(Results-Framework Document)for
R F D
Department of PWD (R & B)
(2012-2013)
08/02/2013 4.52 PMGenerated on
Section 1:Vision, Mission, Objectives and Functions
Results-Framework Document (RFD) for Department of PWD (R & B)-(2012-2013)
To develop quality and safe all weather road network including Bridges & Tunnels leading to sustainable and inclusivesocio-economic growth.To construct eco-friendly cost effective Government buildings
Mission
Formulation of perspective plan for road infrastructure development in the State. Plan, design, construct & maintain a
safe and cost effective road network. Construction & maintenance of bridges,Tunnels / Government buildings. Providing
road connectivity to inaccessible and tough terrain areas for equitable development. Evolve a policy mechanism for
development of Highways with toll collections to increase State resources. Quest for excellence through Research and
development; innovative approach to improve and provide quality safe roads / bridges / buildings & green buildings at a
reasonable competitive cost. Designing of buildings as per local architecture
Objective
1 Improvement/up-gradation of existing roads.
2 To construct new roads for providing all weather roads to all unconnected areas (PMGSY)
3 To construct / upgradation of roads for providing all weather connectivity through flagship Scheme (CRF).
4 To develop and upgrade roads for providing all weather connectivity (NABARD)
5 To envisage efficient and safe transportation through a good road network and removal of black spots
6 To take measures for construction of eco friendly Govt offices / residential buildings (NFB).
7 Construction and maintenance of bridges.
8 Completion and maintenance of Mughal Road.
9 Construction and maintenance of Tunnels.
10 To provide support for construction / maintenance of roads, buildings and other departmental operations through Mechanical means
11 Use of advanced technology in construction and maintenance of roads, bridges, buildings and tunnels
12 Preparation of Annual Plan and Strategic Plan
13 Improvement of contracting system
Functions
Vision
08/02/2013 4.52 PMGenerated on
Page : 2 of 35
Section 1:Vision, Mission, Objectives and Functions
Results-Framework Document (RFD) for Department of PWD (R & B)-(2012-2013)
Construction and maintenance of roads, bridges and buildings.1
Act as executing agency for other departments.2
Providing technical support and consultancy to other departments3
To ensure monitoring quality of works executed.4
Implementation of Ribbon Development Act.5
Providing of mechanical equipments/vehicles for facilitating construction of roads, bridges, buildings and tunnels.6
Preparation of Schedule of rates on regular intervals.7
Preparation/ Notification of yearly price index based on Market intelligence.8
E-procurement.9
Purchase and supply of key construction material10
To develop web based Road Infrastructure System (RIS) including e-governance and e-procurement.11
08/02/2013 4.52 PMGenerated on
Page : 3 of 35
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Improvement/up-gradation of existing roads. 17.00 Getting clearance of DPRs Submission to Plg.Deptt.
No. 291 226 1942583236.00[1] [1.1] [1.1.1]
Implementation of StatePlan projectized works
Upgradation ofroads
Km 995.54 774.20 663.60884.801106.158.00[1.2] [1.2.1]
Monitoring Inspections No. 36 28 2432403.00[1.3] [1.3.1]
To construct new roads for providing allweather roads to all unconnected areas(PMGSY)
18.00 Getting clearance of DPRs Submission to Govt.of India
No. 180 140 1201602004.00[2] [2.1] [2.1.1]
Construction of new roads Length Km 1080 840 72096012005.00[2.2] [2.2.1]
Connectivity No. of habitations No. 225 175 1502002503.00[2.3] [2.3.1]
Monitoring No. of inspections No. 405 315 2703604502.00[2.4] [2.4.1]
Training Skill upgradation ofcontractors andemployees
No. 90 70 60801001.00[2.5] [2.5.1]
Award of works Length of awardedworks
Km 540 420 3604806003.00[2.6] [2.6.1]
To construct / upgradation of roads forproviding all weather connectivity throughflagship Scheme (CRF).
11.00 Getting clearance ofDPRs(CRF)
submission to Govt.of India
No. 12 10 911131.00[3] [3.1] [3.1.1]
Approval of DPRs(CRF) Approval by MORTH No. 0 0 0001.00[3.2] [3.2.1]
Construction/up-gradationof roads(CRF)
Upgradation ofroads
Km 34.42 26.77 22.9430.5938.243.00[3.3] [3.3.1]
Construction ofroads
Km 12.38 9.63 8.2611.0013.761.00[3.3.2]
08/02/2013 4.52 PMGenerated on
Page : 4 of 35
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Expenditure(CRF) Submission of UCs % 90 70 60801002.00[3.4] [3.4.1]
Monitoring(CRF) No. of inspections No. 10 8 79113.00[3.5] [3.5.1]
To develop and upgrade roads for providingall weather connectivity (NABARD)
15.00 Preparation of estimates Submission toNABARD
No. 86 67 5877965.00[4] [4.1] [4.1.1]
Approval of DPRs Approval byNABARD
No. 81 63 5472903.00[4.2] [4.2.1]
Construction / upgradationof roads
Upgradation Km 81.26 63.20 54.1772.2390.294.00[4.3] [4.3.1]
Construction Km 248.55 193.32 165.70220.94276.171.00[4.3.2]
Expenditure Submission of UCs % 90 70 60801002.00[4.4] [4.4.1]
To envisage efficient and safe transportationthrough a good road network and removal ofblack spots
12.00 Annual Maintenance ofroads
Roads Km 766.21 595.94 510.81681.08851.354.00[5] [5.1] [5.1.1]
Culverts No. 89 69 5979992.00[5.1.2]
Drains RM 4377 3404 2918389048631.00[5.1.3]
Bridges No. 18 14 1216202.00[5.1.4]
Shoulders to bemaintained (length)
Km 46 36 3141521.00[5.1.5]
Re-carpeting Length to be re-surfaced
Km 142.20 110.60 94.80126.401581.00[5.2] [5.2.1]
08/02/2013 4.52 PMGenerated on
Page : 5 of 35
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Removal of Black spots Improvment Km 7.20 5.60 4.806.4081.00[5.3] [5.3.1]
To take measures for construction of ecofriendly Govt offices / residential buildings(NFB).
3.00 Construction of Greenbuildings and retrofitting ofexisting buildings.
Completion of Ecofriendly buildings
No. 1 1 0113.00[6] [6.1] [6.1.1]
Construction of buildings Retro fitting ofbuildings
No. 0 0 0000.00[6.2] [6.2.1]
Evolving a scheme forecofriendly buildings inconsultation with BEE /Green Building Council
To take up with theBEE / GreenBuilding council
No. 0 0 0000.00[6.3] [6.3.1]
Construction and maintenance of bridges. 10.00 Preparation of DPRs fornew bridges
Getting clearancefrom State Plg.Deptt.
No. 28 23 2026333.00[7] [7.1] [7.1.1]
Construction Ongoing No. 28 23 2026337.00[7.2] [7.2.1]
Completion and maintenance of MughalRoad.
4.00 Completion Connectivity Km(cm) 74.70 58.10 58.1066.40834.00[8] [8.1] [8.1.1]
Maintenance Roads Km 0 0 0000.00[8.2] [8.2.1]
Construction and maintenance of Tunnels. 0.00 Getting clearance of DPRs Submission to Govtof India
No. 0 0 0000.00[9] [9.1] [9.1.1]
Construction New Km 0 0 --000.00[9.2] [9.2.1]
To provide support for construction /maintenance of roads, buildings and otherdepartmental operations through Mechanicalmeans
3.00 Deployment of machinery Revenue realization Rs in cr 9.00 7.00 6.008.0010.001.00[10] [10.1] [10.1.1]
08/02/2013 4.52 PMGenerated on
Page : 6 of 35
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Efficient functioning of RFD system 6.00 Timely submission of Draft forApproval
On-time submission Date 27/12/2012 29/12/2012 30/12/201228/12/201226/12/20122.0*
Implementation of Sevottam Create a compliant systemto implement, monitor andreview Citizen’s / Client’s
Date 25/03/2013 27/12/2013 28/03/201326/12/201324/03/20132.0
* Mandatory Objective(s)
Snow / slide clearance Coverage of roadlength in 24 hours
Km 4050 3150 2700360045001.00[10.2] [10.2.1]
Maintenance of HospitalHeating System
Coverage ofhospitals
No. 18 14 1216201.00[10.3] [10.3.1]
Use of advanced technology in constructionand maintenance of roads, bridges,buildings and tunnels
0.00 Providing of equipments Boring of tunnels byusing modern boringequipments
No. 0 0 --000.00[11] [11.1] [11.1.1]
Upgradation of roads byrecycling
Paving andmaintenance ofroads throughsensor pavers andmilling machines forrecycling throughRAP
Km 0 0 --000.00[11.2] [11.2.1]
Mobile bridges Maintenance andrehabilitation ofbridges by usingMobile bridges
No. 0 0 --000.00[11.3] [11.3.1]
Preparation of Annual Plan and StrategicPlan
1.00 Preparation of Annual Plandocument
Submission toAnnual Plan
No. 1 0 0011.00[12] [12.1] [12.1.1]
Preparation of StrategicPlan
Submission ofStrategic Plan
No. 0 0 --000.00[12.2] [12.2.1]
08/02/2013 4.52 PMGenerated on
Page : 7 of 35
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Charter
Create a Compliant systemto redress and monitorpublic Grievances
Date 25/03/2013 27/03/2013 28/03/201326/03/201324/03/20132.0
* Mandatory Objective(s)
08/02/2013 4.52 PMGenerated on
Page : 8 of 35
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Target Value ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 10/11
Unit
FY 12/13FY 11/12 FY 13/14
Actual Value Actual Value
FY 14/15
360 323No.Submission to Plg.Deptt.
Improvement/up-gradation of existingroads.
Getting clearance ofDPRs
400 400357[1] [1.1] [1.1.1]
1515 1106.15KmUpgradation of roadsImplementation of StatePlan projectized works
1120 11201601[1.2] [1.2.1]
10 40No.InspectionsMonitoring 40 4015[1.3] [1.3.1]
284 200No.Submission to Govt. ofIndia
To construct new roads for providingall weather roads to all unconnectedareas (PMGSY)
Getting clearance ofDPRs
180 200250[2] [2.1] [2.1.1]
466.67 1200KmLengthConstruction of newroads
1300 14001026.65[2.2] [2.2.1]
151 250No.No. of habitationsConnectivity 260 270238[2.3] [2.3.1]
166 450No.No. of inspectionsMonitoring 450 450669[2.4] [2.4.1]
112 100No.Skill upgradation ofcontractors andemployees
Training 110 11547[2.5] [2.5.1]
625 600KmLength of awardedworks
Award of works 625 650580[2.6] [2.6.1]
68 13No.submission to Govt. ofIndia
To construct / upgradation of roadsfor providing all weather connectivitythrough flagship Scheme (CRF).
Getting clearance ofDPRs(CRF)
16 1630[3] [3.1] [3.1.1]
12 0No.Approval by MORTHApproval of DPRs(CRF) 12 120[3.2] [3.2.1]
72.39 38.24KmUpgradation of roadsConstruction/up-gradation of roads(CRF)
44.55 4559.20[3.3] [3.3.1]
08/02/2013 4.52 PMGenerated on
Page : 9 of 35
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Target Value ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 10/11
Unit
FY 12/13FY 11/12 FY 13/14
Actual Value Actual Value
FY 14/15
0 13.76KmConstruction of roads 15 160[3.3.2]
100 100%Submission of UCsExpenditure(CRF) 100 100100[3.4] [3.4.1]
8 11No.No. of inspectionsMonitoring(CRF) 15 169[3.5] [3.5.1]
224 96No.Submission toNABARD
To develop and upgrade roads forproviding all weather connectivity(NABARD)
Preparation of estimates 100 100137[4] [4.1] [4.1.1]
271 90No.Approval by NABARDApproval of DPRs 100 1000[4.2] [4.2.1]
115 90.29KmUpgradationConstruction /upgradation of roads
145 145135[4.3] [4.3.1]
220 276.17KmConstruction 225 225230[4.3.2]
100 100%Submission of UCsExpenditure 100 100100[4.4] [4.4.1]
437.71 851.35KmRoadsTo envisage efficient and safetransportation through a good roadnetwork and removal of black spots
Annual Maintenance ofroads
704 906455.15[5] [5.1] [5.1.1]
32 99No.Culverts 24 2622[5.1.2]
10468 4863RMDrains 4750 50004171[5.1.3]
0 20No.Bridges 20 250[5.1.4]
0 52KmShoulders to bemaintained (length)
102 2020[5.1.5]
08/02/2013 4.52 PMGenerated on
Page : 10 of 35
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Target Value ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 10/11
Unit
FY 12/13FY 11/12 FY 13/14
Actual Value Actual Value
FY 14/15
0 158KmLength to be re-surfaced
Re-carpeting 214 23489.61[5.2] [5.2.1]
0 8KmImprovmentRemoval of Black spots 27 270[5.3] [5.3.1]
0 1No.Completion of Ecofriendly buildings
To take measures for construction ofeco friendly Govt offices / residentialbuildings (NFB).
Construction of Greenbuildings and retrofittingof existing buildings.
2 20[6] [6.1] [6.1.1]
0 0No.Retro fitting ofbuildings
Construction of buildings 3 30[6.2] [6.2.1]
-- 0No.To take up with theBEE / Green Buildingcouncil
Evolving a scheme forecofriendly buildings inconsultation with BEE /Green Building Council
-- -- --[6.3] [6.3.1]
117 33No.Getting clearance fromState Plg. Deptt.
Construction and maintenance ofbridges.
Preparation of DPRs fornew bridges
36 36120[7] [7.1] [7.1.1]
86 33No.OngoingConstruction 36 3646[7.2] [7.2.1]
40 83Km(cm)ConnectivityCompletion and maintenance ofMughal Road.
Completion 84.10 84.1080[8] [8.1] [8.1.1]
0 0KmRoadsMaintenance 16 200[8.2] [8.2.1]
0 0No.Submission to Govt ofIndia
Construction and maintenance ofTunnels.
Getting clearance ofDPRs
5 50[9] [9.1] [9.1.1]
0 0KmNewConstruction 5 50[9.2] [9.2.1]
8 10Rs in crRevenue realizationTo provide support for construction /maintenance of roads, buildings andother
Deployment of machinery 10 119[10] [10.1] [10.1.1]
08/02/2013 4.52 PMGenerated on
Page : 11 of 35
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Target Value ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 10/11
Unit
FY 12/13FY 11/12 FY 13/14
Actual Value Actual Value
FY 14/15
-- 31/01/2013DateOn-time submissionEfficient functioning of RFD system Timely submission of Draft forApproval
30/05/2013 30/05/2014 --*
* Mandatory Objective(s)
departmental operations throughMechanical means
4000 4500KmCoverage of roadlength in 24 hours
Snow / slide clearance 4500 47004200[10.2] [10.2.1]
20 20No.Coverage of hospitalsMaintenance of HospitalHeating System
22 2520[10.3] [10.3.1]
0 0No.Boring of tunnels byusing modern boringequipments
Use of advanced technology inconstruction and maintenance ofroads, bridges, buildings and tunnels
Providing of equipments 1 20[11] [11.1] [11.1.1]
0 0KmPaving andmaintenance of roadsthrough sensor paversand milling machinesfor recycling throughRAP
Upgradation of roads byrecycling
100 1500[11.2] [11.2.1]
0 0No.Maintenance andrehabilitation of bridgesby using Mobilebridges
Mobile bridges 1 20[11.3] [11.3.1]
1 1No.Submission to AnnualPlan
Preparation of Annual Plan andStrategic Plan
Preparation of AnnualPlan document
1 11[12] [12.1] [12.1.1]
0 0No.Submission ofStrategic Plan
Preparation of StrategicPlan
1 10[12.2] [12.2.1]
08/02/2013 4.52 PMGenerated on
Page : 12 of 35
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Target Value ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 10/11
Unit
FY 12/13FY 11/12 FY 13/14
Actual Value Actual Value
FY 14/15
-- 25/02/2013DateCreate a compliant system toimplement, monitor andreview Citizen’s / Client’sCharter
Implementation of Sevottam 30/05/2013 30/05/2014 --
-- 25/03/2013DateCreate a Compliant system toredress and monitor publicGrievances
20/06/2013 20/06/2014 --
* Mandatory Objective(s)
08/02/2013 4.52 PMGenerated on
Page : 13 of 35
Section 4:Acronym
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
AcronymSI.No Description
Percentage1 %
Central Road Fund2 CRF
Detailed Project Reports3 DPRs
Jammu and Kashmir4 J & K
Kilometer5 Km
Ministry of Road Tranport and Highways6 MORTH
Page : 14 of 35
Section 4:Acronym
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
AcronymSI.No Description
National Bank for Agriculture and Rural Development7 NABARD
Non Functional Building8 NFB
Number9 No.
Planning Department10 Plg. Deptt
Pradhan Mantri Gram Sadak Yojna11 PMGSY
Recycling Asphaltic Product12 RAP
Page : 15 of 35
Section 4:Acronym
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
AcronymSI.No Description
Road Infrastructure System13 RIS
Running Meter14 RM
State Road Development Corporation15 SRDC
Utilization Certificates16 UCs
Page : 16 of 35
Section 4:Description and Definition of Success Indicators and Proposed Measurement
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Success indicator Description Definition MeasurementSI.No General Comments
Lessons will be learnt on the basisof inspections conducted by the
NQMs / SQMs for further actions.
This indicator will reflect thesuccess story of
improvement / upgradation ofthe road.
The inspection will reveal whether thepublic has felt satisfaction over thisimprovement / upgradation and theNational / State Quality Monitors willcheck this aspect including its quality
parameters
1 Number of inspection[1.3.1] Inspections
This indicator will measureposing of DPR to GOI
PMGSY roads normally connect theunconnected habitations. The
scheme will provide details of DPRssubmitted and cleared by the Ministry.
2 Number of DPRs[2.1.1] Submission to Govt. of India
PMGSY scheme is a NationalFlagship scheme with the
mandate to share the resourceswith the weaker sections of the
society for equity purposes.
This indicator will measurelength of new road
constructed
The scheme connects the far flungand remote areas thereby benefitting
the uncovered population.
3 Length in kms[2.2.1] Length
Connectivity of habitations isjustified to reach the poor of the
poorest which otherwise getsneglected in the real
developmental process
This indicator will measurenumber of habitations
connected
Various habitations are unconnectedand PMGSY programme is expectedto yield results on this account by way
of connectivity.
4 Habitations in numbers[2.3.1] No. of habitations
Inspection of State QualityMonitors will measure
number of inspections carriedout
Insection are necessary to check thequality of work and leval of
achievement of targets.
5 Inspection in numbers[2.4.1] No. of inspections
08/02/2013 4.52 PMGenerated on
Page : 17 of 35
Section 4:Description and Definition of Success Indicators and Proposed Measurement
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Success indicator Description Definition MeasurementSI.No General Comments
Approval of CRF projects by theMinistry is mandatory otherwisescheme cannot be implemented.
This indicator will measuresanction of DPR by MoRTH
Approval of the Ministry forconsidering its release of CentralAssistance and monitoring at the
central level is necessary
6 DPRs in numbers[3.2.1] Approval by MORTH
This indicator will reflect thenumber of inspections carried
out
For monitoring purposes to check thequality and impact of the work,
inspections are necessary at variouslevels.
7 Inspection in numbers[3.5.1] No. of inspections
This indicator will reflect thelength of road maintained by
way of recapeting etc.
Under PMGSY one of the significantlyhigh importance item is maintenanceof roads upto 5 years. Therefore thisindicator will measure length of roadon which pot holes be filled. Forestclearance, Maintenance of widenedPMGSY roads and re-carpeting willmeasure length of road resurfaced
8 Length in Kms[5.1.1] Roads
For the development of humanresource, training of officials hasbeen felt necessary so that the
delivery system improves
To indicate No. ofpersons/staff trained
For capacity building of stake holdersand the staff, training is quite
necessary.
9 Number of officials[2.5.1] Skill upgradation of contractors andemployees
08/02/2013 4.52 PMGenerated on
Page : 18 of 35
Section 4:Description and Definition of Success Indicators and Proposed Measurement
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Success indicator Description Definition MeasurementSI.No General Comments
This indicator reflects thelength of works awarded for
execution.
PMGSY allocations are not receivedin full therefore projectization is madefor a specific length to be awarded for
execution.
10 Length in Kms[2.6.1] Length of awarded works
This indicator will measureexpenditure incurred on
construction of roads(Utilization Certificates).
For monitoring puposes UtilizationCertificates serve as an instrument.
11 Percentage[3.4.1] Submission of UCs
Green buildings are designed toreduce adverse stress on
environment by 1) Efficiently usingenergy, water, and otherresources 2) Protecting
occupancy health and improvingemployee productivity 3)
Reducing waste, pollution andenvronmental degradation.
Eco friendly buildingsenvisage providing of Green
buildings.
Green building is the practice ofcreating structures and using
processes that are environmentallyresponsible and resouce efficient
throughout a building's life cycle fromsiting to design, construction,
operation, maintenance, renovationand deconstruciton. this practiceexpands and complements the
classical building design concerns ofeconomy, utility, durability, and
comfort, Green building is also knownas a sustainable or high performance
building.
12 Numbers[6.1.1] Completion of Eco friendly buildings
08/02/2013 4.52 PMGenerated on
Page : 19 of 35
Section 4:Description and Definition of Success Indicators and Proposed Measurement
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Success indicator Description Definition MeasurementSI.No General Comments
This indicator will reflect theshoulder widening part of
road which is accident prone
To take care of averting accidents,roads especially in hilly terrain at
curves require widening so that thesafety of transportation of public is
ensure.
13 Length in Kms[5.1.5] Shoulders to be maintained (length)
This indicator will reflects theprojects to be submitted for
funding to the State PlanningDepartment
Normally the projects funded by thePlanning & Development Department
are reflected in the Plan documentand DPRs are the pre-requisite for
launching of the schemes and withoutDPR administrative approvals /technical sanctions cannot be
accorded.
14 DPRs in numbers[7.1.1] Getting clearance from State Plg. Deptt.
This indicator will measureconnectivity of unconnectedareas (Backward/ far flung
and inaccessible areas) andwill indicate habitations
benefitted
Bridges provide the connectivity andbenefit the public by reducing their
travel time, carriage cost of materialespecially when the rivers are of
perinial nature and poses difficulty fortransportation purposes of men and
material
15 Number of bridges[7.2.1] Ongoing
Clearance of projects by theMinistry is a necessary condition
for the execution of the work
This indicator will measureposing of DPR to GOI
Preparation of DPRs is a pre-requisiteas this is based on field survey,
alignment of road, estimation anddrawings prepared for the DPR
16 DPRs in numbers[3.1.1] submission to Govt. of India
08/02/2013 4.52 PMGenerated on
Page : 20 of 35
Section 4:Description and Definition of Success Indicators and Proposed Measurement
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Success indicator Description Definition MeasurementSI.No General Comments
This indicator will measureexpenditure incurred on
construction of roads(Utilization Certificates)
UCs are supporting document formonitoring purposes on the basis of
which supplementary loan assistanceis provided for completion of roads /
bridges
17 Percentage[4.4.1] Submission of UCs
This activity will prove beneficialfor strengthening of roads in theRural areas for creation of good
impact in the public.
This indicator will reflectresurfacing of the widenedpart and black spots of theroads constructed under
PMGSY
Resurfacing normally is upgradationpart of the road already constructed
which window has been openedrecently by the Ministry of RuralDevelopment in this direction.
18 Length in Kms[5.2.1] Length to be re-surfaced
This indicator will reflectconstruction of residential
accomodation for the officers/ officials who are not theresidents of that area and
work as the residentialofficers / officials
Residential accomodation isconstructed as per the plan
19 Numbers[6.2.1] Retro fitting of buildings
20 [9.2.1] New
Upgradation of roads in the hillyareas is absolutely necessary
especially at the curves to avoidthe accidents
Upgradation of roads reflectsthe development of road in
terms of widening andstrengthening of sub grade.
Depending on the traffic intensity,roads require upgradation so that the
two way traffic is possible andprofitable for the general public
21 Kilometer[3.3.3] Upgradation of roads
08/02/2013 4.52 PMGenerated on
Page : 21 of 35
Section 4:Description and Definition of Success Indicators and Proposed Measurement
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Success indicator Description Definition MeasurementSI.No General Comments
Upgradation of roads in the hillyareas is absolutely necessary
especially at the curves to avoidthe accidents
Upgradation of roads reflectsthe development of road in
terms of widening andstrengthening of sub grade.
Depending on the traffic intensity,roads require upgradation so that the
two way traffic is possible andprofitable for the general public
21 Kilometer[3.3.3] Upgradation of roads
nullConstruction reflectsproviding of new roads.
For connectivity purposes, new roadsare required for developmental
purposes as the roads are key todevelopment of other sectors.
22 [3.3.4] Construction of roads
On the surface of the road,small side drains are
necessary to save the ridingsurface from the deterioationfrom rain water and the deep
drains under the roadensures flow of running waterfrom various sources natural
/ domestic.
Side and deep drains for maintainingthe road condition is absolutely
necessary
23 Running meter[5.1.3] Drains
Brides are engulfing the gapand making the road fullytrafficable to access the
unconnected part
Sometimes the bridges get damageddue to erosional work of rivers andthese require immediate restorationotherwise can create lot of problems
for the public.
24 Number[5.1.4] Bridges
08/02/2013 4.52 PMGenerated on
Page : 22 of 35
Section 4:Description and Definition of Success Indicators and Proposed Measurement
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Success indicator Description Definition MeasurementSI.No General Comments
The culverts faciliteate movementof goods and services.
This is a small cantilever ontwo abutments on two sidesof big nallah which normally
is of cement concretecomposition.
Village roads provide Nallah crossingculverts to ensure accessibility.
25 Meter[5.1.2] Culverts
nullThis is in the defect in theroad created by weather
conditions
The defect is restored forimprovement purposes which creates
impact on ground.
26 Kilometer[5.3.1] Improvment
This indicator will reflectprioritization of sections of
remettling the metalledsurface and their selection
Roads and upgradation andimprovments at every stage
espectially in hilly terrain which getsworn out due to weather conditions
and hte riding surface of roadsrequires upgradation by way of
widening and improving roads forsafety purposes.
27 Number[1.1.1] Submission to Plg. Deptt.
nullTunnels are the hollowsmade inside the mountains to
reduce the road length
Tunnels can reduce the timeinvolvment and coverage of distance.In the rainy season the such passes
can remain open for tours and travels
28 [9.1.1] Submission to Govt of India
Financing of projects throughvarious sources includingPlanning Commission orFinance Commission is
necessary. The proposals
The documents reflect the name ofthe project, costing and targets fixed
for completion over a period ofnormally three years and in case ofdifficulties encountered because of
various
29 [12.1.1] Submission to Annual Plan
08/02/2013 4.52 PMGenerated on
Page : 23 of 35
Section 4:Description and Definition of Success Indicators and Proposed Measurement
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Success indicator Description Definition MeasurementSI.No General Comments
are submitted to theseauthorities for providing funds
which enable to implementvarious developmental
programmes.
reasons, the phasing is done on thebasis of expertise and ground
situtations.
29 [12.1.1] Submission to Annual Plan
This heritage road and has beendeveloped and will be thrown
open by the end of June 2014.However, the road maintenance
has been surveyed and mayrequire huge investments in a
phased manner during the courseof 12th Five Year Plan as the road
sides are unstable which cancreate problems at times
especially during rains and cloudbursts
To connect the far flungareas of Poonch & Rajouridistricts with the Valley, a
road length of 84.10 kms hasbeen constructed
The road has two segments Bufliaz(Poonch) to Peer Ki Gali and fromPeer Ki Gali to Shopian District in
valley measuring 84.10 kms
30 Kilometers[8.1.1] Connectivity
Due to unstable geographicalposition of the road,
necessary improvementsduring the rainy seasons formanagement purposes willrequire proper maintenance
of 84.10 kms
This is a heritage roads and needsregular maintenance till the
vulnerable places gets stabilized.
31 Kilometer[8.2.1] Roads
08/02/2013 4.52 PMGenerated on
Page : 24 of 35
Section 4:Description and Definition of Success Indicators and Proposed Measurement
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Success indicator Description Definition MeasurementSI.No General Comments
Upgradation of roads in the hillyareas is absolutely necessaryespecially at the blind spots to
avoid the accidents
Upgradation of roads reflectsthe development of road in
terms of widening andstrengthening of sub grade.
Depending on the traffic intensity,roads require upgradation so that the
two way traffic is possible andprofitable for the general public.
32 Kilometers[1.2.2] Upgradation of roads
Loan Assistance by the FinancialInstitutions is part of Plan and has
helped in achieving greaterprogress
Submission of projectestimates with Accord of
Administrative Approval areforwarded by the StateFinance Department to
NABARD for approval andfinancing.
NABARD provides loan assistancewhich is reimbursed as per the laiddown terms and conditions and are
being reimbursed by the StateFinance Department after completion
of projects.
33 Number of schemes[4.1.1] Submission to NABARD
Approval of projects to befinanced under NABARDloan are accorded after
clearance of projects by theState Planning & FinanceDepartment and thereafter
these projects are approvedby the NABARD authorities.
This is a mandatory part for gettingthe projects approved for investment
purposes.
34 [4.2.1] Approval by NABARD
Upgradation of roads in the hillyareas is absolutely necessary
especially at the curves to avoidthe accidents.
Upgradation of roads reflectsthe development of road in
terms of widening andstrengthening of sub grade
Depending on the traffic intensity,roads require upgradation so that the
two way traffic is possible andprofitable for the general public
35 Kilometer[4.3.1] Upgradation
08/02/2013 4.52 PMGenerated on
Page : 25 of 35
Section 4:Description and Definition of Success Indicators and Proposed Measurement
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Success indicator Description Definition MeasurementSI.No General Comments
Construction reflectsproviding of new roads.
For connectivity purposes, new roadsare required for developmental
purposes as the roads are key todevelopment of other sectors.
36 [4.3.2] Construction
New bridges reflect theengulfing of gap between two
areas by providingconnectivity enabled bylaying cement concrete
cantilever
New bridges are constructed formaking access to the inaccessible
area which reduces the distance andsaves travel time.
37 NumberNew
Revenue realization is aresource generated byproviding machinery,
equipment and vehicles onrentals to the users.
Mechanical Engineering Departmenthas fleet of trucks, dozers, snow
clearance machinery etc which areprovided to various departments on
rentals which is deposited in the StateTreasury as per targets fixed by the
State Finance Department during thecourse of Budget Meetings
38 Rupees in crores[10.1.1] Revenue realization
Coverage of roads reflectsclearance as a result of
sliding and snow fallespecially during winter.
During the rainy season slides andsnowfall are experienced which
becomes barriers in the transportationand travel. To remove these
obstacles mechanical departmentsprovides machinery for clearance of
roads
39 Kilometer[10.2.1] Coverage of road length in 24 hours
08/02/2013 4.52 PMGenerated on
Page : 26 of 35
Section 4:Description and Definition of Success Indicators and Proposed Measurement
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Success indicator Description Definition MeasurementSI.No General Comments
Hospitals having installationof machinery and equipments
especially the CentralHeating System which arelooked by ther MechanicalEngineering Departmentsand these Hospitals arecovered for mechanical
convergence
Central Heating Systems in the majorhospitals are covered by the
Mechanical Department during winterseason to ensure safety and security
of patients from the cold weather.
40 Number[10.3.1] Coverage of hospitals
As the name suggeststunnels require heavymachinery for boring
purposes.
Tunnels reduce the travel time andthe distance in a short span of time.For construction of tunnels modern
equipments of boring are to bearranged depending upon the
availability of funds during 2013-14and onwards.
41 [11.1.1] Boring of tunnels by using modern boringequipments
As the name suggest theroad surface already
constructed needs pavingand maintenance as
presently the various areas ofdevelopment especially thehousing colony roads haveattained greater height ascompared to the plinths ofthe houses. These need to
be reduced in height and for
Department has to make necessaryarrangements for achieving successon various fronts as otherwise the
footpaths and central verges alreadyconstructed require reconstructionand raising of heights as and when
the remetalling and macadamizationoperations are performed. The newmachinery of milling and recycling is
expected to reduce the cost of
42 Kilometer[11.2.1] Paving and maintenance of roads throughsensor pavers and milling machines for recyclingthrough RAP
08/02/2013 4.52 PMGenerated on
Page : 27 of 35
Section 4:Description and Definition of Success Indicators and Proposed Measurement
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Success indicator Description Definition MeasurementSI.No General Comments
ensuring this modernequipment and machinery of
recycling nature are to beintroduced.
material and render the surplusmaterial for use at some alternative
places.
42 Kilometer[11.2.1] Paving and maintenance of roads throughsensor pavers and milling machines for recyclingthrough RAP
As the name suggest thebridges are to be maintainedand rehabilitated for which a
new machinery has comeinto the market which isbeing introduced in the
system during next year.
Modern techniques of developmentneed to be introduced for better
results
43 Number[11.3.1] Maintenance and rehabilitation of bridgesby using Mobile bridges
Page : 28 of 35
Section 5 :Specific Performance Requirements from other Departments
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Organisation TypeRelevant Success
Indicator
What is yourrequirement fromthis organisation
Justification for thisrequirement
LocationType
Please quantify yourrequirement fromthis Organisation
What happens ifyour requirement is
not met.State Organisation Name
Projects cannot beimplemented
Approval and providingof funds
[3.1.1] submission toGovt. of India
Central Road Fund is aCentrally Sponsored Scheme
which is financed on therealization of cess on Petorl and
Disel by the Govt of India.Tunnels are proposed during
hte course of 12th five year planand their financing is proposedto be provided by the Ministry
CentralGovernment
FullMinistry of SurfaceTransport and Highways
Ministry
[3.2.1] Approval byMORTH
[3.4.1] Submission ofUCs
[9.1.1] Submission toGovt of India
[9.2.1] New
[11.1.1] Boring oftunnels by usingmodern boringequipments
Programme cannot beimplemented
PMGSY programmesare financed by theMinisty of RuralDevelopment acrossthe country the countryespecially for theimplementation ofBharat Nirman,therefore funds are
[2.1.1] Submission toGovt. of India
PMGSY is a centrallysponsored scheme, thereforefunding as per the laid down
norms is justified for the State.
Other Union Ministries
08/02/2013 4.52 PMGenerated on
Page : 29 of 35
Section 5 :Specific Performance Requirements from other Departments
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Organisation TypeRelevant Success
Indicator
What is yourrequirement fromthis organisation
Justification for thisrequirement
LocationType
Please quantify yourrequirement fromthis Organisation
What happens ifyour requirement is
not met.State Organisation Name
Programme cannot beimplemented
required to be arrangedfrom the saidorganization
[2.1.1] Submission toGovt. of India
PMGSY is a centrallysponsored scheme, thereforefunding as per the laid down
norms is justified for the State.
Other Union Ministries
Road cannot ensureconnectivity as such
project cannot beimplemented
Forest clearance[2.2.1] Length Forest clearance for roadconnectivity is necessary as
otherwise full road lengthcannot be achieved for thebenefit of the public living
beyond the forest area
J & KStateGovernment
Stretch of road whichcomes under forest area
Department of Forests andEnvironment
Departments
[3.3.4] Construction ofroads
[4.3.2] Construction
[9.2.1] New
Project cannot beimplemented and broughtto the logical conclusion
Acquisition of land[2.2.1] Length For widenign of the road andpassing through a stretch which
either belongs to Govt or is aprivate land
To the extent it will berequired at a particular
place
Department of Revenue &Relief
[3.3.4] Construction ofroads
[4.3.2] Construction
New
[9.2.1] New
08/02/2013 4.52 PMGenerated on
Page : 30 of 35
Section 5 :Specific Performance Requirements from other Departments
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Organisation TypeRelevant Success
Indicator
What is yourrequirement fromthis organisation
Justification for thisrequirement
LocationType
Please quantify yourrequirement fromthis Organisation
What happens ifyour requirement is
not met.State Organisation Name
Project cannot beimplemented
Agreement forproviding funds
[1.1.1] Submission toPlg. Deptt.
It is necessary FullDepartment of Planning &Development
[1.2.2] Upgradation ofroads
[1.3.1] Inspections
[3.4.1] Submission ofUCs
[3.5.1] No. ofinspections
[4.1.1] Submission toNABARD
[4.2.1] Approval byNABARD
[4.4.1] Submission ofUCs
[5.1.1] Roads
[5.1.2] Culverts
[5.1.3] Drains
[5.1.4] Bridges
[5.1.5] Shoulders to bemaintained (length)
[5.2.1] Length to be re-surfaced
08/02/2013 4.52 PMGenerated on
Page : 31 of 35
Section 5 :Specific Performance Requirements from other Departments
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Organisation TypeRelevant Success
Indicator
What is yourrequirement fromthis organisation
Justification for thisrequirement
LocationType
Please quantify yourrequirement fromthis Organisation
What happens ifyour requirement is
not met.State Organisation Name
[5.3.1] Improvment
[6.1.1] Completion ofEco friendly buildings
[6.2.1] Retro fitting ofbuildings
[7.1.1] Gettingclearance from StatePlg. Deptt.
[7.2.1] Ongoing
New
[8.1.1] Connectivity
[8.2.1] Roads
[9.2.1] New
[11.1.1] Boring oftunnels by usingmodern boringequipments
[11.2.1] Paving andmaintenance of roadsthrough sensor paversand milling machines forrecycling through RAP
08/02/2013 4.52 PMGenerated on
Page : 32 of 35
Section 5 :Specific Performance Requirements from other Departments
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Organisation TypeRelevant Success
Indicator
What is yourrequirement fromthis organisation
Justification for thisrequirement
LocationType
Please quantify yourrequirement fromthis Organisation
What happens ifyour requirement is
not met.State Organisation Name
[11.3.1] Maintenanceand rehabilitation ofbridges by using Mobilebridges
[12.1.1] Submission toAnnual Plan
Projects cannot beimplemented
Approval for theprojects and funding.For revenuerealization, targets arefixed int the budgetwhich are to be met bythe department.
[3.4.1] Submission ofUCs
If the approval / funds will notbe received programmes
cannot be launched
Department of Finance
[3.5.1] No. ofinspections
[4.1.1] Submission toNABARD
[4.2.1] Approval byNABARD
[4.4.1] Submission ofUCs
[5.1.1] Roads
[5.1.2] Culverts
[5.1.3] Drains
[5.1.4] Bridges
08/02/2013 4.52 PMGenerated on
Page : 33 of 35
Section 5 :Specific Performance Requirements from other Departments
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Organisation TypeRelevant Success
Indicator
What is yourrequirement fromthis organisation
Justification for thisrequirement
LocationType
Please quantify yourrequirement fromthis Organisation
What happens ifyour requirement is
not met.State Organisation Name
[5.1.5] Shoulders to bemaintained (length)
[10.1.1] Revenuerealization
Page : 34 of 35
Section 6:Outcome/Impact of Department/Ministry
Results-Framework Document (RFD) for Department of PWD (R & B) -(2012-2013)
Outcome/Impact ofDepartment/Ministry
Jointly responsible forinfluencing this outcome /impact with the following
department (s) / ministry(ies)
SuccessIndicator
FY 10/11 FY 12/13FY 11/12 FY 13/14 FY 14/15Unit
466.67 1200LengthImproved Road Infrastructure Ministry of Rural DevelopmentDepartment, GOI, State Revenue,Forest, Planning & Dev. and PublicWorks (R&B) Department.
1300 14001026.651 Km
151 250No. of habitations 260 270238No
72.69 38.24Upgradation of roadsImprovement and up-gradation of roadinfrastructure (CRF)
Ministry of Road Transport & HighwaysDepartment, GOI, State Revenue,Forest, Finance Planning & Dev. andPublic Works (R&B) Department.
44.55 4559.202 Km
1515 1106.15Upgradation of roadsImproved and up-gradation ofroad infrastructure(State Plan/Non Plan)
State Revenue, Forest, Traffic Police,Transport, Finance Planning & Dev. andPublic Works (R&B) Department.
1120 112016013 Km
115 90.29UpgradationUp-gradation andconstruction of roadinfrastructure (NABARD)
State Revenue, Forest, Traffic Police,Transport, Finance Planning & Dev. andPublic Works (R&B) Department.
145 1451354 Km
220 276.17Construction 225 225230Km
AccidentsReduction in road accidentsby improving black spots
Traffic Police, Transport and PublicWorks (R&B) Department
5 Nos
36 6Travel timeSaving of time byconstruction of Mughal Road
Traffic Police, Public Works Departmentand Transport Department
6 6366 Hours
10.00Revenue RealizationEnhancing Revenuecollection
State Finance & MechanicalEngineering Department
10.10 10.207 Rs in lacs
TouristsImprovement in Tourism PWD / Tourism/ Transport/ Transport &Traders