RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME
AMIT YADAV 51452734
![Page 2: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/2.jpg)
INTRODUCTIONR-APDRP is meant for collecting baseline data for total
energy audit and accounting, through an integrated IT strategy across the distribution value chain.
The objective is to reduce the ATC (aggregate technical and commercial) losses from the current level of over 30 per cent to less than 15 per cent over next five years, by automating and integrating various utility processes like
Part A of R-APDRP should be done by HCL TEAM to provide IT support and training for deployment of this project.
Modules under Part-A of R-APRDP project are shown below :
![Page 3: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/3.jpg)
METERING
BILLING
PAYMENT CREDIT
PAYMENT GATEWAY
SINGLE SIGN-ON
DMS
BI PUBLISHER
WEB SELF SERVICE
CUSTOMER CARE
CENTER
WORK AND ASSET MGMT
GIS
ENERGY AUDIT
DATA MIGRATION
SPOT BILLING
MACHINE
MDAS
![Page 4: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/4.jpg)
PROJECT SCHEME DIVIDED IN TWO PARTSPart – A: (Part A can be done by HCL R-APDRP TEAM)Consumer Indexing, Asset MappingGIS Mapping of the entire distribution networkAutomatic Meter Reading (AMR) on Distribution
Transformers & FeedersAutomatic Data Logging for all Distribution Transformers
and Feeders SCADA/DMS in big towns / cities (with population > 4 lakh
& energy input > 350 MU)Feeder Segregation / Ring FencingEstablishment of IT enabled customer service centreEstablishment of the Base Line data System
![Page 5: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/5.jpg)
Part – B: It includes:Renovation, modernization and strengthening
of 11 kV level Substations, Transformers/Transformer Centre
Re- conductoring of lines at 11 kV level and below
Load Bifurcation, Load BalancingHVDS (11kV)Installation of capacitor banks and mobile
service centre etc.
![Page 6: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/6.jpg)
MAJOR CHALLENEGES AND ISSUESGround realitiesTimelineRing fencing(help to make GIS-based network mapping and
energy accounting)Energy auditTechnical challenges in R-APDRP implementation like CCC (customer care center) ,WSS (web self service)Enterprise security , data protection and business continuityNetwork analysisGIS (Geographical Information System)Data migrationSystem IntegrationLong term benefits
![Page 7: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/7.jpg)
Modules of R-APDRP
![Page 8: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/8.jpg)
POWER SCENARIO AND ITS GENERATION IN INDIAThe electricity sector in India had an installed
capacity of 214.630 GW as of February 2013The world fifth captive country has produced an extra 31.5 GW Non Renewable Power Plants constitute 87.55% of the installed capacity On other side renewable resources constitute of 12.45% of installed capacity
![Page 9: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/9.jpg)
ENERGY RESOURCES
Conventional energy resources
Non Conventional energy resources
![Page 10: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/10.jpg)
Capacity addition target of 78,700MW by 2012
![Page 11: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/11.jpg)
Capacity addition target of 1,00,000MW by 2017
![Page 12: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/12.jpg)
DEMANDThe present Peak Demand is about 1,15,000
MW and the Installed Capacity is 1,52,380 MW
Power generation mix is thermal (63%), hydro (25%), nuclear (9%) and renewables (9%)
The projected Peak Demand and the Installed Capacity
Requirement in next 15 years is
![Page 13: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/13.jpg)
Electric Power TransmissionEnergy is transmitted at step up high
voltages (132 KV or above) to compensate energy losses in long distance transmission
Transmission networks use components such as power lines, cables, circuit breakers, switches and transformers
Transmission efficiency is hugely improved by devices that increase the voltage
![Page 14: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/14.jpg)
POWER TRANSMISSION FLOW
![Page 15: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/15.jpg)
General overview of Generation ,Transmission and Distribution
![Page 16: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/16.jpg)
Problem FacedLOAD BALANCINGThere are several problem one of them is load
balancingThe transmission system should provides for base load and peak load capability, with safety and fault tolerance marginsBROWNOUTS AND BLACKOUTS Brownouts occur when the supply power drops below the demand. Blackouts occur when the supply fails completely
![Page 17: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/17.jpg)
Load SheddingRolling blackouts(also called load shedding)
are used to distribute insufficient power when the demand for electricity exceeds the supply
Transmission Substation A transmission substation decreases the
voltage of incoming electricity, allowing it to connect from long distance high voltage transmission to local lower voltage distribution.
![Page 18: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/18.jpg)
FACTORS ON WHICH POWER TRANSMISSION DEPENDS• Voltage=IR or I*p L/A where p is rho • The amount of power that can be send over
the power lines is directly proportional on the length of power lines
• We need more voltage with increase in length of transmission line
• Other factors also have significant effect like cross sectional area of transmission line , with more cross
sectional area we need lesser voltages
![Page 19: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/19.jpg)
POWER DISTRIBUTIONElectric distribution substations transform
power from transmission voltage to the lower voltage used for local distribution to homes and businesses
The voltage used is appropriate for the shorter distance and varies from 2,300 to about 35,000 volts depending on utility standard practice , distance and load to be served
Urban and suburban distribution is done with 3-phase systems to serve both residential, commercial, and industrial loads
![Page 20: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/20.jpg)
Shows how Power will be distributed
![Page 21: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/21.jpg)
Hierarchy in electric power corporation
![Page 22: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/22.jpg)
JUNIOR ENGINEER RESPONSIBILTYTest like commercial feasibility test Handle operation and maintenance departmentDistributionChange of supply type like commercial ,
educational etc.Load enhancementChange transmissionChange of connectionDisconnection
![Page 23: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/23.jpg)
TYPES OF DISCONNECTION
![Page 24: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/24.jpg)
AT & C LOSSAT & C is abbreviated for aggregated technical and
commercial lossAT&C= 1 – Na * Nc where
Billing Efficiency (Na) = Total Units Sold Total Input
Collection Efficiency(Nc) = Revenue Collected( Rs.)
Amount Billed(Rs.)
![Page 25: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/25.jpg)
![Page 26: R-APDRP (Restructured Accelerated Power Development And Reforms Programme)](https://reader031.fdocuments.in/reader031/viewer/2022032620/55c5a747bb61eb1b2a8b4811/html5/thumbnails/26.jpg)
THANK YOU