

  • 8/11/2019 R-quantity Surveyors as Profit Center

    8/29

    Case: Quantity Surveyor of A

    Construction Co

    Mr X, a Matriculate, Started as Administrative

    Assistant in the QS Dept

    Diligent Observation, Studies Enabled Rise To

    The Position OF HOD

    On Retirement, The Position Was Difficult to Fill

    He Studied General Conditions of Contract ofEach Tender, Made Copious Notes of

    Strengths and Weaknesses in the Documents

    Which Enabled Successful Claims Later On!

  • 8/11/2019 R-quantity Surveyors as Profit Center

    9/29

    Case: QS Director In UK Const Co

    Personal Experience

    As Head of Foreign Operations, Visited ALeading Construction Co in UK

    The Managing Director Introduced Fellow

    Board Members; One Was Director, QS! The MD Clarified That During Lean Periods, It

    is The QS Director Who Helped Generated

    Profits Thro Identifying Claims At The TenderStage

  • 8/11/2019 R-quantity Surveyors as Profit Center

    10/29

    Qualifications

    You may also be able to enter without any

    degree at all. You will need to be prepared towork your way through the industry

    Some businesses may actually fund degreecourses related to quantity surveying so thatyou can get the education necessary to makethe most out of this career.

    if you do have a degree unrelated to quantitysurveying you complete further study and theRICS. The RICS is a qualification programdesigned to give career seekers another routeto becoming a quantity surveyor.

  • 8/11/2019 R-quantity Surveyors as Profit Center

    11/29

    Skills Required Methodical and analytical thinking as will as practical

    and logical reasoning skills Problem solving skills with a creative approach

    Skill related to mathematics and financialmanagement

    Concise writing skills to produce reports on complexinformation * Thorough knowledge and understandingof building and construction codes, regulations, etc

    have enough hands on, work experience

    Formal education is important, but being able todemonstrate that you have a relevant understandingof building and construction can go a long way

  • 8/11/2019 R-quantity Surveyors as Profit Center

    12/29

    Continuing Professional

    Development (CPD)

    Continuing professional development is almost the

    norm in today's business world.

    The RICS offers a lifelong learning programme that

    will allow you to record and mark any professionaldevelopments that you have made over the years.

    Programs designed to promote learning in an open

    atmosphere, as well as provide a space for private

    study

    RICS has also established conferences and events

    that quantity surveyors can attend to learn more

  • 8/11/2019 R-quantity Surveyors as Profit Center

    13/29

    Quantity Surveyor Functions

    The QS reports to Project Manager Provides advice in the decision-making throughout themanagement of a project from initial inception to finalcompletion

    The QS handles estimating and cost control, thetendering process and, after contract award, thecommercial interface

    QS carries out estimating and measurement of worksprior to tender, producing the bill of quantities; produce

    tender documentation and manage the tenderprocess; clarify and evaluate tenders; and manage theresultant contract through monthly valuations,variations control, contract administration andassessment of claims.

    .

  • 8/11/2019 R-quantity Surveyors as Profit Center

    14/29

    Quantity Surveyor Functions

    Some are trained in techniques of cost control. Those

    who emphasize the cost discipline Are Often Called

    "Construction Cost Consultant". They ensure that

    projects are designed and constructed in such as toGet value for money, cost certainty , programme dates

    Others emphasize contracts management. Trained to

    draft, interpret and administer complex contracts,

    those who operate in the broader field of projectmanagement often adopt other titles such as

    "Contracts Manager" or "Construction Surveyor".

  • 8/11/2019 R-quantity Surveyors as Profit Center

    15/29

    Contractor's QS

    Responsible for performance of operations thatmirror those of the owner's QS- themeasurement and pricing of construction work,

    but specifically that actually performed by thecontractor as opposed to the construction workdescribed and measured in the constructioncontract between the owner and the contractor.

    Such a difference in quantity of work may arisefrom changes required by an owner, or by anarchitect or engineer on an owner's behalf.

    Typically, the settlement of a change

  • 8/11/2019 R-quantity Surveyors as Profit Center

    16/29

    Contractor's QS

    The role of a contractor's QS will extend further

    than the day to day running of building projects

    Will cover sub-contract formation, forecasting of

    costs and values of the project, cash flow

    forecasts and the collation of the operation and

    maintenance manuals of the project

    This increase in the capacity of the surveying

    profession has led to an increased demand for

    qualified personnel

  • 8/11/2019 R-quantity Surveyors as Profit Center

    17/29

    About RICS

    : RICS (Royal Institution of CharteredSurveyors) coversall aspects of property,construction and associated environmentalissues. RICS has 86,000 chartered members(FRICS and MRICS) and 55,000 members inother categories of membership globally.

    It represents, regulates and promotes the work

    of these property professionals throughout 146countries. RICS is governed by a Royal Charterapproved by Parliament which requires it to actin the public interest. It is also a professional

    regulatory body approved by Government

  • 8/11/2019 R-quantity Surveyors as Profit Center

    18/29

    Planning

    During the planning procedures the QS plays a

    key role in assessing whether the project isfeasible economically

    The Quantity Surveyor may act in consultingrole to engineers and architects, advising them

    on cost effective methodologies and procedures Professionally trained in building code and by-

    laws, He ensures the project adheres to localand national regulations

    Feasibility, both engineering and economical ,is a key factor in the planning procedure

  • 8/11/2019 R-quantity Surveyors as Profit Center

    19/29

    Construction While the project is underway , the Quantity

    Surveyor Ensures the process runs smoothlyand within budget limits

    Conflict can arise and the Quantity SurveyorSteps in to act as a liaison between conflicted

    members of the construction process Interpersonal relationships Among the

    construction team keep the project moving

    Attention to monitoring the costs andeconomics involved during the construction.Keeping the project running without conflict

    C

  • 8/11/2019 R-quantity Surveyors as Profit Center

    20/29

    Post-Construction

    After the project is completed, responsibilities

    and function shift. This objective now is tomonitor the building and make sure thatoperational costs are kept inside the budget.

    the responsibilities are to make sure the project

    adheres to local and national tax laws. Insurance claims and cost of replacement are

    dealt with by the Quantity Surveyor. Accurateestimates of damages and costs of destroyed

    or damaged goods are also provided.

  • 8/11/2019 R-quantity Surveyors as Profit Center

    21/29

    Responsibilities During Tendering

    To establish the cost of installation, materials

    and workmanships and to come out with a wellplanned quotation which is beneficial to boththe company and the main contractors for each

    individual project that the company is handling To prepare contracts for projects by stating

    clearly the terms and conditions, studying andunderstand the contracts

    When projects are completed, proceed withclaiming of payments from the relevant partiesand complete the collection of payments as

    soon as possible.

    B i R l A d R ibiliti

  • 8/11/2019 R-quantity Surveyors as Profit Center

    22/29

    Basic Roles And Responsibilities

    Prepare , submit and collect claims for payment

    Prepare, submit quotations. Diligently to following up Do awarding of contracts and preparation of contracts

    related documents

    Sourcing and purchasing of materials and related

    products needed for production Perform liaison with engineer and sales department

    Perform liaison with main contractors, sub contractorsand other parties involved the projects

    Studies other project cases to solve any problems

    Report Progress Daily to boss without being asked

  • 8/11/2019 R-quantity Surveyors as Profit Center

    23/29

    Monitor Construction Cost

    As advisers, they estimate and monitor

    construction costs, from the feasibility stage of

    a project through to the completion of the

    construction period

    After construction they may be involved with tax

    depreciation schedules, replacement cost

    estimation for insurance purposes and, ifnecessary, mediation and arbitration.

  • 8/11/2019 R-quantity Surveyors as Profit Center

    24/29

    Liaison Work

    Quantity Surveyors work closely with architects,financiers, engineers, contractors, suppliers,project owners, accountants, insurance

    underwriters, solicitors and Courts Quantity surveyors get their name from the Bill

    of Quantities,. This is measured from designdrawings, to be used by the contractors fortendering and for progress payments, forvariations and changes and ultimately forstatistics, taxation and valuation.

  • 8/11/2019 R-quantity Surveyors as Profit Center

    25/29

    Advise on Economics

    Initially quantity surveyors use their knowledge ofconstruction methods and costs to advise on the mosteconomical way

    They use Cost Planning, Estimating, Cost Analysis,

    Cost-in-use Studies and Value Engg to establish aproject budget

    During design the QS ensures that the design remainson budget through Cost Management

    Essential additions offset by identified other savings On completion of design and drawings, the quantity

    surveyor may prepare a Bill of Quantities, which isissued with the specification, for use by contractors in

    submitting tenders.

  • 8/11/2019 R-quantity Surveyors as Profit Center

    26/29

    Tenders

    The contractor's quantity surveyors preparetenders, and price alternatives

    Involved in assessing tenders, advise on the

    type of contract or special clauses in it During construction they fairly value progresspayments at regular intervals, value changes todesign or quantities which may arise by

    reference to appropriate Bill of Quantities rates They prepareclaims for progress payments and

    additional work.

  • 8/11/2019 R-quantity Surveyors as Profit Center

    27/29

    Role On Project Completion

    On completion the quantity surveyor producesdepreciation schedules of project componentsadvises on insurance replacement costs

    In case of disputes the quantity surveyor iscalled on as an expert witness, and somequantity surveyors act as arbitrators. Both thecontractor's and owner's quantity surveyors will

    be involved in this They use their skills in refurbishment of old

    buildings, alterations to existing buildings andinsurance replacement estimates

  • 8/11/2019 R-quantity Surveyors as Profit Center

    28/29

    Analytical Mind

    Quantity surveyors have orderly and analytical

    minds and prepared to work to very rigid time

    schedules. As decisions involving large sums of

    money are often made using information

    produced by them they must be accurate in allaspects of their work

    Quantity surveyors work in the private sector

    with Contractors, in the public sector mainlywith the Government Departments/Authorities,

    financiers, property developers, project

    managers and universities

  • 8/11/2019 R-quantity Surveyors as Profit Center

    29/29

    Comments, queries, suggestions?

    [email protected]

    mailto:[email protected]:[email protected]