7/31/2019 R-12-090_Pressure Meter Test Report
1/30
PRESSURE METER TEST REPORT
(R-012-090)
PROPOSED
KING ABDULLAH FOUNDATION PROJECT,
RIYADH,
KINGDOM OF SAUDI ARABIA.
-
7/31/2019 R-12-090_Pressure Meter Test Report
2/30
PRESSUREMETER TEST REPORT
KING ABDULLAH FOUNDATION PROJECT, RIYADH,
KINGDOM OF SAUDI ARABIA.
TABLE OF CONTENTS PAGE
1. INTRODUCTION 22. PURPOSE AND SCOPE OF WORK 23. PRESSURE-METER CALIBRATION 24. TEST PROCEDURE 35. ANALYSIS WITH MEASUREMENT RESULTS 36. SUMMARY AND CONCLUSIONS 3
APPENDIX A
1.FIGURE 01 : PG CORRECTED STRAIGHT LINE2.STRESS DEFORMATION CURVES3.TABLE 01 : SUMMARY OF PRESSUREMETER TEST RESULTS
-
7/31/2019 R-12-090_Pressure Meter Test Report
3/30
PRESSUREMETER TEST REPORT
KING ABDULLAH FOUNDATION PROJECT, RIYADH,
KINGDOM OF SAUDI ARABIA.
INTRODUCTION
This report presents the results of the Pressuremeter Tests carried out by AL JAZZAR
(Omar Jazzar Consulting Engineers), Geotechnical & Materials Engineers, for the King
Abdullah Foundation Project, Riyadh, Kingdom of Saudi Arabia. The work was
authorized byM/s. Saudi Binladin Group,Kingdom of Saudi Arabia.
The Pressuremeter tests were conducted at site from 11th
& 15th
April, 2012 in presence of
client engineer. Total of Twenty One (21) tests were conducted in three boreholes viz., BH#5,
BH#6 & BH#9 at various depth of boreholes where in rock parameters were supposed to be
determined and the results are presented in this report.
This report describes the field work done on the site, analysis of measurement and results
obtained from the measurement from site.
PURPOSE & SCOPE OF WORK
The purpose of conducting Pressuremeter test is to evaluate the engineering properties of sub-
surface rock like the ground co-efficient, elastic modulus and shear modulus for the use in the
design of foundation and substructures
PRESSURE METER CALIBRATION
The Elastmeter function to let the pressure exerted on the Borehole wall via rubber tube.
Because of its elasticity retained, rubber indicates the variation with its thickness influenced
-
7/31/2019 R-12-090_Pressure Meter Test Report
4/30
PRESSUREMETER TEST REPORT
KING ABDULLAH FOUNDATION PROJECT, RIYADH,
KINGDOM OF SAUDI ARABIA.
Figure - 01 shown Appendix A represents the relation between Pressure "P" and the
thickness variation volume (PG Corrected straight line) where the line slope (Inclination
Factor) is K = 69
TEST PROCEDURE
1. Drilling of borehole: The drilling of borehole must be accomplished as smooth aspossible to have less disturbance of the borehole wall.
2. Eliminate air bubbles in the high pressure tube3. Lowering the probe into borehole and subsequent measurement.4. Pressurizing and measuring5. Pressurizing the probe with increment. (Step loading).6. Measure the pressure and the displacement values with applying equal pressure
gradually.
7. The loading increments shall be about 0.5 MPa.8. Proceed to next step after the reading promptly.9. The test should be terminated when reaching the limit of its maximum.10.Release the pressure to deflate packer, then retrieve the probe from the borehole or
shift the probe to another test depth.
11.The diameter of borehole should be close to the same diameter of probe.12.The interval of measuring depth is 5.0 m.
ANALYSIS AND CONCLUSIONS
The indicator of the Elastmeter system get two raw reads, Pressure applied and Radius of the
-
7/31/2019 R-12-090_Pressure Meter Test Report
5/30
PRESSUREMETER TEST REPORT
KING ABDULLAH FOUNDATION PROJECT, RIYADH,
KINGDOM OF SAUDI ARABIA.
SUMMARY AND CONCLUSIONS
The result of a pressure-meter testing has been conducted at the proposed King Abdullah
Foundation Project, Riyadh, Kingdom of Saudi Arabia.
Table 01of Appendix - A shows the results of the pressuremeter test with Ground Co-
efficient (K), Modulus of Elasticity (E) & Shear Modulus, (G) for the different boreholes at
various depths.
The wide range obtained for the pressuremeter modulus might be attributed to the nature of
the rock mass at the site. Values of modulus might be affected by the existence of
discontinuities, anomalies and size of cavities at or near the test locations. It might be of
interested to note that the highest modulus value (50,017 MPa) obtained at a depth of
(33.00m) of borehole # 6 where as the lowest modulus value (1017 MPa) obtained at a depth
of (10.00m) of borehole # 9
Yours very truly,
FOR OMAR JAZZAR CONSULTING ENGINEERS
(Geotechnical & Materials Engineers)
S. Joseph Ravi, M.E; MIGS;DBM;,
Branch Manager
-
7/31/2019 R-12-090_Pressure Meter Test Report
6/30
$33(1',;$
-
7/31/2019 R-12-090_Pressure Meter Test Report
7/30
PRESSUREMETER TEST REPORT
KING ABDULLAH FOUNDATION PROJECT, RIYADH,
KINGDOM OF SAUDI ARABIA.
Table 01 : Summary of Pressuremeter Test Results
BH
#
Depth
(m)
GroundCoefficient,
K=P/R,
MPa
Modulus ofElasticity,
E=(1+).r.K
MPa
ShearModulus,
G=E/2(1+)
MPa
5
17 93 9253* 3559
22 105 10540 4054
27 143 14323 5509
32 500 49479 1903037 500 49946 19210
6
8 429 43691 16804
13 105 10924 4202
18 429 43352 16674
23 167 16959 6523
33 500 50017 19237
38 43 4358* 1676
43 500 49896 19191
9
10 10 1017* 391
15 204 20482 7878
20 263 26355 10137
25 143 14307 5503
30 400 39947 15364
35 172 17187 6610
40 114 11263 4332
44.5 500 49892 19189
N t
-
7/31/2019 R-12-090_Pressure Meter Test Report
8/30
PRESSUREMETER TEST REPORT
KING ABDULLAH FOUNDATION PROJECT, RIYADH,
KINGDOM OF SAUDI ARABIA.
-
7/31/2019 R-12-090_Pressure Meter Test Report
9/30
Figure - 01 : PG Corrected Straight Line K = 69
0.0
5.0
10.0
15.0
20.0
25.0
0 0.05 0.1 0.15 0.2 0.25 0.3
Pressure'P'(MPa)
Thickness Variation Volume (mm)
-
7/31/2019 R-12-090_Pressure Meter Test Report
10/30
76.868, 3.0
76.873, 3.5
76.881, 4
3.0
3.5
4.0
4.5
BH # 5 - Depth 17.0 m
Ground Coefficient
K =P/R = (4.0-1.5)/(76.881-76.854) = 93
76.372, 0.5
76.849, 1.0
76.854, 1.5
76.862, 2.0
. , .
0.0
0.5
1.0
1.5
2.0
.
76.300 76.400 76.500 76.600 76.700 76.800 76.900 77.000
Stress
P
Deformation R
-
7/31/2019 R-12-090_Pressure Meter Test Report
11/30
77.042, 5.5
77.043, 6.0
77.045, 6.5
77.046, 7.0
77.050, 7.5
77.051, 8.0
6.0
7.0
8.0
9.0
BH # 5 - Depth 22.0 m
Ground Coefficient
K =P/R = (5.0-1.0)/(77.041-77.003) = 105
76.773, 0.5
77.003, 1.0
77.015, 1.5
77.020, 2.0
77.025, 2.5
77.030, 3.0
77.031, 3.5
77.036, 4.0
77.037, 4.5
77.041, 5.0
0.0
1.0
2.0
3.0
4.0
.
76.750 76.800 76.850 76.900 76.950 77.000 77.050 77.100
St
ress
P
Deformation R
-
7/31/2019 R-12-090_Pressure Meter Test Report
12/30
77.126, 3.5
77.131, 4
77.135, 4.5
77.133, 5
77.141, 5.5
4.0
5.0
6.0
BH # 5 - Depth 27.0 m
Ground Coefficient
K = P/R = (4.5-1.5)/(77.135-77.114) = 143
76.736, 0.5
77.124, 1.0
77.114, 1.5
77.119, 2.0
77.120, 2.5
77.121, 3
0.0
1.0
2.0
3.0
76.700 76.750 76.800 76.850 76.900 76.950 77.000 77.050 77.100 77.150 77.200
St
ress
P
Deformation R
-
7/31/2019 R-12-090_Pressure Meter Test Report
13/30
76.166, 5.5
76.167, 6.0
76.168, 6.5
76.165, 7.0
76.166, 7.5
76.171, 8.0
6.0
7.0
8.0
9.0
BH # 5 - Depth 32.0 m
Ground Coefficient
K =P/R = (4.0-1.0)/(76.124-76.118) = 500
76.118, 1.0
76.119, 1.5
76.120, 2.0
76.121, 2.5
76.122, 3.0
76.123, 3.5
76.124, 4.0
76.125, 4.5
. , .
0.0
1.0
2.0
3.0
4.0
.
76.110 76.120 76.130 76.140 76.150 76.160 76.170 76.180
Stress
P
Deformation R
-
7/31/2019 R-12-090_Pressure Meter Test Report
14/30
76.843, 5.5
76.844, 6.0
76.845, 6.5
76.846, 7.0
76.844, 7.5
76.845, 8.0
6.0
7.0
8.0
9.0
BH # 5 - Depth 37.0 m
Ground Coefficient
K =P/R = (5.5-3.0)/(76.843-76.838) = 500
76.827, 1.0
76.839, 1.5
76.836, 2.0
76.837, 2.5
76.838, 3.0
76.839, 3.5
76.840, 4.0
76.841, 4.5
76.842, 5.0
0.0
1.0
2.0
3.0
4.0
.
76.825 76.830 76.835 76.840 76.845 76.850
Stress
P
Deformation R
-
7/31/2019 R-12-090_Pressure Meter Test Report
15/30
78.419, 5.5
78.420, 6.0
78.421, 6.5
78.422, 7.0
78.423, 7.5
78.424, 8.0
6.0
7.0
8.0
9.0
BH # 6 - Depth 8.0 m
Ground Coefficient
K = P/R = (8.0-5.0)/(78.424-78.417)= 429
78.124, 1.0
78.269, 1.5
78.365, 2.0
78.407, 2.5
78.409, 3.0
78.410, 3.5
78.415, 4.0
78.420, 4.5
. , .
0.0
1.0
2.0
3.0
4.0
.
78.100 78.150 78.200 78.250 78.300 78.350 78.400 78.450
S
tress
P
Deformation R
-
7/31/2019 R-12-090_Pressure Meter Test Report
16/30
79.826, 5.5
79.832, 6.0
79.833, 6.5
79.839, 7.0
79.840, 7.5
79.846, 8.0
6.0
7.0
8.0
9.0
BH # 6 - Depth 13.0 m
Ground Coefficient
K =P/R = (7.0-5.0)/(79.839-79.820)= 105
79.654, 1.0
79.709, 1.5
79.741, 2.0
79.765, 2.5
79.784, 3.0
79.803, 3.5
79.840, 4.0
79.815, 4.5
. , .
0.0
1.0
2.0
3.0
4.0
.
79.600 79.650 79.700 79.750 79.800 79.850 79.900
S
tress
P
Deformation R
-
7/31/2019 R-12-090_Pressure Meter Test Report
17/30
77.814, 5.5
77.815, 6.0
77.812, 6.5
77.813, 7.0
77.814, 7.5
77.816, 8.0
6.0
7.0
8.0
9.0
BH # 6 - Depth 18.0 m
Ground Coefficient
K = P/R = (5.5-2.5)/(77.814-77.807)= 429
77.796, 1.0
77.801, 1.5
77.806, 2.0
77.807, 2.5
77.809, 3.0
77.810, 3.5
77.811, 4.0
77.812, 4.5
. , .
0.0
1.0
2.0
3.0
4.0
.
77.795 77.800 77.805 77.810 77.815 77.820
S
tress
P
Deformation R
-
7/31/2019 R-12-090_Pressure Meter Test Report
18/30
78.269, 5.5
78.275, 6.0
78.276, 6.5
78.277, 7.0
78.274, 7.5
78.316, 8.0
6.0
7.0
8.0
9.0
BH # 6 - Depth 23.0 m
Ground Coefficient
K =P/R = (7.0-5.0)/(78.280-78.268)= 167
78.181, 1.0
78.203, 1.5
78.216, 2.0
78.230, 2.5
78.239, 3.0
78.248, 3.5
78.254, 4.0
78.263, 4.5
. , .
0.0
1.0
2.0
3.0
4.0
.
78.160 78.180 78.200 78.220 78.240 78.260 78.280 78.300 78.320 78.340
S
tress
P
Deformation R
-
7/31/2019 R-12-090_Pressure Meter Test Report
19/30
78.120, 1.0
0.8
1.0
1.2
BH # 6 - Depth 28.0 m
Probe Rubber Punctured
75.638, 0.0
77.184, 0.5
0.0
0.2
0.4
0.6
75.500 76.000 76.500 77.000 77.500 78.000 78.500
S
tress
P
Deformation R
-
7/31/2019 R-12-090_Pressure Meter Test Report
20/30
76.952, 5.5
76.953, 6.0
76.950, 6.5
76.951, 7.0
76.952, 7.5
76.950, 8.0
6.0
7.0
8.0
9.0
BH # 6 - Depth 33.0 m
Ground Coefficient
K = P/R = (5.5-3.5)/(76.952-76.948)= 500
76.924, 1.0
76.932, 1.5
76.937, 2.0
76.942, 2.5
76.947, 3.0
76.948, 3.5
76.949, 4.0
76.950, 4.5
. , .
0.0
1.0
2.0
3.0
4.0
.
76.920 76.925 76.930 76.935 76.940 76.945 76.950 76.955
S
tress
P
Deformation R
-
7/31/2019 R-12-090_Pressure Meter Test Report
21/30
77.134, 5.5
77.142, 6.0
77.147, 6.5
77.152, 7.0
77.157, 7.5
77.158, 8.0
6.0
7.0
8.0
9.0
BH # 6 - Depth 43.0 m
Ground Coefficient
K =P/R = (5.0-3.0)/(77.129-77.083)= 44
76.961, 1.0
77.011, 1.5
77.046, 2.0
77.063, 2.5
77.083, 3.0
77.095, 3.5
77.108, 4.0
77.120, 4.5
. , .
0.0
1.0
2.0
3.0
4.0
.
76.950 77.000 77.050 77.100 77.150 77.200
S
tress
P
Deformation R
-
7/31/2019 R-12-090_Pressure Meter Test Report
22/30
76.765, 5.5
76.766, 6.0
76.767, 6.5
76.765, 7.0
76.766, 7.5
76.763, 8.0
6.0
7.0
8.0
9.0
BH # 6 - Depth 43.0 m
Ground Coefficient
K = P/R = (6.0-3.5)/(76.766-76.761)= 500
76.741, 1.0
76.750, 1.5
76.754, 2.0
76.755, 2.5
76.760, 3.0
76.761, 3.5
76.762, 4.0
76.763, 4.5
. , .
0.0
1.0
2.0
3.0
4.0
.
76.735 76.740 76.745 76.750 76.755 76.760 76.765 76.770
S
tress
P
Deformation R
-
7/31/2019 R-12-090_Pressure Meter Test Report
23/30
79.279, 3.0
79.333, 3.5
79.369, 4.0
3.0
3.5
4.0
4.5
BH # 9 - Depth 10.0 m
Ground Coefficient
K =
P/
R = (4.0-2.5)/(79.369-79.217)= 10
77.200, 0.5
78.774, 1.0
78.972, 1.5
79.111, 2.0
79.217, 2.5
0.0
0.5
1.0
1.5
2.0
2.5
77.000 77.500 78.000 78.500 79.000 79.500
S
tress
P
Deformation R
-
7/31/2019 R-12-090_Pressure Meter Test Report
24/30
77.357, 5.5
77.358, 6.0
77.359, 6.5
77.520, 7.0
77.525, 7.5
77.530, 8.0
6.0
7.0
8.0
9.0
BH # 9 - Depth 15.0 m
77.332, 1.0
77.333, 1.5
77.338, 2.0
77.343, 2.5
77.344, 3.0
77.345, 3.5
77.346, 4.0
77.347, 4.5
. , .
0.0
1.0
2.0
3.0
4.0
.
77.300 77.350 77.400 77.450 77.500 77.550
S
tress
P
Deformation R
Ground CoefficientK =P/R = (6.5-1.0)/(77.359-77.332)= 204
-
7/31/2019 R-12-090_Pressure Meter Test Report
25/30
77.042, 5.5
77.043, 6.0
77.045, 6.5
77.046, 7.0
77.047, 7.5
77.044, 8.0
6.0
7.0
8.0
9.0
BH # 9 - Depth 20.0 m
Ground Coefficient
K =P/R = (7.0-2.0)/(77.047-77.028)= 263
77.018, 1.0
77.023, 1.5
77.028, 2.0
77.029, 2.5
77.030, 3.0
77.034, 3.5
77.036, 4.0
77.037, 4.5
. , .
0.0
1.0
2.0
3.0
4.0
.
77.015 77.020 77.025 77.030 77.035 77.040 77.045 77.050
S
tress
P
Deformation R
-
7/31/2019 R-12-090_Pressure Meter Test Report
26/30
77.046, 5.5
77.043, 6.0
77.048, 6.5
77.046, 7.0
77.047, 7.5
77.048, 8.0
6
7
8
9
BH # 9 - Depth 25.0 m
Ground Coefficient
K =P/R = (5.0-3.0)/(77.045-77.031)= 143
76.970, 1.5
77.005, 2.0
77.021, 2.5
77.030, 3.0
77.034, 3.5
77.039, 4.0
77.040, 4.5
. , .
0
1
2
3
4
76.960 76.970 76.980 76.990 77.000 77.010 77.020 77.030 77.040 77.050 77.060
S
tress
P
Deformation R
-
7/31/2019 R-12-090_Pressure Meter Test Report
27/30
76.821, 5.5
76.822, 6.0
76.823, 6.5
76.828, 7.0
76.829, 7.5
76.833, 8.0
6.0
7.0
8.0
9.0
BH # 9 - Depth 30.0 m
Ground Coefficient
K =P/R = (5.0-3.0)/(76.824-76.819)= 400
76.804, 1.0
76.813, 1.5
76.814, 2.0
76.818, 2.5
76.819, 3.0
76.820, 3.5
76.822, 4.0
76.823, 4.5
. , .
0.0
1.0
2.0
3.0
4.0
.
76.800 76.805 76.810 76.815 76.820 76.825 76.830 76.835
S
tress
P
Deformation R
-
7/31/2019 R-12-090_Pressure Meter Test Report
28/30
76.684, 5.5
76.689, 6.0
76.693, 6.5
76.694, 7.0
76.695, 7.5
76.696, 8.0
6.0
7.0
8.0
9.0
BH # 9 - Depth 35.0 m
Ground Co-efficient
K =
P/
R = (7.0 -2.0)/(76.694-76.665) = 70
76.620, 1.0
76.650, 1.5
76.658, 2.0
76.663, 2.5
76.671, 3.0
76.676, 3.5
76.677, 4.0
76.682, 4.5
. , .
0.0
1.0
2.0
3.0
4.0
.
76.610 76.620 76.630 76.640 76.650 76.660 76.670 76.680 76.690 76.700 76.710
S
tress
P
Deformation R
-
7/31/2019 R-12-090_Pressure Meter Test Report
29/30
76.250, 5.5
76.251, 6.0
76.256, 6.5
76.257, 7.0
76.258, 7.5
76.259, 8.0
6.0
7.0
8.0
9.0
BH # 9 - Depth 40.0 m
Ground Co-efficient
K =P/R = (4.5 -2.0)/(76.255-76.233) = 114
76.217, 1.0
76.218, 1.5
76.226, 2.0
76.237, 2.5
76.242, 3.0
76.246, 3.5
76.251, 4.0
76.255, 4.5
. , .
0.0
1.0
2.0
3.0
4.0
.
76.210 76.215 76.220 76.225 76.230 76.235 76.240 76.245 76.250 76.255 76.260 76.265
S
tress
P
Deformation R
-
7/31/2019 R-12-090_Pressure Meter Test Report
30/30
76.765, 5.5
76.766, 6.0
76.764, 6.5
76.765, 7.0
76.766, 7.5
76.767, 8.0
6.0
7.0
8.0
9.0
BH # 9 - Depth 44.5 m
Ground Co-efficient
K =P/R = (5.0 -2.0)/(76.760-76.754) = 500
76.741, 1.0
76.750, 1.5
76.754, 2.0
76.755, 2.5
76.756, 3.0
76.757, 3.5
76.758, 4.0
76.759, 4.5
. , .
0.0
1.0
2.0
3.0
4.0
.
76.735 76.740 76.745 76.750 76.755 76.760 76.765 76.770
S
tress
P
Deformation R